phase 2 development overview - instant property towers - 2015.pdf · –otis gen2 (regen drive) up...

22
ATHOLL TOWERS 129 Patricia Rd, Sandton PHASE 2 DEVELOPMENT OVERVIEW PHASE 1 COMPLETE AND OCCUPIED BY VOLKSWAGEN GROUP SOUTH AFRICA OCTOBER 2011

Upload: nguyenkhanh

Post on 06-Feb-2018

214 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: PHASE 2 DEVELOPMENT OVERVIEW - Instant Property Towers - 2015.pdf · –OTIS GeN2 (Regen Drive) up to 75% more efficient than non-generative drives •Application for Green Star SA

ATHOLL TOWERS 129 Patricia Rd, Sandton

PHASE 2 – DEVELOPMENT OVERVIEW

PHASE 1 – COMPLETE AND OCCUPIED BY VOLKSWAGEN GROUP SOUTH AFRICA – OCTOBER 2011

Page 2: PHASE 2 DEVELOPMENT OVERVIEW - Instant Property Towers - 2015.pdf · –OTIS GeN2 (Regen Drive) up to 75% more efficient than non-generative drives •Application for Green Star SA

Katherine Street View

Page 3: PHASE 2 DEVELOPMENT OVERVIEW - Instant Property Towers - 2015.pdf · –OTIS GeN2 (Regen Drive) up to 75% more efficient than non-generative drives •Application for Green Star SA

Patricia Road View

Page 4: PHASE 2 DEVELOPMENT OVERVIEW - Instant Property Towers - 2015.pdf · –OTIS GeN2 (Regen Drive) up to 75% more efficient than non-generative drives •Application for Green Star SA

Location / Places of Interest

A – Park Inn Sandton B – Southern Sun Katherine Street C – City Lodge Sandton Katherine Street D – Atholl Guest House E – Atholl Square Centre F – Grayston Shopping Centre G – Sandton City Mall H – Radisson Blu Gautrain Hotel I – Radisson Blue Hotel Sandton

Page 5: PHASE 2 DEVELOPMENT OVERVIEW - Instant Property Towers - 2015.pdf · –OTIS GeN2 (Regen Drive) up to 75% more efficient than non-generative drives •Application for Green Star SA

Location

•Katherine Street is one of the main arteries into Sandton CBD. •1.2km from Sandton CBD and Gautrain Station. •Gautrain Bus stop directly outside offices. •Atholl Square 100m away with great restaurants and retail. •Park Inn Radisson Hotel directly adjacent. •1.5km from the M1 Grayston interchange. •100m from proposed Bus Rapid Transport (BRT).

Page 6: PHASE 2 DEVELOPMENT OVERVIEW - Instant Property Towers - 2015.pdf · –OTIS GeN2 (Regen Drive) up to 75% more efficient than non-generative drives •Application for Green Star SA

Immediate Area

Page 7: PHASE 2 DEVELOPMENT OVERVIEW - Instant Property Towers - 2015.pdf · –OTIS GeN2 (Regen Drive) up to 75% more efficient than non-generative drives •Application for Green Star SA

Access

Page 8: PHASE 2 DEVELOPMENT OVERVIEW - Instant Property Towers - 2015.pdf · –OTIS GeN2 (Regen Drive) up to 75% more efficient than non-generative drives •Application for Green Star SA

Access

•Secure controlled access to the development. •Access from Patricia Road. •Generous on-site visitors parking, with easy, fluid access into the reception areas. •Pedestrian access from Katherine Street –Atholl Square –Gautrain Bus –BRT (future council plan)

Page 9: PHASE 2 DEVELOPMENT OVERVIEW - Instant Property Towers - 2015.pdf · –OTIS GeN2 (Regen Drive) up to 75% more efficient than non-generative drives •Application for Green Star SA

Modern and Iconic design

Page 10: PHASE 2 DEVELOPMENT OVERVIEW - Instant Property Towers - 2015.pdf · –OTIS GeN2 (Regen Drive) up to 75% more efficient than non-generative drives •Application for Green Star SA

Modern and Iconic design

Page 11: PHASE 2 DEVELOPMENT OVERVIEW - Instant Property Towers - 2015.pdf · –OTIS GeN2 (Regen Drive) up to 75% more efficient than non-generative drives •Application for Green Star SA

Phase 1 Completed September 2011

Page 12: PHASE 2 DEVELOPMENT OVERVIEW - Instant Property Towers - 2015.pdf · –OTIS GeN2 (Regen Drive) up to 75% more efficient than non-generative drives •Application for Green Star SA

