Page 1 of 3 CFO/ACM March 2018 PEACE CORPS Overseas Request for Quotation (RFQ) for Supplies/Services/Equipment RFQ Number: PC-384-19-3021 Date: 28 August 2019 Peace Corps/Sri Lanka has a need for interior buildout of office building located at 11 Kinross Ave, Colombo 04. Peace Corps is soliciting fixed-price quotations from the vendor community for the supplies and/or services detailed below. If you are interested in submitting a quotation, please do so by sending your completed and signed Attachment 1 along with all required submissions listed on the Vendor Quotation Form [by mail OR by e- mail to: Name: David Crowley Director of Management and Operations Address: Peace Corps/Sri Lanka 11 Kinross Ave, Colombo 04 OR E-mail: [email protected] Quotations are due no later than 12:00 PM (noon) on 16 September 2019. Late quotations will not be accepted. Written questions about this Request for Quotation (RFQ) may be sent in the same fashion to the individual noted above in advance of the RFQ due date. No phone calls please. Peace Corps will evaluate all quotations received by the deadline based on the minimum requirements and/or evaluation factor(s) shown below. Contingent on the availability of funds and continued need for the supplies and/or services, at the end of the evaluation process, Peace Corps intends to award a firm- fixed-price contract for the purchase of the required supplies and/or services to the selected vendor. A. Statement of Work/Description of Requirements Complete buildout of office interior located at 11 Kinross Ave, Colombo 04 in accordance with architectural designs and engineering plans provided by Peace Corps and detailed in the attached Bill of Quantities (BOQ). Interior buildout to be completed on floors one thru four includes partitions, ceiling finishes and painting. Interior buildout to be completed on floor six includes renovation of existing partitions. B. Place of Performance and Required Work or Delivery Schedule Office building located at 11 Kinross Ave, Colombo 04 Work to commence immediately upon selection and award and completed in accordance with construction schedule agreed upon during negotiation (to be determined based on the availability of materials). Target completion date is December 31, 2019. C. Contract Terms and Conditions As an Agency of the United States Government, Peace Corps has an approved contract template that it intends to use for the award. Peace Corps reserves the right to deny making a contract award to a vendor should they refuse to sign the Peace Corps approved contract template. Generally, firm-fixed-price contracts are used to acquire construction. They may be priced—

Upload: others

Post on 24-Mar-2020

5 views

Category:

Documents


0 download

TRANSCRIPT

Page 1 of 3

CFO/ACM March 2018

PEACE CORPS Overseas Request for Quotation (RFQ) for Supplies/Services/Equipment

RFQ Number: PC-384-19-3021 Date: 28 August 2019 Peace Corps/Sri Lanka has a need for interior buildout of office building located at 11 Kinross Ave, Colombo 04. Peace Corps is soliciting fixed-price quotations from the vendor community for the supplies and/or services detailed below. If you are interested in submitting a quotation, please do so by sending your completed and signed Attachment 1 along with all required submissions listed on the Vendor Quotation Form [by mail OR by e-mail to: Name: David Crowley Director of Management and Operations Address: Peace Corps/Sri Lanka 11 Kinross Ave, Colombo 04 OR E-mail: [email protected] Quotations are due no later than 12:00 PM (noon) on 16 September 2019. Late quotations will not be accepted. Written questions about this Request for Quotation (RFQ) may be sent in the same fashion to the individual noted above in advance of the RFQ due date. No phone calls please. Peace Corps will evaluate all quotations received by the deadline based on the minimum requirements and/or evaluation factor(s) shown below. Contingent on the availability of funds and continued need for the supplies and/or services, at the end of the evaluation process, Peace Corps intends to award a firm-fixed-price contract for the purchase of the required supplies and/or services to the selected vendor. A. Statement of Work/Description of Requirements Complete buildout of office interior located at 11 Kinross Ave, Colombo 04 in accordance with architectural designs and engineering plans provided by Peace Corps and detailed in the attached Bill of Quantities (BOQ). Interior buildout to be completed on floors one thru four includes partitions, ceiling finishes and painting. Interior buildout to be completed on floor six includes renovation of existing partitions. B. Place of Performance and Required Work or Delivery Schedule Office building located at 11 Kinross Ave, Colombo 04 Work to commence immediately upon selection and award and completed in accordance with construction schedule agreed upon during negotiation (to be determined based on the availability of materials). Target completion date is December 31, 2019. C. Contract Terms and Conditions As an Agency of the United States Government, Peace Corps has an approved contract template that it intends to use for the award. Peace Corps reserves the right to deny making a contract award to a vendor should they refuse to sign the Peace Corps approved contract template.

Generally, firm-fixed-price contracts are used to acquire construction. They may be priced—

Page 2 of 3

CFO/ACM March 2018

(1) On a lump-sum basis (when a lump sum is paid for the total work or defined parts of the work), (2) On a unit-price basis (when a unit price is paid for a specified quantity of work units), or (3) Using a combination of the two methods.

The contractor shall submit, as part of the proposal, a schedule of proposed payments based on targeted deliverables in the scope of work. These targeted deliverables can be negotiated during the bidding process and will be based on the agreed upon time frame of the entire project. D. Minimum Criteria: A quotation will not be considered further if it does not meet the following minimum criteria:

• Completed pricing on BOQ • Proposed construction schedule (timeline) • Proposed payment schedule • List 3 references for work completed in last 36 months

E. Evaluation Factors: Quotations that meet the minimum criteria listed above may be further evaluated based on the following factors:

• Total price of project • Delivery timeframe • Past experience with USG facilities • Staffing capacity for this project • Warranties offered on completed work

Award may be made with or without negotiations between the Peace Corps and the selected vendor. Award may be made to a vendor that provided the lowest priced technically acceptable quotation, or to a vendor other than the one that provided the lowest priced quotation, should that vendor be determined to have provided the best value quotation to the Peace Corps taking technical and cost factors into account. All vendors that submit quotations in response to this RFQ will be notified of the results.

[End of RFQ]

Page 3 of 3

CFO/ACM March 2018

ATTACHMENT 1 – VENDOR QUOTATION FORM RFQ Number: PC-384-19-3021 Vendor: Authorized Representative: Name: Position/Title: Phone Number: E-mail Address: TO BE CONSIDERED FOR THIS CONTRACT AWARD, PLEASE SUMBIT THE FOLLOWING INFORMATION IN YOUR PROPOSAL

1. Quoted Prices (Inclusive of Administrative and/or Overhead Costs and VAT/DUTY FREE): Submit completed BOQ (template provided)

2. Work or Delivery Schedule: Submit proposed construction schedule

3. Payment Terms: Submit proposed payment schedule or requirements

4. Warranty Terms (If Any): List any warranties offered

5. Additional Terms and/or Conditions: Describe your company’s current staffing structure and

describe in detail your company’s plan for providing qualified individuals to fulfill this requirement and providing supervision of your staff members assigned to work this project.

6. References: provide 3 references for past work of similar scope and size and indicate past

experience with working on U.S. Government facilities SUPPLIER AUTHORIZED REPSENTATIVE Signature: _______________________________ Date: _______________________________

BILL OF QUANTITIES

PROPOSED INTERIOR FIT-OUT

PEACE CORPS SRILANKA AT COLOMBO 4

Content / Page 2

PROPOSED INTERIOR FIT-OUT FOR PEACE CORPS SRILANKA AT COLOMBO 4

BILL OF QUANTITIES

CONTENT

● GENERAL NOTES

● PRELIMINARIES

● CEILLING FINISHES

● PARTITIONS

● PAINTING

● GENERAL SUMMARY

CONTENT

General Notes / Page 3

PROPOSED INTERIOR FIT-OUT FOR PEACE CORPS SRILANKA AT COLOMBO 4

BILL OF QUANTITIES GENERAL NOTES

A - GENERAL NOTES

General Notes / Page 4

PROPOSED INTERIOR FIT-OUT FOR PEACE CORPS SRILANKA AT COLOMBO 4

BILL OF QUANTITIES GENERAL NOTES

A. GENERAL NOTES

A1. SCOPE OF WORK

The scope of work shall be as provided in the Contract Drawings, Bills of Quantities, and as described in relevantspecifications.

A2. BILLS OF QUANTITIES

These Bills of Quantities have been prepared generally in accordance with the principles laid down in the Methodof Measurement of Building Works (First Revision) SLS 573:1999 (Issued by the Sri Lankan Standards Institution,17 Victoria Place Elvitigala Mawatha Colombo 08 Sri Lanka.) Where SLS 573 is not applicable Standard Methodof Measurement of Building Works Edition 7 issued in 1989 (SMM7) by the Royal Institution of CharteredSurveyors UK shall prevail.

Specially described or prescribed rules / instructions shall prevail over the general rules in Methods ofMeasurement stated above.

The Bills of Quantities shall be rated strictly according to the Specifications and Drawings. In the event ofdiscrepancies between Bills of Quantity and Drawings, the Drawings prevail. Between Drawings and Specification,the Specification shall prevail.

A3. UNITS

In these Bills of Quantities, the following abbreviations have been used.

mm - Millimetrem - Meterm2 - Square Meterm3 - Cubic Meternr, Nr., No - Numbert - Metric Tone> - Exceeding> - Equal to or Exceeding< - Less than< - Not Exceeding or Equal% - PercentageQR - Quote Rate

General Notes / Page 5

PROPOSED INTERIOR FIT-OUT FOR PEACE CORPS SRILANKA AT COLOMBO 4

BILL OF QUANTITIES GENERAL NOTES

A4. RATES

Rates for all items shall be inclusive of the following unless measured, itemised, or specified otherwise:

1. Providing samples, tests, specimens etc., for such items of work as required by the Engineer2. All handling, loading and unloading of materials, equipments, accessories and spares whether specifically mentioned or not in the respective items.3. All cost of mobilisation, demobilisation, and maintenance of plant and equipments.4. All necessary scaffolding unless otherwise measured separately.5. All temporary work as required.6. Providing bonds and guarantees 7. Removal of all temporary work8. Submission of programmes and bar charts9. Construction management10. Revenue stamps if required11. Providing all holes, chasings etc., as directed by the Engineer for all services, and making good the same as and when such installations are provided.12. All builders work in connection with Mechanical and Electrical Installations 13. Submission of shop drawings in triplicate.

A5. MATERIALS

All materials, equipments and accessories shall be the best of their kind and shall comply with the requirements ofthe relevant Standards, Specifications or equivalent where such exists. In all cases of permanent workspecifications, model nos., makes etc., and other technical data shall be approved by the Engineer before an order isplaced, and all materials, equipment, accessories and spares etc., supplied shall correspond in quality with theapproved samples. The Engineer will exercise the right to reject all such items not complying in quality with thestandard of the approved items and all costs incurred by this rejection shall be borne by the Contractor. All suchrejected items shall be removed from the site. The Contractor shall provide the necessary details to the Engineerregarding the dates and sources of obtaining such items.

The Contractor shall submit the following information on the Items/equipment quoted for together with theContract:

1. Make;2. Model Number;3. Technical data;4. Country of Manufacture;5. Delivery Period;

General Notes / Page 6

PROPOSED INTERIOR FIT-OUT FOR PEACE CORPS SRILANKA AT COLOMBO 4

BILL OF QUANTITIES GENERAL NOTES

A6. INSPECTION OF SITE

Bidder are advised to visit the site to acquaint themselves with all existing conditions and the type of work to bedone under this Contract as no claims will be entertained on the plea of want of information due to neglect on theirpart in this regard.

