  • 8/3/2019 P2 Changes PIP

    1/7

    Project information paper

    After phase one consultation, weanalysed all the feedback that wereceived during the consultationperiod and interim engagementevents. We considered thisinformation alongside thedevelopments in engineering designand any new information.

    This information paper explains howour proposed scheme has changedcompared to that presented at phaseone consultation and why. This isa high-level overview of the changes,for more detailed informationplease see our Site information

    papers and Phase two schemedevelopment report.

    Main tunnel sites andtunnelling strategyWe require sites to build the main

    tunnel at:

    each end of the main tunnel inwest and east London

    suitable intervals along the route ofthe main tunnel

    in locations where the type of

    geology that the main tunnel goesthrough changes.

    Thetwoguresoverleafshowour preferred sites related to ourtunnelling strategy for phaseone consultation and phasetwo consultation.

    Changes

    We have reviewed our preferred sites and tunnelling strategy to comeup with a revised and rened scheme for phase two consultation.

  • 8/3/2019 P2 Changes PIP

    2/7

    Changes

    Phase one consultation preferred tunnelling strategy

    Phase two consultation preferred tunnelling strategy

    CITY OF WESTMINSTERKENSINGTON

    & CHELSEA

    CITY OF LONDON

    TOWER HAMLETS

    NEWHAM

    GREENWICHLEWISHAMLAMBETH SOUTHWARK

    EALING HAMMERSMITH

    & FULHAM

    WANDSWORTH

    RICHMOND

    UPON

    THAMES

    HOUNSLOW

    1

    2

    4

    3

    5

    6

    7

    8

    Drive H

    Drive I

    Drive K

    Drive J

    Drive L

    Acton Storm Tanks

    Hammersmith Pumping Station

    Barn Elms

    Bell Lane Creek

    King Georges Park

    Tideway Walk

    Kings Stairs Gardens

    Druid Street

    Greenwich Pumping Station

    Abbey Mills Pumping Station

    Main tunnel

    Connection tunnel

    Lee Tunnel (under construction)

    Acton Storm Tanks

    Dormay Street

    King Georges Park

    Carnwath Road Riverside

    Kirtling Street

    Chambers Wharf

    Greenwich Pumping Station

    Abbey Mills Pumping Station

    Main tunnel

    Connection tunnel

    Lee Tunnel (under construction)

    2

    2

    3

    3

    4

    4

    5

    5

    6

    6

    7

    7

    8

    8

    9

    1

    1

    10

    CITY OF WESTMINSTERKENSINGTON

    & CHELSEA

    CITY OF LONDON

    TOWER HAMLETS

    NEWHAM

    GREENWICHLEWISHAMLAMBETH SOUTHWARK

    EALING HAMMERSMITH

    & FULHAM

    WANDSWORTH

    RICHMOND

    UPON

    THAMES

    HOUNSLOW

    1

    2

    3

    4

    5

    6

    7

    9

    10

    8

    Drive B

    Drive A

    Drive C

    Drive D

    Drive E

    Drive F

    Drive G

  • 8/3/2019 P2 Changes PIP

    3/7

    Changes

    Main tunnel sitesAt phase one consultation the construction of our

    preferred main tunnel started in the west at Barn Elmsdrives A and B). The central section was to be built from

    Tideway Walk (drive C) and the eastern section from

    Abbey Mills Pumping Station to Kings Stairs GardensdriveD).TheowswouldthenbetransferredviatheLee

    Tunnel (which is already under construction) to BecktonSewage Treatment Works.

    At phase two consultation, we are proposing that the

    main tunnel extends to Acton Storm Tanks, where we alsoneed to intercept a CSO (drive H). The main tunnel would

    henfollowthepreviouspreferredroutetonishatAbbeyMills. The sites at both ends of the main tunnel would onlybe used to take the tunnel boring machines (TBMs) out of

    he ground and are known as reception sites.

    Barn Elms/Carnwath Road RiversideAt phase one consultation, Barn Elms was our preferredsite to construct the main tunnel and to intercept the

    existing local CSO (West Putney Storm Relief CSO). Weproposed to drive a short section of the main tunnel to

    Hammersmith Pumping Station site (drive A) and then

    drive the main tunnel towards Tideway Walk (drive B).

    After phase one consultation we reviewed the size of our

    main tunnel sites in areas of clay geology and we nowlonger need as much space as we previously thought.

    Because of this we have re-assessed potential sites in thewest. At phase two consultation, we propose to use

    Carnwath Road Riverside to drive the main tunnel to

    Acton Storm Tanks (drive H).

    Carnwath Road Riverside is now our preferred site. Themain reasons are:

    itisabrowneldsite

    the existing wharves and the width of the River

    Thames at this point would allow the use of larger

    barges to remove material excavated duringconstruction of the main tunnel

    therewouldbemuchlessconictwiththerecreationaluses of the River Thames than at Barn Elms.

