paul emma injector/bc1 commissioning [email protected] april 20, 2006 1 injector/bc1...
Post on 22-Dec-2015
215 views
TRANSCRIPT
Paul EmmaPaul Emma
Injector/BC1 CommissioningInjector/BC1 Commissioning [email protected]@SLAC.Stanford.edu
April 20, 2006April 20, 20061
Injector/BC1 CommissioningInjector/BC1 Commissioning(Dec. 1, ’06 through Aug. 1, ‘07)(Dec. 1, ’06 through Aug. 1, ‘07)
P. EmmaP. Emma LCLSLCLS FAC Meeting FAC Meeting
Accelerator Systems BreakoutAccelerator Systems Breakout April 20, 2006April 20, 2006
LCLSLCLS
Paul EmmaPaul Emma
Injector/BC1 CommissioningInjector/BC1 Commissioning [email protected]@SLAC.Stanford.edu
April 20, 2006April 20, 20062
LCLSLCLS Accelerator Schematic and Time Frames Accelerator Schematic and Time Frames
SLAC linac tunnelSLAC linac tunnel research yardresearch yard
Linac-0Linac-0L L =6 m=6 m
Linac-1Linac-1L L 9 m9 m
rf rf 25°25°
Linac-2Linac-2L L 330 m330 mrf rf 41°41°
Linac-3Linac-3L L 550 m550 mrf rf 0° 0°
BC1BC1L L 6 m6 m
RR5656 39 mm39 mm
BC2BC2L L 22 m22 m
RR5656 25 mm25 mm DL2 DL2 L L =275 m=275 mRR56 56 0 0
DL1DL1L L 12 m12 mRR56 56 0 0
undulatorundulatorL L =130 m=130 m
6 MeV6 MeVz z 0.83 mm 0.83 mm 0.05 %0.05 %
135 MeV135 MeVz z 0.83 mm 0.83 mm 0.10 %0.10 %
250 MeV250 MeVz z 0.19 mm 0.19 mm 1.6 %1.6 %
4.30 GeV4.30 GeVz z 0.022 mm 0.022 mm 0.71 %0.71 %
13.6 GeV13.6 GeVz z 0.022 mm 0.022 mm 0.01 %0.01 %
Linac-Linac-XXL L =0.6 m=0.6 mrfrf= =
21-1b,c,d
...existinglinac
L0-a,b
rfrfgungun
21-3b24-6dX
25-1a30-8c
Commission in Jan. 2007Commission in Jan. 2007 Commission in Jan. 2008Commission in Jan. 2008
Paul EmmaPaul Emma
Injector/BC1 CommissioningInjector/BC1 Commissioning [email protected]@SLAC.Stanford.edu
April 20, 2006April 20, 20063
Machine Commissioning PlansMachine Commissioning PlansSchedule developed in MS-ProjectSchedule developed in MS-ProjectOne file/manager per systemOne file/manager per systemLink to milestones and events in Master fileLink to milestones and events in Master file
Injector-BC1Injector-BC1
Dec.Dec.‘‘0606
BC2BC2
Dec.Dec.‘‘0707
Dec.Dec.‘‘0505
Sep.Sep.‘‘0707
Aug.Aug.‘‘0606
installinstall installinstall
Mar.Mar.‘‘0808
LTU-und.LTU-und.