The Bidder shall take into consideration the following in their pricing wherever it is applicable:

1. Extent and nature of the work to be done.2. Site conditions.3. Transport facilities and storage facilities inside and outside the site premises.4. Working conditions.5. Limitation of working time and Limitation of space available.6. Strength and stability of the adjoining structures.7. Access to the location.8. Ground water table and rock levels.9. Weather during the construction period and extra ordinary weather conditions.10. Removing/ relocating existing services.12. General security arrangements in the country and security at site.13. Traffic movement at the vicinity of the site.14. Special security measures to be provided for the approval of the authorities.

15. Erecting/Leasing of ware house for external storage to the approval of Board of Investment Sri Lanka.

16. Special arrangement for storage, transportation, handling and re-handling of materials, plants and equipment due to the security situation.

A7. PLANT AND EQUIPMENTS

Prior approval shall be obtained from the Engineer regarding the suitability, type and capacities of the plant andequipment to be used.

A8. ANALYSIS OF RATESBidder shall submit an analysis of rates for any item or items with all the documentary evidence for approval forany item or items if called upon to do so by the Engineer. The Engineer’s assessment shall be final.

A9. DIMENSIONS

All dimensions for the items stated in this Bills of Quantities, Drawings or Specifications should be checked at thesite by the Contractor prior to commencing all such work. In the event of any discrepancies, the Contractor isadvised to inform the Engineer for necessary instructions well in advance prior to, commencing, ordering, andfabrication of such items.

A10. ELECTRICITYIt shall be the responsibility of the Contractor to ensure continuous supply of electricity for the Works during thecourse of construction and obtaining the necessary connections to the Work and all expenses shall be included inthe rates, unless specified otherwise. In the case of a breakdown of power supply, the Contractor shall ensure thatelectricity is provided for the works through other means, and all expenses shall be included within the rates.

General Notes / Page 7

PROPOSED INTERIOR FIT-OUT FOR PEACE CORPS SRILANKA AT COLOMBO 4

BILL OF QUANTITIES GENERAL NOTES

A11. WATER

It shall be the Contractors responsibility to ensure continuous supply of water for the Works during the course ofconstruction and for obtaining necessary connections, and all expenses shall be included in the rates, unlessspecified otherwise. In the case of a shortage of water for the Works, the Contractor shall ensure that adequatewater supply is maintained for the works through other means, and all expenses shall be included within the rates.

A12. DETAIL DRAWINGS

Any additional detail drawings issued to the Contractor to assist him in his work during the course of constructionshall not constitute a variation if it is given for purposes of clarity.

A13. KEEPING ADJACENT STREETS/AREAS CLEAN

During demolition, construction, and excavation, the Contractor shall be responsible for keeping adjacent area in aclean condition not endangering/hindering the traffic/public, by provision of necessary hoarding and protectivemeasures.

A14. LIAISONS WITH LOCAL AUTHORITIES

Prior to taking possession of the site the Contractor shall discuss and make arrangements with all RelevantAuthorities with regard to traffic of his transport fleet to the area, entry during periods of heavy traffic movements,location of concrete plant, if any, or discharge-location of pre-mixed concrete trucks, temporary connections forpower, water supply, waste water/soil water disposal, telephone connections etc.,

A15. TRADE NAMES

Where trade names, brands and/or catalogue numbers are referred to, sole preference to any material equipment andaccessories is not intended. Any other materials equipment and accessories or equivalent may be used providedthat the characteristics of type, quality, appearance, finish, method of Construction and/or performance is not lessthan specified and provided also that the approval is first obtained from the Engineer.

A16. SAMPLES

Rates of all items shall be inclusive of providing Specifications, model nos., maintenance manual, makes, technicalinformation, catalogue and literature, when requested by the Engineer for approval. No extra payments will beallowed for submission of the same.

A17. PRELIMINARIES

Lists of general preliminary items are given in this Bills of Quantities. The Bidders shall include their price for totalpreliminary work in their quote.

General Notes / Page 8

PROPOSED INTERIOR FIT-OUT FOR PEACE CORPS SRILANKA AT COLOMBO 4

BILL OF QUANTITIES GENERAL NOTES

A18. VALUE ADDED TAX (VAT) and NBT

Tender sum shall not include Value Added Tax (V.A.T.) The tenderer shall provide his estimated V.A.Tcomponent separately together with the detail calculation at the tender summary as shown.

The contractor shall submit his invoice to the owner based on the payment certificates issued by the consultant withactual V.A.T component including all necessary documentary evidences for such payment.

If applicable, NBT payments to be included in the rates and No extra payment shall be made.

A19. DETAIL DRAWINGS

Any additional detail drawings issued to the Contractor to assist him in his work during the course of constructionshall not constitute a variation if it is given for purposes of clarity.

A20. PROVISIONAL SUMS

Payments for all provisional items shall be as per actual measurements of works done at site. The Contractor isadvised to keep proper records for such items with the approval of the Engineer. Provisional Sums have beenallowed in the Bills of Quantity, which shall be spent wholly or in part as requested by the Engineer.

END OF GENERAL NOTES

Section 1 - BoQ / Page 1

PROPOSED INTERIOR FIT-OUT FOR PEACE CORPS SRILANKA AT COLOMBO 4

BILL OF QUANTITIESNo UNIT QTY RATE AMOUNT

SECTION 1 - PRELIMINARIES

1.0 Notes:

A The tenderer is advised to refer to the General Notes,Pricing Preambles, Drawings, Specifications, Conditionsof Contract and other relevant documents prior topricing of the following items.

Note

B The tenderer is advised to visit the site of the proposedwork, as it is his responsibility to ascertain the conditionssuch as access to the site, external working space,storage area etc. or any other conditions of relevance.

Note

C A list of typical general items are given below. However,the tenderer is requested to price only those items thatmay affect this contract.

Note

D Any other preliminary items not listed below but deemednecessary for the successful execution of the projectshall be included in the tender rates, as no claims forextra payments for such, would be entertained.

Note

E The contractor shall be responsible for any loss ordamages to the works, existing structures, adjoining oradjacent structures and unfixed materials during the termof the contract.

Note

F The Contractor shall be responsible for providingnecessary warning notices. Note

G The items in the Preliminaries will be paid on actual butnot exceeding the quoted value. Note

H The Contractor should submit a list of all sub contractorsthat he intents to employ on the site and the extent oftheir works.

Note

I The Contractor shall be responsible for remove thetemporary sheds and etc.. from site after completion theproject.

Note

PRELIMINARIESDESCRIPTION

CARRIED TO COLLECTION LKR

Section 1 - BoQ / Page 2

PROPOSED INTERIOR FIT-OUT FOR PEACE CORPS SRILANKA AT COLOMBO 4

BILL OF QUANTITIESNo UNIT QTY RATE AMOUNT

PRELIMINARIESDESCRIPTION

PRELIMINARIES (Cont'd…)

J Whether stated or not, the Contractor shall prepare andsubmit Shop drawings and obtain Consultant's approvalbefore proceeding the fabrication and work.

Note

(a) The Contractor shall check Site dimensions and makefabricated work corresponding to the "approved" ShopDrawings.

(b) Drawings shall show in detail, various portions of thework, kind of materials, size of members and thestructural stability of the fabricated units.

K The Contractor should arrange to display all theapproved samples and the construction working order inthe site office.

Note

2.0 Plant, Material & Work Practices

L No work in any trade shall be carried out in such amanner as to cause any nuisance to adjacent owners orthe public or any damages to adjacent structures. TheContractor is advised to co-operate with the Client inmaintaining an environment free of unnecessary noiseand dust pollution as possible.

Note

M Mechanical plant and equipment which emits excessivenoise, water, smoke, fumes or obnoxious liquids, gases,etc. will not be allowed to be used on the site. If the useof such machinery becomes necessary the contractor isexpected to obtain prior approval from the Consultant.

Note

N The Consultant has the discretion as to when he deems itnecessary for the Contractor to take precautions,maintain or repair any such plant and equipment or ordertheir removal from the site.

Note

O The Contractor shall be responsible for protecting andsafeguarding the works, materials and plants againstdamage , trespass and carrying out tests etc.

Note

CARRIED TO COLLECTION LKR

Section 1 - BoQ / Page 3

PROPOSED INTERIOR FIT-OUT FOR PEACE CORPS SRILANKA AT COLOMBO 4

BILL OF QUANTITIESNo UNIT QTY RATE AMOUNT

PRELIMINARIESDESCRIPTION

PRELIMINARIES (Cont'd…)

3.0 Facilities for the Contractor

3.1As soon as the Contractor has been given instructions to proceed with the Works, he shall immediately present to the Engineer his location and layout plan of the office facilities for approval and arrange for completion within 1 week of the Engineer's approval.

Note

3.2 The office shall be lockable and contains the following as specified Note

3.3 The Contractor's office shall be open at all reasonable hours to receive instructions and other communications duration of the construction period.

Note

3.4 Allow for erection of temporary sheds forprotection and storage of materials and maintainsame for the duration of the construction period. Note

3.5 Allow for erection of temporary sanitaryaccommodation at site and maintain for theduration of the construction period. Note

3.6 Allow for erection of temporary site office toaccommodate Contractor's staff and maintain samefor the duration of the construction period. Note

4.0 Insurances and Bonds

4.1 Allow for Contractor's All Risk Insurance Policy,including third party liability Note

4.2 Allow for insurance against claims for worker'scompensation. The Engineer appointed by the Employerand Consultant's representatives, shall be included in theInsurance Policy .

Note

CARRIED TO COLLECTION LKR

CARRIED TO COLLECTION LKR

Section 1 - BoQ / Page 4

PROPOSED INTERIOR FIT-OUT FOR PEACE CORPS SRILANKA AT COLOMBO 4

BILL OF QUANTITIESNo UNIT QTY RATE AMOUNT

PRELIMINARIESDESCRIPTION

PRELIMINARIES (Cont'd…)

4.3 Allow for providing Performance Bond as required bythe Contract. The bond shall be effective from the dateof commencement of Contract upto the end of defectsliability period and further 28 days thereafter.

Note

4.4 Allow for providing advance payment bond as requiredby the Contract. The bond shall be effective from thedate of commencement of Contract upto the end ofConstruction period and further 28 days thereafter.

Note

4.5 Allow for insurance against loss or damage to the works,adjacent structures, any existing over head and/or underground services that may cause damages as a result ofexcavation work to their prevailing market values of therelevant properties

Note

5.0 Use & Maintenance of the Site

The prior approval shall be taken from the Engineer forlocation , time for disposal of garbage

Note

5.1 Allow for maintaining the site in a clean and orderlycondition during the entire construction period, and oncompletion removal of all temporary facilities rubbishand debris and clearing of site and leaving all in goodorder at handing over.

Note

6.0 Site Operations

6.1 Allow for use of existing electricity at site forconstruction during the construction period Note

6.2 Allow for maintain and use of Existing water connectionfor works during construction. (Connection shall beprovided by the Employer)

Note

CARRIED TO COLLECTION LKR

CARRIED TO COLLECTION LKR

Section 1 - BoQ / Page 5

PROPOSED INTERIOR FIT-OUT FOR PEACE CORPS SRILANKA AT COLOMBO 4

BILL OF QUANTITIESNo UNIT QTY RATE AMOUNT

PRELIMINARIESDESCRIPTION

PRELIMINARIES (Cont'd…)

7.0 Quality Control Procedure

7.1 Allow for supplying specimens, samples and samplepanels of material and testing of materials as appropriateand as directed by the Consultant.

