Typical Production cycle in Process Industry
...Previous
Here we have to mention the Person responsible and standard value type “SAP1 – Normal Production”.
Search
Be the first of your friends to like this
SAPTechnical
ABAP consultants required for for atop MNC in Pune, India (MagarpattaCity) .
Experience: 4+ years in SAPLocation: PuneJoining time: 2 weeks... See More
535 Likes · 2 Comments · 11 Shares
Comment Share
October 5, 2014
SAPTechnicalSeptember 16, 2014
SAPTechnical12,309 likes
Like Page Share
pdfcrowd.comopen in browser PRO version Are you a developer? Try out the HTML to PDF API
Here we are planning to give the controlling area and cost center. Finally save the data. The same procedurehas to be repeated for CRC-002
3. Create Recipe using resource and material in T-code C201
In the above screen we have to enter the material we want to produce “FG 1”, and give the plant code andprofile “PI01” then enter.
pdfcrowd.comopen in browser PRO version Are you a developer? Try out the HTML to PDF API
In the recipe header we have to enter the status as “4” and Usage as “1” , go for Operations screen
Here we have to call the resource and the description details, for example in reactor CRC-001, the operationslike Heating and transfer process will be carried out the same has been explained in this description field. Asper standard value key we have to give the duration for the operation time and labor time. Both will be takenfor scheduling.
In the material tab, we have to enter the version for the BOM and usage details, after that we have to enterthe list of raw materials required for making 50 kg of the FG 1 product. Here co-product is generating so wehave to give the co-product “BP 1” 60 L as “Negative” producing after the process (NOT as INPUT) andactivate as Co-Product by selecting the line item and press items tab and select co-product tab.
In the header level line item we have the base quantity i.e Finished goods quantity, give 50 and save
pdfcrowd.comopen in browser PRO version Are you a developer? Try out the HTML to PDF API
Now Recipe is ready.
4. Create MIC using QS21 transaction
pdfcrowd.comopen in browser PRO version Are you a developer? Try out the HTML to PDF API
Click here to continue...
Please send us your feedback/suggestions at [email protected]
Home • Contribute • About Us • Privacy • Terms Of Use • Disclaimer • Safe • Companies: Advertise on SAPFunctional.COM | Post Job • Contact Us
©2006-2007 SAPFunctional.COM. All rights reserved.All product names are trademarks of their respective companies. SAPFunctional.COM, Inc. is in no way affi l iated with SAP AG.
SAP, SAP R/3, R/3 software, mySAP, ABAP, BAPI, xApps, SAP NetWeaver, and and any other SAP trademarks are registered trademarks of SAP AG in Germany and in several other countries.Every effort is made to ensure content integrity. Use information on this site at your own risk.
Graphic Design by Round the Bend Wizards