Peter Co Lim 10 Redwood St. New Marikina Subdivision Marikina City, Philippines 1801 (63917) 8340717 [email protected] Profile Highlights More than 5 years of Functional Experience across different releases of SAP R/3 and ECC specific to the areas of SD with 4 implementation cycle and 1 roll out project and 13 years of total work experience. Proven to be a valuable team player in successful SAP Projects in the field of high tech manufacturing, quick service restaurant, semiconductors, battery manufacturing, lead manufacturing, plastic manufacturing, furniture/foam manufacturing & distribution, food manufacturing & distribution, and Oil & Gas Industry. Presently working as a SAP SD Lead Consultant at ABM Global Solutions. Had worked extensively with top management and operational business process owners and users to articulate, define and derive the strategic focus of the enterprise, optimize resources and assure system integration. Strong experience in SAP consulting, Pre-sales, Implementation and Development. Experience in conducting an instructor led SAP academy program. Conducted a successful audit project and highlighted observations and recommendations Certified in SD ECC 6.0 Strong planning and communication skills Core strengths in Sales include R/3 SD with master data and integration knowledge across all modules and holistic solution development from R/3 for KPI/Planning and Consolidation. Effectively articulate, discuss and define strategies at Board and top management level Strong Team Management, Solution Management and Business Development skills. Areas of Expertise SD: Order Processing Others: Transportation Management, Integration with Materials Management and Financial Accounting

Upload: peter-lim

Post on 08-Aug-2015

14 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Peter Lim  CV  Dec 2014 V1

Peter Co Lim10 Redwood St. New Marikina SubdivisionMarikina City, Philippines 1801(63917) [email protected]

Profile Highlights

More than 5 years of Functional Experience across different releases of SAP R/3 and ECC specific to the areas of SD with 4 implementation cycle and 1 roll out project and 13 years of total work experience. Proven to be a valuable team player in successful SAP Projects in the field of high tech manufacturing, quick service restaurant, semiconductors, battery manufacturing, lead manufacturing, plastic manufacturing, furniture/foam manufacturing & distribution, food manufacturing & distribution, and Oil & Gas Industry.

Presently working as a SAP SD Lead Consultant at ABM Global Solutions. Had worked extensively with top management and operational business process owners and users to articulate, define and derive the strategic focus of the enterprise, optimize resources and assure system integration.

Strong experience in SAP consulting, Pre-sales, Implementation and Development.

Experience in conducting an instructor led SAP academy program. Conducted a successful audit project and highlighted observations and

recommendations Certified in SD ECC 6.0 Strong planning and communication skills Core strengths in Sales include R/3 SD with master data and integration

knowledge across all modules and holistic solution development from R/3 for KPI/Planning and Consolidation.

Effectively articulate, discuss and define strategies at Board and top management level

Strong Team Management, Solution Management and Business Development skills.

Areas of Expertise

SD: Order Processing Others: Transportation Management, Integration with Materials

Management and Financial Accounting modules

Skills and Proficiency

Software/ Hardware

Year Starting of Experience

ECC 6 2008R/3 System 4.0 and 4.7

2009

R/3 System 4.5B 2002

Page 2: Peter Lim  CV  Dec 2014 V1

PETER CO LIM

Microsoft Office 1993

Project Experience

1) ECC 6.0 Implementation

Industry: Foam and Furniture Manufacturing and DistributionCompany: Mandaue Foam Inc. Country: Cebu City, PhilippinesModules: Financial Accounting / Sales & Distribution / Materials

Management / Warehouse ManagementProject Duration: June 2014 to December 2014SAP System: R/3 Enterprise version 6.0 EHP7Project Objective: To implement ECC 6.0 to replace the current ERP system

(In house ) integrated with a POS system with the same live date

Customer’s Major Challenges:

System capability is very limited No availability check Limited sales reports

Business Benefits Real-time inventory checking in the system Improved report generation turnover

RoleMajor Responsibilities:

Conducted blueprinting sessions with the process owners. Prepared the to be process flows

Conducted user training in SAP for the users to give them a general perspective of the S&D module.

Configuration of the system to suit customer’s requirements

Conducted end user training Creation of LSMW programs for upload of customer / credit

limit /pricing related condition records Post Go-live support

2) ECC 6.0 Implementation

Industry: Battery Manufacturing and DistributionCompany: Marshall Power Australia Ltd.Country: Australia & New ZealandModules: Financial Accounting / Sales & Distribution / Materials

Management / Production PlanningProject Duration: February 2013 to September 2013SAP System: R/3 Enterprise version 6.0Project Objective: To implement ECC 6.0 to replace the current ERP system

of JDECustomer’s Major Challenges:

System capability is very limited

Business Benefits Use of delivery dockets/ manual entry in SAP was eliminated

Real-time inventory checking in the system

Page 2 of 8

Page 3: Peter Lim  CV  Dec 2014 V1

PETER CO LIM

Improved report generation turnoverRoleMajor Responsibilities:

Conducted blueprinting sessions with the process owners. Prepared the to be process flows

Conducted user training in SAP for the users to give them a general perspective of the S&D module.

