overview of the 2008 cafo rule november 30, 2010 multi-state cnmp symposium, mitchell sd

35
Overview of the 2008 CAFO Rule November 30, 2010 Multi-state CNMP Symposium, Mitchell SD Qian K. Zhang, P.E. Donna Porter EPA Region 8 EPA Region 7 303-312-6267 913-551-7929

Upload: macy

Post on 12-Jan-2016

26 views

Category:

Documents


0 download

DESCRIPTION

Overview of the 2008 CAFO Rule November 30, 2010 Multi-state CNMP Symposium, Mitchell SD. Qian K. Zhang, P.E. Donna Porter EPA Region 8 EPA Region 7 303-312-6267 913-551-7929 [email protected] [email protected]. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Overview of the 2008 CAFO Rule  November 30, 2010 Multi-state CNMP Symposium, Mitchell SD

Overview of the 2008 CAFO Rule November 30, 2010

Multi-state CNMP Symposium, Mitchell SD

Qian K. Zhang, P.E. Donna PorterEPA Region 8 EPA Region 7303-312-6267 [email protected] [email protected]

Page 2: Overview of the 2008 CAFO Rule  November 30, 2010 Multi-state CNMP Symposium, Mitchell SD

Presentation Outline

– CAFO Rule History– Overview of 2005 Appeals Court Case– Highlights of 2008 CAFO Rule

• Duty to Apply• Terms of the NMP• Annual Report Requirements

– Litigation on 2008 CAFO Rule

Page 3: Overview of the 2008 CAFO Rule  November 30, 2010 Multi-state CNMP Symposium, Mitchell SD

CAFO Rule History1972 Congress enacts the CWA

1974/1976 EPA establishes first effluent limitation guidelines and permit regulations for CAFOs

February 2003 EPA issues revised CAFO regulations

February 2005 2nd Circuit court of Appeals Decision in Waterkeeper v. EPA

June 2006 Proposed rule published to address Waterkeeper decision

March 2008 Supplemental proposed rule with additional options

November 2008 CAFO rule revisions published in Federal Register

Page 4: Overview of the 2008 CAFO Rule  November 30, 2010 Multi-state CNMP Symposium, Mitchell SD

Overview of 2005 Appeals Court Case

Waterkeeper Alliance, et. al., v. EPA

• U.S. Court of Appeals for the 2nd Circuit decided challenges to 2003 CAFO rule brought by environmental and industry petitioners:– Upheld technical requirements of 2003 rule– Required EPA to revise duty to apply – CAFOs must submit NMPs; permit authorities must review

and add NMP terms to permit and must offer public review of NMPs

• Remanded certain new source performance standards and technology requirements for fecal coliform

Page 5: Overview of the 2008 CAFO Rule  November 30, 2010 Multi-state CNMP Symposium, Mitchell SD

Highlights of 2008 CAFO Rule

(Publication Date: November 20, 2008)(Effective Date: December 22, 2008)

CAFOs that “discharge or propose to discharge” must apply for NPDES permit

Provides new certification option

Establishes additional nutrient management plan (NMP)-related requirements

Revises alternative NSPS provision for new source swine, poultry and veal calf facilities

Affirms BCT limitations for fecal coliform

Page 6: Overview of the 2008 CAFO Rule  November 30, 2010 Multi-state CNMP Symposium, Mitchell SD

Who must apply for an NPDES Permit

– National Pollutant Discharge Elimination System (NPDES) permit is needed if the CAFO discharges or proposes to discharge to waters of the US; based on the CAFO’s design, construction, operation, and maintenance.

– Site-specific assessment should also consider climatic (rainfall, evaporation), hydrologic (proximity to surface water), topographic (drainage), geologic factors (soils), discharge history, exposure of manure and feed to precipitation….

Page 7: Overview of the 2008 CAFO Rule  November 30, 2010 Multi-state CNMP Symposium, Mitchell SD

Voluntary Certification OptionAn unpermitted CAFO that does not discharge or propose to discharge may

choose to voluntarily certify.

• What is the incentive for an unpermitted CAFO to certify?

– In the event of a discharge from a properly certified CAFO, the CAFO would only be subject to liability for the unpermitted discharge, not for failure to seek permit coverage prior to the discharge.

