Download - Peter Lim CV Dec 2014 V1
Peter Co Lim10 Redwood St. New Marikina SubdivisionMarikina City, Philippines 1801(63917) [email protected]
Profile Highlights
More than 5 years of Functional Experience across different releases of SAP R/3 and ECC specific to the areas of SD with 4 implementation cycle and 1 roll out project and 13 years of total work experience. Proven to be a valuable team player in successful SAP Projects in the field of high tech manufacturing, quick service restaurant, semiconductors, battery manufacturing, lead manufacturing, plastic manufacturing, furniture/foam manufacturing & distribution, food manufacturing & distribution, and Oil & Gas Industry.
Presently working as a SAP SD Lead Consultant at ABM Global Solutions. Had worked extensively with top management and operational business process owners and users to articulate, define and derive the strategic focus of the enterprise, optimize resources and assure system integration.
Strong experience in SAP consulting, Pre-sales, Implementation and Development.
Experience in conducting an instructor led SAP academy program. Conducted a successful audit project and highlighted observations and
recommendations Certified in SD ECC 6.0 Strong planning and communication skills Core strengths in Sales include R/3 SD with master data and integration
knowledge across all modules and holistic solution development from R/3 for KPI/Planning and Consolidation.
Effectively articulate, discuss and define strategies at Board and top management level
Strong Team Management, Solution Management and Business Development skills.
Areas of Expertise
SD: Order Processing Others: Transportation Management, Integration with Materials
Management and Financial Accounting modules
Skills and Proficiency
Software/ Hardware
Year Starting of Experience
ECC 6 2008R/3 System 4.0 and 4.7
2009
R/3 System 4.5B 2002
PETER CO LIM
Microsoft Office 1993
Project Experience
1) ECC 6.0 Implementation
Industry: Foam and Furniture Manufacturing and DistributionCompany: Mandaue Foam Inc. Country: Cebu City, PhilippinesModules: Financial Accounting / Sales & Distribution / Materials
Management / Warehouse ManagementProject Duration: June 2014 to December 2014SAP System: R/3 Enterprise version 6.0 EHP7Project Objective: To implement ECC 6.0 to replace the current ERP system
(In house ) integrated with a POS system with the same live date
Customer’s Major Challenges:
System capability is very limited No availability check Limited sales reports
Business Benefits Real-time inventory checking in the system Improved report generation turnover
RoleMajor Responsibilities:
Conducted blueprinting sessions with the process owners. Prepared the to be process flows
Conducted user training in SAP for the users to give them a general perspective of the S&D module.
Configuration of the system to suit customer’s requirements
Conducted end user training Creation of LSMW programs for upload of customer / credit
limit /pricing related condition records Post Go-live support
2) ECC 6.0 Implementation
Industry: Battery Manufacturing and DistributionCompany: Marshall Power Australia Ltd.Country: Australia & New ZealandModules: Financial Accounting / Sales & Distribution / Materials
Management / Production PlanningProject Duration: February 2013 to September 2013SAP System: R/3 Enterprise version 6.0Project Objective: To implement ECC 6.0 to replace the current ERP system
of JDECustomer’s Major Challenges:
System capability is very limited
Business Benefits Use of delivery dockets/ manual entry in SAP was eliminated
Real-time inventory checking in the system
Page 2 of 8
PETER CO LIM
Improved report generation turnoverRoleMajor Responsibilities:
Conducted blueprinting sessions with the process owners. Prepared the to be process flows
Conducted user training in SAP for the users to give them a general perspective of the S&D module.
Configuration of the system to suit customer’s requirements
3) ECC 6.0 Implementation support / Mobile POS Roll-out & support
Industry: Battery DistributionCompany: Super Charge Batteries Country: Australia Modules: Financial Accounting/ Sales & Distribution / Materials
ManagementProject Duration: February 2012 to April 2013SAP System: R/3 Enterprise version 6.0Project Objective: To roll-out the POS system across all Australia sales repsCustomer’s Major Challenges:
Lack of customer/inventory data Delayed transmittal of delivery dockets for encoding in SAP
Role
Use of delivery dockets/ manual entry in SAP was eliminated
Real-time inventory checking on the devices SD Consultant
Major Responsibilities:
Trained sales reps and warehouse personnel on the use of the handheld devices and desktop systems.