Note

7.2 Allow for submitting two sets of shop drawings asrequired time to time to the Consultant for approvalprior to commencement of works covered by such shopdrawings as instructed

Note

7.3 Allow for submitting two sets of approved as-builtdrawings of interior works with soft copies including acomplete inventory on completion of works to theConsultant.

Note

7.4 Allow sum for provide photographic record during theConstruction period. Note

8.0 Site Administration

8.1 The Contractor shall provide sufficient staff andequipment to perform the administrative duties involvedin executing the Contract. Such staff shall be properlyqualified to perform their respective duties and shall notbe removed from the Site or replaced without the priorpermission of the Engineer.

Note

8.2 Allow for the provision of construction management Noteservices on site. (One Construction Manager, One SiteEngineer, One Quantity Surveyor, Five site supervisorsa minimum requirement )

8.3 Allow for the provision of an engineer to cordinate withall nominated/ domestic subcontractors, suppliers,consultants, employer, to assure the progress inline withagreed mile stones and construction programme

Note

CARRIED TO COLLECTION LKR

CARRIED TO COLLECTION LKR

Section 1 - BoQ / Page 6

PROPOSED INTERIOR FIT-OUT FOR PEACE CORPS SRILANKA AT COLOMBO 4

BILL OF QUANTITIESNo UNIT QTY RATE AMOUNT

PRELIMINARIESDESCRIPTION

PRELIMINARIES (Cont'd…)

9.0 Safety & Site Security

9.1 Noise control during constructionThe contractor is responsible to maintain allowable noiselevel during the construction . Note

9.2 The Contractor shall provide suitable lights, watchmen's,watchmen's hut, necessary fencing etc., for the protectionof the materials and plant etc. Note

10.0 Temporary fire fighting service and protection

10.1 Provide and maintain efficient fire fighting facilities andequipment together with personnel trained in its use asdetails on specification

Note

11.0 First Aid

11.1 The Contractor shall provide and maintain first aidfacility on the site to the approval of The Engineer. Note

12.0 Any Other

12.1 Allow for any other preliminary items deemed necessaryfor the completion of the works. (Contractor to statedetails and cost of such items if included). Note

CARRIED TO COLLECTION LKR

Section 1 - BoQ / Page 7

PROPOSED INTERIOR FIT-OUT FOR PEACE CORPS SRILANKA AT COLOMBO 4

BILL OF QUANTITIESNo UNIT QTY RATE AMOUNT

PRELIMINARIESDESCRIPTION

COLLECTION SUMMARY

Section 1 - BoQ / Page 1

Section 1 - BoQ / Page 2

Section 1 - BoQ / Page 3

Section 1 - BoQ / Page 4

Section 1 - BoQ / Page 5

Section 1 - BoQ / Page 6

CARRIED TO SUMMARY LKR

CARRIED TO COLLECTION LKR

Section - 02 BoQ / Page 1

PROPOSED INTERIOR FIT-OUT FOR PEACE CORPS SRILANKA AT COLOMBO 4

BILL OF QUANTITIESNo UNIT QTY RATE AMOUNT

SECTION 02 - CEILLING FINISHES

Notes:

A The tenderer is advised to refer to the General Notes,Pricing Preambles, Drawings, specifications,Conditions of Contract and other relevant documentsprior to pricing of the following items.

Note

B All the materials to be submitted to the Architect to getthe approval prior to the commencement of work. Allthe vendors specifications to be supplied with the Billof Quantities. Note

C Ceilling finishes included the Emulsion paints and thatshall be consists of one coat of filler and two coats ofEmulsion paints as per the approved colour.

Note

D All work shall comply with relevant standards as statedin the architectural specification. Note

E The Bidder shall submit the Ceiling system, Ceilingframing system & Technical details with the bid.

Note

F All ceiling work to be in a reputed system acceptable tothe Engineer.

Note

G Rate for suspended ceiling shall include access ceilingpanel finished flushed for services as per specification

Note

H Gypsum board coffered ceiling area is measured on theexposed face including vertical sides of recess anddrops.

Note

I Suspended ceilings are include working over andaround obstructions, support works and accessories forfittings and all suspension and framed members.

Note

J Rates shall include for preparation of surfaces forproper bonding, Cutting and etc..

Note

K Rate shall include for any additional suspended frame ifrequired to hang the ceiling from the roof members.

Note

L The Bidder is advised to visit the site of the proposedwork, as it is his responsibility to ascertain theconditions governing, actual amount of work involved,access to the site, the external working space, storagearea etc.,

CEILLING FINISHESDESCRIPTION

Section - 02 BoQ / Page 2

PROPOSED INTERIOR FIT-OUT FOR PEACE CORPS SRILANKA AT COLOMBO 4

BILL OF QUANTITIESNo UNIT QTY RATE AMOUNT

CEILLING FINISHESDESCRIPTION

First Floor

The tenderer is advised to refer to the Drawing No:PEACE CO/2019/TEN/AR/FN-C-01 prior to pricing of the following items.

1 Supplying and Intallation of 600mm x 600mm Mineralfiber ceiling, furring suspension ceiling system, usingGI furring bars clipped on top inter - locking hot -dipped GI main tees and suspended using GI adjustablehanger rods with spring clips and complete with allnecessary accessories as per manufactures instructionand acceptable to the Engineer's detail drawings andspecifications.

Sq.ft. 1293.00

Second Floor

The tenderer is advised to refer to the Drawing No:PEACE CO/2019/TEN/AR/FN-C-02 prior to pricing of the following items.

2 Supplying and Intallation of Metal Perforatedsuspended ceiling system, using GI furring bars clippedon top inter - locking hot - dipped GI main tees andsuspended using GI adjustable hanger rods with springclips and complete with all necessary accessories as permanufactures instruction and acceptable to theEngineer's detail drawings and specifications.

Sq.ft. 860.00

CARRIED TO COLLECTION LKR

Section - 02 BoQ / Page 3

PROPOSED INTERIOR FIT-OUT FOR PEACE CORPS SRILANKA AT COLOMBO 4

BILL OF QUANTITIESNo UNIT QTY RATE AMOUNT

CEILLING FINISHESDESCRIPTION

3 Supplying and Intallation of 12mm thick Gypsum boardceiling (approx 365 sq.ft) without grooves, furringsuspension ceiling system, using GI furring bars clippedon top inter - locking hot - dipped GI main tees andsuspended using GI adjustable hanger rods with springclips. Joints will be taped with joint tape and completewith all necessary accessories including emulsion paintfinish for Gypsum board ceiling area. Rate shall IncludeCarpet tiles pasted on plywood structure (approx 182sq.ft) with necessary frame work for fixed to the slab,15 Nr of size 3" x 5", Approx. length 18'-0", treated"Tulang wood" horizontal timber bars (water basedfinish) in Conference Room decorative ceiling as permanufactures instruction related to the system andacceptable to the Engineer's detail drawings andspecifications. Recomanded brand for Carpet tiles-Shaw Carpet - USA - Model no : Snudge53500 - (ReferAnnex 03)

Sq.ft. 547.00

4 Supplying and Intallation of 12mm thick Gypsum boardceiling without grooves, furring suspension ceilingsystem, using GI furring bars clipped on top inter -locking hot - dipped GI main tees and suspended using04mm thick GI adjustable hanger rods with spring clips.Joints will be taped with joint tape and complete withall necessary accessories as per manufacturesinstruction related to the system and acceptable to theEngineer's detail drawings and specifications. Rate shallInclude emulsion paint finish as per Architectinstructions.

Sq.ft. 1050.00

Thired Floor

The tenderer is advised to refer to the Drawing No:PEACE CO/2019/TEN/AR/FN-C-03 prior to pricing of the following items.

5 Supplying and Intallation of Metal Perforatedsuspended ceiling system, using GI furring bars clippedon top inter - locking hot - dipped GI main tees andsuspended using GI adjustable hanger rods with springclips and complete with all necessary accessories as permanufactures instruction and acceptable to theEngineer's detail drawings and specifications.

Sq.ft. 1375.00

CARRIED TO COLLECTION LKR

Section - 02 BoQ / Page 4

PROPOSED INTERIOR FIT-OUT FOR PEACE CORPS SRILANKA AT COLOMBO 4

BILL OF QUANTITIESNo UNIT QTY RATE AMOUNT

CEILLING FINISHESDESCRIPTION

6 Supplying and Intallation of 12mm thick Gypsum boardceiling without grooves, furring suspension ceilingsystem, using GI furring bars clipped on top inter -locking hot - dipped GI main tees and suspended usingGI adjustable hanger rods with spring clips. Joints willbe taped with joint tape and complete with all necessaryaccessories as per manufactures instruction related tothe system and acceptable to the Engineer's detaildrawings and specifications. Rate shall Includeemulsion paint finish as per Architect instructions.

Sq.ft. 1004.00

Fourth Floor

The tenderer is advised to refer to the Drawing No:PEACE CO/2019/TEN/AR/FN-C-04 prior to pricing of the following items.

7 Supplying and Intallation of Metal Perforatedsuspended ceiling system, using GI furring bars clippedon top inter - locking hot - dipped GI main tees andsuspended using GI adjustable hanger rods with springclips and complete with all necessary accessories as permanufactures instruction and acceptable to theEngineer's detail drawings and specifications.

Sq.ft. 1240.00

8 Supplying and Intallation of 12mm thick Gypsum boardceiling without grooves, furring suspension ceilingsystem, using GI furring bars clipped on top inter -locking hot - dipped GI main tees and suspended usingGI adjustable hanger rods with spring clips. Joints willbe taped with joint tape and complete with all necessaryaccessories as per manufactures instruction related tothe system and acceptable to the Engineer's detaildrawings and specifications. Rate shall Includeemulsion paint finish as per Architect instructions.

Sq.ft. 1188.00

CARRIED TO COLLECTION LKR

Section - 02 BoQ / Page 5

PROPOSED INTERIOR FIT-OUT FOR PEACE CORPS SRILANKA AT COLOMBO 4

BILL OF QUANTITIESNo UNIT QTY RATE AMOUNT

CEILLING FINISHESDESCRIPTION

COLLECTION SUMMARY

Page No. Section -02 BoQ /Page 1

Page No. Section -02 BoQ /Page 2

Page No. Section -02 BoQ /Page 3

Page No. Section -02 BoQ /Page 4

CARRIED TO SUMMARY LKR -

Section - 03 BoQ / Page 1

PROPOSED INTERIOR FIT-OUT FOR PEACE CORPS SRILANKA AT COLOMBO 4

BILL OF QUANTITIESNo UNIT QTY RATE AMOUNT

SECTION 3 - PARTITION

Notes:

A The tenderer is advised to refer to the General Notes,Pricing Preambles, Drawings, specifications, Conditions ofContract and other relevant documents prior to pricing ofthe following items.

Note

B All the materials to be submitted to the Architect to get theapproval prior to the commencement of work. All thevendors specifications to be supplied with the Bill ofQuantities. Note

C All the Internal Emulsion paints must be consists of onecoat of fillerand two coats of Emulsion paints as per theapproved colour. Note

D All work shall comply with relevant standards as stated inthe architectural specification. Note

E All aluminium frames shall be exterior quality powdercoated (not less than 60 microns) in approved colour withcorrect sizes and thickness as specified by themanufacturer to suit with the actual dimensions ofopenings including all surfaces and method of constructionand strong enough to stand for the specified wind pressure.All fixings shall be to suit the location and environment ofthe project (close proximity to sea and sea breeze) andshall be in materials free from corrosion with all primaryand secondary framing, fixings and accessories. All framesshall be in bevelled edge corners.

