overview bisnis energy bersih listrik tenaga mini hydro pltmh _ _ _ _ _ _ _ _ _ _ _ _ ± sumatera u...
TRANSCRIPT
![Page 1: OVERVIEW BISNIS ENERGY BERSIH Listrik Tenaga Mini Hydro PLTMH _ _ _ _ _ _ _ _ _ _ _ _ ± Sumatera U tara Project Sponsor : Danareksa Capital Date Report : March 2012 Disclaimer Statements](https://reader031.vdocuments.us/reader031/viewer/2022022116/5c83e42e09d3f2bc2b8b91ed/html5/thumbnails/1.jpg)
10/25/2016`1 FOOTER GOES HERE 1
OVERVIEW BISNIS ENERGY BERSIH
TRAINING ANALIS INGKUNGAN HIDUP LJK
RAYMOND BONA – SUSTAINABLE FINANCE SPECIALIST
![Page 2: OVERVIEW BISNIS ENERGY BERSIH Listrik Tenaga Mini Hydro PLTMH _ _ _ _ _ _ _ _ _ _ _ _ ± Sumatera U tara Project Sponsor : Danareksa Capital Date Report : March 2012 Disclaimer Statements](https://reader031.vdocuments.us/reader031/viewer/2022022116/5c83e42e09d3f2bc2b8b91ed/html5/thumbnails/2.jpg)
Policy Implementation
Support implementation of
OJK Sustainable Finance
Road Map. Conducting
research and ESRA Training
ICED approach in supporting banks and financial
institutions to increase clean energy portfolio
Increase Capacity in
Banks and Financial
InstitutionsProvide capacity building for
banks and financial institutions
Technical Assistance
Provide technical assistance to
banks and financial institutions in
reviewing clean energy project
proposal
Risk Sharing
MechanismIntroduce alternative risk sharing
mechanism trough Partial Credit
Guarantee of USAID DCA
(Development Credit Authority)
Reduced project risk Improved Enabling Environment
![Page 3: OVERVIEW BISNIS ENERGY BERSIH Listrik Tenaga Mini Hydro PLTMH _ _ _ _ _ _ _ _ _ _ _ _ ± Sumatera U tara Project Sponsor : Danareksa Capital Date Report : March 2012 Disclaimer Statements](https://reader031.vdocuments.us/reader031/viewer/2022022116/5c83e42e09d3f2bc2b8b91ed/html5/thumbnails/3.jpg)
Example of ICED Technical Assistance for Banks and
Financial Institution
Basic Project Description
Check List & Assessment on
Permitting / Licensing
Review on Hydrology
Review on Engineering Design
Review on Technology Selection
Review on Equipment Specification
Review on Cost and Investment
Review on Economic FeasibilityOu
tlin
e P
roje
ct
Mem
o
Mini Hydro Power Plant
Biomass Power Plant
Biogas Power Plant
Solar PV Project
Wind Farm Project
Pro
ject
ICED Project Memo Pembangkit Listrik Tenaga Biogas PLTBG ____________ – Lampung
Project Sponsor : Bank BNI Date Report : February 2012
Disclaimer
Statements made by ICED-Tetra Tech relating to the information, and all surveys, forecasts, recommendations and opinions in
any report, presentation or deliverable are made in good faith on the basis of information available at the time. Forecasts,
recommendations and opinions are not representations, undertakings or a warranty as to outcome or achievable results. The
user therefore releases and discharges Tetra Tech from all liability, direct and indirect, in any way connected to the report,
presentation or deliverable
ICED Project Memo! Pembangkit Listrik Tenaga Mini Hydro PLTMH ____________ – Sumatera Utara
Project Sponsor : Bank BRI Syariah Date Report : August 2012
Disclaimer
Statements made by ICED-Tetra Tech relating to the information, and all surveys, forecasts, recommendations and opinions in
any report, presentation or deliverable are made in good faith on the basis of information available at the time. Forecasts,
recommendations and opinions are not representations, undertakings or a warranty as to outcome or achievable results. The
user therefore releases and discharges Tetra Tech from all liability, direct and indirect, in any way connected to the report,
presentation or deliverable
ICED Project Memo! Pembangkit Listrik Tenaga Mini Hydro PLTMH ____________ – Jawa Barat
Project Sponsor : Bank BRI Syariah Date Report : July 2012
Disclaimer
Statements made by ICED-Tetra Tech relating to the information, and all surveys, forecasts, recommendations and opinions in
any report, presentation or deliverable are made in good faith on the basis of information available at the time. Forecasts,