Configuration of the system to suit customer’s requirements

3) ECC 6.0 Implementation support / Mobile POS Roll-out & support

Industry: Battery DistributionCompany: Super Charge Batteries Country: Australia Modules: Financial Accounting/ Sales & Distribution / Materials

ManagementProject Duration: February 2012 to April 2013SAP System: R/3 Enterprise version 6.0Project Objective: To roll-out the POS system across all Australia sales repsCustomer’s Major Challenges:

Lack of customer/inventory data Delayed transmittal of delivery dockets for encoding in SAP

Role

Use of delivery dockets/ manual entry in SAP was eliminated

Real-time inventory checking on the devices SD Consultant

Major Responsibilities:

Trained sales reps and warehouse personnel on the use of the handheld devices and desktop systems.

Acted as support personnel after rollout of each rep. Made sure SAP custom programs addressed the

requirement of transferring correct data from POS to SAP and vice versa

4) PSSLAI Loans Management Implementation

Industry: LendingCompany: PSSLAICountry: PhilippinesModules: Financial AccountingProject Duration: January 2012 to February 2012SAP System: R/3 Enterprise version 6.0Project Objective: Create SAP Loans Management SystemCustomer’s Major Challenges:

Existence of a secondary system that impeded operational decision-making and reporting

Generation of reports for easy monitoring Business Benefits: Creation of a single enterprise system for all transaction.Role FI Consultant

Page 3 of 8

Page 4: Peter Lim  CV  Dec 2014 V1

PETER CO LIM

Major Responsibilities:

Verified the configuration of the system to comply with the approved design.

Performed integration testing to assure accuracy of the programs developed.

5) ECC 6.0 Implementation Project

Industry: Battery Manufacturing & DistributionCompany: Ramcar Batteries Inc.Country: U.S.A.Modules: Financial Accounting, Controlling, Materials Management,

Production Planning, and Sales & DistributionProject Duration: February 2011 to July 2011SAP System: R/3 Enterprise version 6.0Project Objective: Upgrade to SAP 6.0 from SAP 4.0B by July 2011Customer’s Major Challenges:

Existence of a secondary system for their production since PP module was not implemented in 4.0B

Lack of users to transact in SAP Business Benefits Achieved after the Project:

Creation of a single enterprise system for all transactions Improved efficiency with the use of the newer GUI and

user’s better understanding of the capabilities of the system

Improved report generation turnoverRole SD ConsultantMajor Responsibilities:

Evaluate and document existing business processes and initiated improvements in the design.

Configure the system to comply with the approved design. Focus on and ensure the correctness of the

implementation of the sales & distribution modules of the system.

Perform integration testing with the other modules to assure accuracy of the configuration.

Conduct comprehensive user trainingMajor Accomplishments: Integration of business functions that enhance

productivity, flexibility, and customer responsiveness. Through use of SAP reports, key data and information can be automatically generated for better productivity.

Creation of new customized reports previously done offline.

6) ECC 6.0 Implementation Project

Industry: Power IndustryCompany: CBK Co. Inc.Country: PhilippinesModules: Financial Accounting, Controlling, Materials Management,

Plant Maintenance, Sales & DistributionProject Duration: June 2009 to February 2010SAP System: R/3 Enterprise version 4.7Project Objective: Create SAP Backend system that can interface seamlessly

Page 4 of 8

Page 5: Peter Lim  CV  Dec 2014 V1

PETER CO LIM

with the in-house banking systems and leverage with available SAP standard reports

Customer’s Major Challenges:Business Benefits Achieved after the Project:

Existence of multiple systems that impeded operational decision-making and reporting

Creation of a single enterprise system for all transactions Increase efficiency through streamlining and elimination of

manual/redundant processes, and automation by at least 30%

Reduced business transaction processing efforts by 10%Improved report generation turnover

Role SD ConsultantMajor Responsibilities:

Evaluated and documented existing business processes and initiated improvements in the design.

Configured the system to comply with the approved design.

Focused on and ensured the correctness of the implementation of the sales & distribution modules of the system.

Performed integration testing with the other modules to assure accuracy of the configuration.

Conducted comprehensive user trainingMajor Accomplishments:

Integration of business functions that enhance productivity, flexibility, and customer responsiveness. Through use of SAP reports, key data and information can be automatically generated for better productivity.

7) ECC 4.7 Roll Out Project Industry: Fast Moving Consumer Goods Company: Quench Plus Country: PhilippinesModules: Financial Accounting, Controlling, Materials Management,

Plant Maintenance, Sales & DistributionProject Duration: March 2010 to June 2010SAP System: R/3 Enterprise version 4.7Project Objective: Project Roll out to extend the system to a new companyCustomer’s Major Challenges:

Insufficient human resources to serve as end users and functional team. Unavailability or the users.