• What are the qualifications for the voluntary certification option?

– A technical evaluation of manure storage structures that ensures no discharge and development and implementation of an NMP.

– Must submit a signed statement, general information about the facility, and description of eligibility.

• If a properly certified CAFO discharges, can it recertify?

– After a discharge from a properly certified CAFO, the CAFO can recertify if it permanently fixes the cause of the discharge and it has not previously recertified after a discharge from the same cause.

• States are not required to adopt the provisions for no discharge certification.

Page 8: Overview of the 2008 CAFO Rule  November 30, 2010 Multi-state CNMP Symposium, Mitchell SD

CAFOOwner/Operator

Do not applyDo not certify

Decide to certifyApply for NPDES

permit

Manage CAFO withno discharge

CAFO does not discharge other than

agricultural storm waterCAFO discharges

Satisfy eligibility

Submit certificationto permitting authority

Manage CAFO with no discharge

CAFO does not discharge other than

agricultural storm waterCAFO discharges

301 violationNo 308 violation if properly certified

Permit coverage issued

301 violation308 violation

in almost all cases

Manage CAFO with no discharge

CAFO does not discharge other than

agricultural storm waterCAFO discharges

Discharge either allowed under the permit or

eligible for “upset/bypass”affirmative defense

Discharge in violation of permit

301 violation

Page 9: Overview of the 2008 CAFO Rule  November 30, 2010 Multi-state CNMP Symposium, Mitchell SD

Discharges from Land Application Areas • CAFOs that land apply do not need an NPDES permit in order to

qualify for the Agricultural Storm water exemption if they meet the requirements of 122.23(e)…

• If an operator land applies in accordance with site specific nutrient management practices that ensure appropriate agricultural utilization of the nutrients in the manure…as outlined in 122.42(e)(vi)-(ix) then a precipitation related discharge is defined as agricultural storm water.

• Nutrient management planning and appropriate recordkeeping will be necessary to support an operator’s claim to the exemption.

Page 10: Overview of the 2008 CAFO Rule  November 30, 2010 Multi-state CNMP Symposium, Mitchell SD

Regulatory Framework

• 2nd Circuit Court Decision– NMP terms constitute effluent limitations

– NMP terms must be made available for public review

– NMP terms must be incorporated into the permit

• Final rule– NMP must be submitted with application/NOI

– Agency review of NMP/identification of terms

– Public review of NMP and terms

Page 11: Overview of the 2008 CAFO Rule  November 30, 2010 Multi-state CNMP Symposium, Mitchell SD

Nutrient Management Technical Standard

• Established and adopted by State Permitting Authority

• Addresses– Field-specific assessment of N and P transport from

field to WOUS (waters of the US)– Address form, source, amount, timing and method of

application of nutrients– Balance nutrient needs of crops and potential adverse

water quality impacts in setting methods and criteria to determine application rates.

– Soil and manure sampling methods– Crop removal rates, yields

Page 12: Overview of the 2008 CAFO Rule  November 30, 2010 Multi-state CNMP Symposium, Mitchell SD

Nine Minimum Measures for Nutrient Management Plan

• Applicable to all permitted and certified CAFOs– Implementation of a NMP that contains BMPs that address the nine minimum

requirements [§122.42(e)(1)(i)-(ix)]

1. Adequate storage with O&M

2. Mortality management

3. Clean water diversion from the production area

4. Prevention of direct animal contact with WOUS

5. Chemical containment

6. Site specific conservation practices• Setbacks and buffers

7. Manure and soil testing

8. Protocols for land application

9. Record Keeping

Unpermitted Large CAFOs

claiming agricultural stormwaterexemption

Page 13: Overview of the 2008 CAFO Rule  November 30, 2010 Multi-state CNMP Symposium, Mitchell SD

Comparison of NMP and CNMP Elements

NPDES NMP Minimum Practices USDA CNMP Elements

Adequate storage capacity

Animal mortality

Diversion of clean water

Manure and wastewater handling and storage

Conservation practices to control nutrient loss

Land treatment practices

Protocols for the land application of manure and wastewater

Protocols for manure and soil testing

Nutrient management

Record keeping Record keeping

Feed management

Other utilization options

Chemical handling

Preventing direct contact of animals with WOUS

Page 14: Overview of the 2008 CAFO Rule  November 30, 2010 Multi-state CNMP Symposium, Mitchell SD

