PEMEX OFFSHORE DEHYDRATION AND PRODUCED WATER
TREATMENT PROJECTS Jorge A. Herrera Rodríguez / PEMEX EXPLORACION Y PRODUCCION
Friday, February 5, 16 The Produced Water Society Seminar 2016 1
Friday, February 5, 16 The Produced Water Society Seminar 2016 2
Introduction APC is one of the main oil producing assets in Mexico, with oil production of 268 TBPD, to April 30th, 2015
Oil producing fields: Akal, Sihil, Ixtoc, Nohoch, Chac, Kutz,
Takín, Kambesah, Ek y Balam
Geological Horizons: Tertiary (Eocene Medium), Cretaceous, JSK and JSO
• Oil Production (Tbpd): 298**
• Gas Production (MMcfd): 1,260**
• Producing Wells: 205**
• Production Facilities: 7
** March 2015 data
AKAL
NOHOCH
CHAC
TAKIN
KUTZ
KAMBESAHIXTOC
EK-BALAM
SIHIL
KU
MALOOB
ZAAP
ABKATUN
TARATUNICH
CAAN
A I C
AIKMZ
APC’s Data Sheet
Current status of produced water sent to TMDB (onshore)
Friday, February 5, 16 The Produced Water Society Seminar 2016 3
C.P. Akal-J
TMDB
L1
L3
C.P. Akal-C C.P. Akal-G
-2C
-2C
-2C
-2C
-2C
-2C
-2C
-2C
-2C
-2C
-2C
-2C
-C
-C
-C
C.P. Akal-B
C.P. Akal-L Ek-Balam
Dehydration systems
Akal-D
Aqueduct Pipeline Oil / Water
L2
Pipeline 2 to TMDB
Capacity
Oil Production 90 TBPD Produced Water 52 TBPD Total 142 TBPD
Pipeline 1 to TMDB
Capacity
Oil Production 156 TBPD Produced Water 91 TBPD Total 247 TBPD
Pipeline 3 to TMDB
Capacity
Oil Production 53.3 TBPD Produced Water 11 TBPD Total 64.3 TBPD
C.P. Nohoch-A
System Capacity Dehydration Akal-G1 10 TBPD Dehydration Nh-A* 45 TBPD Total PW injected 55 TBPD
Separated PW
Total oil / pw sent to TMDB
Total oil / pw sent to TMDB
Total oil / pw sent to TMDB
Future Produced Water Management
Friday, February 5, 16 The Produced Water Society Seminar 2016 4
C.P. Akal-J
TMDB
L1
L3
PW injection on Akal-TJ Capacity
Total 90 TBPD
C.P. Akal-C C.P. Akal-G
-2C
-2C
-2C
-2C
-2C
-2C
-2C
-2C
-2C
-2C
-2C
-2C
-C
-C
-C
C.P. Akal-B
Akal-L Ek-Balam
Dehydration systems
Capacity Dehydration & Desalt 260 TBPD PW treatment 100 TBPD Contractual Start Up 10 / Nov / 13 Estimated Start Up 20 / May / 15
Akal-J1 Dehydration & Desalt System
PW injection on Nohoch-A Capacity
Total 90 TBPD
Nohoch-A/Perf (Revamp)
Capacity Dehydration (Total Liquid)
150 TBPD
PW treatment 100 TBPD Estimated Start Up 25 / Feb / 16
Aqueduct Pipeline Oil / Water Oil
C.P. Nohoch-A
Akal-C Dehydration
Capacity Dehydration (Total Liquid) 400 TBPD PW treatment 200 TBPD Estimated Start Up 31 / Mar / 18
AKAL G2 DDP Capacity
Dehydration (Total Liquid) 300 TBPD PW treatment 250 TBPD Estimated Start up TBD
Akal-CD
Akal-G2
Friday, February 5, 16 The Produced Water Society Seminar 2016 5
Friday, February 5, 16 The Produced Water Society Seminar 2016 6
Maintenance Pressure
Remainder reserve for DDP ~ 900 MMbls
STOOIP.
Gas cap
Aquifer
Gravity Drainage
There are ~1000 MM additional oil barrels tramp in the aquifer.
Water is removed to begin the process of double displacement and retrieving the volume of oil available in the area invaded by the aquifer.
Produce Water treatment Sending to the sea
Nitrogen Injection
F.E. 31%
F.E. 53%
Field Development and Production
According the water production is reduced the window moves down to the bottom, exposing the rock to the gas cap, encouraging the gravity drainage.
The available window oil will reduce, generating a gas cap and the lower section is flooded. Current oil reserves (South zone): 416 MMBls
Double Displacement
THANK YOU