    For more information on the selection of this site please

    see the Carnwath Road Riverside Site information paper.

    We would still need a site at Barn Elms to intercept the

    West Putney Storm Relief CSO located there. At B arn Elmsthiswillsignicantlyreducetheconstructionareaand

    time on site.

    Tideway Walk/Kirtling StreetAt phase one consultation, Tideway Walk was ourpreferred site to construct the main tunnel and to

    intercept the two local CSOs (Heathwall Pumping StationCSO and South West Storm Relief CSO). This site would

    receive the main tunnel from Barn Elms (drive B) and drive

    the main tunnel to Kings Stairs Gardens (drive C). Sincethen, the site has been granted planning permission andwork has started on a new residential development. This

    means that the site is no longer available to the project.

    At phase two consultation, we propose to use Kirtling

    Street, which is located to the west of the Tideway Walksite. We propose to use Kirtling Street as a double drive

    site (drives I and J). This means we would drive one sectionof the main tunnel westward to Carnwath Road (drive I)

    and drive another section of the tunnel eastward toChambers Wharf (drive J).

    Kirtling Street is now our preferred site to tunnel both eastandwest(atthesametime)becauseitisbrowneldland

    in a mainly industrial area. It also has more space toaccommodate the tunnelling activities associated with a

    main tunnel double drive site. By including the land at

    Cringle Street (next to the Kirlting Street site) we there isalso more river frontage, which would provide better

    arrangements for jetties and barges.

    As Kirtling Street is not located next to the two CSOs we

    also need to intercept, we propose using another site atthe Heathwall Pumping Station including the use of

    Middle Wharf.

    For more information on the selection of this site pleasesee the Kirtling Street and Heathwall Pumping Station Siteinformation papers.

    Phase two preferred site Carnwath Road Riverside

    Phase one preferred site Barn Elms

    Local authorityboundary

    N

    Wandsw

    orthBridge

    Putn

    eyBridg

    e

    Barn Elms and Carnwath Road Riverside sites

    N

    Phase two preferred site Kirtling Street and HeathwallPumping Station

    Phase one preferred site Tideway Walk

    Local authority boundary

    Nin

    eEl

    msL

    ane

    A320

    5

    Kir

    tlin

    gS

    treet

    Tideway Walk and Kirtling Street sites

  • 8/3/2019 P2 Changes PIP

    4/7

    Changes

    Combinedseweroverow(CSO)sitesandconnection tunnelsAt phase one consultation we presented 20 preferred CSO

    sites, three of them combined with main tunnel sites. Atphase two consultation we propose 17 preferred CSO sites.

    Further technical work has allowed us to drop threeCSO sites.

    The following explains what we proposed at phase one

    and phase two consultation, and provides a snapshot of

    the potential consequences of the changes.

    Acton Storm Tanks

    We still intend to use this site to intercept the Acton StormRelief CSO. At phase one consultation, we proposed to

    drive a connection tunnel to t he site from Hammersmith

    Pumping Station (drive E). We are now proposing to drivethe main tunnel from Carnwath Road Riverside to the site

    (drive H), which will involved a slightly larger shaft andlonger construction period.

    Phase oneconsultation

    Phase twoconsultation

    Consequences

    Intercept the CSOand receive a smallTBM.

    Intercept theCSO and receivethe main tunnelTBM.

    Slightly largerconstruction arearequired and alonger constructionperiod.

    Hammersmith Pumping StationAt phase one consultation, we proposed to use the site todrive a connection tunnel to t he Acton Storm Tanks site

    (drive E) and to intercept the Hammersmith PumpingStation CSO. We also proposed to use this site to receive

    the main tunnel from Barn Elms (drive A).

    At phase two consultation we propose to only use this site

    to intercept the CSO as we now propose to drive the maintunnel from Carnwath Road Riverside to Acton Storm

    Tanks (drive H).

    Phase oneconsultation

    Phase twoconsultation

    Consequences

    Intercept the CSO,drive a connectiontunnel, and receivethe main tunnelTBM.

    Intercept theCSO.

    Reducedconstruction areaand time on site.

    Barn ElmsAt phase one consultation we proposed to use the site todrive the main tunnel up to the Hammersmith Pumping

    Station site and to then drive the main tunnel to theTideway Walk site in Battersea (drives A and B).

    Sincephaseoneconsultation,wehaveidentied

    Carnwath Road Riverside as our preferred alternative site

    over Barn Elms for the construction of the main tunnel.However, we still require a site at Barn Elms to intercept

    the West Putney Storm Relief CSO located there.

    Phase oneconsultation

    Phase twoconsultation

    Consequences

    Intercept the CSO,drive the main tunnelup to HammersmithPumping Station andthen drive the maintunnel to TidewayWalk in Battersea.