NMP Terms: Protocols for Land Application of Manure and Process Wastewater

• Protocols for land application must be in the State Director identified technical standards– State technical standards commonly include State

NRCS 590 conservation standards

• 2008 CAFO Rule– Site specific terms– Terms for each approach for expressing application

rates• Linear• Narrative Rate

Page 15: Overview of the 2008 CAFO Rule  November 30, 2010 Multi-state CNMP Symposium, Mitchell SD

Site Specific Terms• Site specific terms for protocols for land application

are required by the regulations to follow either a linear or narrative rate approach.

• Terms for both approaches– Fields available for land application– Timing restrictions/prohibitions (may be standard terms)– Outcome of the N and P transport risk assessment for

each field– Planned crop or other use or alternative crop– Realistic annual yield goal– N and P recommendation for each crop

(may be standard terms)

Page 16: Overview of the 2008 CAFO Rule  November 30, 2010 Multi-state CNMP Symposium, Mitchell SD

• Terms for Linear Approach only– Credits for all N in the field that will be plant available– Consideration of multi-year P application– Accounting for all other additions of plant available N

and P– Form and source of manure, litter, and process

wastewater– Timing and method of application– Application rate in pounds of N and P from manure,

litter, and process wastewater– Methodology to account for the amount of N and P in

the manure, litter, and process wastewater

Site Specific Terms: Linear Approach

Page 17: Overview of the 2008 CAFO Rule  November 30, 2010 Multi-state CNMP Symposium, Mitchell SD

• Terms for Narrative Rate Approach only– Maximum amount of N and P from all sources – Methodology to account for:

• plant available N in the field

• soil test results

• non-manure N and P sources

• Consideration of multi-year P

application

• form and source of manure

• timing and method of application

• volatilization/mineralization

Site Specific Terms:Narrative Rate Approach

Page 18: Overview of the 2008 CAFO Rule  November 30, 2010 Multi-state CNMP Symposium, Mitchell SD

Fields Available for Land Application• Field Specific Components

– Table• Field name or ID• Total field acres to receive manure• Location

– Maps • Fields should be easily related to fields listed in table by;

– Field name or ID and/or; – Location

• Example: MMP Field Data Report:Field ID Subfield

ID Total Size

(Acres)

Spread-able Size (Acres)

Storage Distance (Miles)

County (If Different From

Operation's County)

Predominant Soil Type (Name, Texture, Survey Area

ID, Map Symbol, Slope Range)

Slope % (If Not Ave.)

Irri-gated With

Water

Is Not Owned

Farm ID

FSA Farm

FSA Tract

FSA Field

Notes

1 25.5 25.1 1 Dewey SIC

(105 DwD3 12-20%)

2 17.5 17.5 1.2 Dewey SIL

(105 FsE 20-30%)

3 53.8 50.5 1.1 Etowah SIL

(105 HeB 2-5%)

4 33.9 33.9 0.3 Emory SIL

(105 Em 1-3%)

Location not shown

Page 19: Overview of the 2008 CAFO Rule  November 30, 2010 Multi-state CNMP Symposium, Mitchell SD
Page 20: Overview of the 2008 CAFO Rule  November 30, 2010 Multi-state CNMP Symposium, Mitchell SD

Timing as a Term and as a Factor of the Methodology

• As a term:– Macro-scale; Timing limitations or conditional restraints– Set by State standards

• Verification of permit writer– Examples:

• Prohibitions November through March– Term: All fields for this time period

• Application to frozen ground only allowed on fields with slopes that are ≤ 4%– Term: Fields that do not meet this requirement must be listed

• As factor of the narrative rate methodology:– Micro-scale; Timing conditions that impact nutrient availability– Example:

• If land application is incorporated after 5 days of being surfaced applied a different volatilization factor will be used compared to if manure was injected

Page 21: Overview of the 2008 CAFO Rule  November 30, 2010 Multi-state CNMP Symposium, Mitchell SD