Acted as support personnel after rollout of each rep. Made sure SAP custom programs addressed the
requirement of transferring correct data from POS to SAP and vice versa
4) PSSLAI Loans Management Implementation
Industry: LendingCompany: PSSLAICountry: PhilippinesModules: Financial AccountingProject Duration: January 2012 to February 2012SAP System: R/3 Enterprise version 6.0Project Objective: Create SAP Loans Management SystemCustomer’s Major Challenges:
Existence of a secondary system that impeded operational decision-making and reporting
Generation of reports for easy monitoring Business Benefits: Creation of a single enterprise system for all transaction.Role FI Consultant
Page 3 of 8
PETER CO LIM
Major Responsibilities:
Verified the configuration of the system to comply with the approved design.
Performed integration testing to assure accuracy of the programs developed.
5) ECC 6.0 Implementation Project
Industry: Battery Manufacturing & DistributionCompany: Ramcar Batteries Inc.Country: U.S.A.Modules: Financial Accounting, Controlling, Materials Management,
Production Planning, and Sales & DistributionProject Duration: February 2011 to July 2011SAP System: R/3 Enterprise version 6.0Project Objective: Upgrade to SAP 6.0 from SAP 4.0B by July 2011Customer’s Major Challenges:
Existence of a secondary system for their production since PP module was not implemented in 4.0B
Lack of users to transact in SAP Business Benefits Achieved after the Project:
Creation of a single enterprise system for all transactions Improved efficiency with the use of the newer GUI and
user’s better understanding of the capabilities of the system
Improved report generation turnoverRole SD ConsultantMajor Responsibilities:
Evaluate and document existing business processes and initiated improvements in the design.
Configure the system to comply with the approved design. Focus on and ensure the correctness of the
implementation of the sales & distribution modules of the system.
Perform integration testing with the other modules to assure accuracy of the configuration.
Conduct comprehensive user trainingMajor Accomplishments: Integration of business functions that enhance
productivity, flexibility, and customer responsiveness. Through use of SAP reports, key data and information can be automatically generated for better productivity.
Creation of new customized reports previously done offline.
6) ECC 6.0 Implementation Project
Industry: Power IndustryCompany: CBK Co. Inc.Country: PhilippinesModules: Financial Accounting, Controlling, Materials Management,
Plant Maintenance, Sales & DistributionProject Duration: June 2009 to February 2010SAP System: R/3 Enterprise version 4.7Project Objective: Create SAP Backend system that can interface seamlessly
Page 4 of 8
PETER CO LIM
with the in-house banking systems and leverage with available SAP standard reports
Customer’s Major Challenges:Business Benefits Achieved after the Project:
Existence of multiple systems that impeded operational decision-making and reporting
Creation of a single enterprise system for all transactions Increase efficiency through streamlining and elimination of
manual/redundant processes, and automation by at least 30%
Reduced business transaction processing efforts by 10%Improved report generation turnover
Role SD ConsultantMajor Responsibilities:
Evaluated and documented existing business processes and initiated improvements in the design.
Configured the system to comply with the approved design.
Focused on and ensured the correctness of the implementation of the sales & distribution modules of the system.
Performed integration testing with the other modules to assure accuracy of the configuration.
Conducted comprehensive user trainingMajor Accomplishments:
Integration of business functions that enhance productivity, flexibility, and customer responsiveness. Through use of SAP reports, key data and information can be automatically generated for better productivity.
7) ECC 4.7 Roll Out Project Industry: Fast Moving Consumer Goods Company: Quench Plus Country: PhilippinesModules: Financial Accounting, Controlling, Materials Management,
Plant Maintenance, Sales & DistributionProject Duration: March 2010 to June 2010SAP System: R/3 Enterprise version 4.7Project Objective: Project Roll out to extend the system to a new companyCustomer’s Major Challenges:
Insufficient human resources to serve as end users and functional team. Unavailability or the users.
Business Benefits Achieved after the Project:
Creation of a single enterprise system for all transactions Increase efficiency through streamlining and elimination of
manual/redundant processes and automation Improved report generation turnover
Role SD ConsultantMajor Responsibilities:
Major Accomplishments:
Evaluated and documented existing business processes and initiated improvements in the design.
