Hold Wax: Hopper• Designed to hold an entire bag of
wax flakes
• Reduces operator work during operation
• Hopper held within base with springs to reduce affects of vibrations from vibrator
For drawings see attached
Transport Wax: Chute• Goal: Transport 2 gallons of
wax at a time into the tank• Wax flow controlled by a
door operator by a linear actuator
• Ideal chute angle to transport wax flakes: 45°
• Vibrator is attached to the backside of chute to improve transfer
Super-Quiet Low-Impact Electric VibratorNonadjustable Force, 115 VAC,
1.4 Amps, 25 lbs Forcehttp://www.mcmaster.com/#catalog/119/517/=lsgnla
Melt Wax: Melting Tank• Goal: Melt 2 gallon batch of wax
within 10 minutes
• Aluminum tank structure• heaters around exterior wall of tank is
sole provider of heat to melt the wax• Aluminum shaft and 2 stirrers induce
flow and increase melt rate• Insulation surrounding tank prevent
heat loss to surroundings
Heat Requirements
Energy Required to Melt 50 lb of Wax
50 lb/hr 100 lb/hr
KC 4088 983 1967
Cerita 28-8 1148 2296
Solucore 1149 1711 3422
Testing Melter Efficiency 39%
• Melted varying quantities of three sample wax in a home wax melting unit
• Determined melter efficiency by comparing results from testing to known material, paraffin
• Used data to determine amount of energy required to achieve customer requirement of 50 lb/hour
Sample CalculationsRaw Data Analyzed Data Power Required
Trial Amt (lbs) Melt Time (min) Time (s) Weight (kg) Melt Rate
(kg/s)Heat of Fusion
(J/kg) 50 lb/hr 100 lb/hr
1 0.6 16.58 995 0.2722 0.00027 213E+3 1341 2682
2 0.6 11.82 709 0.2722 0.00038 152E+3 956 1911
3 0.6 14.98 899 0.2722 0.00030 192E+3 1212 2423
4 0.6 16.83 1010 0.2722 0.00027 216E+3 1361 2723
5 1 26.17 1570 0.4536 0.00029 202E+3 1270 2539
6 1 20.63 1238 0.4536 0.00037 159E+3 1001 2002
7 1 20.38 1223 0.4536 0.00037 157E+3 989 1978
8 1 24.37 1462 0.4536 0.00031 188E+3 1182 2365
9 1.4 35.02 2101 0.6350 0.00030 193E+3 1214 2427
10 1.4 27.50 1650 0.6350 0.00038 151E+3 953 1906
Average 182E+3 1148 2296
Power (W) 58.23
Required Melt Rate (lb/hr) 50 Required Melt
Rate (kg/s) 0.0063
Required Melt Rate (lb/hr) 100 Required Melt
Rate (kg/s) 0.0126
System Heaters• System will require 4
heaters to provide enough energy and cover the tank
• Heaters will come up to 2.25in down from the top of the tank
• Heat density of 100W/in2
Watlow Band/Barrel Heatershttp:/www.watlow.com/downloads/en/catalogs/band-barrel.pdf/
Melted Wax Transport• Goal: Achieve 50 lb/hour flowrate
• Flow rate out of tank controlled by a door operated by a linear actuator
• Outlet through current baseplate into reservoir
BOM: MetalMetals
Item # Quantity Description Part Vendor Code/Part Number Lead Time Unit Price Total Price
13 1 Cold Roll Mild Steel Sheet A366/1008, 20"x20" 16 Gauge
Chute wall of Hopper
online metals - - $ 24.00 $ 24.00
14 1 Cold Roll Mild Steel Sheet A366/1008, 10"x60" 16 Gauge
Hopper bottom wall (3 sides)
online metals - - $ 24.00 $ 24.00
15 2 Cold Roll Mild Steel Sheet A366/1008, 12"x40" 16 Gauge Hopper box online
metals - - $ 19.20 $ 38.40
16 4 Cold Roll Mild Steel Sheet A366/1008, 12"x24" 16 Gauge
Heater box walls
online metals - - $ 9.31 $ 37.24
17 1 Cold Roll Mild Steel Sheet A366/1008, 12"x12" 16 Gauge Heater box top online
metals - - $ 4.82 $ 4.82
18 1 Cold Finish Mild Steel Rectangle 1018, 6"x30"x1/8"
Hopper support (Angled)
online metals - - $ 30.30 $ 30.30
19 1 Cold Finish Mild Steel Rectangle 1018 , 1/4"x2"x36"
Hopper support (Horizontal)
online metals - - $ 17.20 $ 17.20
20 4DOM Mild Steel Tube A513 TYPE 5, length 36", OD=3/4", ID=0.53" with wall thickness 0.109 "
Support Rods online metals - - $ 10.09 $ 40.36
21 1 Cold Finish Alloy Sheet Steel 4130 Annealed, 10"x10"x.19" L Brace online
metals $ 38.00 $ 38.00
22 1 Extruded Aluminum Round 6061 T6511, length 2-1/4", OD=8" Heater base online
metals - - $ 57.89 $ 57.89