recommendations and opinions are not representations, undertakings or a warranty as to outcome or achievable results. The
user therefore releases and discharges Tetra Tech from all liability, direct and indirect, in any way connected to the report,
presentation or deliverable
ICED Project Memo Pembangkit Listrik Tenaga Mini Hydro PLTMH ____________ – Sumatera Utara
Project Sponsor : Danareksa Capital Date Report : March 2012
Disclaimer
Statements made by ICED-Tetra Tech relating to the information, and all surveys, forecasts, recommendations and opinions in
any report, presentation or deliverable are made in good faith on the basis of information available at the time. Forecasts,
recommendations and opinions are not representations, undertakings or a warranty as to outcome or achievable results. The
user therefore releases and discharges Tetra Tech from all liability, direct and indirect, in any way connected to the report,
presentation or deliverable
ICED Project Memo Pembangkit Listrik Tenaga Biomass PLTBM ____________ – Kalimantan Barat
Project Sponsor : Nusantara Infrastructure Date Report : September 2012
Disclaimer
Statements made by ICED-Tetra Tech relating to the information, and all surveys, forecasts, recommendations and opinions in
any report, presentation or deliverable are made in good faith on the basis of information available at the time. Forecasts,
recommendations and opinions are not representations, undertakings or a warranty as to outcome or achievable results. The
user therefore releases and discharges Tetra Tech from all liability, direct and indirect, in any way connected to the report,
presentation or deliverable
DeliverablesTechnical Assistance ICED Bank / FI Partners
![Page 4: OVERVIEW BISNIS ENERGY BERSIH Listrik Tenaga Mini Hydro PLTMH _ _ _ _ _ _ _ _ _ _ _ _ ± Sumatera U tara Project Sponsor : Danareksa Capital Date Report : March 2012 Disclaimer Statements](https://reader031.vdocuments.us/reader031/viewer/2022022116/5c83e42e09d3f2bc2b8b91ed/html5/thumbnails/4.jpg)
Example of ICED Capacity Building for Banks and
Financial Institutions
Introduction to Mini Hydro
Power Project
Key aspect in assessment
Hydro project proposal
Due diligence check list for
Hydro project
PPA and Legal aspect in
Hydro
Risk assessment for Hydro
Project
Lesson learn from
practitioner
Ou
tlin
e T
rain
ing
One or two days training
Material are tailored to banks
needs
Site visit to Mini Hydro
Projects
Real case study
Co
ncep
t
DeliverablesActivities ICED Bank / FI Partners
![Page 5: OVERVIEW BISNIS ENERGY BERSIH Listrik Tenaga Mini Hydro PLTMH _ _ _ _ _ _ _ _ _ _ _ _ ± Sumatera U tara Project Sponsor : Danareksa Capital Date Report : March 2012 Disclaimer Statements](https://reader031.vdocuments.us/reader031/viewer/2022022116/5c83e42e09d3f2bc2b8b91ed/html5/thumbnails/5.jpg)
Value Chain Energy – Hulu ke Hilir
ExtractionRefinery
Transport
Power Generation
PLN & Swasta
Transmission - PLN
Distribution
PLN
End User
Storage
Transmission - PLN
![Page 6: OVERVIEW BISNIS ENERGY BERSIH Listrik Tenaga Mini Hydro PLTMH _ _ _ _ _ _ _ _ _ _ _ _ ± Sumatera U tara Project Sponsor : Danareksa Capital Date Report : March 2012 Disclaimer Statements](https://reader031.vdocuments.us/reader031/viewer/2022022116/5c83e42e09d3f2bc2b8b91ed/html5/thumbnails/6.jpg)
EBTBBM
Gas
Batubara
Saat ini 2025
Kapasitas Pembangkit
Listrik Nasional
55 GW 135 GW
Kapasitas Pembangkit
Listrik EBT
8,7 GW(15,7%)
45 GW(33%)
1. Energi fosil lambat laun akan habis, hari
ini kita impor 800 ribu barel per hari,
sementara potensi optimis EBT sekitar
866 GW, namun pemanfaatannya baru
1% (8,6 GW);
2. Dibutuhkan lompatan 13% EBT dalam 10
tahun, dari saat ini 10% menjadi
minimum 23% di tahun 2025 (PP
79/2014). Target Pembangkit Listrik EBT
sebesar 45 GW di tahun 2025 (RUEN),
diperlukan investasi sekitar Rp.1.300 T
s.d 1.600 T;
3. Masih ada 12.659 desa yang belum
sepenuhnya menikmati listrik, bahkan
2.519 desa terdepan masih gelap gulita.