Note

F All glass in external glazed partitions and doors shall beclear glass or toughened glass minimum 10 mm thick(unless measured separately) depending on the size of theopening as per manufacture's instruction in an approvedmanufacture to suit with the specific requirements. Allglass shall be in Asahi, Pilkington, Saint Goblin SingaporeSafety Glass (SSG) or equivalent make.

Note

G All ironmongery in aluminium doors shall be as follows orequivalent approved reputed make in their original make,Hinges - Stainless steel with neoprene gasket Screws -Stainless steel Note

PARTITIONDESCRIPTION

Section - 03 BoQ / Page 2

PROPOSED INTERIOR FIT-OUT FOR PEACE CORPS SRILANKA AT COLOMBO 4

BILL OF QUANTITIESNo UNIT QTY RATE AMOUNT

PARTITIONDESCRIPTION

H Sealant, beadings and gaskets to be used, shall beappropriate to the climate of Sri Lanka and theenvironment of the location of this project and necessarytechnical informations to be submitted for prior approval.All joints to be sealed in an appropriate manner and shallbe Dowconing 791-P silicon beading sealant or equivalentmake with structural silicon. All gaskets, rubber beadingshall be Neoprene in white colour.

Note

I All partitions will be accommodated with cable trunking as a skirting where necessary Note

J The Bidder is advised to visit the site of the proposedwork, as it is his responsibility to ascertain the conditionsgoverning, actual amount of work involved, access to thesite, the external working space, storage area etc.,

Note

First Floor

The tenderer is advised to refer to the Drawing No:PEACE CO/2019/TEN/AR/PL-01 prior to pricing of thefollowing items.

Frameless Glass Partition

Note: Graphic stickers, Sand Blast stickers will be done byother contractor.

Supply and install Frameless 10mm tk.Tempered GlassPartition with high quality 1" S/S "U" channels.

1 Type G7, Size Approx. Length 16' -0" x height 9'- 5" (upto ceiling level ). Rate shall include type D2 door, Size3'-0" x 7'-0" single door - 10mm tk tempered glass, includingdoor hinges (VVP or equivalent) door handle, door lock,beading with all accessories as per the Detailing Drawings/ Architect's instructions

No 1.00

2 Type G8, Size Approx. Length 5' -1" x height 9'- 5" (up toceiling level ). Rate shall include type D2 door, Size3'-0"x 7'-0" single door - 10mm tk tempered glass, includingdoor hinges (VVP or equivalent) door handle, door lock,beading with all accessories as per the Detailing Drawings/ Architect's instructions

No 1.00

CARRIED TO COLLECTION LKR -

Section - 03 BoQ / Page 3

PROPOSED INTERIOR FIT-OUT FOR PEACE CORPS SRILANKA AT COLOMBO 4

BILL OF QUANTITIESNo UNIT QTY RATE AMOUNT

PARTITIONDESCRIPTION

3 Type G9, Size Approx. Length 6' -0" x height 9'- 5" (up toceiling level ). Rate shall include type D1 door, Size 6'-0"x 7'-0" double swing door- 10mm tk tempered glass,including door hinges (VVP or equivalent) doorhandle,door lock, beading with all accessories as per theDetailing Drawings / Architect's instructions

No 1.00

4 Type G10, Size Approx. Length (10'-0" + 3'-0" + 6'-0") xheight 9'- 5" (up to ceiling level ). Rate shall include typeD2 door, Size 3'-0" x 7'-0" single door - 10mm tktempered glass, including door hinges (VVP or equivalent)door handle, door lock, beading with all accessories as perthe Detailing Drawings / Architect's instructions

No 1.00

Dry wall and Gypsum Board Partition

Supply, Fabricate and Fix 50mm wide drywall and GI "C"channel (45mm) Framed with Gypsum Board ( 10 mm tk.)Partition (Both Side) including one coat of filler, one coatof primer and 2 coats of emulsion Painting as perSchedules - Partitions / Partition Detailing Drawings /Architect's instructions in followings

5 Type GY4, Size Approx. Length 25' -0" x height 9'- 5" (upto ceiling level ).

No 1.00

6 Type GY5, Size Approx.Length 46' - 3" x height 9'- 5" (upto ceiling level ). Rate shall include type D5 door, Size 3'-0" x 7'-0", 1.25" tk plywood door, powder coated Alframe, sash in veneer finish, door closer (VVP orequivalent) , door hinges, beading, door lock with handle(prime cost for door lock-4000Rs) and type D5 door, Size3'-0" x 7'-0", 1.25 " tk plywood door with powder coatedAl frame, sash in veneer finish, door closer (VVP orequivalent) , door hinges, beading, door lock with handle(prime cost for door lock-4000Rs) including allaccessories as per the Detailing Drawings / Architect'sinstructions

No 1.00

CARRIED TO COLLECTION LKR -

Section - 03 BoQ / Page 4

PROPOSED INTERIOR FIT-OUT FOR PEACE CORPS SRILANKA AT COLOMBO 4

BILL OF QUANTITIESNo UNIT QTY RATE AMOUNT

PARTITIONDESCRIPTION

7 Type GY6, Size Approx.Length 25' - 0" x height 9'- 5" (upto ceiling level ). Rate shall include type D5 door, Size 3'-0" x 7'-0", 1.25 " tk plywood door with powder coated Alframe, sash in veneer finish, door closer (VVP orequivalent) , door hinges, beading, door lock with handle(prime cost for door lock-4000Rs) including allaccessories. including all accessories.with all accessoriesas per the Detailing Drawings / Architect's instructions

No 1.00

8 Type GY7, Size Approx. Length 5' -0" x height 9'- 5" (upto ceiling level ). Rate shall include type D5 door, 1.25 "tk plywood door with powder coated Al frame, sash inveneer finish, door closer (VVP or equivalent) , doorhinges, beading, door lock with handle (prime cost fordoor lock-4000Rs) including all accessories. including allaccessories.with all accessories as per the DetailingDrawings / Architect's instructions

No 1.00

Second Floor

The tenderer is advised to refer to the Drawing No:PEACE CO/2019/TEN/AR/PL-02 prior to pricing of thefollowing items.

Frameless Glass Partition

Note: Graphic stickers, Sand Blast stickers will be done byother contractor.

Supply and install Frameless 10mm tk.Tempered GlassPartition with high quality 1" S/S "U" channels.

9 Type G6, Size Approx. Length 6' -0" x height 9'- 5" (up toceiling level ). Rate shall include type D1 door, Size 6'-0"x 7'-0" double swing door- 10mm tk tempered glass,including door hinges (VVP or equivalent) doorhandle,door lock, beading with all accessories as per theDetailing Drawings / Architect's instructions

No 1.00

- CARRIED TO COLLECTION LKR

Section - 03 BoQ / Page 5

PROPOSED INTERIOR FIT-OUT FOR PEACE CORPS SRILANKA AT COLOMBO 4

BILL OF QUANTITIESNo UNIT QTY RATE AMOUNT

PARTITIONDESCRIPTION

Dry wall and Gypsum Board Partition

Supply, Fabricate and Fix 50mm wide drywall and GI "C"channel (45mm) Framed with Gypsum Board ( 10 mm tk.)Partition (Both Side) including one coat of filler, one coatof primer and 2 coats of emulsion Painting as perSchedules - Partitions / Partition Detailing Drawings /Architect's instructions in followings

10 Type GY2, Size Approx. Length 9' -2" x height 9'- 5" (upto ceiling level ).

No 1.00

11 Type GY3, Size Approx.Length 5' - 0" x height 9'- 5" (upto ceiling level ). Rate shall include type D5 door, Size 3'-0" x 7'-0", 1.25 " tk plywood door with powder coated Alframe, sash in veneer finish, door closer (VVP orequivalent) , door hinges, beading, door lock with handle(prime cost for door lock-4000Rs) including allaccessories. including all accessories.with all accessoriesas per the Detailing Drawings / Architect's instructions

No 1.00

12 Type GY23, Size Approx. Length 53' - 3" x height 9'- 5"(up to ceiling level ). Rate shall include 03 Nr of type D5door, Size 3'-0" x 7'-0", single door - 2 " tk plywoodsound proof door with veneer finish, doorcloser(VVP orequivalent) , door hinges, beading, door lock with handle(prime cost for door lock-Rs.4000) including allaccessories.

No 1.00

Gypsum Board Partition with Sound proofInsulation

Supply, Fabricate and Fix 75mm wide drywall and GI "C"channel (45mm) Framed with Gypsum Board (10 mm tk.)Partition (Both Side). Rate shall including sound proofinsulation (Styrofoam) inside and one coat of filler, onecoat of primer and 2 coats of emulsion Painting as perSchedules - Partitions / Partition Detailing Drawings /Architect's instructions in followings (above ceilingpartition measured separately)

13 Type SGY11, Size Approx. Length 9' - 2" x height 9'- 5"(up to ceiling level ).

No 1.00

14 Type SGY12, Size Approx. Length 15' - 0" x height 9'- 5"(up to ceiling level ).

No 1.00

CARRIED TO COLLECTION LKR -

Section - 03 BoQ / Page 6

PROPOSED INTERIOR FIT-OUT FOR PEACE CORPS SRILANKA AT COLOMBO 4

BILL OF QUANTITIESNo UNIT QTY RATE AMOUNT

PARTITIONDESCRIPTION

Above Ceiling Partitions

15 Supply, Fabricate and Fix Size Approx. Length 9' - 2" xheight 1'- 2", Gypsum Board ( 10 mm tk.) Partition (BothSide) with 75mm wide GI "C" channel (45mm) Framedwith . Rate shall including sound proof insulation(Styrofoam) inside as per Schedules - Partitions / PartitionDetailing Drawings / Architect's instructions (for TypeSGY11 partition)

No 1.00

16 Supply, Fabricate and Fix Size Approx. Length 15' - 0" xheight 1'- 2", Gypsum Board ( 10 mm tk.) Partition (BothSide) with 75mm wide GI "C" channel (45mm) Framedwith . Rate shall including sound proof insulation(Styrofoam) inside as per Schedules - Partitions / PartitionDetailing Drawings / Architect's instructions (for TypeSGY12 partition)

No 1.00

Sliding and Folding Panel system

17 Supply, Fabricate and Fix type SF1, Size Approx. Length24' - 11" x height 9'- 5", Sliding and Folding Panel system& framework as per Schedules - Partitions / PartitionDetailing Drawings / Architect's instructions. ReferTechnical detail sheet is attached with BOQ (Annex 1) as a reference source. Bidders shall rete for equivalent productsand should submitt the Technical Details along with theTender .

No 1.00

Thired Floor

The tenderer is advised to refer to the Drawing No:PEACE CO/2019/TEN/AR/PL-03 prior to pricing of thefollowing items.

Frameless Glass Partition

Note: Graphic stickers, Sand Blast stickers will be done byother contractor.

Supply and install Frameless 10mm tk.Tempered GlassPartition with high quality 1" S/S "U" channels.

