    REFINING - 95D.A.P.G., Diisseldorf

    3.6 DUSSELDORF

    ery: Deutsch-Amerikanische Petroleum-GesellschaftOn Rhine River harbor at Dtisseldorf. Street address, Fringstrasse 24.Latitude 510 13' N, longitude 6 47 E.

    and Plans: Layout plan, page 96. Location map, below. Photograph, page 94.Description: Annual capacity 25,000 metric tons. This small plant is a combinationbulk plant and gasoline rerunning unit. It is equipped with a still, run-downtanks, agitators and process tanks. The plant also has a boiler and pumphouse,and filling racks for railway tank oars, barges and trucks.

    Total tankage: Approximately 20,000 metric tons (126,000 barrels).

    Refinery: Rhenania-Ossag Mineralolwerke A.G.Location: At Reisholz on the north bank of the Rhine, four miles southeast ofDusseldorf. Latitude 51 10* N, longitude 6 51* E. A large power stationadjoins the plant on the west.Maps and Plans: Layout plan, page 97. Location map below. Photograph, page 98,Description: Annual capacity 65,000 metric tons. This is a rerunning plant equippedwith shell stills and manufactures white spirits, special benzines and gasolines. It is accessible by road, rail andbarge. Prior to the war stocks were normally received by river tank barges comingfrom Rotterdam, the port of importation inthe Netherlands.

    Total tankage: A prewar tankage listis given below. It has not been possibleto definitely identify the tanks listedwith those shown on the layout plan onpage 97.

    Details of TankageCapacity

    Tank No. Product M3 BarrelsA Gasoline 2,656 16,733B 4,325 27,248C n 1,471 9,267D Gas o i 1,471 9,267S Gasoline 1,048 6,602F n 6 5 4 4,120G n 6 5 6 4,133

    LEGEND H n 5,192 32,710AB

    Refinery of DEUTSCH-AMERIKANISCHEPETROLEUM-GESELIjSCHAFTR.W.E. POWER STATION

    IKMtt 5,1822,915 32,64718,365

    CD.

    Refinery of RHENANIA-OSSAG MINER.ALOLWERKE A.G.Oil Storage" OLE X "

    L1rt 2,0326 2 2 12,8023,919

    LOCATION MAP, REFINING FACILITIES,DUSSELDORF AREA23

    Itrt

    7 0 96 2 4 4,4673,931

  • 8/14/2019 Petroleum Facilites of Germany 1945 104

    2/11

    96 - REFININGD*A.P.G, , DusseldorfBridge over Rhtin

    i i i i i i i i i i i i i i i i i ' i > =

  • 8/14/2019 Petroleum Facilites of Germany 1945 104

    3/11

    REFINING . 97R&enania-Ossag, Reisholz

    oo o\ O i - t c j r o ^ ir> rI ori oi d- - C M C g Cv jC M ( N C M C M C M C M C v J m

  • 8/14/2019 Petroleum Facilites of Germany 1945 104

    4/11

    98 - REFININGRhenan ia -Ossag , Re i sho lz

  • 8/14/2019 Petroleum Facilites of Germany 1945 104

    5/11

    REFINING - 99Emmerlcn*Details of Tankage (Continued)

    Tank No. Product4 Gasoline5 n6 n7 wa n9 n

    n1 6 17 l f l1 9 2 0 n2 1 tt

    N 1 nN 2 N 3 N 7

    7 less than 200 M3I B Receiving Tanks3 9 Filling tanks

    T o t a

    CapacityM 3 Barrels3 3 0 2,0792 R 6 1,8022 R 6 l ,R022 8 5 1,7963 3 0 2,0793 2 9 2,07 32 9 3 1,R462 6 2 1 ,6512 6 1 1,6442 6 1 1,6442 6 2 1,6512 6 1 1,6442 6 1 1,6442 0 5 1,2922 0 4 1,2852 0 4 1,2ft 52 9 3 1,845

    1,251 7,flfll

    4 5 1 2,R419 7 1 6,117

    36,843 232,112

    3.7 EMMERICHRefinery: Deutsche Gasolin A.G.Location: At Emmerich on the north bank of the Rhine, near the Netherlands border.

    Latitude 51 501 N, longitude 6 16 E, The plant lies between one arm of theriver harbor for barges, and the railway yard.

    Maps and Plans: Layout plan, page 100,Description: Annual capacity 60,000 metric tons. This refinery is equipped withpipe stills and a small cracking unit. It processes indigenous German crudeoil and produces gasoline, gas oil, lubricants and greases.

    Total tankage is unknown but at least ten large partially buried storagetanks are reported.