Configured the system to comply with the approved design.
Focused on and ensured the correctness of the implementation of the sales & distribution modules of the system.
Performed integration testing with the other modules to assure accuracy of the configuration.
Conducted comprehensive user training Integration of business functions that enhance
productivity, flexibility, and customer responsiveness.
Page 5 of 8
PETER CO LIM
Through use of SAP reports, key data and information can be automatically generated for better productivity.
8) SLA Support
Industry: Quick Service Restaurant, Food Manufacturing, Battery Manufacturing & distribution, Media Publishing, clothing manufacturing, Semi Conductor manufacturing, Petro Chemical Manufacturing.
Company: Ramcar Group of Companies, Big E , Summit Media, JG Petrochem, Golden ABC, CBK Power, PSI Technologies
Country: Philippines, U.S.A. , Australia Modules: Financial Accounting, Controlling, Materials Management,
Production Planning, Sales & DistributionProject Duration: March 2009 to June 2009, December 2009 to April 2011SAP System: R/3 Enterprise version 4.0, 4.7 & ECC 6Role SD ConsultantMajor Responsibilities:
Resolve tickets and issues SD in nature
Major Accomplishments:
Quick resolution of major tickets received.
Work Experience
1) ABM Global Solutions
Country: PhilippinesIndustry: IT Consulting ServicesPosition: SAP Business AnalystEmployment Dates: June 2014 to PresentMajor Responsibilities & Accomplishments:
Implement SAP solutions for various enterprises based on ASAP methodology.
Conduct pre-sales to clients Provide SAP support to end-users.
2) Chevron Holdings Inc.
Country: PhilippinesIndustry: IT Consulting ServicesPosition: SAP Business AnalystEmployment Dates: September 2013 to June 2014Major Responsibilities & Accomplishments:
Implement SAP solutions for various enterprises based on ASAP methodology.
Provide SAP support to end-users for North and Latin American Countries.
3) Kaisa Consulting Company Incorporated
Country: Philippines
Page 6 of 8
PETER CO LIM
Industry: IT Consulting ServicesPosition: ConsultantEmployment Dates: January 2009 to September 2013Major Responsibilities & Accomplishments:
Implement SAP solutions for various enterprises based on ASAP methodology.
Provide SAP support to end-users. Conduct SAP Academy trainings. Conduct pre-sales to clients
4) Honda Cars Makati Incorporated
Country: PhilippinesIndustry: Car IndustryPosition: Sales ExecutiveEmployment Dates: May 2002 to October 2004Major Responsibilities & Accomplishments:
Effectively market the company's line of Vehicles and Maintenance Services
Achieve sales targets through acquisition and management of corporate accounts
Received various awards for exemplary sales performance
End user for SAP ECC 4.5B SD functions
5) Alveo Land Inc. (formerly Community Innovations Inc.)
Country: PhilippinesIndustry: Real Estate IndustryPosition: Property SpecialistEmployment Dates: January 2005 to October 2005Major Responsibilities & Accomplishments:
Effectively market the Company’s projects like Serendra and Columns.
Work-Related Trainings and Certification
Institution: Kaisa Academy (Philippines)Date: February 2009Course: SAP ECC 6.0 SD Module
Certified SAP Consultant (ID No. S0006443008 )
Institution: Digileaf Philippines Date: November 8-9, 2011Course: Enterprise Analysis & Domain Modeling
Institution: Digileaf Philippines Date: November 16-18, 2011Course: Business Analysis (Eliciting, Documenting & Managing
Requirements)
Page 7 of 8
PETER CO LIM
Institution: Kaisa E-Academy (Philippines)Date: September 2008 – January 2009Course: SAP ECC 6.0 SD Module
Institution: Kaisa Academy (Philippines)Date: September 9-12, 2009Course: Project Management Boot Camp
Instructor Experience
Institution: Kaisa Academy (Philippines)Date: March 2011Course: TSCM60 Order Fulfillment 1
Institution: Kaisa Academy (Philippines)Date: February 10, 2010Course: SAP SD User Training
Education
Institution: De La Salle University, Manila, PhilippinesDate: December 2000Degree: AB Political Science
Page 8 of 8