CARRIED TO COLLECTION LKR -

Section - 03 BoQ / Page 7

PROPOSED INTERIOR FIT-OUT FOR PEACE CORPS SRILANKA AT COLOMBO 4

BILL OF QUANTITIESNo UNIT QTY RATE AMOUNT

PARTITIONDESCRIPTION

18 Type G4, Size Approx. Length 9' -0" x height 9'- 5" (up toceiling level ). Rate shall include type D1 door, Size 6'-0"x 7'-0" double swing door- 10mm tk tempered glass,including door hinges (VVP or equivalent) doorhandle,door lock, beading with all accessories as per theDetailing Drawings / Architect's instructions

No 1.00

19 Type G5, Size Approx. Length 7' -7" x height 9'- 5" (up toceiling level ). Rate shall include type D2 door, Size 3'-0"x 7'-0" single door - 10mm tk tempered glass, includingdoor hinges (VVP or equivalent) door handle, door lock,beading with all accessories as per the Detailing Drawings/ Architect's instructions

No 1.00

20 Type G15, Size Approx. Length 16' -0" x height 9'- 5" (upto ceiling level ). Rate shall include type D2 door, Size 3'-0" x 7'-0" single door - 10mm tk tempered glass, includingdoor hinges (VVP or equivalent) door handle, door lock,beading with all accessories as per the Detailing Drawings/ Architect's instructions

No 1.00

21 Type G16, Size Approx. Length 10' -0" x height 9'- 5" (upto ceiling level ). Rate shall include type D2 door, Size 3'-0" x 7'-0" single door - 10mm tk tempered glass, includingdoor hinges (VVP or equivalent) door handle, door lock,beading with all accessories as per the Detailing Drawings/ Architect's instructions

No 1.00

22 Type G17, Size Approx. Length 10' -0" x height 9'- 5" (upto ceiling level ). Rate shall include type D2 door, Size 3'-0" x 7'-0" single door - 10mm tk tempered glass, includingdoor hinges (VVP or equivalent) door handle, door lock,beading with all accessories as per the Detailing Drawings/ Architect's instructions

No 1.00

23 Type G18, Size Approx. Length 19' -0" x height 9'- 5" (upto ceiling level ). Rate shall include type D2 door, Size 3'-0" x 7'-0" single door - 10mm tk tempered glass, includingdoor hinges (VVP or equivalent) door handle, door lock,beading with all accessories as per the Detailing Drawings/ Architect's instructions

No 1.00

CARRIED TO COLLECTION LKR -

Section - 03 BoQ / Page 8

PROPOSED INTERIOR FIT-OUT FOR PEACE CORPS SRILANKA AT COLOMBO 4

BILL OF QUANTITIESNo UNIT QTY RATE AMOUNT

PARTITIONDESCRIPTION

Dry wall and Gypsum Board Partition

Supply, Fabricate and Fix 50mm wide drywall and GI "C"channel (45mm) Framed with Gypsum Board ( 10 mm tk.)Partition (Both Side) including one coat of filler, one coatof primer and 2 coats of emulsion Painting as perSchedules - Partitions / Partition Detailing Drawings /Architect's instructions in followings

24 Type GY8, Size Approx. Length 9' -2" x height 9'- 5" (upto ceiling level ).

No 1.00

25 Type GY9, Size Approx. Length 10' - 0" x height 9'- 5"(up to ceiling level ).

No 1.00

26 Type GY10, Size Approx. Length 9' - 2" x height 9'- 5"(up to ceiling level ).

No 1.00

27 Type GY12, Size Approx. Length 10' - 0" x height 9'- 5"(up to ceiling level ).

No 1.00

28 Type GY14, Size Approx. Length 9' - 2" x height 9'- 5"(up to ceiling level ).

No 1.00

29 Type GY11, Size Approx. Length 6' - 0" x height 9'- 5"(up to ceiling level ). Rate shall include D5 door, 1.25 " tkplywood door with powder coated Al frame, sash in veneerfinish, door closer (VVP or equivalent) , door hinges,beading, door lock with handle (prime cost for door lock-4000Rs) including all accessories. including allaccessories.with all accessories as per the DetailingDrawings / Architect's instructions

No 1.00

30 Type GY13, Size Approx. Length 6' - 0" x height 9'- 5"(up to ceiling level ). Rate shall include D5 door, 1.25 " tkplywood door with powder coated Al frame, sash in veneerfinish, door closer (VVP or equivalent) , door hinges,beading, door lock with handle (prime cost for door lock-4000Rs) including all accessories. including allaccessories.with all accessories as per the DetailingDrawings / Architect's instructions

No 1.00

CARRIED TO COLLECTION LKR -

Section - 03 BoQ / Page 9

PROPOSED INTERIOR FIT-OUT FOR PEACE CORPS SRILANKA AT COLOMBO 4

BILL OF QUANTITIESNo UNIT QTY RATE AMOUNT

PARTITIONDESCRIPTION

Brick wall Partitiom

Brick work shall be in Grade 1 quality, acceptable to theConsultant.

Note

Rates for plastering between different surfaces shallinclude for spandex metal lathing to avoid any cracksbetween different surfaces.

Note

Rates shall include for door and window reveals, jambs,plaster bands, tapered work, recesses, patterned work, sillsand the like unless otherwise given separately and Noadditional payment shall be made.

Note

Internal painting shall be interior quality emulsion paintmanufacture of AkzoNobel or equivalent to suit with theenvironment, climate and location of this project.

Note

Rate for painting shall include for painting to door andwindow reveals. Paint of reveals not measured separately.

Note

31 Type W3, 6" thick, Brick wall partition, Size Approx.Length (4' - 0" + 3'- 4" + 4'- 0" + 9' - 9" ) x height 11'- 0".Rate shall including, Proper bonding method of exitingfloor and exiting slab, Exiting floor chipping (if required),16mm thick internal smooth plaster in cement and sand1:5 finished smooth with one coat of filler, one coat ofprimer and 2 coats of emulsion Painting and Cost of typeD3 door, Size 3'-0" x 7'-0", single door - 2 " tk plywoodsound proof door with veneer finish, door closer(VVP orequivalent) , door hinges, beading, door lock with handle(prime cost for door lock-Rs.4000) including allaccessories as per Schedules - Partitions / PartitionDetailing Drawings / Architect's instructions.

No 1.00

Fourth Floor

The tenderer is advised to refer to the Drawing No:PEACE CO/2019/TEN/AR/PL-04 prior to pricing of thefollowing items.

Frameless Glass Partition

Note: Graphic stickers, Sand Blast stickers will be done byother contractor.

Supply and install Frameless 10mm tk.Tempered GlassPartition with high quality 1" S/S "U" channels.

LKR - CARRIED TO COLLECTION

Section - 03 BoQ / Page 10

PROPOSED INTERIOR FIT-OUT FOR PEACE CORPS SRILANKA AT COLOMBO 4

BILL OF QUANTITIESNo UNIT QTY RATE AMOUNT

PARTITIONDESCRIPTION

32 Type G2, Size Approx. Length 9' -0" x height 9'- 5" (up toceiling level ). Rate shall include type D1 door, Size 6'-0"x 7'-0" double swing door- 10mm tk tempered glass,including door hinges (VVP or equivalent) doorhandle,door lock, beading with all accessories as per theDetailing Drawings / Architect's instructions

No 1.00

33 Type G3, Size Approx. Length 16' - 0" x height 9'- 5" (upto ceiling level ). Rate shall include type D2 door, Size 3'-0" x 7'-0" single door - 10mm tk tempered glass, includingdoor hinges (VVP or equivalent) door handle, door lock,beading with all accessories as per the Detailing Drawings/ Architect's instructions

No 1.00

34 Type G12, Size Approx.Length 12' -0" x height 9'- 5" (upto ceiling level ) Rate shall include type D2 door, Size 3'-0" x 7'-0" single door - 10mm tk tempered glass, includingdoor hinges (VVP or equivalent) door handle, door lock,beading with all accessories as per the Detailing Drawings/ Architect's instructions

No 1.00

35 Type G13, Size Approx.Length 12' -0" x height 9'- 5" (upto ceiling level ) Rate shall include type D2 door, Size 3'-0" x 7'-0" single door - 10mm tk tempered glass, includingdoor hinges (VVP or equivalent) door handle, door lock,beading with all accessories as per the Detailing Drawings/ Architect's instructions

No 1.00

36 Type G14, Size Approx.Length 13' -0" x height 9'- 5" (upto ceiling level ) Rate shall include type D2 door, Size 3'-0" x 7'-0" single door - 10mm tk tempered glass, includingdoor hinges (VVP or equivalent) door handle, door lock,beading with all accessories as per the Detailing Drawings/ Architect's instructions

No 1.00

37 Type G19, Size Approx. Length 6' -3" x height 9'- 5" (upto ceiling level ). Rate shall include type D2 door,Size 3'-0" x 7'-0" single door - 10mm tk tempered glass, includingdoor hinges (VVP or equivalent) door handle, door lock,beading with all accessories as per the Detailing Drawings/ Architect's instructions

No 1.00

38 Type G20, Size Approx. Length 20' -3" x height 9'- 5" (upto ceiling level ). Rate shall include type D1 door,Size 6'-0" x 7'-0" double swing door- 10mm tk tempered glass,including door hinges (VVP or equivalent) doorhandle,door lock, beading with all accessories as per theDetailing Drawings / Architect's instructions

No 1.00

CARRIED TO COLLECTION LKR -

Section - 03 BoQ / Page 11

PROPOSED INTERIOR FIT-OUT FOR PEACE CORPS SRILANKA AT COLOMBO 4

BILL OF QUANTITIESNo UNIT QTY RATE AMOUNT

PARTITIONDESCRIPTION

Dry wall and Gypsum Board Partition

Supply, Fabricate and Fix 50mm wide drywall and GI "C"channel (45mm) Framed with Gypsum Board ( 10 mm tk.)Partition (Both Side) including one coat of filler, one coatof primer and 2 coats of emulsion Painting as perSchedules - Partitions / Partition Detailing Drawings /Architect's instructions in followings

39 Type GY15, Size Approx. Length 9' -2" x height 9'- 5" (upto ceiling level ).

No 1.00

40 Type GY16, Size Approx. Length 9' -2" x height 9'- 5" (upto ceiling level ).

No 1.00

41 Type GY18, Size Approx. Length 10' -0" x height 9'- 5"(up to ceiling level ).

No 1.00

42 Type GY17, Size Approx. Length 6' - 0" x height 9'- 5"(up to ceiling level ). Rate shall include D5 door, 1.25 " tkplywood door with powder coated Al frame, sash in veneerfinish, door closer (VVP or equivalent) , door hinges,beading, door lock with handle (prime cost for door lock-4000Rs) including all accessories. including allaccessories.with all accessories as per the DetailingDrawings / Architect's instructions

No 1.00

43 Type GY19, Size Approx. Length 9' -9" x height 9'- 5" (upto ceiling level ).

No 1.00

Cashier Cage Partition

44 Design, Fabricate, Supply and Fix Type CP1, SizeApprox. Length 4' -0" x height 9'- 5" (up to ceiling level )including 0.25" Thk steel frame work with vertical grillsand Type CP2, Size Approx. Length 4' -0" x height 9'- 5"(up to ceiling level ) including type D4 door, Size 3'-0" x7'-0", single door - 2 " tk plywood sound proof door withveneer finish, door closer(VVP or equivalent) , doorhinges, beading, door lock with handle (prime cost fordoor lock-Rs.4000) including all accessories as perSchedules - Partitions / Partition Detailing Drawings /Architect's instructions.

