design and integration of communication subsystem for pratham
DESCRIPTION
Design and Integration of Communication subsystem for Pratham. Department of Aerospace Engineering IIT Bombay. Contents. Design of telemetry, beacon and uplink modules Design and fabrication of final Onboard PCBs Allocation of frequencies by IARU - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: Design and Integration of Communication subsystem for Pratham](https://reader035.vdocuments.us/reader035/viewer/2022062501/5681644b550346895dd612fe/html5/thumbnails/1.jpg)
Design and Integration of Communication subsystem for Pratham
Department of Aerospace EngineeringIIT Bombay
![Page 2: Design and Integration of Communication subsystem for Pratham](https://reader035.vdocuments.us/reader035/viewer/2022062501/5681644b550346895dd612fe/html5/thumbnails/2.jpg)
ContentsDesign of telemetry, beacon and uplink
modules Design and fabrication of final Onboard
PCBs Allocation of frequencies by IARU Integration of Groundstation at IITBSocial Goal
![Page 3: Design and Integration of Communication subsystem for Pratham](https://reader035.vdocuments.us/reader035/viewer/2022062501/5681644b550346895dd612fe/html5/thumbnails/3.jpg)
Communication Subsystem Onboard
Beacon
Telemetry
Uplink
Groundstation
PolarisationMeasurement
Signal reception
![Page 4: Design and Integration of Communication subsystem for Pratham](https://reader035.vdocuments.us/reader035/viewer/2022062501/5681644b550346895dd612fe/html5/thumbnails/4.jpg)
Telemetry Module
• CC 1020 daughter board
• Coded by OBC• Data input in the
form of AX.25 packets
Modulates the signal
• RF5110 G with perpendicular berg strips and perpendicular SMA
Amplifies the signal • Monopole
• Characterization done
Radiates the signal
![Page 5: Design and Integration of Communication subsystem for Pratham](https://reader035.vdocuments.us/reader035/viewer/2022062501/5681644b550346895dd612fe/html5/thumbnails/5.jpg)
Beacon Module
• Atmega 8 microcontroller to be used
• Bit banged code to be used as 8 bit SPI not workingCodes the
daughter board
• ADF 7020 daughter board
• Transmitting at 144.5 MHz
• To be tuned • Duty cycle is 25 %
Modulates the signal
• RF5110 G with perpendicular berg strips and perpendicular SMA
Amplifies the signal
• Monopole• Characterization
done
Radiates the signal
![Page 6: Design and Integration of Communication subsystem for Pratham](https://reader035.vdocuments.us/reader035/viewer/2022062501/5681644b550346895dd612fe/html5/thumbnails/6.jpg)
Uplink Module
• Monopole• Characterizati
on done
Radiates the signal
• SRZ LNA from RFMD
• To be characterised
• Satisfies the operational parameters
Amplifies the received
signal • CC 1020 daughter board
• Receiving at 437 MHz
• Demodulates after a certain RSSI value
Demodulates the signal
• Atmega 8 microcontroller to be used
• Decode the kill signal and pass on to Power
Decodes the signal
![Page 7: Design and Integration of Communication subsystem for Pratham](https://reader035.vdocuments.us/reader035/viewer/2022062501/5681644b550346895dd612fe/html5/thumbnails/7.jpg)
Monopole and Monopole holder
![Page 8: Design and Integration of Communication subsystem for Pratham](https://reader035.vdocuments.us/reader035/viewer/2022062501/5681644b550346895dd612fe/html5/thumbnails/8.jpg)
Onboard antenna mounting
![Page 9: Design and Integration of Communication subsystem for Pratham](https://reader035.vdocuments.us/reader035/viewer/2022062501/5681644b550346895dd612fe/html5/thumbnails/9.jpg)
Allocation of frequencies by IARUConditions for frequency allocation
Amateur Ham License or a Custodian Detailed link budget analysis Telemetry sequenceDetails about the GS and Onboard circuity and
their functionalitiesUplink or telecommand to control the satellite.
![Page 10: Design and Integration of Communication subsystem for Pratham](https://reader035.vdocuments.us/reader035/viewer/2022062501/5681644b550346895dd612fe/html5/thumbnails/10.jpg)
Groundstation setup: Polarisation
• Crossed Yagi mounted on a rotor controlled by NOVA and ARS
Antenna
![Page 11: Design and Integration of Communication subsystem for Pratham](https://reader035.vdocuments.us/reader035/viewer/2022062501/5681644b550346895dd612fe/html5/thumbnails/11.jpg)
Groundstation setup: Telemetry
• Crossed Yagi mounted on a rotor controlled with ARS and NOVA
Antennae
![Page 12: Design and Integration of Communication subsystem for Pratham](https://reader035.vdocuments.us/reader035/viewer/2022062501/5681644b550346895dd612fe/html5/thumbnails/12.jpg)
Social Goal We have undertaken Social goal as a part of our
Communication Subsystem task. The Social goal aims to involve universities
across the nation for the purpose of generating a TEC Map of India.
The readings received from the Groundstation can also be used for the purpose of Tomography of the Ionosphere.
We have also entered into a collaboration with IPGP France who shall be utilising our TEC data for their scientific research.
![Page 13: Design and Integration of Communication subsystem for Pratham](https://reader035.vdocuments.us/reader035/viewer/2022062501/5681644b550346895dd612fe/html5/thumbnails/13.jpg)
Thank You