permit system within port and freezone areas

38
Technical Services Department March 2015 Mohammed Al Badi

Upload: drshahzada-irshad-mohammed

Post on 07-Dec-2015

223 views

Category:

Documents


3 download

DESCRIPTION

Omani Free Zone Permits Procedures

TRANSCRIPT

Page 1: Permit System Within Port and FreeZone Areas

Technical Services Department

March 2015 Mohammed Al Badi

Page 2: Permit System Within Port and FreeZone Areas
Page 3: Permit System Within Port and FreeZone Areas

Contents

• Introduction • SUA Procedure • Unit responsibilities • Type of Permit • Permit requirements

• Permit process and Procedure • Utilities and Spatial Planning

Page 4: Permit System Within Port and FreeZone Areas

Site Operations Unit

UNIT RESPONSIBILIITES

• Management of SIPC Permits • Site Inspections • Hand over/Take over land and corridor • Land Survey • Site Coordination between Industries • Data Management • Spatial Planning

Page 5: Permit System Within Port and FreeZone Areas

SUA Procedure

- Prepare final plot - Allocate Utilities 9

corridor1New Prospect

Expression of interest

8 Government 102 Agree on utilities Approval SIPC R of W Propose plot location

3

Issue Initial plot plan

4 711 Send the Initial plot

Sign LLA Sign the LLA Apply for PWPplan to new prospect

5

Review the initial plotIf interested 6 plan

Page 6: Permit System Within Port and FreeZone Areas

Site Operations Unit

MANAGEMENT OF SIPC and Free Zone PERMITS

• Plot Work Permit

• Common Area Work Permit • Pipeline Permit • Special Transport Permit

Page 7: Permit System Within Port and FreeZone Areas

Site Operations Unit

MANAGEMENT OF SIPC PERMITS

• Plot Work Permit Is the permit issued by FZSA to the applicant or their agent that gives permission for works to begin on the Applicant plot. This may be part or all of works applied for

Page 8: Permit System Within Port and FreeZone Areas
Page 9: Permit System Within Port and FreeZone Areas

Site Operations Unit

MANAGEMENT OF SIPC PERMITS

• Common Area Work Permit

A permit, issued by the Permit Authority to execute work in Common Areas.

Page 10: Permit System Within Port and FreeZone Areas

Common Area Work Permit

Page 11: Permit System Within Port and FreeZone Areas

• Pipeline Permit

Means a permit, issued by SIPC/FZS to a FZS user or an authorized party, to construct, own, operate and maintain one or more Pipelines/Cables in the Common Areas.

Page 12: Permit System Within Port and FreeZone Areas

Pipeline Permit

Page 13: Permit System Within Port and FreeZone Areas

• Special Transport Permit

A permit, issued by the permit authority to execute the transportation of a load through the Common Areas not satisfying applicable road design criteria.

Page 14: Permit System Within Port and FreeZone Areas

Special Transport Permit

Page 15: Permit System Within Port and FreeZone Areas

Special Transport Permit

Page 16: Permit System Within Port and FreeZone Areas

Site Operations Unit Permit requirements

1 2 3 4

Commercial requirements) One Stop Shop HSSE Technical requirements

- General Arrangement(Focal Point)- Soil test - Soil Report (base line) Drawing Request letter of PWP - Insurance - Stack Height Approval - Floor Plan - Third party insurance (Civil Aviation Authority) - Elevation - Construction all risk - HSSE plan - Finish floor & site level

insurance - Emergency response plan - Souk way Pit Detail - Contractual obligation - NOC from Sohar - Boundary Fence Plan & ( Financial grantee ) Environment unit Sections

Page 17: Permit System Within Port and FreeZone Areas

Site Operations Unit Permit requirements

Technical requirements

• General Arrangement Drawing: Drawing will show the full building

- General Arrangement layout in plan form with all elements Drawing

- Floor Plan to be illustrated.- Elevation • Floor Plans: Show clearly the proposed internal layout and finish

of - Finish floor & site level the development and should explain the proposal in - Souk way Pit Detail

sufficient detail as to clearly demonstrate it is fit for - Boundary Fence Plan & purpose. Sections

• Elevation: show clearly the proposed finish and structure of the development indicating building materials and clearance between

adjacent building • Finish floor and site level. Showing existing/original ground level

,proposed future ground level andproposed finished floor level.

Page 18: Permit System Within Port and FreeZone Areas

General Arrangement drawing

Page 19: Permit System Within Port and FreeZone Areas

Elevation

Page 20: Permit System Within Port and FreeZone Areas

Finish floor & site level drawing

Page 21: Permit System Within Port and FreeZone Areas

Fence Typical Design

Page 22: Permit System Within Port and FreeZone Areas

Souk a way pit Typical Design

Page 23: Permit System Within Port and FreeZone Areas

Site Operations Unit Basic Work Flow for the Plot Work Permits

Tenant applies For PWP)

Review documents

ROP Get the required PermitActivity starts

Civil Defense approval issued

SIPC MonitorsHSSE approvalCivil Aviation & corrects

Technical Approval Request Work Complete

C.C MECA

Commercial Approval

Page 24: Permit System Within Port and FreeZone Areas

Site Operations Unit Work Procedure

SIPC Tenant SIPC SIPCPermit Issued Marking Witness Site hand over

H.O certificate

TenantTe ntOperations

Work start

Inspect thesite

SIPC Tenant PCCompletion Certificate SEU Work Completed MonitoringCivil

Def.

SIPC

Page 25: Permit System Within Port and FreeZone Areas

Areas under SIPC Management

Page 26: Permit System Within Port and FreeZone Areas

Land Survey - Plot marking

Page 27: Permit System Within Port and FreeZone Areas

Land Survey - Plot marking

Page 28: Permit System Within Port and FreeZone Areas

Checking the route

Page 29: Permit System Within Port and FreeZone Areas

Site Operations Unit Main interfaces

Tenants MECA Permit Application

ROP Permit Application Comm. Dep.

SEU Harbor Master HSSE

Page 30: Permit System Within Port and FreeZone Areas

Site Operations Unit

Spatial Planning- Main responsibility

- Plan the overall land use

(Master

planning) - Allocation of plot for new investors -

Allocation of corridors for utilities and

services

- Coordination with SIPC tenants to seek

their future plan

Page 31: Permit System Within Port and FreeZone Areas
Page 32: Permit System Within Port and FreeZone Areas
Page 33: Permit System Within Port and FreeZone Areas

Spatial planning for the Port Area & Sohar Free zone

Page 34: Permit System Within Port and FreeZone Areas

Site Operations Unit

Question ???

What could happen if there is no permit System?

Page 35: Permit System Within Port and FreeZone Areas

S

Page 36: Permit System Within Port and FreeZone Areas

S

Page 37: Permit System Within Port and FreeZone Areas

S

Page 38: Permit System Within Port and FreeZone Areas

THANK YOU

www.soharportandfreezone.com