EBT paling mudah digunakan untuk
realisasi elektrifikasi;
Latar Belakang dan Tantangan Pengembangan EBT
6
19%
37%10%
34%
204
MTOE
23%
25%30%
22%
412
MTOE
Sumber: Presentasi EBTKE Kebijakan Pengembangan Energi Terbarukan
![Page 7: OVERVIEW BISNIS ENERGY BERSIH Listrik Tenaga Mini Hydro PLTMH _ _ _ _ _ _ _ _ _ _ _ _ ± Sumatera U tara Project Sponsor : Danareksa Capital Date Report : March 2012 Disclaimer Statements](https://reader031.vdocuments.us/reader031/viewer/2022022116/5c83e42e09d3f2bc2b8b91ed/html5/thumbnails/7.jpg)
PEMBANGKIT ENERGI TERBARUKAN
NOJENIS
PEMBANGKIT
KAPASITAS TERPASANG KUMULATIF
S.D TAHUN 2015 (MW)
OFF GRID ON GRID TOTAL
1 PANAS BUMI - 1.438,50 1.438,50
2 ENERGI AIR 84,65 5.247,20 5.331,85
3 BIOENERGI 1.626,10 115,30 1.741,40
4 ENERGI SURYA 71,23 9,02 80,25
5 ENERGI ANGIN 1,30 1,12 2,42
6 HYBRID 0,54 3,22 3,76
T O T A L 1.783,82 6.814,36 8.598,18
tambahan kapasitas
PLT Energi Terbarukan
pada tahun 2015 sebesar
NO JENIS PEMBANGKIT
KAPASITAS TERPASANG KUMULATIF
S.D TAHUN 2014 (MW)
OFF GRID ON GRID TOTAL
1 PANAS BUMI - 1.403,50 1.403,50
2 ENERGI AIR 81,79 5.229,39 5.311,18
3 BIOENERGI 1.626,10 86,23 1.712,33
4 ENERGI SURYA 62,00 5,00 67,00
5 ENERGI ANGIN 1,30 1,12 2,42
6 HYBRID 0,54 - 0,54
T O T A L 1.771,73 6.725,24 8.496,97
dari kapasitas pembangkit listrik nasional saat ini
(55.523 MW)
Kapasitas Terpasang Pembangkit Listrik EBT (saat ini)
Sumber: Presentasi EBTKE Kebijakan
Pengembangan Energi Terbarukan
![Page 8: OVERVIEW BISNIS ENERGY BERSIH Listrik Tenaga Mini Hydro PLTMH _ _ _ _ _ _ _ _ _ _ _ _ ± Sumatera U tara Project Sponsor : Danareksa Capital Date Report : March 2012 Disclaimer Statements](https://reader031.vdocuments.us/reader031/viewer/2022022116/5c83e42e09d3f2bc2b8b91ed/html5/thumbnails/8.jpg)
Saat ini 2025
Kapasitas Pembangkit Listrik Nasional 55 GW 135 GW
Kapasitas Pembangkit Listrik EBT8,7 GW(15,7%)
45 GW(33%)
+ 80 GW (LISTRIK NASIONAL)
+ 36,3 GW (LISTRIK EBT)
dalam 10 tahun
2025PLTP 7,2 GW
PLT A+PLTM/MH 21.0 GW
PLT Bioenergi 5,5 GW
PLT Surya 6,4 GW
PLT Bayu 1,8 GW
PLT Laut 3,1 GW
Totall 45 GW8,66
10,8011,73
12,94
15,81
18,48
24,66
29,28
35,74
41,01
45,04
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
PLTP PLT Bioenergi PLTA Mini Hidro PLTS PLT Bayu PLT Laut Total
Kondisi Saat Ini vs Target 2025: Listrik EBT
8
Sumber: Presentasi EBTKE
Kebijakan Pengembangan
Energi Terbarukan
![Page 9: OVERVIEW BISNIS ENERGY BERSIH Listrik Tenaga Mini Hydro PLTMH _ _ _ _ _ _ _ _ _ _ _ _ ± Sumatera U tara Project Sponsor : Danareksa Capital Date Report : March 2012 Disclaimer Statements](https://reader031.vdocuments.us/reader031/viewer/2022022116/5c83e42e09d3f2bc2b8b91ed/html5/thumbnails/9.jpg)
Karakteristik bisnis energi bersih di Indonesia, skala
kecil dan menengah