Outcome of the Field Specific Assessment

• Assessment method should be defined by the State’s technical standard.• Term should include:

– Method used• Technical Standard may have multiple options

– The risk rating (if applicable) • Example: Soil test thresholds do not determine a “risk”

– The corresponding application rate

MMP report out for P-Index:

Field Crop Year

Site and Transport

Factor Mgmt. and

Source Factor P Index

w/o P Apps P Index

w/ P Apps P Loss Risk 1 2008 20 14 40 280 High

1 2009 20 2 40 40 Low

1 2010 20 14 40 280 High

1 2011 20 14 40 280 High

1 2012 20 13 40 260 High

Field Crop Year Soil Test P Application Limit Field 1 2008 75 ppm 1.5 x Crop P2O5 Removal

MMP report out for Soil Test :

Report for each field for each year

of the permit

Risk

Application Rate

Page 22: Overview of the 2008 CAFO Rule  November 30, 2010 Multi-state CNMP Symposium, Mitchell SD

Crops to be Planted and Yield GoalsCrop Data Report from MMP

• Crop needs to be linked to a field and year

• Yield goal needs to be linked to a crop– Needs Units– Source is not included as part of the term– Allowable source should be defined by the technical

standards– Permit writer has the authority to request the source

• Technical standards may provide options

Field ID Subfield ID

Crop Year

Planned Crop Yield Goal

(/Acre)

Yield Units

1 2008 Corn silage 22 Ton

1 2009 Grass-clover hay new 4 Ton

1 2010 Grass-clover hay maint 6 Ton

1 2011 Corn silage 22 Ton

1 2012 Grass-clover hay new 4 Ton

Page 23: Overview of the 2008 CAFO Rule  November 30, 2010 Multi-state CNMP Symposium, Mitchell SD

Maximum amount of N and P from all Sources• Identifying the Sources of Nutrients

• The maximum amount of N – Sources will include;

• Applied N (manure, fertilizer, biosolids, irrigation water)

• In field available N ( N credits from previous manure applications, legumes)

– Maximum term should match the crop recommendation term

• The maximum amount of P – Sources will include;

• Applied P (manure, fertilizer, biosolids)

– Soil P can not be included as a ‘source’ of nutrients• Non-linear relationship among P applied and P in the soil

• The maximum amount of P will not necessarily match crop recommendation1. Field risk assessment may allow an N-base rate application of manure

2. Even if manure application is a P-based rate, removal rate may be followed

Page 24: Overview of the 2008 CAFO Rule  November 30, 2010 Multi-state CNMP Symposium, Mitchell SD

Including NMP Terms inNPDES Permits

• Approaches for writing permit terms for the minimum measures– Site-specific terms

• Required for protocols for land application• Strongly encouraged for adequate storage and conservation practices

– Generally applicable terms • Discretionary for mortality management, clean water diversions,

prevention of direct animal contact with water, chemical handling, manure and soil testing, and recordkeeping

• EPA encourages these generally applicable terms to be supplements with site-specific information provided by the NMP

• Methods for writing terms in the permit– Incorporation the entire NMP by reference– Incorporation of only the terms by reference, using language that parallels

the regulatory provisions for the terms of the NMP– Specifically identify what is a permit term in an NMP

Page 25: Overview of the 2008 CAFO Rule  November 30, 2010 Multi-state CNMP Symposium, Mitchell SD

Enforceability of NMP Terms

• Once incorporated into the permit, NMP terms, like all other permit conditions, are enforceable.

• Permit writers should consider enforceability of identified terms– Concrete practices, activities, BMPs, etc.– Specific frequencies, procedures, etc., where

applicable

• Ambiguous terms = ambiguous enforcement

Page 26: Overview of the 2008 CAFO Rule  November 30, 2010 Multi-state CNMP Symposium, Mitchell SD

Changes to NMPs: Substantial Changes

• Addition of new land application areas – Unless already included in an

approved NMP • Any Change to application rates

– maximum application rates (N and P in manure)(linear approach)

– maximum amounts of N and P form all sources (narrative rate approach)

• Addition of any crops • Changes that are likely to increase the risk of

N and P transport to WOUS

Page 27: Overview of the 2008 CAFO Rule  November 30, 2010 Multi-state CNMP Symposium, Mitchell SD

Changes to NMPs: Substantial Changes (cont.)

