overall site plan - prime construction group, inc. … · rev date by description date checked...

1
DATE REV BY DESCRIPTION DATE CHECKED DRAWN DESIGNED 10223B.10 JOB NO. DRAWING NO. SCALES ACCORDINGLY VERIFY SCALES THIS SHEET, ADJUST IF NOT ONE INCH ON BAR IS ONE INCH ON ORIGINAL DRAWING 0 1" JANUARY 2017 CITY OF ORLANDO WATER CONSERV I BNR IMPROVEMENTS 1 2 3 4 5 6 7 8 9 10 11 12 13 A B C D E F 1 2 3 4 5 6 7 8 9 10 11 12 13 A B C D E F G G ® SHEET OF 10 WILLIAM D. MARSHALL P.E. NO. 66282 WDM QRR BRW G-003 3 OVERALL SITE PLAN 1 M-001 BNR IMPROVEMENTS PLAN BNR SECONDARY CLARIFIERS AND RAS/WAS PS DENITRIFICATION FILTERS TERTIARY FILTERS AND CCT FINAL CLARIFIERS (NOT USED) EFFLUENT STORAGE AND PS PRIMARY CLARIFIERS (NOT USED) PRELIMINARY TREATMENT STRUCTURE EQUALIZATION TANK AND PUMP STATION ANAEROBIC DIGESTERS AND ENERGY CONTROL BUILDING CHEMICAL SYSTEMS BUILDING MAINTENANCE FACILITY ADMINISTRATION BUILDING

Upload: others

Post on 24-Jul-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: OVERALL SITE PLAN - Prime Construction Group, Inc. … · rev date by description date checked drawn designed 10223b.10 job no. drawing no. scales accordingly verify scales this sheet,

DATEREV BY DESCRIPTION

DATE

CHECKED

DRAWN

DESIGNED10223B.10JOB NO.

DRAWING NO.

SCALES ACCORDINGLY

VERIFY SCALES

THIS SHEET, ADJUSTIF NOT ONE INCH ON

BAR IS ONE INCH ONORIGINAL DRAWING

0 1"

JANUARY 2017

CITY OF ORLANDO

WATER CONSERV I BNR IMPROVEMENTS

1 2 3 4 5 6 7 8 9 10 11 12 13

A

B

C

D

E

F

1 2 3 4 5 6 7 8 9 10 11 12 13

A

B

C

D

E

F

G G

®

SHEET OF 10WILLIAM D. MARSHALLP.E. NO. 66282

WDM

QRR

BRW

G-003

3OVERALL SITE PLAN

1M-001

BNR IMPROVEMENTSPLAN

BNR

SECONDARY CLARIFIERSAND RAS/WAS PS

DENITRIFICATION FILTERS

TERTIARYFILTERS AND

CCT

FINAL CLARIFIERS(NOT USED)

EFFLUENT STORAGEAND PS

PRIMARYCLARIFIERS(NOT USED)

PRELIMINARYTREATMENTSTRUCTURE

EQUALIZATION TANKAND PUMP STATION

ANAEROBIC DIGESTERS ANDENERGY CONTROL BUILDING

CHEMICAL SYSTEMSBUILDING

MAINTENANCEFACILITY

ADMINISTRATIONBUILDING