Reduction of waste and increasing productivity through 5S and Lean Manufacturing activities
5s, Lean Manufacturing, Productivity
2 GE Title or job number
05/02/2023
• Problem Areas• Mishandling of Product• Safety Hazards • Lifting heavy material above head
• Flow of Material• Damaged components
Phase Module Flow Tube Cart
3 GE Title or job number
05/02/2023
• Improvement Areas• Process Improvement• Flow of Material• Handling• Safety
Phase Module Flow Tube Cart