Paul EmmaPaul Emma
Injector/BC1 CommissioningInjector/BC1 Commissioning [email protected]@SLAC.Stanford.edu
April 20, 2006April 20, 20064
Paul EmmaPaul Emma
Injector/BC1 CommissioningInjector/BC1 Commissioning [email protected]@SLAC.Stanford.edu
April 20, 2006April 20, 20065
Injector Through BC1 CommissioningInjector Through BC1 Commissioning
xx,,yy
and sliceand slice
EE
EERF RF
deflectordeflector
no laser-heaterno laser-heater
Paul EmmaPaul Emma
Injector/BC1 CommissioningInjector/BC1 Commissioning [email protected]@SLAC.Stanford.edu
April 20, 2006April 20, 20066
Injector Through BC1 Commissioning (2)Injector Through BC1 Commissioning (2)
xx,,yy
EE
EEslice slice yy
stopperstopper
relative relative bunch length bunch length
monitorsmonitors
X-band X-band RFRF
BC1BC1
Paul EmmaPaul Emma
Injector/BC1 CommissioningInjector/BC1 Commissioning [email protected]@SLAC.Stanford.edu
April 20, 2006April 20, 20067
Many Measurement Simulations DoneMany Measurement Simulations Done
Linac-1 RF phase scanLinac-1 RF phase scan(X-band off, BC1 bends at 295 MeV)(X-band off, BC1 bends at 295 MeV)
set phase to set phase to 2525˚̊0.50.5˚̊
20-20-m res. BC1 BPMm res. BC1 BPM
L1 RF phaseL1 RF phase
Linac-1Linac-1newnew
rfrfgungun
21-1b21-1b21-1d21-1d XX
= meas. sim.= calc.= y distribution= actual
DL1 slice-emit on WS02DL1 slice-emit on WS02
Slice Emittance MeasurementSlice Emittance MeasurementL1-Linac RF PhasingL1-Linac RF Phasing
Paul EmmaPaul Emma
Injector/BC1 CommissioningInjector/BC1 Commissioning [email protected]@SLAC.Stanford.edu
April 20, 2006April 20, 20068
Also available:Also available:P. Emma,P. Emma,P. Krejcik,P. Krejcik,C. Limborg,C. Limborg,J. Schmerge,J. Schmerge,et al.et al.
LCLSLCLS Drive-LaserDrive-Laser Commissioning Commissioning8-Hour Cycle (5 days/week, 8-Hour Cycle (5 days/week, 8/1/06 to 12/1/068/1/06 to 12/1/06, 16 total weeks), 16 total weeks)
DAY SHIFT DAY SHIFT (8:00-16:00)(8:00-16:00)W. White, J. Castro,W. White, J. Castro,
D. Dowell, S. Gilevich,D. Dowell, S. Gilevich,H. Loos, S. Peng (as needed)H. Loos, S. Peng (as needed)
DAY SHIFT DAY SHIFT (8:00-16:00)(8:00-16:00)W. White, J. Castro,W. White, J. Castro,
D. Dowell, S. Gilevich,D. Dowell, S. Gilevich,H. Loos, S. Peng (as needed)H. Loos, S. Peng (as needed)
SWING SHIFT SWING SHIFT (16:00-24:00)(16:00-24:00)(none)(none)
SWING SHIFT SWING SHIFT (16:00-24:00)(16:00-24:00)(none)(none)
OWL SHIFT OWL SHIFT (0:00-8:00)(0:00-8:00)(none)(none)
OWL SHIFT OWL SHIFT (0:00-8:00)(0:00-8:00)(none)(none)
(see W. White)(see W. White)
Paul EmmaPaul Emma
Injector/BC1 CommissioningInjector/BC1 Commissioning [email protected]@SLAC.Stanford.edu
April 20, 2006April 20, 20069
DAY SHIFT DAY SHIFT (8:00-16:00)(8:00-16:00)1 lead physicist, 1 physicist,1 lead physicist, 1 physicist,
1 controls eng., 1 sys. engineer,1 controls eng., 1 sys. engineer,1 LCLS operator, 1 laser operator1 LCLS operator, 1 laser operator
DAY SHIFT DAY SHIFT (8:00-16:00)(8:00-16:00)1 lead physicist, 1 physicist,1 lead physicist, 1 physicist,