    Intercept theCSO.

    Signicantlyreducedconstruction areaand time on site.

    Putney Bridge ForeshoreThis remains our preferred site at phase two consultation,

    to intercept the CSO located underneath Putney Bridge.We have listened to stakeholders and made improvements

    to the construction layout to help reduce local impacts.

    Kings Stairs Gardens/Chambers Wharfn the east, we previously proposed to drive the main

    unnel from Abbey Mills Pumping Station to Kings StairsGardens (drive D). Two connection tunnels would also be

    driven from Kings Stairs Gardens, one to GreenwichPumping Station (drive F) and one to Druid Street

    drive G).

    Sincephaseone,wehaveidentiedapotentialalternative

    ite at Chambers Wharf, to the west of the Kings StairsGardens site. This site was not previously available to us as

    he site had planning permission and site clearance hadtarted for a residential development.

    Since then, we have purchased the site in conjunction with

    St James (a part of the Berkeley Group). This means thatwe have secured the ability to use it, should it be deemed

    appropriate to do so following public consultation.

    As the site has much better river access than we wouldhave had at Abbey Mills Pumping Station, we are now

    proposing to drive the main tunnel from Chambers Whar fto Abbey Mills Pumping Station (drive K). Chambers Wharf

    would also receive the connection tunnel from Greenwich

    Pumping Station (drive L).

    N

    Phase two preferred site Chambers Wharf

    Local authority boundary

    Phase one preferred site Kings Stairs Gardens

    JamaicaRo

    ad

    Bevin

    gto

    nSt

    reet

    Paradise

    Street

    Kings Stairs Gardens and Chambers Wharf sites

  • 8/3/2019 P2 Changes PIP

    5/7

    Changes

    Bell Lane Creek/Dormay StreetAt phase one consultation, we proposed to use the site to

    ntercept the Frogmore Storm Relief (Bell Lane Creek) CSOand to construct a connection tunnel to the main tunnel

    and connect to the Frogmore Storm Relief (BuckholdRoad) CSO.

    Forphasetwoconsultation,wehaveidentiedapotentialalternative site at Dormay Street, just to the north of theBell Lane Creek site. Use of this site would mean that we

    do not have to use the premises of a local business, which

    would have needed to be relocated.

    Phase oneconsultation

    Phase twoconsultation

    Consequences

    Intercept the CSO atthe Bell Lane Creeksite and construct aconnection tunnel tothe Frogmore StormRelief (BuckholdRoad) CSO and themain tunnel.

    Intercept the CSOat Dormay Streetand construct aconnection tunnelto the FrogmoreStorm Relief(Buckhold Road)CSO and the maintunnel.

    Change of site,no overall changein constructionactivity. Localbusiness nolonger needs tobe relocated.

    King Georges ParkThis remains our preferred site at phase two consultation

    to intercept Frogmore Storm Relief (Buckhold Road CSO).There is no change to the connection tunnel, except it

    would now come from Dormay Street instead of BellLane Creek.

    Jews RowFurther technical work undertaken since phase oneconsultation has concluded that it is no longer necessary

    to identify a site for the interception of these two CSOs.Thisisbecausemodicationstotheexistingsewerage

    systemwillsucientlyreducethenumberofspillstotheriver, without the need to carry out any further works to

    intercept the CSO.

    Bridges Court Car Park/FalconbrookPumping StationAt phase one consultation we proposed to use an area ofthe Bridges Court Car Park to intercept the Falconbrook

    PumpingStationCSO.Wehavenowidentiedapotential

    alternative site at the Falconbrook Pumping Station itself,which is now seen as technically feasible and allows us to

    make use of our own land.

    Phase oneconsultation

    Phase twoconsultation

    Consequences

    Intercept the CSOusing Bridges CourtCar Park as aworksite.

    Intercept theCSO usingFalconbrookPumping Stationand somesurroundingland as aworksite.

    Change of site, nooverall change inconstructionactivity.

    Phase two preferred site Falconbrook Pumping Station

    Phase one preferred site Bridges Court Car Park

    N

    YorkR

    oad

    Brid

    gesC

    ourt

    CottonRow

    Bridges Court Car Park and Falconbrook Pumping Station sites

    N

    Phase two preferred site Dormay Street

    Phase one preferred site Bell Lane Creek

    ArmouryW

    ay

    Frogmore

    Dorm

    ay

    Stre

    et

    Bell Lane Creek and Dormay Street sites

  • 8/3/2019 P2 Changes PIP

    6/7

    Changes

    Cremorne Wharf Foreshore/Cremorne Wharf DepotAt phase one consultation we proposed to use theoreshore in front of Cremorne Wharf Depot to intercept

    he Lots Road Pumping Station CSO. At phase two our

    preferred location to intercept the CSO is Cremorne WharfDepot, as we can access the site from Lots Road, instead

    of using a part of Cremorne Gardens for this purpose.

