    PROPOSED VISUAL DISPLAY BOARD

    AND SHIFT HAND-OVER MEETING

    01 March 2008

  • 8/14/2019 PF Proposed Hand-over meeting.ppt

    2/22

    Significance:

    Communication gaps can result to production

    downtime/delays. Communication gaps can lead to serious mistakes.

    Communication is becoming more critical as we

    move into multi-product manufacturing.

    Proposed PF Visual Display Board &

    Shift Hand-over Meeting

  • 8/14/2019 PF Proposed Hand-over meeting.ppt

    3/22

  • 8/14/2019 PF Proposed Hand-over meeting.ppt

    4/22

    TO BE: To have a single shift hand-over meeting.

    To centralize the display board to provide a onestop overview of the plant daily shift performance.

    To use the display board as a tool for shift hand-over meeting.

    To create ownership/accountability of metrics.

    To improve the hand-over of information (ie. work

    instructions, learning's, other communication.) To improve team engagement.

    Proposed Visual Display Board &

    Shift Hand-over Meeting

  • 8/14/2019 PF Proposed Hand-over meeting.ppt

    5/22

    TO BE:

    PF-1 VISUAL DISPLAY BOARD

    Other Metrics

    Safety

    Daily report

    Safety

    Safety

    Incident report

    Shift Lead

    Shift Lead

    Shift Lead

    Quality

    Event / Atypical

    daily report

    RFT report

    Quality

    cGMP / GDP

    daily report

    Shift Lead

    Shift Lead

    Shift Lead

    TCM-710

    Compression

    Shift Output

    TCM-720

    Compression

    Shift Output

    Dispensing

    Shift Output

    HSM

    Shift Output

    TCM-730

    Compression

    Shift Output

    Charging

    Shift Output

    Supply / Productivity

    Report

    Technician

    Technician

    Technician

    Technician

    Technician

    Technician

    Work

    Assignment

    Kaizen

    Submission

    Work

    Instructions /

    Communication

    Shift

    Attendance

    Team Engagement

    All

    Shift Lead

    3 ROWS DESIGN. USING A4 SIZE PAPER

    Meeting

    Agenda

    Meeting

    Dos & Don'ts

    Guidelines

    Shift Lead

    Shift Lead

    cGMP / GDP

    talk

    Safety talk

    5 S talk

    Shift Lead

    Shift Lead

    Shift Lead

    Work

    Instructions /

    Communication

    Shift Lead

    Work

    Instructions /

    Communication

    Shift Lead

    Shift Lead

    Shift Lead

  • 8/14/2019 PF Proposed Hand-over meeting.ppt

    6/22

    SHIFT HAND-OVER MEETING AGENDA:

    SafetyShift Lead

    Safety daily report (traffic light)

    Incident/Accident report (brief)

    QualityShift Lead

    Event / Atypical Report. 5 Why?

    ProductivityTechnician

    Production output (qty, yield). Downtime hours. Why?

    Work order status. On schedule or behind schedule, how many days?

    Team EngagementShift Lead

    Kaizen submission by technician

    Work instruction / communication

    Safety talk cGMP / GDP talk

    5 S talk

    TO BE:

  • 8/14/2019 PF Proposed Hand-over meeting.ppt

    7/22

    SHIFT HAND-OVER MEETING AGENDA:

    Required to attend from out-going shift Shift Lead

    Shift Supervisor

    1 Technician from each module

    Maintenance Technician

    Required to attend from in-coming shift

    All. Including Maintenance Technician.

    Except technicians assigned to take-over the module

    Hand-over procedure - 1 to 1 (To take place at the module)

    Step 1 - The in-coming shift lead shall assign a technician totake-over the modules that cannot stop operation. A 1 to 1

    hand-over shall take place at the module.Step 2 - Module out-put, issues encountered shall be discussed

    in brief. MPD and clean & usage log shall be checked by thein-coming technician for completeness. This action would helpdrive the reduction of GDP errors.

    TO BE:

  • 8/14/2019 PF Proposed Hand-over meeting.ppt

    8/22

    SHIFT HAND-OVER MEETING AGENDA:

    Hand-over procedureGroup (To take place at the VisualBoard)

    Step 1The out-going Shift Lead shall report the safetyperformance. To discuss in brief any incident report.

    Step 2The out-going shift Lead shall report the qualityperformance. To discuss in brief any event or atypical.

    Step 3The out-going shift technician (designated for eachmodule) shall report the production performance. To explainbrief why target is not met & any issue.

    Step 4The out-going shift lead shall report any newinstructions/communications.

    Step 5The out-going shift can leave.

    Step 6The in-coming shift lead shall continue with the meetingto discuss the days work assignment, safety talk, cGMP talkand 5 S talk & any CI suggestions.

    Step 7 - End the meeting.

    TO BE:

  • 8/14/2019 PF Proposed Hand-over meeting.ppt

    9/22

    Meeting Ground Rules Responsibility

    1. Be on-time. All

    2. Update the visual display board before meeting starts.Out-going shift

    3. Provide full attention. One meeting policy. All

    4. Switch-off walkie talkie. All

    5. Speak clearly. All

    6. Lengthy discussion shall be placed on a parking lot. All

    Meeting Timing:

    Morning - 7:30am to 7:45am

    Night - 7:30pm to 7:45pm

    Meeting Venue:

    Visual Display Board

    SHIFT HAND-OVER GROUD RULES:

    TO BE:

  • 8/14/2019 PF Proposed Hand-over meeting.ppt

    10/22

    SAFETY REPORTING

  • 8/14/2019 PF Proposed Hand-over meeting.ppt

    11/22

    Safety Traffic Light Daily Reporting

    Date Team Status Remarks

    01 MarchA

    B

    02 MarchC IBC lid drop-out.

    D Walkie stacker hit the wall.