1 controls eng., 1 sys. engineer,1 controls eng., 1 sys. engineer,1 LCLS operator, 1 laser operator1 LCLS operator, 1 laser operator
LCLSLCLS Injector/BC1 Commissioning Injector/BC1 Commissioning24-Hour Cycle (7 days/week, 24-Hour Cycle (7 days/week, 12/1/06 to 8/1/0712/1/06 to 8/1/07, 32 total weeks), 32 total weeks)
SWING SHIFT SWING SHIFT (16:00-24:00)(16:00-24:00)1 lead physicist, 1 physicist,1 lead physicist, 1 physicist,
1 LCLS operator, 1 laser operator1 LCLS operator, 1 laser operator
SWING SHIFT SWING SHIFT (16:00-24:00)(16:00-24:00)1 lead physicist, 1 physicist,1 lead physicist, 1 physicist,
1 LCLS operator, 1 laser operator1 LCLS operator, 1 laser operator
OWL SHIFT OWL SHIFT (0:00-8:00)(0:00-8:00)1 LCLS operator, 1 operator,1 LCLS operator, 1 operator,
1 laser operator1 laser operator
OWL SHIFT OWL SHIFT (0:00-8:00)(0:00-8:00)1 LCLS operator, 1 operator,1 LCLS operator, 1 operator,
1 laser operator1 laser operator
Paul EmmaPaul Emma
Injector/BC1 CommissioningInjector/BC1 Commissioning [email protected]@SLAC.Stanford.edu
April 20, 2006April 20, 200610
Shift LeadersShift Leaders (initially) (initially)(1 per D/S shift)(1 per D/S shift)
1.1. Dave DowellDave Dowell2.2. Paul EmmaPaul Emma3.3. Patrick KrejcikPatrick Krejcik4.4. Cecile LimborgCecile Limborg5.5. Bill WhiteBill White
OperationsOperations(1 per DAY & SWING (1 per DAY & SWING shift and 2 per OWL)shift and 2 per OWL)
Personnel Available for Personnel Available for LCLSLCLS Injector/BC1 Commissioning Injector/BC1 Commissioning
LCLS PhysicistsLCLS Physicists(1 per D/S shift)(1 per D/S shift)
1.1. Sasha GilevichSasha Gilevich2.2. Henrik LoosHenrik Loos3.3. Heinz-Dieter NuhnHeinz-Dieter Nuhn4.4. John SchmergeJohn Schmerge5.5. Dave SchultzDave Schultz6.6. Jim WelchJim Welch7.7. Juhao WuJuhao Wu
Controls eng.Controls eng.(1 per DAY shift)(1 per DAY shift)
1.1. Stephanie AllisonStephanie Allison2.2. Mike ZelazneyMike Zelazney3.3. Debbie RogindDebbie Rogind4.4. Diane FairleyDiane Fairley5.5. Stephen NoremStephen Norem6.6. Arturo Arturo AlarconAlarcon7.7. Doug MurrayDoug Murray8.8. Sergei ChevtsovSergei Chevtsov9.9. Karen KotturiKaren Kotturi10.10. Kristi LuchiniKristi Luchini11.11. Sheng PengSheng Peng12.12. Stephen SchuhStephen Schuh13.13. Till StraumannTill Straumann
Sys. EngineersSys. Engineers(1 per DAY shift)(1 per DAY shift)
1.1. Eric BongEric Bong2.2. Carl RagoCarl Rago3.3. Leif ErikssonLeif Eriksson4.4. Richard F. BoyceRichard F. Boyce5.5. Jose ChanJose Chan6.6. Tim MontagneTim Montagne7.7. Paul BellomoPaul Bellomo8.8. Antonio de LiraAntonio de Lira9.9. Dave MacNairDave MacNair
Accelerator, ILC, SSRLAccelerator, ILC, SSRL1.1. Franz-Josef DeckerFranz-Josef Decker2.2. Jim TurnerJim Turner3.3. Rick IversonRick Iverson4.4. Doug McCormickDoug McCormick5.5. Joe FrischJoe Frisch6.6. Marc RossMarc Ross7.7. Jeff CorbettJeff Corbett8.8. James SafranekJames Safranek
Laser OperatorsLaser Operators
Visitors ?Visitors ?