Item 1.00

CARRIED TO COLLECTION LKR -

Section - 03 BoQ / Page 12

PROPOSED INTERIOR FIT-OUT FOR PEACE CORPS SRILANKA AT COLOMBO 4

BILL OF QUANTITIESNo UNIT QTY RATE AMOUNT

PARTITIONDESCRIPTION

Brick wall Partitiom

Brick work shall be in Grade 1 quality, acceptable to theConsultant.

Note

Rates for plastering between different surfaces shallinclude for spandex metal lathing to avoid any cracksbetween different surfaces.

Note

Rates shall include for door and window reveals, jambs,plaster bands, tapered work, recesses, patterned work, sillsand the like unless otherwise given separately and Noadditional payment shall be made.

Note

Internal painting shall be interior quality emulsion paintmanufacture of AkzoNobel or equivalent to suit with theenvironment, climate and location of this project.

Note

Rate for painting shall include for painting to door andwindow reveals. Paint of reveals not measured separately.

Note

45 Type W1, 6" thick, Brick wall partition, Size Approx.Length 10' -0" x height 11'- 0". Rate shall includingProper bonding method of exiting floor and exiting slab,Exiting floor chipping (if required), 16mm thick internalsmooth plaster in cement and sand 1:5 finished smoothwith one coat of filler, one coat of primer and 2 coats ofemulsion Painting as per Schedules - Partitions / PartitionDetailing Drawings / Architect's instructions.

No 1.00

46 Type W2, 6" thick, Brick wall partition, Size Approx.Length 10' -0" x height 11'- 0". Rate shall includingProper bonding method of exiting floor and exiting slab,Exiting floor chipping (if required), 16mm thick internalsmooth plaster in cement and sand 1:5 finished smoothwith one coat of filler, one coat of primer and 2 coats ofemulsion Painting as per Schedules - Partitions / PartitionDetailing Drawings / Architect's instructions.

No 1.00

CARRIED TO COLLECTION LKR -

Section - 03 BoQ / Page 13

PROPOSED INTERIOR FIT-OUT FOR PEACE CORPS SRILANKA AT COLOMBO 4

BILL OF QUANTITIESNo UNIT QTY RATE AMOUNT

PARTITIONDESCRIPTION

Sixth Floor

The tenderer is advised to refer to the Drawing No:PEACE CO/2019/TEN/AR/PL-05 prior to pricing of thefollowing items.

Dry wall and Gypsum Board Partition

Supply, Fabricate and Fix 50mm wide drywall and GI "C"channel (45mm) Framed with Gypsum Board ( 10 mm tk.)Partition (Both Side) including one coat of filler, one coatof primer and 2 coats of emulsion Painting as perSchedules - Partitions / Partition Detailing Drawings /Architect's instructions in followings

47 Type GY1, Size Approx. Length 8' -9" x height 9'- 5" (upto ceiling level ).

No 1.00

48 Type GY21, Size Approx. Length (13' - 6" + 3' - 2" ) xheight 9'- 5" (up to ceiling level ). Rate Shall Include typeD5 door, 1.25 " tk plywood door with powder coated Alframe, sash in veneer finish, door closer (VVP orequivalent) , door hinges, beading, door lock with handle(prime cost for door lock-4000Rs) including allaccessories. including all accessories.with all accessoriesas per the Detailing Drawings / Architect's instructions.

No 1.00

49 Type GY22, Size Approx. Length 17' -6" x height 9'- 5"(up to ceiling level ). Rate shall include 02 Nr of type D5door, Size 3'-0" x 7'-0" single door - 10mm tk temperedglass, including door hinges (VVP or equivalent) doorhandle, door lock, beading with all accessories as per theDetailing Drawings / Architect's instructions

No 1.00

50 Type GY20, Size Approx. Length 17' - 6" x height 9'- 5"(up to ceiling level ). Rate Shall Include type D5 door,1.25 " tk plywood door with powder coated Al frame, sashin veneer finish, door closer (VVP or equivalent) , doorhinges, beading, door lock with handle (prime cost fordoor lock-4000Rs) including all accessories. including allaccessories.with all accessories as per the DetailingDrawings / Architect's instructions.

No 1.00

CARRIED TO COLLECTION LKR -

Section - 03 BoQ / Page 14

PROPOSED INTERIOR FIT-OUT FOR PEACE CORPS SRILANKA AT COLOMBO 4

BILL OF QUANTITIESNo UNIT QTY RATE AMOUNT

PARTITIONDESCRIPTION

COLLECTION SUMMARY

Page No. Section -03 BoQ /Page 1

Page No. Section -03 BoQ /Page 2

Page No. Section -03 BoQ /Page 3

Page No. Section -03 BoQ /Page 4

Page No. Section -03 BoQ /Page 5

Page No. Section -03 BoQ /Page 6

Page No. Section -03 BoQ /Page 7

Page No. Section -03 BoQ /Page 8

Page No. Section -03 BoQ /Page 9

Page No. Section -03 BoQ /Page 10

Page No. Section -03 BoQ /Page 11

Page No. Section -03 BoQ /Page 12

Page No. Section -03 BoQ /Page 13

CARRIED TO SUMMARY LKR

Section - 04 BoQ / Page 1

PROPOSED INTERIOR FIT-OUT FOR PEACE CORPS SRILANKA AT COLOMBO 4

BILL OF QUANTITIESNo UNIT QTY RATE AMOUNT

SECTION 4 - PAINTING & DEMOLITIONWORK

Notes:A The tenderer is advised to refer to the General Notes,

Pricing Preambles, Drawings, specifications,Conditions of Contract and other relevant documentsprior to pricing of the following items.

Note

B All the materials to be submitted to the Architect to getthe approval prior to the commencement of work. Allthe vendors specifications to be supplied with the Billof Quantities. Note

C The Bidder is advised to visit the site of the proposedwork, as it is his responsibility to ascertain theconditions governing, actual amount of work involved,access to the site, the external working space, storagearea etc., Note

D All work shall comply with relevant standards as statedin the architectural specification. Note

E Internal painting shall be interior quality emulsion paintmanufacture of AkzoNobel or equivalent to suit withthe environment, climate and location of this project.

Note

F External painting shall be exterior quality weathershieldpaint manufacture of AkzoNobel or equivalent to suitwith the environment, climate and location of thisproject.

Note

G Rate for painting shall include for painting to door andwindow reveals. Paint of reveals not measuredseparately.

Note

Internal Wall Painting

1 Cleaning, removing of existing paint (if required) andprepair the Existing plastered surfaces of all internalfaces of walls with Coping and apply minimum twocoats of approved interior quality, emulsion paint withminimum one coat of acrylic filler as perManufacturer's printed Instructions in First Floor.

Sqr 27.00

2 - Ditto- in Second Floor Sqr 27.00

3 - Ditto- in Thired Floor Sqr 27.50

PAINTING & DEMOLITION WORKDESCRIPTION

CARRIED TO COLLECTION LKR

Section - 04 BoQ / Page 2

PROPOSED INTERIOR FIT-OUT FOR PEACE CORPS SRILANKA AT COLOMBO 4

BILL OF QUANTITIESNo UNIT QTY RATE AMOUNT

PAINTING & DEMOLITION WORKDESCRIPTION

4 - Ditto- in Fourth Floor Sqr 27.50 -

5 - Ditto- in Sixth Floor Sqr 20.00 -

6 Cleaning, removing of existing paint (if required) andprepair the Existing plastered surfaces of all internalfaces of walls with Coping and apply minimum twocoats of approved weathershield paint with minimumone coat of acrylic filler as per Manufacturer's printedInstructions in First Floor Wash Room area.

Sqr 3.10

7 - Ditto- in Second Floor Sqr 3.10

8 - Ditto- in Thired Floor Sqr 3.10

9 - Ditto- in Fourth Floor Sqr 3.10

10 - Ditto- in Sixth Floor Sqr 1.10

DEMOLITION WORK - 6th floor

11 size 3'-9"x7'-0", 9" brick wall to be demolished andcreate a door opening allowing a connection pathbetween two existing appartments. Manual demolitionmethod to be carriedout by using non vibrative tools -

Item 1.00

CARRIED TO COLLECTION LKR

Section - 04 BoQ / Page 3

PROPOSED INTERIOR FIT-OUT FOR PEACE CORPS SRILANKA AT COLOMBO 4

BILL OF QUANTITIESNo UNIT QTY RATE AMOUNT

PAINTING & DEMOLITION WORKDESCRIPTION

COLLECTION SUMMARY

Page No. Section -04 BoQ /Page 1

Page No. Section -04 BoQ /Page 2

CARRIED TO SUMMARY LKR

General Summary / Page 1

BILL OF QUANTITIES

PROPOSED INTERIOR FIT-OUT FOR PEACE CORPS SRILANKA AT COLOMBO 4

GENERAL SUMMARY

DESCRIPTION

SECTION 1 PRELIMINARIES

SECTION 2 CEILLING FINISHES

SECTION 3 PARTITIONS

SECTION 4 PAINTING & DEMOLITION WORK

SUB TOTAL I

Ddt:Discount if any (……..%.....)

GRAND SUMMARY (Excluding VAT)

In words:

Bidder WITNESS

SIGNATURE : ……………...……………………….. ……………………………………………………………

NAME : ……….……………………….……… ……………………………………………………………

ADDRESS : ………..…………………………… ……………………………………………………………

………………………………………… ……………………………………………………………

DATE : …………………………………………………….. ……………………………………………………………

GENERAL SUMMARY

SECTION PAGE NUMBER AMOUNT LKR

Page No. Section -01 BoQ /Page 7

Page No. Section -02 BoQ /Page 5

Page No. Section -03 BoQ /Page 14

Page No. Section -04 BoQ /Page 3

LKR

LKR

GY-4

GY-5

25'-0"

46'-3

"

G-10

6'-0

"10

'-0"

3'-0"

6'-0

"

D1

D5

D5

D7

D2

DATE

COPY

RIG

HT O

F DE

SIGN

S SH

OWN

ARE

RETA

IN B

Y TH

E CO

NSUL

TANT

.

CONS

ULTA

NTPR

OPOS

ED IN

TERI

OR F

IT-O

UT F

OR P

EACE

COR

PSSR

ILAN

KA A

T CO

LOM

BO 4

ARCH

T. B

UDDH

INI D

ISSA

NAYA

KEB.

ARCH

(HON

S), A

IA(S

L)

SCAL

EDR

AWN

CHEC

KED

SHEE

T NO

:PE

ACE

CO/2

019/

TEN/

AR/

::::

PART

ITIO

N L

AYO

UT

BUDD

HINI

DIS

SANA

YAKE

CHA

RTER

ED A

RCHI

TECT

S59

/3 G

alpo

thth

a ro

ad,N

awal

a

ARCH

T. B

UDDH

INI

AS S

HOW

N

DMDM

PL-0

1

5'-0"

FIRST FLOOR PLANPARTITION LAYOUT

G-8

D2

D2

D5

+56'-0"

+56'-0"

G-9

5'-1"

G-7

16'-0

"

25'-0"

GY-6

GY-7

5'-0"

FINAL CONFIRMATION OF SCHEMATIC DESIGN STAGE.confirmation of design consultantsconfirmation of client - peace corps srilanka

G

- FRAMELESS GLASS PARTITION

SG - 10mm thk. soundproof toughen glass panels as double glazed partition with frame

SGY - 75mm wide dry wall with 10mmthk gypsum board partition with sound insulation Styrofoam inside

W - 6" THK Brick wall with plastering and emulsion paint

up to ceiling (+ 9.5' )

up to ceiling (+ 9.5' )

up to ceiling (+ 9.5' )

up to slab (+ 11' )

GY - 50mm wide drywall with 10mm thk gypsum boards

SF - sliding & folding panel system (technical details are attached to BOQ)

up to ceiling (+ 9.5' )

up to ceiling (+ 9.5' )

SCALE 1" = 8'

TEN

DER

DRA

WIN

G16

.08.