Phase 2 Under Construction

Page 13: PHASE 2 DEVELOPMENT OVERVIEW - Instant Property Towers - 2015.pdf · –OTIS GeN2 (Regen Drive) up to 75% more efficient than non-generative drives •Application for Green Star SA

Typical Flexible Floor Plate

Page 14: PHASE 2 DEVELOPMENT OVERVIEW - Instant Property Towers - 2015.pdf · –OTIS GeN2 (Regen Drive) up to 75% more efficient than non-generative drives •Application for Green Star SA

Sample Fifth Floor Layout

Page 15: PHASE 2 DEVELOPMENT OVERVIEW - Instant Property Towers - 2015.pdf · –OTIS GeN2 (Regen Drive) up to 75% more efficient than non-generative drives •Application for Green Star SA

Area and Parking Allocation

*MEASURED AS PER SAPOA’S METHOD FOR MEASURING FLOOR AREAS IN OFFICE BUILDINGS

Page 16: PHASE 2 DEVELOPMENT OVERVIEW - Instant Property Towers - 2015.pdf · –OTIS GeN2 (Regen Drive) up to 75% more efficient than non-generative drives •Application for Green Star SA

Interior Design Concepts VWSA – Design by Giant Leap

Page 17: PHASE 2 DEVELOPMENT OVERVIEW - Instant Property Towers - 2015.pdf · –OTIS GeN2 (Regen Drive) up to 75% more efficient than non-generative drives •Application for Green Star SA

Interior Design Concepts VWSA – Design by Giant Leap

Page 18: PHASE 2 DEVELOPMENT OVERVIEW - Instant Property Towers - 2015.pdf · –OTIS GeN2 (Regen Drive) up to 75% more efficient than non-generative drives •Application for Green Star SA

Reduced Carbon Footprint •Energy efficient envelope –Double Glazing –Insulation •Energy efficient design –Air-conditioning – Central Heat Recovery VRV –Lighting (efficient fittings, motion sensors etc.) –Hot water generated from waste heat from the air- conditioning system •Efficient Elevators –OTIS GeN2 (Regen Drive) up to 75% more efficient than non-generative drives •Application for Green Star SA – Office v1 Design certification –4-Star Green Star SA Certified Rating

Page 19: PHASE 2 DEVELOPMENT OVERVIEW - Instant Property Towers - 2015.pdf · –OTIS GeN2 (Regen Drive) up to 75% more efficient than non-generative drives •Application for Green Star SA

Phase ‘1’ and ‘2’ •Phase 1 – Completed September 2011 •Phase 2 commenced construction – November 2011 –Total GLA SAPOA 10,211 m2 –6 Floors of approx. 1,650 m2 –5 parking bays per 100 m2 –Proposed completion February 2015

Page 20: PHASE 2 DEVELOPMENT OVERVIEW - Instant Property Towers - 2015.pdf · –OTIS GeN2 (Regen Drive) up to 75% more efficient than non-generative drives •Application for Green Star SA

Proposed Rental •Single Tenant R145 per m2 entire building •Multiple Tenants R135 per m2 net 1st floor •Multiple Tenants R140 per m2 net 2nd floor •Multiple Tenants R145 per m2 net 3rd floor •Multiple Tenants R145 per m2 net 4th floor •Multiple Tenants R155 per m2 net 5th floor •Multiple Tenants R165 per m2 net 6th floor •R35 – Operating costs •Escalating at 9% per annum •R715 – per parking bay (480 parking bays) •R44 – Per square meter for balconies (918 m2) •R66 – per square metre for basement storage (385 m2) •Tenant Installation Allowance R800 – R1000 per m2 depending on lease terms

Page 21: PHASE 2 DEVELOPMENT OVERVIEW - Instant Property Towers - 2015.pdf · –OTIS GeN2 (Regen Drive) up to 75% more efficient than non-generative drives •Application for Green Star SA

Professional Team

•ALW Estates - Development Managers •AMA - Architects •Stefanutti Stocks Building – Main Contractor •MCB Consulting Engineers – Structural Engineers •Quad Africa – Electrical Engineers •RPP Consulting – Mechanical Engineers •Schneid Libera – Quantity Surveyors •Aurecon – Green Star, Environmental and Landscaping

Page 22: PHASE 2 DEVELOPMENT OVERVIEW - Instant Property Towers - 2015.pdf · –OTIS GeN2 (Regen Drive) up to 75% more efficient than non-generative drives •Application for Green Star SA

More Information

•Please contact Wayne Berger at Instant Property for more information –Wayne: (Tel) 011 463 3596 (Cel) 082 850 8289 –Email: [email protected] –Website: www.instantproperty.co.za 199 Bryanston Drive, Bryanston