    Phase oneconsultation

    Phase twoconsultation

    Consequences

    Use the foreshoresite at CremorneWharf to interceptthe CSO.

    Use the depotsite at CremorneWharf tointercept the

    CSO.

    Change of site, nooverall change inconstructionactivity. No longer

    need to useCremorne Gardensfor access.

    Chelsea Embankment ForeshoreAt phase one consultation we proposed a foreshore site

    opposite Ranelagh Gardens, which was further from theCSOasweweretryingtoavoidtheareaidentiedand

    protected for Crossrail 2, the Chelsea Hackney line.Crossrail no longer consider our site to be a problem, at

    phase two consultation the foreshore remains ourpreferred site, but it has been moved westward.

    Albert Embankment Foreshore, VictoriaEmbankment Foreshore and BlackfriarsBridge ForeshoreThese sites have not changed and remain our preferredsites at phase two consultation to intercept their

    respective CSOs.

    Druid StreetAtourphaseoneconsultationweidentiedthesiteat

    Druid Street to intercept the Shad Thames PumpingStation CSO. After carrying out more detailed

    investigations and analysis into how the local sewersystem operates, we no longer need the site at Druid

    StreetifweinsteadmakemodicationstotheexistingShad Thames Pumping Station.

    Phase oneconsultation

    Phase twoconsultation

    Consequences

    Intercept the CSO atDruid Street.

    Modicationstothe existingShad ThamesPumpingStation.

    Site at Druid Streetis no longerrequired.

    Phase two preferred site Cremorne Wharf Depot

    Local authority boundary

    Phase one preferred site Cremorne Wharf Foreshore

    Lots

    Roa

    dAshburnhamRoad

    TademaRoad

    Lots

    Road

    Cremorne Wharf Foreshore and Depot sites

    King Edward Memorial Park ForeshoreAt phase one consultation we proposed to use theforeshore. Since phase one consultation, we have looked

    at potential alternative sites but we believe the foreshore

    location with a revised layout should remain our preferredphase two site to intercept the CSO (as the existing

    sewer runs through the park) and to connect it to the

    main tunnel.

    Butcher RowWe have carried out detailed investigations and analysis

    into how the local sewerage system operates and we havenow found we no longer need to use the site at Butcher

    Row to intercept the local CSO. A temporary worksite willbe required at Bekesbourne Street to make the necessary

    modicationstotheseweragesystem.

    Earl Pumping StationThis site has not changed and remains our preferred siteat phase two consultation to intercept this CSO.

    Borthwick Wharf Foreshore/Deptford Church StreetAtphaseoneconsultationweidentiedanareaofforeshore at Bor thwick Wharf to intercept the Deptford

    StormReliefCSO.Wehavesinceidentiedapreferred

    alternative site at Deptford Church Street.

    Phase oneconsultation

    Phase twoconsultation

    Consequences

    Intercept the CSOusing the foreshoreat Borthwick Wharfas a worksite.

    Intercept theCSO using thesite at DeptfordChurch Street.

    Change of site, nooverall change inconstructionactivity.

    Norman

    Road

    Phase two preferred site Deptford Church Street

    Local authority boundary

    Phase one preferred site Borthwick Wharf Foreshore

    CreekRoad

    D e

    p t f o r d

    C h u r c h S t r e e t

    BorthwickStreet

    EvelynStreet

    Wa

    terga

    teS

    tree

    t

    Borthwick Wharf Foreshore and Deptford Church Street sites

  • 8/3/2019 P2 Changes PIP

    7/7

    For further information see our website: www.thamestunnelconsultation.co.ukor call us on 0800 0721 086.

    Phase two consultation (Autumn 2011)

    Changes

    Related

    documents

    Project information papers

    Build

    Site information papers

    Technical reports

    Site selection

    methodology

    Phase two schemedevelopment report

    110-ED-PNC-00

    000-000049

    Greenwich Pumping StationAt phase one consultation we proposed to use this site tointercept the local CSO and to receive a TBM from KingsStairs Gardens (drive F). At phase two this remains ourpreferred site to intercept the CSO, but with someadditional land at Phoenix Wharf we propose to drive aconnection tunnel to Chambers Wharf (drive L). Thisconnection tunnel also connects two other CSOs (EarlPumping Station CSO and Deptford Church Street CSO) to

    the main tunnel.

    Phase oneconsultation

    Phase twoconsultation

    Consequences

    Receive a TBMfrom Kings StairsGardens andintercept the CSO.

    Drive aconnection tunnelfrom the site toChambers Wharfand intercept theCSO.

    Site now used todrive theconnection tunnel.