Paul EmmaPaul Emma
Injector/BC1 CommissioningInjector/BC1 Commissioning [email protected]@SLAC.Stanford.edu
April 20, 2006April 20, 200611
Man-Power Requirements (12/1/06 – 8/1/07)Man-Power Requirements (12/1/06 – 8/1/07)32 weeks total (12/1/06 to 8/1/07, minus 2 weeks)32 weeks total (12/1/06 to 8/1/07, minus 2 weeks)80% coverage (downtime)80% coverage (downtime)14 14 lead-physicistlead-physicist shifts/week shifts/week14 14 physicistphysicist shifts/week shifts/week7 7 controls eng.controls eng. shifts/week shifts/week7 7 sys. engineersys. engineer shifts/week shifts/week21 21 laser operatorlaser operator shifts/week shifts/week(28 (28 operatoroperator shifts/week) shifts/week)
Average of Average of 2.82.8 shifts/week for each shifts/week for each lead physicistlead physicistAverage of Average of 2.02.0 shifts/week for each shifts/week for each physicistphysicistAverage of Average of 0.50.5 shifts/week for each shifts/week for each controls eng.controls eng.Average of Average of 0.80.8 shifts/week for each shifts/week for each sys. engineersys. engineerAverage of 4-Average of 4-55 shifts/week for each shifts/week for each laser operatorlaser operator
(32 weeks)(32 weeks)(2(214 + 214 + 27 + 21)7 + 21)(80%) (80%) 1600 man-shifts = 1600 man-shifts =12900 man-hours 12900 man-hours 6.5 man-years (+ 2.9 from op’s)6.5 man-years (+ 2.9 from op’s)
Paul EmmaPaul Emma
Injector/BC1 CommissioningInjector/BC1 Commissioning [email protected]@SLAC.Stanford.edu
April 20, 2006April 20, 200612
LCLSLCLS Commissioning Parameters Commissioning Parameters
ParameterParameter ValueValue CommentsComments
RF rateRF rate 30 Hz30 Hz 30 Hz in linac (possible short-term 120 Hz linac rate 30 Hz in linac (possible short-term 120 Hz linac rate in L0-BC1 for feedback tests, etc) - 120 Hz in gun for in L0-BC1 for feedback tests, etc) - 120 Hz in gun for short time to verify full rateshort time to verify full rate
Beam rateBeam rate ≤≤30 Hz30 Hz 30 Hz e- beam as baseline – possible 120-Hz tests in 30 Hz e- beam as baseline – possible 120-Hz tests in L0-BC1 for short term verification of feedback, etcL0-BC1 for short term verification of feedback, etc
Drive-laser rateDrive-laser rate 120 Hz120 Hz 120-Hz all the times – pulse-picker provides 120-Hz all the times – pulse-picker provides ee rate rate as required aboveas required above
Bunch chargeBunch charge 200-500 pC200-500 pC 200-500 pC, depending on QE and diagnostics - 200-500 pC, depending on QE and diagnostics - short spans at 10 pC – later in ’07 we explore 1-nCshort spans at 10 pC – later in ’07 we explore 1-nC
Drive-laser pulse lengthDrive-laser pulse length 10 ps fwhm10 ps fwhm 10 ps fwhm startup with possibility of 6-ps at 0.2 nC 10 ps fwhm startup with possibility of 6-ps at 0.2 nC later – early laser tests may provide path to more later – early laser tests may provide path to more convenient pulse-length changesconvenient pulse-length changes
Gun gradientGun gradient 120 MV/m120 MV/m 120 MV/m, although 110 MV/m is adequate in ‘07120 MV/m, although 110 MV/m is adequate in ‘07
Paul EmmaPaul Emma
Injector/BC1 CommissioningInjector/BC1 Commissioning [email protected]@SLAC.Stanford.edu
April 20, 2006April 20, 200613
IssuesIssues
Controls will be mixed (SLC & epics) and Controls will be mixed (SLC & epics) and capabilities may be limited initiallycapabilities may be limited initially
Most High-Level Applications (emittance, Most High-Level Applications (emittance, bunch length, feedback) must done through bunch length, feedback) must done through MATLAB as a temporary solutionMATLAB as a temporary solution
Most Most LCLSLCLS physicists not yet experienced in physicists not yet experienced in SLAC control room with SLC controlsSLAC control room with SLC controls
Help from operations group will be neededHelp from operations group will be needed