• Investasi yang di butuhkan didepan cukup besar per proyeknya berkisar antaraUS$ 2.5 juta – US$ 25 juta, US$ 2.5 juta/ MW;
• Ada ratusan proposal proyek-proyek energi bersih yang hampir 90% didominasi oleh proyek-proyek Hidro;
• Walaupun proyek dalam skala kecil /menengah tetapi dalam pengembangannyasangat kompleks
• Sponsor proyek adalah para entrepreneur/individu, perusahaan skalamenengah, group perusahaan dan technology provider;
• Telah terjadi mobilisasi pendanaan tinggi baik dalam bentuk ekuitas maupunpinjaman. Struktur transaksi sebagian besar balance sheet financing. SyariahBank memimpin pendanaan dari bank;
• Investor asing menunjukan ketertarikan yang sangat besar pada sektor ini
![Page 10: OVERVIEW BISNIS ENERGY BERSIH Listrik Tenaga Mini Hydro PLTMH _ _ _ _ _ _ _ _ _ _ _ _ ± Sumatera U tara Project Sponsor : Danareksa Capital Date Report : March 2012 Disclaimer Statements](https://reader031.vdocuments.us/reader031/viewer/2022022116/5c83e42e09d3f2bc2b8b91ed/html5/thumbnails/10.jpg)
Tipikal Struktur Bisnis Ketenaga Listrikan, Independent
Power Producer (IPP)
PLN / Off TakerProject Sponsor /
Shareholders
EPC /
Kontraktor
Insurance /
guarantor
Bank / Lender
Vendor/ Supplier Mesin
IPP
Loan Agreement
PPA
Premi
Asuransi
Shareholders
Agreement
Warranty Kontrak
EPC
Kontrak
![Page 11: OVERVIEW BISNIS ENERGY BERSIH Listrik Tenaga Mini Hydro PLTMH _ _ _ _ _ _ _ _ _ _ _ _ ± Sumatera U tara Project Sponsor : Danareksa Capital Date Report : March 2012 Disclaimer Statements](https://reader031.vdocuments.us/reader031/viewer/2022022116/5c83e42e09d3f2bc2b8b91ed/html5/thumbnails/11.jpg)
Study
$1%
Financial Close
$4%
COD
$95%
Early stage
DevelopmentLate stage
Development
Construction
PhaseInitial Operation Operation
Total Project Cost Total Project Cost Total Project Cost
Project Risk Stabilised
Project Risk Peaked
Typical RE Project Development
![Page 12: OVERVIEW BISNIS ENERGY BERSIH Listrik Tenaga Mini Hydro PLTMH _ _ _ _ _ _ _ _ _ _ _ _ ± Sumatera U tara Project Sponsor : Danareksa Capital Date Report : March 2012 Disclaimer Statements](https://reader031.vdocuments.us/reader031/viewer/2022022116/5c83e42e09d3f2bc2b8b91ed/html5/thumbnails/12.jpg)
Permen ESDM No.21/2016
On 4 August 2016, Ministry of Energy and
Mineral Resources ("MEMR") Regulation
No. 21 of 2016 on the Purchase of Electric
Power from Biomass and Biogas Power
Plants by PT Perusahaan Listrik Negara
("PLN") was enacted ("Regulation 21").
Regulation 21 replaces MEMR Regulation
No. 27 of 2014 on the Purchase of Electric
Power from Biomass and Biogas Power
Plants by PLN ("Regulation 27"). The
structure of Regulation 21 is modelled in a
very similar manner to the recent
regulations issued in respect of mini-
hydro projects.
