overdale primary school tallmadge city school district continuous improvement plan initial plan:...
TRANSCRIPT
Overdale Primary School
TALLMADGE CITY SCHOOL DISTRICT
CONTINUOUS IMPROVEMENT PLAN
Initial Plan: November 1999Revised: May 2003Revised: September 2004Revised: September 2006Revised: May 2007Revised: September 2007Revised: May 2008
““Every Child Every Day…”Every Child Every Day…”
Systematically Improving Student AchievementSystematically Improving Student Achievement
OVERDALE PRIMARY SCHOOLContinuous Improvement Team
Core Team Board of Education
Mrs. Karen Moore Principal Mr. Thom Craig President
Mrs. Patty Desmett Teacher Mrs. Valorie Prulhiere Vice President
Mrs. Jean Showalter Teacher Mr. Dennis Loughry Member
Mrs. Regina Lindeman Teacher Mr. Rick Kellar Member
Mrs. Traci Kosmach Intervention Specialist Mrs. Amy Goodson-Beal Member
Advisory Team
Mr. Jeff Ferguson Superintendent
Dr. Lynn Hruschak Director of Curriculum
Mr. Brad Croskey Director of Technology
Dr. JoAnn Chirakos Director of Special Education
Mrs. Nancy Wack Communications Coordinator
Mrs. Diane Kilo Gifted Coordinator
Overdale Primary SchoolVision and Mission
Vision
“We envision a future in which Overdale Primary School is an exemplary place of learning, producing learners with the skills and values necessary to become productive and responsible citizens.”
Mission
“The mission of Overdale Primary School is to promote an educationally sound, safe, and challenging environment in which everyone is actively engaged in learning.”
Overdale Primary School Beliefs
We Believe and Support:We Believe and Support:
DECISIONS ARE MADE BASED ON WHAT IS BEST FOR CHILDREN
THE CHILD’S TOTAL ENVIRONMENT AFFECTS LEARNING AND WE ARE RESPONSIBLE FOR ADDRESSING THESE ISSUES
THAT IT IS OUR RESPONSIBILITY TO REPORT STUDENT ACHIEVEMENT AND/OR TO FACILITATE COLLABORATIVE RELATIONSHIPS BETWEEN SCHOOL AND COMMUNITY
Our Beliefs form the Underpinnings of Our Mission and VisionOur Beliefs form the Underpinnings of Our Mission and Vision
Tallmadge City Schools
CIP GOAL
… to continue as a district of excellence through 2009 as determined by multiple measures including the Local Report Card.
Strategic Planning LeadershipStudent and Stakeholder
Focus
Maintain a district level CIP team to meet at least twice a year
Maintain building-level CIP teams which will meet K-12, district wide, at least twice a year
The board, superintendent, and treasurer will:
Provide resources & allow reallocation of existing resources to meet literacy goals
Analyze and review strategic process results at least annually
Communicate policies, practices, expectations and results to staff and stakeholders
Coordinate instructional practices with support services to enhance student learning
Familiarize students and staff, and inform stakeholders about content standards which are … what kids should know and be able to do
Inform students and stakeholders about our strategic plan which is … what we need to achieve and how we’re going to achieve it
Continue to provide instruction driven by data and supported by quality work and other best practice research
Invite input and involvement of students, staff, and stakeholders
Initiatives Supporting All StrategiesOn Going 06-07 07-08 08-09
Human ResourcesSupport & Process
ManagementInformation & Analysis
Continue to develop a common understanding of and plan for implementation of a standards-based instructional and assessment system across the curriculum
Continue to orient all staff and provide for professional development and on-going support to the grade level indicators, benchmarks and standards in all content areas
Continue to provide professional development in standards-based instructional strategies including differentiated instruction
Continue to implement an appropriate process for support and facilitation of standards collaboration (Tuning Protocol)
Continue to develop, implement and review/analyze/react to results of standards-based common, formative assessments
Integrate reading, writing and mathematics standards and strategies across the curriculum
Provide opportunities for standards-based cross content collaboration
Continue to provide appropriate professional development and on-going support
Continue to monitor subgroup growth within the district
Continue to review and analyze Local Report Card Indicators and Performance Index
Continue to review AYP data
Begin professional development of key staff in “value added”
Continue professional development in and use of Progress Book and DASL
Continue to review and analyze data on item analysis
Continue to use ODE upgrades and online resources
Initiatives Supporting All StrategiesOn Going 06-07 07-08 08-09
CIP Strategies
To develop a common understanding of and plan for implementation of a standards-based instructional and assessment system across the curriculum.
To integrate reading, writing and mathematics standards and strategies across the curriculum.
To review and analyze annual results and trends in reading, writing, mathematics, social studies and science to determine instructional needs and practices.
Action Planning: Integrating Literacy and Math Across the Curriculum … 2008-2009
Overdale Primary School
Long Term Action PlanIntegrating Math and Literacy Across the Curriculum
Action Plan For Current School Year
Responsibility Timeline
• Continue and expand the modeling of literacy integration with math throughout the day (#1)• Understand AYP as it pertains to Math and Reading (#2)• Continue to collaborate regarding strategies for integration of mathematics throughout the day (#3)• Implement a home-school communication regarding Math development/instruction (#4)
All Staff (#1) On-Going
(#2) Introduced in early Oct. and revisited throughout the year(#3) On-going
(#4) On-going
Results/Measurements:1) PLC minutes2) Copies of Home/ School Connections 3) Survey Parents for GAR feedback
Action Planning: Analysis of Trends in Core Content Areas … 2008-2009
Overdale Primary School
Long Term Action Plan• Continue to assess mathematics achievement to parallel literacy assessments (on-going, formative, and reflective)• Continue to use assessment results to guide instruction
Action Plan For Current School Year Responsibility Timeline
• PLC’s supported by the GAR grant will further develop home-school communication of Math achievements (#1)• Create a math Smart goal that would drive instruction/intervention through PLC (#2)• Develop the concept of Buddy Math to parallel Buddy Reading (#3)• Continue to review/ revise IEP/ 504 accommodations (#4)
• All Staff On-going
Results/Measurements:1) Results of Math Assessments2) Documentation of Buddy Time
Action Planning: Becoming Standards Based … 2008-2009
Overdale Primary School
Long Term Action PlanCreate a culture that supports and reinforces Standards – Based differentiated instruction for all studentsProvide professional development in order to continue to develop the goals of our Professional Learning CommunityContinue to develop , understand and apply the pyramid of interventions
Action Plan For Current School Year
Responsibility Timeline
• Audit building commitment to Key PLC concepts in Sept.• Use data from the audit to plan and implement building growth in PLC• Determine a building wide SMART goal based on the audit and students results from common assessments• Assess student success based on intervention results
• All staff On-going
Results/Measurements:1) Audit and Intervention results 2) PD documentation – Pods/ Buddy/Team/Staff