23 1 Aluminum 6061-T6 Bare Sheet, 18" x 26", thickness=1/8" Heater tank online
metals - - $ 60.84 $ 60.84
24 1 Extruded Aluminum Round 6061 T6511, length 24", dia 3/4" Stir shaft online
metals - - $ 4.74 $ 4.74
25 1 Extruded Aluminum Round 6061 T6511, length 24" L, dia 1.5" Stir blades online
metals - - $ 18.95 $ 18.95
26 1 Mild Steel BLANCHARD GROUND Plate 1018, 24"x24"x1/2" Base plate online
metals - - $ 284.51 $ 284.51
Metal Sub-Total $ 681.25
BOM: ElectricalElectrical Components
Item # Quantity Description Part Vendor Code/Part Number Lead Time Unit Price Total Price
1 12 Logic Gates Electrical Component DigiKey 4 AND, 2 NOR, 2 OR, 4
Inverter packages 5 Days $ 0.42 $ 5.04
2 10 1% resistors for booster circuit Electrical Component Digikey - 3-5 Days $ 0.50 $ 5.00
3 4 MOSFETs for booster circuits Electrical Component Digikey - - $ 0.60 $ 2.40
4 2 120 V Relays Electrical Component Digikey Z774-ND - $ 2.07 $ 4.14
5 1 20 A breaker Electrical Component Lowes Square D Qo 20A
breakerReady to purchase $ 6.44 $ 6.44
6 1 12/2 Wire Electrical Component Lowes 50' of 12 AWG 12-2 Ready to
purchase $ 33.24 $ 33.24
7 1 Light Switch Electrical Component Lowes Single standard 15 A
light switchReady to purchase $ 5.00 $ 5.00
8 1 Primary Drive Motor Electrical Component Grainger Dayton motor 1/3 HP
GP item #5K917 Purchased $ 130.00 $ 130.00
9 2 Linear actuator for valves Electrical Component
Firgelli automation - - $ 160.00 $ 320.00
10 1 Signal wire Electrical Component - 20 gauge signal wire of
various colors, 10ft On hand $ - $ -
11 1 K-A-Watt Electrical Component - - - $ 40.00 $ 40.00
12 4 Heater Electrical Component Watlow ME7L3AP1 Purchased 2
weeks ago $ 130.00 $ 520.00
Electrical Components Sub-Total $ 1,071.26
BOM: AuxilliaryAuxiliary Components
Item # Quantity Description Part Vendor Code/Part Number Lead Time Unit Price Total Price
27 2High-Temp Cast Iron Mounted STL Ball Bearing 2-Bolt Flange Mount, for 3/4" Shaft Diameter
Bearing McMaster-Carr 6665K33 2 Weeks $ 112.72 $ 225.44
28 1 Right-Angle Speed Reducer Shaft Input, 30:1 Ratio, 1.33" Center, Left Output
Speed reducer/ Gear box
McMaster-Carr 5887K321 3 Days $ 357.87 $ 357.87
29 2 Steel Machinable-Bore Sprocket for #25 Chain, 1/4" Pitch, 30 Teeth, 3/8" min Bore
Bore sprockets for roller chain
McMaster-Carr 6793K19 In stock $ 10.35 $ 20.70
30 1 Standard ANSI Roller Chain #25, Single Strand, 1/4" Pitch, .13" Dia, 4ft length Chain McMaster-
Carr 6261K171 In stock $ 14.92 $ 14.92
31 1Very HI-Temp Mineral Wool Insulation Wire Mesh One Side, 1" Thick, 24" X 48" Sheet
Insulation McMaster-Carr 9328K21 In stock $ 18.79 $ 18.79
32 10 Reusable SS Harsh-Environment Cable Tie 45" Length, bundle dia 12 1/2"
Insulation holder
McMaster-Carr 1853T64 In stock $ 2.36 $ 23.60
33 1 Tape Made with Kapton® Polyimide High Temperature, 6" W, 5 Yards, .0025" Thk
Electrical Insulator
McMaster-Carr 7648A718 In stock $ 57.94 $ 57.94
34 1 2 oz., highly conductive two part epoxy to 500°F
Thermally Conductive
EpoxiesOmega OB-200-2 In stock $ 17.00 $ 17.00
35 1Super-Quiet Low-Impact Electric Vibrator Nonadjustable Force, 115 VAC, 1.4 Amps, 25 lbs Force
Hopper vibrator McMaster-Carr 5802K13 In stock $ 264.63 $ 264.63
36 8 High Load Plastic Compression Spring 250 in-lbs Energy Cap, 1.11" Overall Diameter Springs McMaster-
Carr 9677K12 In stock $ 8.14 $ 65.12
Auxiliary Sub-Total $ 1,066.01
Manufacturing CostsManufacturing Cost
Item # Quantity Description Part Vendor Code/Part Number Lead Time Unit Price Total Price
37 1 CNC Tank Base Brinkman Lab - 2 weeks $
500.00 $
500.00
38 1 Water jet Base Plate Brinkman Lab ` 1 week $
50.00 $ 50.00
39 1 Water jet L-Brace Brinkman Lab ` 1 week $
50.00 $ 50.00
Manufacturing Sub-Total $ 600.00
Budget Breakdown
Budget Breakdown
Project Budget $ 5,000.00
Metal Parts $ 681.25
Electrical Parts $ 1,071.26
Auxilliary Parts $ 1,066.01
Machining Costs $ 600.00
Total $ 3,418.52
Remaining in Budget $ 1,581.48