Business Benefits Achieved after the Project:

Creation of a single enterprise system for all transactions Increase efficiency through streamlining and elimination of

manual/redundant processes and automation Improved report generation turnover

Role SD ConsultantMajor Responsibilities:

Major Accomplishments:

Evaluated and documented existing business processes and initiated improvements in the design.

Configured the system to comply with the approved design.

Focused on and ensured the correctness of the implementation of the sales & distribution modules of the system.

Performed integration testing with the other modules to assure accuracy of the configuration.

Conducted comprehensive user training Integration of business functions that enhance

productivity, flexibility, and customer responsiveness.

Page 5 of 8

Page 6: Peter Lim  CV  Dec 2014 V1

PETER CO LIM

Through use of SAP reports, key data and information can be automatically generated for better productivity.

8) SLA Support

Industry: Quick Service Restaurant, Food Manufacturing, Battery Manufacturing & distribution, Media Publishing, clothing manufacturing, Semi Conductor manufacturing, Petro Chemical Manufacturing.

Company: Ramcar Group of Companies, Big E , Summit Media, JG Petrochem, Golden ABC, CBK Power, PSI Technologies

Country: Philippines, U.S.A. , Australia Modules: Financial Accounting, Controlling, Materials Management,

Production Planning, Sales & DistributionProject Duration: March 2009 to June 2009, December 2009 to April 2011SAP System: R/3 Enterprise version 4.0, 4.7 & ECC 6Role SD ConsultantMajor Responsibilities:

Resolve tickets and issues SD in nature

Major Accomplishments:

Quick resolution of major tickets received.

Work Experience

1) ABM Global Solutions

Country: PhilippinesIndustry: IT Consulting ServicesPosition: SAP Business AnalystEmployment Dates: June 2014 to PresentMajor Responsibilities & Accomplishments:

Implement SAP solutions for various enterprises based on ASAP methodology.

Conduct pre-sales to clients Provide SAP support to end-users.

2) Chevron Holdings Inc.

Country: PhilippinesIndustry: IT Consulting ServicesPosition: SAP Business AnalystEmployment Dates: September 2013 to June 2014Major Responsibilities & Accomplishments:

Implement SAP solutions for various enterprises based on ASAP methodology.

Provide SAP support to end-users for North and Latin American Countries.

3) Kaisa Consulting Company Incorporated

Country: Philippines

Page 6 of 8

Page 7: Peter Lim  CV  Dec 2014 V1

PETER CO LIM

Industry: IT Consulting ServicesPosition: ConsultantEmployment Dates: January 2009 to September 2013Major Responsibilities & Accomplishments:

Implement SAP solutions for various enterprises based on ASAP methodology.

Provide SAP support to end-users. Conduct SAP Academy trainings. Conduct pre-sales to clients

4) Honda Cars Makati Incorporated

Country: PhilippinesIndustry: Car IndustryPosition: Sales ExecutiveEmployment Dates: May 2002 to October 2004Major Responsibilities & Accomplishments:

Effectively market the company's line of Vehicles and Maintenance Services

Achieve sales targets through acquisition and management of corporate accounts

Received various awards for exemplary sales performance

End user for SAP ECC 4.5B SD functions

5) Alveo Land Inc. (formerly Community Innovations Inc.)

Country: PhilippinesIndustry: Real Estate IndustryPosition: Property SpecialistEmployment Dates: January 2005 to October 2005Major Responsibilities & Accomplishments:

Effectively market the Company’s projects like Serendra and Columns.

Work-Related Trainings and Certification

Institution: Kaisa Academy (Philippines)Date: February 2009Course: SAP ECC 6.0 SD Module

Certified SAP Consultant (ID No. S0006443008 )

Institution: Digileaf Philippines Date: November 8-9, 2011Course: Enterprise Analysis & Domain Modeling

Institution: Digileaf Philippines Date: November 16-18, 2011Course: Business Analysis (Eliciting, Documenting & Managing

Requirements)

Page 7 of 8

Page 8: Peter Lim  CV  Dec 2014 V1

PETER CO LIM

Institution: Kaisa E-Academy (Philippines)Date: September 2008 – January 2009Course: SAP ECC 6.0 SD Module

Institution: Kaisa Academy (Philippines)Date: September 9-12, 2009Course: Project Management Boot Camp

Instructor Experience

Institution: Kaisa Academy (Philippines)Date: March 2011Course: TSCM60 Order Fulfillment 1

Institution: Kaisa Academy (Philippines)Date: February 10, 2010Course: SAP SD User Training

Education

Institution: De La Salle University, Manila, PhilippinesDate: December 2000Degree: AB Political Science

Page 8 of 8