  • 8/14/2019 Petroleum Facilites of Germany 1945 104

    6/11

    100 - REFININGHamburg

    LOCATION MAP LEGENDREFINERY OF 1. RAILROAD STATION2. DISTILLATION UNITDEUTSCHE GASOLIN A. G. 3. LUBRICATING OIL TREATMENT4. CAMOUFLAGED OIL TANKSEMMERICH

    R95

    3 . 8 HAMBURG

    Refinery; Deutsche Petroleum A.G.Location; On the north side of the Reiherstieg Canal in the Wilhelmsburg area ofHamburg harbor, approximately 1-1/& miles west of the Wilhelmsburg railwaystation. Adjoins the Rhenania-Ossag Mineralolwerke A.G. Wilhelmsburg refinery.Maps and Plans; Layout plan, page 123. Location shown on pages 116 and 46-247*Description; Annual capacity 65,000 metric tons* This refinery is equipped withshell stills and vacuum distillation but has no craoking equipment. A detailed description is not available. The layout plan on page 123 is drawnfrom air cover.

    Tankage is estimated at 95,000 metrio tons (598,500 barrels)Refinery; Deutsche Vaouum Oel A.G.Looatlon: At Sohulau on the north bonk of the Elbe, Sohulau, latitude 53 34? N,longitude 9 431 E, is just southeast of the village of Wedel and some 19

    miles downstream from the Hamburg bridge.

  • 8/14/2019 Petroleum Facilites of Germany 1945 104

    7/11

    REFINING - 101Deutsche Vacuum Oel, Hamburg

    Layout Plan of RefineriesDEUTSCHE VACUUM OEL A.G.

    andDEUTSCH - AMERIKANISCHEPETROLEUM - GESELLSCHAFTSCHULAU (near Hamburg)

    A - DEUTSCHE VACUUM REFINERYB - DEUTSCH- AMERIKANISCHEREFINERY

  • 8/14/2019 Petroleum Facilites of Germany 1945 104

    8/11

    - REFININGDeutsche Vacuum Oel, Hamburg

  • 8/14/2019 Petroleum Facilites of Germany 1945 104

    9/11

    REFINING - 103Hamburgand P la n s; Layout pla n, page 101 . Location shown on map on pages 246-247.Photograph on page 102 ,

    D es cr ip tio n: Annual cap acity 20,000 metric to ns . This plant was equipped with as h e l l s t i l l , w ith a da i ly capac i ty of 1,000 barrels but was not equipped forf u l l r e f i n i n g o p e r a t i o n s . Wax d i s t i l l a t e s s h i p p e d by barge or railway tankcar, from the company's refinery at Bremen were pressed and the plant wasdes igned primari ly as a l u b r i c a t i n g o i l and grease treating blending and compounding plant manufacturing high grade lubricants .

    In one corner of the plant the Deutsch-Amerikanische Petroleum-Gesellschaftoperated a s mall gas o l ine rerunning s t i l l and treat ing plant of about 10,000metric tons per annum capacity.Tankage: Total tankage at 3 chulau was approximately 197,000 metric tons( 1 , 2 4 1 , 1 0 0 b a r r e l s ) .

    Refinery: Ebano Asphalt-Werke A.G.Locat ion: On the south bank of the Suder-Elbe River in the Harburg section of Hamburg harb or. Latitude 53 331 N, longitude 10 0 E .Maps and Plans: Layout plan, page 105. Location shown on map on pages 246-247.D es cr ip tio n: Annual ca pa city , 400,000 metric to ns . This plant was designed as anas pha l t re f inery to operate on heavy Mexican or Venezuelan crudes. The plantcan receive ocean tankers and has barge and r a i l car l o a d i n g f a c i l i t i e s .

    There were two s ta g e p ip e s t i l l s e ac h w i th an atmospheric stage and vacuums tage f rac t ionat ing towers . The c a p a c i t i e s of the two d i s t i l l a t i o n u n i t s wereUnit No. 1 Unit No. 2

    Barrels per dayMaximum capacity. .4,800. .5,100Average actual capacity. .4,200. .4,500

    There is no cracking equipment nor lubricating oil facilities.The asphalt oxidizing plant contains two horizontal and one vertical batchstills of 700 barrels capacity each, scubbers, blowers, and cut-back tankswith electric motor-driven paddles.The boiler plant contains three 323 B.H.P. boilers, operating pressures 150pounds per square inch. The boilers and the stills are all coal fired. Electric power is obtained from the city lines, but a 40 kw. emergency generatorwas installed in the plant.The numerous process pumps, transfer and loading pumps and fire pumps aresteam-driven while the fresh water pumps are eleotrically-driven.Water for the refinery operations is taken from the river.The plant has a foamite fire protection system and also all tanks areequipped with sprinklers.

  • 8/14/2019 Petroleum Facilites of Germany 1945 104

    10/11

  • 8/14/2019 Petroleum Facilites of Germany 1945 104

    11/11

    REFINING - 105Ebano, Hamburg

    PLAN OFEBANO ASPHALT-WERKE A. G.HARBURG (HAMBURG)

    ,0 0 20 40 60 80 100 120 140 METERS