![Page 13: OVERVIEW BISNIS ENERGY BERSIH Listrik Tenaga Mini Hydro PLTMH _ _ _ _ _ _ _ _ _ _ _ _ ± Sumatera U tara Project Sponsor : Danareksa Capital Date Report : March 2012 Disclaimer Statements](https://reader031.vdocuments.us/reader031/viewer/2022022116/5c83e42e09d3f2bc2b8b91ed/html5/thumbnails/13.jpg)
• ESDM menugaskan PLN untuk membeli tenaga listrik tenaga biomasa
(PLTBM) / biogas (PLTBG), dengan harga yang sudah ditetapkan;
• Proses pembelian dengan penunjukan langsung, terhadap IPP yang sudah
mendapatkan Izin Usaha Pembangkitan Tenaga Listrik (IUPTL);
• Ada mandatory timeline harus dipenuhi oleh pengembang / IPP, apabila
tidak terpenuhi ada sanksi nya;
• Harga pembelian tanpa negosiasi, diasumsikan bisa mencakup investasi
pembakitan dan jaringan penyambungan;
• Harga dalam cent USD/ KWh, jangka waktu 20 tahun tanpa eskalasi,
pembayaran dalam IDR, invoice di convert menggunakan Jakarta Interbank
Spot Dollar (JISDOR)
• Ada 4 jenis harga, PLTBM dedicated IPP & Excess Power, PTBG dedicated
UPP & Excess Power;13
Ikhtisar Permen
![Page 14: OVERVIEW BISNIS ENERGY BERSIH Listrik Tenaga Mini Hydro PLTMH _ _ _ _ _ _ _ _ _ _ _ _ ± Sumatera U tara Project Sponsor : Danareksa Capital Date Report : March 2012 Disclaimer Statements](https://reader031.vdocuments.us/reader031/viewer/2022022116/5c83e42e09d3f2bc2b8b91ed/html5/thumbnails/14.jpg)
Harga Dedicated Biogas
![Page 15: OVERVIEW BISNIS ENERGY BERSIH Listrik Tenaga Mini Hydro PLTMH _ _ _ _ _ _ _ _ _ _ _ _ ± Sumatera U tara Project Sponsor : Danareksa Capital Date Report : March 2012 Disclaimer Statements](https://reader031.vdocuments.us/reader031/viewer/2022022116/5c83e42e09d3f2bc2b8b91ed/html5/thumbnails/15.jpg)
Harga Excess Power Biogas
![Page 16: OVERVIEW BISNIS ENERGY BERSIH Listrik Tenaga Mini Hydro PLTMH _ _ _ _ _ _ _ _ _ _ _ _ ± Sumatera U tara Project Sponsor : Danareksa Capital Date Report : March 2012 Disclaimer Statements](https://reader031.vdocuments.us/reader031/viewer/2022022116/5c83e42e09d3f2bc2b8b91ed/html5/thumbnails/16.jpg)
Harga Dedicated Biomasa
![Page 17: OVERVIEW BISNIS ENERGY BERSIH Listrik Tenaga Mini Hydro PLTMH _ _ _ _ _ _ _ _ _ _ _ _ ± Sumatera U tara Project Sponsor : Danareksa Capital Date Report : March 2012 Disclaimer Statements](https://reader031.vdocuments.us/reader031/viewer/2022022116/5c83e42e09d3f2bc2b8b91ed/html5/thumbnails/17.jpg)
Harga Excess Power Biomasa
![Page 18: OVERVIEW BISNIS ENERGY BERSIH Listrik Tenaga Mini Hydro PLTMH _ _ _ _ _ _ _ _ _ _ _ _ ± Sumatera U tara Project Sponsor : Danareksa Capital Date Report : March 2012 Disclaimer Statements](https://reader031.vdocuments.us/reader031/viewer/2022022116/5c83e42e09d3f2bc2b8b91ed/html5/thumbnails/18.jpg)
Ringkasan Model PJBL PLTM 2014
http://www.pln.co.id/blog/model-pjbl-pltm/
![Page 19: OVERVIEW BISNIS ENERGY BERSIH Listrik Tenaga Mini Hydro PLTMH _ _ _ _ _ _ _ _ _ _ _ _ ± Sumatera U tara Project Sponsor : Danareksa Capital Date Report : March 2012 Disclaimer Statements](https://reader031.vdocuments.us/reader031/viewer/2022022116/5c83e42e09d3f2bc2b8b91ed/html5/thumbnails/19.jpg)
Perjanjian Jual Beli Listrik / PJBL (PPA)
1. Model PJBL PLTM tahun 2014 http://www.pln.co.id/blog/model-pjbl-pltm/
2. PPA merupakan dasar untuk menentukan aliran pendapatan penjualan (kWh),
harga (Rp / kWh), aliran pembayaran, dan durasi (tahun).