• Process for substantial changes– Public review/comment period and opportunity

for public hearing (same as for draft permits)– Director requires CAFO to further revise NMP if

necessary– Revised NMP terms incorporated into permit– CAFO and public informed

of changes to NMP terms

Page 28: Overview of the 2008 CAFO Rule  November 30, 2010 Multi-state CNMP Symposium, Mitchell SD

Medium CAFO Discharge Criteria

To meet the Medium CAFO definition, an AFO must meet the animal confinement threshold and meet one of the following criteria:

1. Pollutants are discharged into WOUS through a man-made ditch, flushing system, or other similar man-made device, or

2. Pollutants are discharged directly into WOUS that originate outside of the facility and pass over, across, or through the facility or otherwise come into contact with the confined animals.

Page 29: Overview of the 2008 CAFO Rule  November 30, 2010 Multi-state CNMP Symposium, Mitchell SD

Figure 2.1.5.1a NPDES Permitted Facilities in the Elkhorn River Basin

Page 30: Overview of the 2008 CAFO Rule  November 30, 2010 Multi-state CNMP Symposium, Mitchell SD

Figure 2.1.5.1b Active Animal Feeding Operations in the Elkhorn River Basin

Page 31: Overview of the 2008 CAFO Rule  November 30, 2010 Multi-state CNMP Symposium, Mitchell SD

Annual Report Requirements (2003)• Number and type of animals• Estimated amount of manure/wastewater generated,

applied, and transferred in previous 12 months (tons/gallons)

• Total # of land application acres and # of acres applied to in previous 12 months

• Summary of production area discharges• Statement indicating if nutrient management plan

developed or approved by a certified planner

Page 32: Overview of the 2008 CAFO Rule  November 30, 2010 Multi-state CNMP Symposium, Mitchell SD

Additions to Annual Report in 2008

• Most recent manure test results (both approaches)

• Actual crop planted (both approaches)

• Actual yield for each crop in each field (both approaches)

• Actual amount of manure applied to each field (both app.)

• The most recent soil test results (narrative rate only)

• Amount of chemical fertilizer applied (narrative rate only)

• The results of calculations of the maximum amounts of manure, litter, and wastewater to be applied each year (narrative rate only)

Page 33: Overview of the 2008 CAFO Rule  November 30, 2010 Multi-state CNMP Symposium, Mitchell SD

Legal Challenges to the 2008 CAFO Rule

• Six petitions for review pending:– One from three environmental groups (NRDC,

Waterkeeper Alliance and Sierra Club)– Five from industry groups (American Farm Bureau,

National Pork Producers Council and several state member councils (NC and OK); United Egg Producers and National Milk Producers)

• Petitions consolidated for review in U.S. Court of Appeals for the Fifth Circuit

Page 34: Overview of the 2008 CAFO Rule  November 30, 2010 Multi-state CNMP Symposium, Mitchell SD

Legal Challenges Con’t• EPA signed a settlement agreement with environmental petitioners

on May 25, 2010 regarding litigation challenging the Agency’s 2008 CAFO rule.

• As part of the agreement, EPA will propose a rule to collect information from both permitted and unpermitted CAFOs, and will take final action on the proposed rule within two years of the settlement agreement (May 2012).

• EPA will seek public comment as part of the rulemaking process.

• EPA developed a guidance document to clarify the 2008 CAFO rule regarding when CAFOs “discharge or propose to discharge” and therefore clarifying when the CAFO needs to apply for a permit (released on May 28, 2010, available at http://www.epa.gov/npdes/caforule).

• Litigation is still ongoing with the industry petitioners in the 5th Circuit Court of Appeals. The court heard oral arguments regarding the litigation in October.

Page 35: Overview of the 2008 CAFO Rule  November 30, 2010 Multi-state CNMP Symposium, Mitchell SD

Additional information

• For copies of the latest updates and outreach materials….

http://www.epa.gov/npdes/caforule (HQ)

http://www.epa.gov/region8/water/cafo (R8)