2019

G-6

6'-0

"24'-11"

SF-1

SGY-11 SGY-12

GY-23

6'-0

"

GY-2

9'-2"

9'-2" 15'-0"

53'-3

"

GY-3

D1

D5

D5

D5

DATE

COPY

RIG

HT O

F DE

SIGN

S SH

OWN

ARE

RETA

IN B

Y TH

E CO

NSUL

TANT

.

CONS

ULTA

NTPR

OPOS

ED IN

TERI

OR F

IT-O

UT F

OR P

EACE

COR

PSSR

ILAN

KA A

T CO

LOM

BO 4

ARCH

T. B

UDDH

INI D

ISSA

NAYA

KEB.

ARCH

(HON

S), A

IA(S

L)

SCAL

EDR

AWN

CHEC

KED

SHEE

T NO

:::::

PART

ITIO

N L

AYO

UT

BUDD

HINI

DIS

SANA

YAKE

CHA

RTER

ED A

RCHI

TECT

S59

/3 G

alpo

thth

a ro

ad,N

awal

a

ARCH

T. B

UDDH

INI

AS S

HOW

N

DMDM

PL-0

2

SECOND FLOOR PLANPARTITION LAYOUT

D5

D6

(32 SEATS CAPACITY)

C

OU

NT

ER

T

OP

UP

DWN

PEAC

E CO

/201

9/TE

N/AR

/

confirmation of design consultantsconfirmation of client - peace corps srilanka

G

- FRAMELESS GLASS PARTITION

SG - 10mm thk. soundproof toughen glass panels as double glazed partition with frame

SGY - 75mm wide dry wall with 10mmthk gypsum board partition with sound insulation Styrofoam inside

W - 6" THK Brick wall with plastering and emulsion paint

up to ceiling (+ 9.5' )

up to ceiling (+ 9.5' )

up to ceiling (+ 9.5' )

up to slab (+ 11' )

GY - 50mm wide drywall with 10mm thk gypsum boards

SF - sliding & folding panel system (technical details are attached to BOQ)

up to ceiling (+ 9.5' )

up to ceiling (+ 9.5' )

SCALE 1" = 8'

TEN

DER

DRA

WIN

G

5'-0"

16.0

8.20

19

10'-0

"10

'-0"

16'-0

"

7'-7

"

4'-0

"

9'-0

"

D2

D2

D2

D2

D3

DATE

COPY

RIG

HT O

F DE

SIGN

S SH

OWN

ARE

RETA

IN B

Y TH

E CO

NSUL

TANT

.

CONS

ULTA

NTPR

OPOS

ED IN

TERI

OR F

IT-O

UT F

OR P

EACE

COR

PSSR

ILAN

KA A

T CO

LOM

BO 4

ARCH

T. B

UDDH

INI D

ISSA

NAYA

KEB.

ARCH

(HON

S), A

IA(S

L)

SCAL

EDR

AWN

CHEC

KED

SHEE

T NO

:::::

PART

ITIO

N L

AYO

UT

BUDD

HINI

DIS

SANA

YAKE

CHA

RTER

ED A

RCHI

TECT

S59

/3 G

alpo

thth

a ro

ad,N

awal

a

ARCH

T. B

UDDH

INI

AS S

HOW

N

DMDM

PL-0

3

D2

W-3

W-3

D1

UP

DWN

WHITEBOARD

PEAC

E CO

/201

9/TE

N/AR

/

6'-0

"6'

-0"

19'-0

"

9'-2"

10'-0"

GY-9

9'-2"

GY-10

10'-0"

GY-12

9'-2"

GY-14

G-4

3'-4"

G-5

9'-9"

4'-0

"

3B

3B

G-15

G-16

G-17

G-18

GY-8

GY-11

GY-13

confirmation of design consultantsconfirmation of client - peace corps srilanka

G

- FRAMELESS GLASS PARTITION

SG - 10mm thk. soundproof toughen glass panels as double glazed partition with frame

SGY - 75mm wide dry wall with 10mmthk gypsum board partition with sound insulation Styrofoam inside

W - 6" THK Brick wall with plastering and emulsion paint

up to ceiling (+ 9.5' )

up to ceiling (+ 9.5' )

up to ceiling (+ 9.5' )

up to slab (+ 11' )

GY - 50mm wide drywall with 10mm thk gypsum boards

SF - sliding & folding panel system (technical details are attached to BOQ)

up to ceiling (+ 9.5' )

up to ceiling (+ 9.5' )

THIRD FLOOR PLANPARTITION LAYOUT

SCALE 1" = 8'

D5

D5

TEN

DER

DRA

WIN

G16

.08.

2019

13'-0

"12

'-0"

12'-0

"6'

-3"

9'-2"

10'-0"

9'-2"

GY-15

W-1

9'-0

"

G-2

D2

D4

D1

D2

DATE

COPY

RIG

HT O

F DE

SIGN

S SH

OWN

ARE

RETA

IN B

Y TH

E CO

NSUL

TANT

.

CONS

ULTA

NTPR

OPOS

ED IN

TERI

OR F

IT-O

UT F

OR P

EACE

COR

PSSR

ILAN

KA A

T CO

LOM

BO 4

ARCH

T. B

UDDH

INI D

ISSA

NAYA

KEB.

ARCH

(HON

S), A

IA(S

L)

SCAL

EDR

AWN

CHEC

KED

SHEE

T NO

:::::

PART

ITIO

N L

AYO

UT

BUDD

HINI

DIS

SANA

YAKE

CHA

RTER

ED A

RCHI

TECT

S59

/3 G

alpo

thth

a ro

ad,N

awal

a

ARCH

T. B

UDDH

INI

AS S

HOW

N

DMDM

PL-0

4

D2

W-2

10'-0"

G-3

G-20

SAFE &PRINTER

UP

DWN

WHITEBOARD

PEAC

E CO

/201

9/TE

N/AR

/

6'-0

"

G-19

GY-16

GY-18

10'-0"

16'-0

"

20'-3"

CP-1

4'-0

"4'

-0"

CP-2

GY-19

9'-9

" 4A4A

4B

4B

G-12

G-13

G-14

GY-17

confirmation of design consultantsconfirmation of client - peace corps srilanka

G

- FRAMELESS GLASS PARTITION

SG - 10mm thk. soundproof toughen glass panels as double glazed partition with frame

SGY - 75mm wide dry wall with 10mmthk gypsum board partition with sound insulation Styrofoam inside

W - 6" THK Brick wall with plastering and emulsion paint

up to ceiling (+ 9.5' )

up to ceiling (+ 9.5' )

up to ceiling (+ 9.5' )

up to slab (+ 11' )

GY - 50mm wide drywall with 10mm thk gypsum boards

SF - sliding & folding panel system (technical details are attached to BOQ)

up to ceiling (+ 9.5' )

up to ceiling (+ 9.5' )

FOURTH FLOOR PLANPARTITION LAYOUT

SCALE 1" = 8'

D2

D5

D2

6'-0"

TEN

DER

DRA

WIN

G16

.08.

2019

3'-2"

13'-6

"

GY-20

17'-6

"

GY22 17'-6

"

GY1

8'-9"D5

D5

D5

D5 ED

ED

DATE

COPY

RIG

HT O

F DE

SIGN

S SH

OWN

ARE

RETA

IN B

Y TH

E CO

NSUL

TANT

.

TEN

DER

DRA

WIN

GCO

NSUL

TANT

PROP

OSED

INTE

RIOR

FIT

-OUT

FOR

PEA

CE C

ORPS

SRIL

ANKA

AT

COLO

MBO

4AR

CHT.

BUD

DHIN

I DIS

SANA

YAKE

B.AR

CH(H

ONS)

, AIA

(SL)

SCAL

EDR

AWN

CHEC

KED

SHEE

T NO

:::::

PART

ITIO

N L

AYO

UT

BUDD

HINI

DIS

SANA

YAKE

CHA

RTER

ED A

RCHI

TECT

S59

/3 G

alpo

thth

a ro

ad,N

awal

a

ARCH

T. B

UDDH

INI

AS S

HOW

N

DMDM

PL-0

5

SCALE 1" = 8'SIXTH FLOOR PLANPARTITION LAYOUT

LIFT

UP

UP

OPENTO SKY

HANDWASHING

HANDWASHING

EXISTING COUNTER

DWN

DUCT

PEAC

E CO

/201

9/TE

N/AR

/

FINAL CONFIRMATION OF TENDER DESIGN STAGE.confirmation of design consultantsconfirmation of client - peace corps srilanka

G

- FRAMELESS GLASS PARTITION

SG - 10mm thk. soundproof toughen glass panels as double glazed partition with frame

SGY - 75mm wide dry wall with 10mmthk gypsum board partition with sound insulation Styrofoam inside

W - 6" THK Brick wall with plastering and emulsion paint

up to ceiling (+ 9.5' )

up to ceiling (+ 9.5' )

up to ceiling (+ 9.5' )

up to slab (+ 11' )

GY - 50mm wide drywall with 10mm thk gypsum boards

SF - sliding & folding panel system (technical details are attached to BOQ)

up to ceiling (+ 9.5' )

up to ceiling (+ 9.5' )

GY-21

3'-9"

16.0

8.20

19

DATE

COPY

RIG

HT O

F DE

SIGN

S SH

OWN

ARE

RETA

IN B

Y TH

E CO

NSUL

TANT

.

TEN

DER

DRA

WIN

GCO

NSUL

TANT

PROP

OSED

INTE

RIOR

FIT

-OUT

FOR

PEA

CE C

ORPS

SRIL

ANKA

AT

COLO

MBO

4AR

CHT.

BUD

DHIN

I DIS

SANA

YAKE

B.AR

CH(H

ONS)

, AIA

(SL)

SCAL

EDR

AWN

CHEC

KED

SHEE

T NO

:::::

CASH

IER

CAG

EBU

DDHI

NI D

ISSA

NAYA

KE C

HART

ERED

ARC

HITE

CTS

59/3

Gal

poth

tha

road

,Naw

ala

FINAL CONFIRMATION OF SCHEMATIC DESIGN STAGE.confirmation of design consultantsconfirmation of client - peace corps srilanka

ARCH

T. B

UDDH

INI

AS S

HOW

N

DMDM

CC-0

1

SCALE - N.T.S.FOURTH FLOOR PLAN

PARTITION LAYOUT

G

- FRAMELESS GLASS PARTITION

SG - 10mm thk. soundproof toughen glass panels as double glazed partition with frame

SGY - 75mm wide dry wall with 10mmthk gypsum board partition with sound insulation Styrofoam inside

W 6" THK Brick wall with plastering and emulsion paint

up to ceiling (+ 9.5' )

PEAC

E CO

/201

9/TE

N/AR

/

13.0

7.20

19

up to ceiling (+ 9.5' )

up to ceiling (+ 9.5' )

up to slab (+ 11' )

GY - 50mm wide drywall with 10mm thk gypsum boards

SF - sliding & folding panel system (technical details are attached to BOQ)

up to ceiling (+ 9.5' )

up to ceiling (+ 9.5' )

12'-0

"12

'-0"

SG-3

9'-2"

10'-0"

SGY-3

W-1

9'-0

"

G-2

D4

D4

CPD

D1

D2

D4

W-2

10'-0"

G-3

SAFE &PRINTER

WHITEBOARD

SG-2

16'-0

"

CP-1

4'-0

"4'

-0"

CP-2

CASHIER CAGE DETAILS

ELEVATION

PLAN

High security door lock(to be provided by theclient)

3'-6

"

5" Thk block wall

Solid timber framewith enamelpaint/stainedto be fixed to the wall

0.25" Thk steel frame workwith vertical grills

Glass cut for transaction

bullet proof double layer glass doorwith the respective door frame(material will be decidedwith wall finishes as in S/S or solid timber, security lock tobe provided by the client)

SA

FE

&P

RIN

TE

R

10'-0

"

W-1

W2

3'-7"

CP-1 CP-2

CPD

SCALE 1" = 8'FIRST FLOOR PLAN

L E G E N D - C E I L I N G AREA( Sq.Ft.)

