oy has been joining wartsila family. eniram is … · oy has been joining wartsila family. eniram...
TRANSCRIPT
© Wärtsilä NOT YET CLASSIFIED Giampiero De Cubellis/ Port and Shippingtech 2016 1
PORT&SHIPPINGTECH 2016 8^ EDIZIONE - Centro Congressi Stazione Marittima 30 giugno - 1 luglio 2016
BREAKING NEWS: since TODAY, ENIRAM OY has been joining WARTSILA family. ENIRAM is one of the market leaders in fuel saving technology and optimized ships’ operations. The next step a of DIGITALIZATION program is now getting the perfect match Wartsila Genius and Eniram, your choice for the digital shipping revolution!
© Wärtsilä NOT YET CLASSIFIED Giampiero De Cubellis/ Port and Shippingtech 2016 2
On the Edge of Ratification – Retrofitting Ballast Water Management systems. PORT&SHIPPINGTECH 2016 8^ EDIZIONE - Centro Congressi Stazione Marittima 30 giugno - 1 luglio 2016 Giampiero De Cubellis. GM projects sales South Europe and Africa Services
© Wärtsilä NOT YET CLASSIFIED
Points to be covered
• Current ratification status
• Wartsila technology offering
• Segment coverage
• Retrofit capabilities
• Wartsila Aftermarket Support
• Ballast Ready Concept
CONTENTS
Giampiero De Cubellis/ Port and Shippingtech 2016 3
© Wärtsilä NOT YET CLASSIFIED
RATIFICATION UPDATE
Enters into force after ratification by 30 member states representing 35% world gross tonnage
States • Needed: 30 • Currently: 51
World GRT • Needed: 35% • Currently: 34.87% 34.87%
Signatories Albania, Antigua & Barbuda, Barbados, Brazil, Canada, Congo, Cook Islands, Croatia, Denmark, Egypt, France, Germany, Iran, Japan, Jordan, Kenya, Kiribati, Republic of Korea, Lebanon, Liberia, Malaysia, Maldives, Marshall Islands, Mexico, Mongolia, Montenegro, Netherlands, Nigeria, Niue, Norway, Palau, Russian Federation, Saint Kitts and Nevis, Sierra Leone, South Africa, Spain, Sweden, Syrian Arab Republic, Switzerland, Tongo, Trinidad and Tobago, Turkey and Tuvalu, Morocco, Ghana, Indonesia, Belgium, Fiji, St Lucia, Peru
• Finland, India in progress. • Panama ?
Jun
e 2
016
Jun
e 2
016
Giampiero De Cubellis/ Port and Shippingtech 2016 4
© Wärtsilä NOT YET CLASSIFIED Craig Patrick / Posidonia 2016 5
WARTSILA BWM PRODUCTS
AQUARIUS®UV treatment using Ultra-Violet light
AQUARIUS®EC treatment using Electro-chlorination
Small Large
1,000 m3/hr 1,500 m3/hr UV EC
Land-based Testing Successfully completed in all 3
salinities (December 2014)
Shipboard Testing (Started)
Environmental Testing (Started)
Expected Date of Completion: Q42016
Shipboard Testing (starting July 2016)
Land-based Testing
(starting at end of 2016)
Environmental Testing (in planning)
Expected Date of Completion:
Mid 2017
© Wärtsilä NOT YET CLASSIFIED Giampiero De Cubellis/ Port and Shippingtech 2016 6
SEGMENT COVERAGE
Reference ships with Wartsila BWMS Reference ships with Wartsila BWMS
Vessel Category
Vessel TypeRepresentative
Pump Rate (m3/hr)BWT
Choice
Handy 1300 EC/UVPanamax 1800 ECCapasize 3000 EC
Handy 1100 EC/UVAframax 2500 ECSuezmax 3125 ECVLCC 5000 ECULCC 5800 EC
Feeder 250 UVHandy 400 UVSubpanamax 400 UVPanamax 500 UVPostpanamax 750 UV
Chemical Carriers 600 UVPassenger Ships 250 UVGeneral Cargo 400 UVRo/Ro 400 UVCombination Vessels 400 UV
Bulk Carriers
Tankers
Containership
Other Vessels
High Ballast Dependent
Vessels
Low Ballast Dependent
Vessels
© Wärtsilä NOT YET CLASSIFIED
Phased approach to installation
Giampiero De Cubellis/ Port and Shippingtech 2016 7 © Wärtsilä
RETROFIT PHASED APPROACH
1st • Selection of supplier - Wartsila
2nd
• Ship Survey • Feasibility Study
3rd • 3D Scan • Detail Design
4th • Support for plan approval
5th • Pre fabrication (spools, seating, etc.) • Ballast install
6th
• Commissioning
Doc.ID: Revision: Status: © Wärtsilä 8
Fixed OPEX - 2200 TEU Container Vessel • 5 year fixed term support agreement
• Agreement covers 3 UV Ballast systems on 3 vessels
• Fixed Monthly Payment for 60 month
• Includes all scheduled OPEX
• Guaranteed Parts and attendance availability
• 24 Hr Support via Wartsila Contract support
• Wartsila schedules all parts delivery to meet
• Wartsila annual survey and crew training
• Global network support
• Fixed Costs for operator
WARTSILA AFTERMARKET
© Wärtsilä NOT YET CLASSIFIED
AQUARIUS READY
Giampiero De Cubellis/ Port and Shippingtech 2016 10 © Wärtsilä
BALLAST PUMP 1 BALLAST
PUMP 2
FROM SEA CHEST
TO / FROM AFT BALLAST TANKS
TO / FROM FWD BALLAST TANKS
BALLAST OVER- BOARD
© Wärtsilä NOT YET CLASSIFIED
AQUARIUS READY - PHASE #1
Giampiero De Cubellis/ Port and Shippingtech 2016 11 © Wärtsilä
BALLAST PUMP 1 BALLAST
PUMP 2
FROM SEA CHEST
TO / FROM AFT BALLAST TANKS
TO / FROM FWD BALLAST TANKS
BALLAST OVER- BOARD
NEW VALVE BWMS INLET
NEW VALVE BWMS OUTLET TO AFT BALLAST TANKS
NEW VALVE BWMS BYPASS
NEW VALVE BWMS OUTLET TO OVERBOARD / FWD BALLAST TANKS
© Wärtsilä NOT YET CLASSIFIED
AQUARIUS READY - PHASE #2
Giampiero De Cubellis/ Port and Shippingtech 2016 12 © Wärtsilä
BALLAST PUMP 1 BALLAST
PUMP 2
FROM SEA CHEST
TO / FROM AFT BALLAST TANKS
TO / FROM FWD BALLAST TANKS
BALLAST OVER- BOARD
© Wärtsilä NOT YET CLASSIFIED
SUMMARY
Giampiero De Cubellis/ Port and Shippingtech 2016 13
Wartsila BWMS EC and UV on
target for USCG Approval
Wartsila have a partnership
and phased approach to retrofit
solutions
End to End in service solutions
Worldwide service support
Ballast ready solution for 2016
early 2017 dockings
© Wärtsilä NOT YET CLASSIFIED
THANK YOU QUESTIONS ?
Giampiero De Cubellis General Manager Projects sales SEAF [email protected] Mobile: +39 338 9323449
Craig Patrick / Posidonia 2016 14