perak heavy industrial park (phip)...northern islands entertainment island southern islands central...
TRANSCRIPT
PERAK HEAVY INDUSTRIAL PARK (PHIP)
PKNP DEVELOPMENT IN BAGAN DATUK
A B
C D
A to B (8KM)
Internal road to BDWC (10KM)
B to C (14KM)
PHIP access road (4.3KM)
C to D (18KM)
D to WCE Interchange (2.5KM)
Distance & Travel Time (Land):
Kuala Lumpur to Bagan Datuk: 215KM (2.5 hours)
Ipoh to Bagan Datuk: 151KM (2.5 hours)
Bagan Datuk Town to BDWC: 8KM (10 minutes)
BDWC to PHIP: 14KM (15 minutes)
PHIP to Hutan Melintang: 18KM (20 minutes)
D to Teluk Intan Exit (Interchange): 8KM (10 minutes)
D to Hutan Melintang Exit (Interchange): 13KM (12 minutes)
• PHIP will be supported by other federal
and state projects to enhance its
connectivity with Klang Valley, Penang &
Perak.
• Leveraging upon the West Coast
Expressway (WCE), all this completed &
proposed projects will increase PHIP’s
connectivity with its surrounding area
making it the ideal port.
PHIP: LAND INFO AND PROPOSED LAYOUT PLAN Overall Development Area
3,400 Acres
Target Industry
• Port Facility / Terminal
• Oil & Gas
(Oil Refinery)
• Shipyard
• Marine Support Services
• Power Plant
BAGAN DATUK WATER CITY (BDWC)
Northern Islands
Entertainment
Island
Southern Islands
Central Island
Phase 1
Town
Center
• BDWC will cater to the residential
need and commericial needs of
PHIP.
• The whole development consist of
4,100 acres. A significant portion of
the development is on 6 man made
islands.
• BDWC is located approximately
15km (3o mins travel) from PHIP.
UPDATED LAND USE PLAN
• Phase 1 of the development has been
proposed for the Bagan Datuk District
Administrative Centre which houses
multiple government agencies.
• The planned commercial & residential
area is to cater the development of the
government buildings.
END OF PRESENTATION. THANK YOU.