600mmx600mmMineral Fiber Ceiling.

1292

CEILING LAYOUT

DATE

COPY

RIG

HT O

F DE

SIGN

S SH

OWN

ARE

RETA

IN B

Y TH

E CO

NSUL

TANT

.

CONS

ULTA

NTPR

OPOS

ED IN

TERI

OR F

IT-O

UT F

OR P

EACE

COR

PSSR

ILAN

KA A

T CO

LOM

BO 4

ARCH

T. B

UDDH

INI D

ISSA

NAYA

KEB.

ARCH

(HON

S), A

IA(S

L)

SCAL

EDR

AWN

CHEC

KED

SHEE

T NO

:PE

ACE

CO/2

019/

TEN/

AR/

::::

FIN

ISH

ING

- C

EILI

NG

BUDD

HINI

DIS

SANA

YAKE

CHA

RTER

ED A

RCHI

TECT

S59

/3 G

alpo

thth

a ro

ad,N

awal

a

ARCH

T. B

UDDH

INI

AS S

HOW

N

DMDM

FN-C

-01

+56'-0"

+56'-0"

LIFT

PCVLOUNGE

OFFICE

LOBBY

S T O R A G E

DRIVER'SLOUNGE

GENERALSERVICESMANAGER

ASST.GENERALSERVICESMANAGER

WASHROOM

TEN

DER

DRA

WIN

G

4'-11"

74'-6

"

6"dia ceiling mounted LED light(6500 K)

2'x2' ceiling mounted LED light(6500 K)

L E G E N D - E L E C T R I C A L

2'dia ceiling suspended LED light(4000 K)

14

08

4"dia ceiling mounted LED light(4000 K)

09

confirmation of design consultantsconfirmation of client - peace corps srilanka

3'x3' ceiling mounted AC cassette unit

service platform forAC outdoor units.

3'-3"

4'-2"

4'-1

0"6'

-0"

3'-0

"6'

-0"

4'-1

1"3'

-0"

3'-0

"3'

-0"

16.0

8.20

19

FINAL CONFIRMATION OF TENDER DESIGN STAGE.

SECOND FLOOR PLAN

Gypsum Board Ceiling

L E G E N D - C E I L I N G

Metal Perforated

AREA( Sq.Ft.)

860

1415

3"x5" treated wood horizontaltimber bars as thedecorative ceiling

gypsum board

white board

1'-0

"1'

-0"

2'-0

"

6'-0

"6'

-0"

6'-0

"

30'-5"

carpet tiles pasted onplywood structure and fixedto slab.

CEILING LAYOUT

DATE

COPY

RIG

HT O

F DE

SIGN

S SH

OWN

ARE

RETA

IN B

Y TH

E CO

NSUL

TANT

.

CONS

ULTA

NTPR

OPOS

ED IN

TERI

OR F

IT-O

UT F

OR P

EACE

COR

PSSR

ILAN

KA A

T CO

LOM

BO 4

ARCH

T. B

UDDH

INI D

ISSA

NAYA

KEB.

ARCH

(HON

S), A

IA(S

L)

SCAL

EDR

AWN

CHEC

KED

SHEE

T NO

:PE

ACE

CO/2

019/

TEN/

AR/

::::

FIN

ISH

ING

- C

EILI

NG

BUDD

HINI

DIS

SANA

YAKE

CHA

RTER

ED A

RCHI

TECT

S59

/3 G

alpo

thth

a ro

ad,N

awal

a

ARCH

T. B

UDDH

INI

AS S

HOW

N

DMDM

FN-C

-02

(32 SEATS CAPACITY)

C

OU

NT

ER

T

OP

UP

DWN

SCALE 1" = 8'

TEN

DER

DRA

WIN

G

3'-2"

74'-6

"

6"dia ceiling mounted LED light(6500 K)

2'x2' ceiling mounted LED light(6500 K)

L E G E N D - E L E C T R I C A L

2'dia ceiling suspended LED light(4000 K)

14

09

02

4"dia ceiling mounted LED light(4000 K)

15

FINAL CONFIRMATION OF TENDER DESIGN STAGE.confirmation of design consultantsconfirmation of client - peace corps srilanka

3'x3' ceiling mounted AC cassette unit

16.0

8.20

19

THIRD FLOOR PLAN

Gypsum Board Ceiling

L E G E N D - C E I L I N G

Metal Perforated

AREA( Sq.Ft.)

1375

1004

6"dia ceiling mounted LED light(6500 K)

2'x2' ceiling mounted LED light(6500 K)

L E G E N D - E L E C T R I C A L

2'dia ceiling suspended LED light(4000 K)

Ceiling suspendedlamps CEILING LAYOUT

DATE

COPY

RIG

HT O

F DE

SIGN

S SH

OWN

ARE

RETA

IN B

Y TH

E CO

NSUL

TANT

.

CONS

ULTA

NTPR

OPOS

ED IN

TERI

OR F

IT-O

UT F

OR P

EACE

COR

PSSR

ILAN

KA A

T CO

LOM

BO 4

ARCH

T. B

UDDH

INI D

ISSA

NAYA

KEB.

ARCH

(HON

S), A

IA(S

L)

SCAL

EDR

AWN

CHEC

KED

SHEE

T NO

:PE

ACE

CO/2

019/

TEN/

AR/

::::

FIN

ISH

ING

- C

EILI

NG

BUDD

HINI

DIS

SANA

YAKE

CHA

RTER

ED A

RCHI

TECT

S59

/3 G

alpo

thth

a ro

ad,N

awal

a

ARCH

T. B

UDDH

INI

AS S

HOW

N

DMDM

FN-C

-03

OFFICE

WASHROOM

LIFTMEETINGPOD

MEETINGPOD

TRAININGMANAGER

PROGRAMMANAGER

DIRECTOR(PROGRAM &

TRAINING)

PRINTING

WORKINGAREA(12 NOS)

PROGRAMASST.

PROGRAM &TRAINING

COORDINATOR

TRAININGASST.

HOUSINGCOORDINATOR

LOBBY

IT STAFF

SERVERROOM

SCALE 1" = 8'

TEN

DER

DRA

WIN

G

79'-0

"

20'-0"

4'-11"

74'-6

"

17'-0

"

18

18

02

confirmation of design consultantsconfirmation of client - peace corps srilanka

3'x3' ceiling mounted AC cassette unit 04

service platform forAC outdoor units.

3'-3"

4'-2"

16.0

8.20

19

FINAL CONFIRMATION OF TENDER DESIGN STAGE.

FOURTH FLOOR PLAN

Gypsum Board Ceiling

L E G E N D - C E I L I N G

Metal Perforated

AREA( Sq.Ft.)

1240

1188

6"dia ceiling mounted LED light(6500 K)

2'x2' ceiling mounted LED light(6500 K)

L E G E N D - E L E C T R I C A L

2'dia ceiling suspended LED light(4000 K)

CEILING LAYOUT

DATE

COPY

RIG

HT O

F DE

SIGN

S SH

OWN

ARE

RETA

IN B

Y TH

E CO

NSUL

TANT

.

CONS

ULTA

NTPR

OPOS

ED IN

TERI

OR F

IT-O

UT F

OR P

EACE

COR

PSSR

ILAN

KA A

T CO

LOM

BO 4

ARCH

T. B

UDDH

INI D

ISSA

NAYA

KEB.

ARCH

(HON

S), A

IA(S

L)

SCAL

EDR

AWN

CHEC

KED

SHEE

T NO

:PE

ACE

CO/2

019/

TEN/

AR/

::::

FIN

ISH

ING

- C

EILI

NG

BUDD

HINI

DIS

SANA

YAKE

CHA

RTER

ED A

RCHI

TECT

S59

/3 G

alpo

thth

a ro

ad,N

awal

a

confirmation of design consultantsconfirmation of client - peace corps srilanka

ARCH

T. B

UDDH

INI

AS S

HOW

N

DMDM

FN-C

-04

PRINTING

WAITINGAREA

CASHIER

FINANCIALSPECIALIST'S

ROOM

DIRECTOR(MANAGEMENT

&OPERATIONS)

MANAGER(SAFETY &SECURITY)

COUNTRYDIRECTOR

ADMINISTRATIVEASSISTANT

WASHROOM

LOBBY

LIFT

ME

ET

ING

TA

BL

E

ME

ET

ING

TA

BL

E

WAITINGAREA

MEETINGPOD

SCALE 1" = 8'

TEN

DER

DRA

WIN

G

5'-0"

60'-1

"

74'-6

"

15

19

3'x3' ceiling mounted AC cassette unit 04

16.0

8.20

19

FINAL CONFIRMATION OF TENDER DESIGN STAGE.

SIXTH FLOOR PLANCEILING LAYOUT

Gypsum Board Ceiling

600mmx600mm Mineral Fiber Ceiling.

L E G E N D - C E I L I N G

Metal Perforated

6"dia ceiling mounted LED light(4000 K)

L E G E N D - E L E C T R I C A L

DATE

COPY

RIG

HT O

F DE

SIGN

S SH

OWN

ARE

RETA

IN B

Y TH

E CO

NSUL

TANT

.

TEN

DER

DRA

WIN

GCO

NSUL

TANT

PROP

OSED

INTE

RIOR

FIT

-OUT

FOR

PEA

CE C

ORPS

SRIL

ANKA

AT

COLO

MBO

4AR

CHT.

BUD

DHIN

I DIS

SANA

YAKE

B.AR

CH(H

ONS)

, AIA

(SL)

SCAL

EDR

AWN

CHEC

KED

SHEE

T NO

:PE

ACE

CO/2

019/

TEN/

AR/

::::

FIN

ISH

ING

- C

EILI

NG

BUDD

HINI

DIS

SANA

YAKE

CHA

RTER

ED A

RCHI

TECT

S59

/3 G

alpo

thth

a ro

ad,N

awal

a

confirmation of design consultantsconfirmation of client - peace corps srilanka

ARCH

T. B

UDDH

INI

AS S

HOW

N

DMDM

FN-C

-05

LIFT

UP

UP

OPENTO SKY

HANDWASHING

HANDWASHING

EXISTING COUNTER

DWN

DUCT

SCALE 1" = 8'

20

16.0

8.20

19

FINAL CONFIRMATION OF TENDER DESIGN STAGE.