INTRODUCTION TO INTRODUCTION TO PLUG & ABANDONMENT FORUM (PAF) PLUG & ABANDONMENT FORUM (PAF) Plug and Abandonment workshop Plug and Abandonment workshop Sola Quality Airport Hotel 9 Sola Quality Airport Hotel 9 th th of June 2011 of June 2011 Presenter: Nina Ring Presenter: Nina Ring ø ø en, chairman of PAF en, chairman of PAF Sr Drilling Engineer, Centrica Energi Sr Drilling Engineer, Centrica Energi

Upload: others

Post on 10-Oct-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: PAF Workshop NR · Title: Microsoft PowerPoint - PAF Workshop_NR.pptx Author: straumem Created Date: 6/21/2011 12:14:56 PM

INTRODUCTION TO INTRODUCTION TO

PLUG & ABANDONMENT FORUM (PAF) PLUG & ABANDONMENT FORUM (PAF)

Plug and Abandonment workshopPlug and Abandonment workshop

Sola Quality Airport Hotel 9Sola Quality Airport Hotel 9thth of June 2011of June 2011

Presenter: Nina RingPresenter: Nina Ringøøen, chairman of PAFen, chairman of PAF

Sr Drilling Engineer, Centrica EnergiSr Drilling Engineer, Centrica Energi

Page 2: PAF Workshop NR · Title: Microsoft PowerPoint - PAF Workshop_NR.pptx Author: straumem Created Date: 6/21/2011 12:14:56 PM

Plug and Abandonment FORUM

P&A Workshop introductionP&A Workshop introduction

� P&A Forum – were do we belong?

� Top 5 P&A challenges

� Increase & improve common understanding

of permanent P&A requirements

� Give feedback to new revision of

NORSOK D-010 for P&A and initial well design

� Prepare for the ”big wave” of

plug & abandonment operations coming in

the near future

Prepare for a potential “Big wave” of upcoming P&A’s

��When does the majority When does the majority

of P&A come? of P&A come?

��Are we ready ?Are we ready ?

Page 3: PAF Workshop NR · Title: Microsoft PowerPoint - PAF Workshop_NR.pptx Author: straumem Created Date: 6/21/2011 12:14:56 PM

Where does PAF belong?

OLF – Norwegian Oil Industry Association� is a professional body and employer’s association for oil and supplier

companies engaged in the field of exploration and production of oil and gas

� The OLF works to solve common challenges for the members and to strengthen the competitiveness of the Shelf.

Drilling Managers Forum

� 35 oil & gas companies

�Well Integrity Forum (2007)

�Plug and Abandonment Forum (2009)

� “The P&A Forum was established in 2009 to develop robust and cost efficient solutions to the current & upcoming P&A challenges on the Norwegian Continental Shelf together with the service industry”.

Page 4: PAF Workshop NR · Title: Microsoft PowerPoint - PAF Workshop_NR.pptx Author: straumem Created Date: 6/21/2011 12:14:56 PM

� P&A Forum established November 2009 after initiative from a ConocoPhillips

Norway P&A Workshop

� The Forum is comparable to Oil & Gas UK Decommissioning Work Group 5.

� Members: Currently 9 operating companies (Open operator forum)

� Facilitator: OLF

Observer:

� Petroleum Safety Authority

Page 5: PAF Workshop NR · Title: Microsoft PowerPoint - PAF Workshop_NR.pptx Author: straumem Created Date: 6/21/2011 12:14:56 PM

Challenges in P&A operations

The main purpose of the workshop is to encourage the industry toThe main purpose of the workshop is to encourage the industry to solve the P&A solve the P&A

challenges identified by P&A Forum in close cochallenges identified by P&A Forum in close co--operation with the operators and operation with the operators and

their needs:their needs:

� Improve conventional section milling

� Qualify alternatives to section milling, creating annulus barriers

� Qualify alternative materials for annulus barrier

� Abandonment with a light well intervention vessel

� Pulling tubing without rig

P&A Forum

� Qualify one long cement plug with a shared casing cement job as equivalent to two independent barriers

Page 6: PAF Workshop NR · Title: Microsoft PowerPoint - PAF Workshop_NR.pptx Author: straumem Created Date: 6/21/2011 12:14:56 PM

6

� Norway has more than 500 offshore installations (157 platforms) and approximately 2000 wells to

be abandonded (1200 in Statoil)

� 250 000 people are employed in the industry

� Estimations of 160 bill NOK to remove the installations (report from Climate & Pollution

Agency in may 2010)

� Well abandonment cost per well is in a range

of 85 – 155 mill NOK

� This challenges both license owners and

authorities to look for solutions to perform the

P&A of wells in an efficient and safe manner

Norwegian Continental Shelf Norwegian Continental Shelf

–– 42 years of history42 years of history……....