3. Di Indonesia PLN adalah satu-satunya pembeli (off-taker) produksi tenaga listrik
swasta energi terbarukan. Pembelian listrik dijamin oleh negara melalui Kementerian
keuangan;
4. Penandatanganan PPA merupakan tonggak paling penting dalam memulai proses
pendanaan. PPA mendefinisikan jadwal pelaksanaan proyek (pembiayaan, konstruksi, uji
fungsi, tanggal tenggat waktu operasi komersial), kondisi operasi, dan tanggung jawab. PPA
akan mewajibkan semua izin dan persetujuan yang berlaku sebagai “syarat tangguh” untuk
PPA agar berlaku.
5. PLN tidak bertanggung jawab untuk kelayakan teknis dan keuangan proyek.
Sponsor dan penyandang danalah yang menanggung semua risiko yang terkait dengan
desain, konstruksi dan operasi proyek.
![Page 20: OVERVIEW BISNIS ENERGY BERSIH Listrik Tenaga Mini Hydro PLTMH _ _ _ _ _ _ _ _ _ _ _ _ ± Sumatera U tara Project Sponsor : Danareksa Capital Date Report : March 2012 Disclaimer Statements](https://reader031.vdocuments.us/reader031/viewer/2022022116/5c83e42e09d3f2bc2b8b91ed/html5/thumbnails/20.jpg)
Ketentuan Interface Sesuai Model PJBL PLTM 2014
Pembangkit
(PLTBG) Titik Transaksi Titik Interkoneksi
Jaringam Tegangan
Menengah
(JTM) PLN 20KV
Milik IPP Special Facility diserahkan
kepada PLN setelah COD
Dibangun oleh IPP
• PLN yang menentukan titik
transaksi dan titik interkoneksi
• Ada kemungkinan PLN
menggunakan special facility
untuk jaringan transmisi mereka
• Jarak titik interkoneksi
mempengaruhi financial
feasibility
![Page 21: OVERVIEW BISNIS ENERGY BERSIH Listrik Tenaga Mini Hydro PLTMH _ _ _ _ _ _ _ _ _ _ _ _ ± Sumatera U tara Project Sponsor : Danareksa Capital Date Report : March 2012 Disclaimer Statements](https://reader031.vdocuments.us/reader031/viewer/2022022116/5c83e42e09d3f2bc2b8b91ed/html5/thumbnails/21.jpg)
Kondisi Terkini Pengembangan Energi Bersih
• Kunci sukses keterlibatan swasta dalam pembangkitan listrik (IPP)
sangat tergantung dari PLN sebagai single off taker;
• Selama 12 bulan terakhir, jumlah proyek energi bersih yang di tanda
tangani hanya 18 proyek hydro (115.6 MW); dan PLN melakukan PPA
dengan tariff yang lebih kecil dari Permen;
• DPR menolak alokasi subsidi untuk energi terbarukan Rp 1.1 trillion;
21
![Page 22: OVERVIEW BISNIS ENERGY BERSIH Listrik Tenaga Mini Hydro PLTMH _ _ _ _ _ _ _ _ _ _ _ _ ± Sumatera U tara Project Sponsor : Danareksa Capital Date Report : March 2012 Disclaimer Statements](https://reader031.vdocuments.us/reader031/viewer/2022022116/5c83e42e09d3f2bc2b8b91ed/html5/thumbnails/22.jpg)
Published references in Clean Energy assessment for
banks and financial institutions
Release: Aug 2013 Release: Dec 2014 Release: Dec 2015
![Page 23: OVERVIEW BISNIS ENERGY BERSIH Listrik Tenaga Mini Hydro PLTMH _ _ _ _ _ _ _ _ _ _ _ _ ± Sumatera U tara Project Sponsor : Danareksa Capital Date Report : March 2012 Disclaimer Statements](https://reader031.vdocuments.us/reader031/viewer/2022022116/5c83e42e09d3f2bc2b8b91ed/html5/thumbnails/23.jpg)
10/25/2016 FOOTER GOES HERE 23
Thank You
INDONESIA CLEAN ENERGY DEVELOPMENT II
Implemented by Tetra Tech
Menara Jamsostek, North Tower 14th Floor
Jl. Gatot Subroto No.38 | Jakarta12710 INDONESIA
Main: +62 21 5296 4445 | Fax: +62 21 5296 4446
www.iced.or.id