    RED ACCIDENT / LOST TIME

    YELLOW INCIDENT or NEAR MISS

    GREEN NO ISSUE

  • 8/14/2019 PF Proposed Hand-over meeting.ppt

    12/22

    QUALITY REPORTING

  • 8/14/2019 PF Proposed Hand-over meeting.ppt

    13/22

    Quality Daily Reporting

    Date Team # of Event/Atypical Raised

    01 March 08A 2

    B 1

    02 March 08C 0

    D 1

    Event / Atypical Daily Reporting

    To report in brief any event or atypical

  • 8/14/2019 PF Proposed Hand-over meeting.ppt

    14/22

    GMP / GDP Traffic Light Daily Reporting

    Date Reported by Status Remarks

    01 MarchTan

    Peter

    02 MarchJohn IBC # 007 - Missing entry on the clean & usage log .

    Robert MPD - Section C, over-writing.

    RED cGMP / GDP NON-CONFORMANCE

    YELLOW NEEDS IMPROVEMENT

    GREEN NO ISSUE

    To be checked & reported by out-going shift.

    1. MPD check for previous shift.

    2. Clean & usage log check for previous shift

  • 8/14/2019 PF Proposed Hand-over meeting.ppt

    15/22

    PRODUCTIVITY REPORTING

  • 8/14/2019 PF Proposed Hand-over meeting.ppt

    16/22

    USE EXISTING FORMS

    To add a shift target for compression. Example:

    TCM 710 = 10 drums per shift

    TCM 720 = 15drums per shift.

    Or

    Strength, 10/10 = 10 drums per shift

    Strength, 10/20 = 15 drums per shift

    Productivity Reporting

  • 8/14/2019 PF Proposed Hand-over meeting.ppt

    17/22

    TEAM ENGAGEMENT REPORTING

  • 8/14/2019 PF Proposed Hand-over meeting.ppt

    18/22

    EAM D

    NO NAME

    Submitted Implemented Submitted Implemented Submitted Implemented Submitted Implemented Submitted Implemented

    1 Azman Husin IIII II

    2 Niranjan Kumar

    3 Chen Yu Min, Richard

    4 Hou Fang Tao, Hoft

    5 Ooi Kim Seong

    6 Lim Hwee Kiang

    7 Yusainie Bin Rahmat

    8 Lee Teck Hock

    9 Angelo

    10 Udayan

    11 Heng Wei Jie

    12 Rajesh Umakanthan

    MayJan Feb March April

    Kaizen submission tracking

    Total number of suggestions is to be use

    as a performance appraisal target.

    Team Engagement Reporting

  • 8/14/2019 PF Proposed Hand-over meeting.ppt

    19/22

    Team Engagement Reporting

    Period: 11April - 27April

    Dispensing & Charging High Shear Module Compression Others

    Chen Y M

    (Lead)

    LEE

    (Lead)

    Kumar

    (Lead)

    Lim W K Udayan Ooi

    Rajesh Heng W J Hoft

    Azman

    (Mentor)Yus

    Period: 30April - 15 May

    Dispensing & Charging High Shear Module Compression Others

    LEE

    (Lead)

    Chen Y M

    (Lead)

    Kumar

    (Lead)

    Udayan Lim W K Ooi

    Heng W J Rajesh Hoft

    Pairin

    (Mentor)Yus

    Azman(Compression leaning/Other

    assignment to swap with Kumar

    or Ooi)

    Azman

    (Compression leaning/Otherassignment to swap with Kumar

    or Ooi)

  • 8/14/2019 PF Proposed Hand-over meeting.ppt

    20/22

    Safety, GMP & 5 S Talk

    A THEME based communication. Example:

    SafetyBasic PPE

    GMPRule # 1.

    5 S Sort

    The THEME shall remain the same for 1 week and

    change every week. This would help drive

    awareness and behavior change

    Team Engagement Reporting

  • 8/14/2019 PF Proposed Hand-over meeting.ppt

    21/22

    VIDEO

  • 8/14/2019 PF Proposed Hand-over meeting.ppt

    22/22

    TO BE:

    PF-1 VISUAL DISPLAY BOARD

    Other Metrics

    Safety

    Daily report

    Safety

    Safety

    Incident report

    Shift Lead

    Shift Lead

    Shift Lead

    Quality

    Event / Atypical

    daily report

    RFT report

    Quality

    cGMP / GDP

    daily report

    Shift Lead

    Shift Lead

    Shift Lead

    TCM-710

    Compression

    Shift Output

    TCM-720

    Compression

    Shift Output

    Dispensing

    Shift Output

    HSM

    Shift Output

    TCM-730

    Compression

    Shift Output

    Charging

    Shift Output

    Supply / Productivity Report

    Technician

    Technician

    Technician

    Technician

    Technician

    Technician

    Work

    Instructions /

    Communication

    Kaizen

    Submission

    cGMP / GDP

    talk

    Shift

    Attendance

    Safety talk

    5 S talk

    Team Engagement

    All Shift Lead

    Shift Lead

    Shift Lead

    3 ROWS DESIGN. USING A4 SIZE PAPER

    Meeting

    Agenda

    Meeting

    Dos & Don'ts

    Guidelines

    Shift Lead

    Shift Lead