Approximately 2000 wells to be abandoned from 2011 – 2040

� 193 wells temporary abandoned� +/-150 new wells drilled/year

� more to come

Page 7: PAF Workshop NR · Title: Microsoft PowerPoint - PAF Workshop_NR.pptx Author: straumem Created Date: 6/21/2011 12:14:56 PM

7

� Communicate with PSA related to regulatory

requirements, industry standards and guidelines through input to NORSOK D-010 revision

� Co-operate with service industry related to new requirements, technology & materials, and methods

to achieve well integrity in a more efficient operation

� develop best practice and guidelines for how to

achieve and verify robust well integrity

The P&A forum should, amongst other:

Page 8: PAF Workshop NR · Title: Microsoft PowerPoint - PAF Workshop_NR.pptx Author: straumem Created Date: 6/21/2011 12:14:56 PM

8

Be a place to discuss:

� common funding of R&D projects

� Opportunities for P&A activities that can be

performed without a rig

� sharing of “case stories” and experience

transfer among the operators to obtain common understanding

The P&A forum should, amongst other:

Page 9: PAF Workshop NR · Title: Microsoft PowerPoint - PAF Workshop_NR.pptx Author: straumem Created Date: 6/21/2011 12:14:56 PM

9

NORSOK STANDARD DNORSOK STANDARD D--010010””Well Integrity in drilling and well operationsWell Integrity in drilling and well operations”” (2004)(2004)

Page 10: PAF Workshop NR · Title: Microsoft PowerPoint - PAF Workshop_NR.pptx Author: straumem Created Date: 6/21/2011 12:14:56 PM

P&A Forum Increase / improve common understanding of permanent P&A requirements

”Task force” established – prepare proposals for improvements of

NORSOK DNORSOK D--010, rev.3, Aug 2004010, rev.3, Aug 2004

� Terms and definitions finished

� General principles started

� Sidetracks, suspension and abandonment started

� Well Barrier Element Acceptance Criteria

(WBEAC) tables started

Page 11: PAF Workshop NR · Title: Microsoft PowerPoint - PAF Workshop_NR.pptx Author: straumem Created Date: 6/21/2011 12:14:56 PM

NORSOK D-010Dual independent barrier philosophy …!

There shall be

two well barriers

available where a

pressure

differential exists

that may cause

uncontrolled

outflow from the

borehole/well to

the external

environment….

Page 12: PAF Workshop NR · Title: Microsoft PowerPoint - PAF Workshop_NR.pptx Author: straumem Created Date: 6/21/2011 12:14:56 PM

Acceptance CriteriaWhich are....?

Cement

Shoe TrackFormation

Mud

Bridge plug Casing

NORSOK D-010Gives you many answers

Page 13: PAF Workshop NR · Title: Microsoft PowerPoint - PAF Workshop_NR.pptx Author: straumem Created Date: 6/21/2011 12:14:56 PM

13

Plugging & Abandonment NORSOK D-010 Section 9

Primary & Secondary well barriers shallshall be positioned at a

depth with sufficient formation strength at the base of the plug in excess of the potential internal pressure (worst anticipated reservoir

pressure into account for the abandonment period).

• Permanent well barriers shallshall extend across the full cross section of the well, include all annuli and seal both vertically and horizontally.

Page 14: PAF Workshop NR · Title: Microsoft PowerPoint - PAF Workshop_NR.pptx Author: straumem Created Date: 6/21/2011 12:14:56 PM

Applied to a real well

Page 15: PAF Workshop NR · Title: Microsoft PowerPoint - PAF Workshop_NR.pptx Author: straumem Created Date: 6/21/2011 12:14:56 PM

Production Production

PackerPacker

Well design for abandonment ?

Casing cement: Casing cement: ShallShall be minimum 100 m cement above a casing shoe and

100 m above production packer?

Production Packer to be positioned at depth with formation integrity to withstand any internal pressure below

?

Page 16: PAF Workshop NR · Title: Microsoft PowerPoint - PAF Workshop_NR.pptx Author: straumem Created Date: 6/21/2011 12:14:56 PM

16

Lessons from other industries ? ����Plugging and abandoning for eternity ??

Page 17: PAF Workshop NR · Title: Microsoft PowerPoint - PAF Workshop_NR.pptx Author: straumem Created Date: 6/21/2011 12:14:56 PM

Summary

� Focus areas in PAF are amongst others:

� Generate common understanding of regulations, guidelines and standards (NORSOK D-010)

� Share ”Best practise” & Case stories

� Focus on improvement in technical solutions for upcoming P&A operations

� Ensure quality solutions with well integrity in both well design and P&A in a cost effective manner

� Work together with service industry, Co-operate ☺

Page 18: PAF Workshop NR · Title: Microsoft PowerPoint - PAF Workshop_NR.pptx Author: straumem Created Date: 6/21/2011 12:14:56 PM

Solving the P&A challenges on the Norwegian Continental ShelfSolving the P&A challenges on the Norwegian Continental Shelf

Presenter: Nina Ringøen

Title: Sr Drilling EngineerE�mail: [email protected]

Questions? Questions?