Dear Pak Wendy, Following up about your RFQ, please see our clarification as below. I. SCOPE OF WORKS We provide to you the best offer for the following: Design of LPG Storage Tank. The detail of scope of work as the following: 1. Scope of work: - Basic design of LPG storage tank (diameter, thickness, material, nozzle size, etc). - Provide of storage tank general arrangement drawing. 2. Type of analysis: - Tank design based on API 650. 3. Design Limitation: - Static analysis only, we do not perform dynamic analysis. - We do not provide or calculate the foundation of storage tank. 4. Minimum data required: a. Client specifications. b. Storage tank data (temperature, pressure, specific gravity liquid, no of nozzle, no of manway, etc) c. Environmental data (wind load, seismic load, etc). d. Soil site data. 5. Duration We are able to submit the report within 1 month after all minimum required data sent to us. 6. Price 1. Basic design : Rp. 25.000.000,- 2. General arrangement drawing : Rp. 5.000.000,-

Upload: maniaxpdf

Post on 26-Dec-2015

14 views

Category:

Documents


1 download

DESCRIPTION

Penawaran Tank

TRANSCRIPT

Page 1: Penawaran_Tank of Terminal LPG Banyuwangi

Dear Pak Wendy,

Following up about your RFQ, please see our clarification as below.

I. SCOPE OF WORKS

We provide to you the best offer for the following: Design of LPG Storage Tank.

The detail of scope of work as the following:1. Scope of work:- Basic design of LPG storage tank (diameter, thickness, material, nozzle size,

etc).- Provide of storage tank general arrangement drawing.

2. Type of analysis: - Tank design based on API 650. 3. Design Limitation:- Static analysis only, we do not perform dynamic analysis.       - We do not provide or calculate the foundation of storage tank.

4. Minimum data required:a. Client specifications.b. Storage tank data (temperature, pressure, specific gravity liquid, no of nozzle, no

of manway, etc)c. Environmental data (wind load, seismic load, etc).d. Soil site data.

5. DurationWe are able to submit the report within 1 month after all minimum required data sent to us.

6. Price1. Basic design : Rp. 25.000.000,-2. General arrangement drawing : Rp. 5.000.000,-

Total price : Rp. 30.000.000,-

Page 2: Penawaran_Tank of Terminal LPG Banyuwangi

7. PAYMENT1. Down payment (30% payment) should be settled after PO

2. 1st payment (50% payment) should be settled after initial issue document sent3. 2nd payment (20% payment) should be settled, after one month from initial issue

8. TERMS & CONDITIONSIt is to note that we will work on "invisible condition", i.e that is our communications only by email. No person to person meeting attendance will be performed.

Thanks for trusting us, we are looking forward to hearing you. If you have any question and further clarification, please do not hesitate to contact me at my mobile at your convenient time.

Thanks & Regards,Dwi s Adi