Page 1: Peter Bilton

Major Signalised Intersection Construction

Traffic ManagementManaging Traffic at

Mains+Kessels

13August2014

Page 2: Peter Bilton

2014 AITPM National Traffic and Transport

Conference

Adelaide Convention Centre

Page 3: Peter Bilton

CONTENT

1. INTRODUCTION2. TRAFFIC MANAGEMENT3. MAINS+KESSELS4. TRAFFIC SWITCHES5. LARGE SIGNALISED INTERSECTIONS6. PLANNING7. PREPARING8. IMPLEMENTION

Page 4: Peter Bilton

TRAFFIC MANAGEMENT

Page 5: Peter Bilton

TRAFFIC MANAGEMENT = RISK MANAGEMENT

Page 6: Peter Bilton

MAINS+KESSELS 1 July 2014

Page 7: Peter Bilton

1 JULY 2014

Page 8: Peter Bilton
Page 9: Peter Bilton
Page 10: Peter Bilton
Page 11: Peter Bilton
Page 12: Peter Bilton
Page 13: Peter Bilton
Page 14: Peter Bilton
Page 15: Peter Bilton
Page 16: Peter Bilton
Page 17: Peter Bilton
Page 18: Peter Bilton
Page 19: Peter Bilton
Page 20: Peter Bilton
Page 21: Peter Bilton
Page 22: Peter Bilton
Page 23: Peter Bilton
Page 24: Peter Bilton
Page 25: Peter Bilton
Page 26: Peter Bilton
Page 27: Peter Bilton
Page 28: Peter Bilton
Page 29: Peter Bilton
Page 30: Peter Bilton
Page 31: Peter Bilton
Page 32: Peter Bilton
Page 33: Peter Bilton
Page 34: Peter Bilton
Page 35: Peter Bilton
Page 36: Peter Bilton

HEADING

• 14 September 2012

Page 37: Peter Bilton

HEADING

• 29 September 2012

Page 38: Peter Bilton

HEADING

• 1 August 2013

Page 39: Peter Bilton

HEADING

• 1 September 2013

Page 40: Peter Bilton

LARGE SIGNALISED INTERSECTIONS

40m

82m42m

33m

2011

< 2014

Page 41: Peter Bilton

MAJOR TRAFFIC SWITCHES

• What is a Traffic Switch?

IN ONE NIGHT

Page 42: Peter Bilton

PLANNING

• Detailed Design• Construction

Planning• Traffic

Management Planning

• Stakeholder Engagement Planning

Page 43: Peter Bilton

PREPARING

• Pre-Installation and Construction Where Possible

• Aerial Suspension of Signal Cables• Remove Existing Lines, Signs, Barriers • Removing Water from WFB• Brief and Coordinate Stakeholders, Staff,

Suppliers

Page 44: Peter Bilton

IMPLEMENTATION- Using Police Services

• Police Powers Act• Police Special Bookings• Training/Inductions• Chain of Responsibility• Large Intersection Experience• Equipment for Police Officers• Breaks and Contingencies

Page 45: Peter Bilton

IMPLEMENTATION

• Multi Stage Plans Flexible with Works Progress1

3

2

4

Page 46: Peter Bilton

IMPLEMENTATION- Set Up Issues

• Time Critical Activity• Need to Coordinate

Large Team of People• Run Sheets Per Crew,

Not Per Plan• Traffic Controllers

Stuck in Traffic• Under Police Control ~

700vph per lane

Page 47: Peter Bilton

IMPLEMENTATION ISSUES

• Pedestrian Management• Delays to Workforce Movement• Physical Distance between QPS• Noise• Plans are Dynamic, Reaction to Works

Progress• Switching between Alignments

Page 48: Peter Bilton
Page 49: Peter Bilton
Page 50: Peter Bilton
Page 51: Peter Bilton

CONCLUSION

Page 52: Peter Bilton
Page 53: Peter Bilton

office: 433 Logan Road, Stones Corner QLD 4120phone: 07 3040 9998fax: 07 3103 4341email: [email protected]: point8.com.au

QUESTIONS?