Why Growing Interest in OBA?
Growing Interest in OBA Definition. OBA is one method for improving the delivery of
basic services such as water, sanitation and electricity, when the inability of users to pay full cost would justify performance-based subsidies to complement or replace user fees.
Main Aspects of OBA :
Focusing project implementation on results ( i.e, outputs)
Reducing transaction cost, particularly for high capacity borrowers
Providing innovative and efficient means for disbursing, using new designs that remain consistent with Bank policies and procedures.
Does OBA change Fiduciary approach ?All Bank Fiduciary and Safeguard policies required under
investment lending apply to OBA operations:
Financial Management/Reports, Audit, Disbursement (OP 10.02), expenditure eligibility (OP 6.00)
Disbursement – question of expenditure-based vs OBA approach performance-based – definition of eligible expenditures/allocation
Procurement standards (OP 11.00) - OBA Projects are not exempt from Bank Procurement requirements –- distinguishing:(a) OBA through competitive selection of service providers; and(b) OBA through direct arrangements with incumbent service providers.
Fromdesign to
Implementation
How do we get there?
SO, What Fiduciary Arrangements for OBA ?
During Appraisal and Preparation• Project Components. Define classes of Outputs,
estimated their Unit cost and OBA subsidies• FMA. Assess reliability on providing credible data on
unit cost of output• FMR/IFR. Include certified list of outputs completed
and delivered, form basis for disbursement • Audit TORs. Specify sampling review of outputs and
UC and reporting on reasonableness
Fiduciary Processes in OBA : Areas of focus (1)
During Implementation• Supervision. Sample-verification of physical delivery
of outputs and their technical quality as complement to recipient reporting on output completion
• Disbursement. Payment based on output delivery - upon independent verification of pre-defined output(s), in pre-agreed amount for the specified service – regardless of actual cost
MTR. Adjust unit cost if deem necessary after independent review (UC variances).
Fiduciary Processes in OBA : Areas of focus (2)
MEF
Auditors/consultants
Firms / OCBs/consult.
Invoices
PIRPIP
OVR
AGETIP Validated RPONAS RP
Quarterly IFRAdvance ceiling
Quarterly replenishment
Seed fundQuarterly reimbursement
Payment
Quarterly RP
CFPOVCOVR
AGETIP
GPOBA
PaymentInvoices
ONAS
Senegal On site sanitation – A GPOBA structuring Project
Sample of IFR (1/2)
Current Quarter Year to Date
Cumulative to Date
Sources of FundsWorld BankTOTAL
Less:Uses of Fund
Installation of Water Service ConnectionTOTAL
Surplus/ Deficit
Next 6 months
Actual
IFR1- Report on Sources and Uses of FundsFor the quarter ending/ period
in USD
Forecast
IFR2- STATEMENT OF EXPENSES
To: World Bank Loan Department
Executing Agency: East Meets West Foundation
Trimester from: [date] Disbursement category: **
Number of connections
during the period
Service start date
Financial cost per connection
*
Subsidy amount per connection
(USD) **
Percentage of subsidy:
80% / 20% **
1. 1 Danang Hoa Vang GGGG 20.00 XXXXX 125.00 100.00 80% 1,600.00
2 100.00 0.00
3 100.00 0.00
4 100.00 0.00
20.00 1,600.00
** As defined in the Grant Agreement
Confirmation by the Operator:
- - - - - - - - - -- - - - - - - - - - - - - - -- - -- Date: - - - - - - - -- - - - - - - - - - - -
NAME (authorized representative):
TITLE:
TOTAL:
I hereby certify that, in accordance with the provisions of the Grant Agreement dated [insert date], this quarterly request for disbursement has to be sent for review and clearance to the Task Team Leader at The World Bank, which is acting as Administrator of the Global Partnership on Output-based Aid. I also certify that the information provided on this invoice is accurately presenting the number of eligible water connections made during the aforementioned period and the number of eligible connections which have been in service for at least six months. I also understand that the Word Bank Task Team Leader might request that the conclusion of an independant verification agent be received prior to disbursing the funds, in accordance with the provisions of the Operations Manual. This request will be officially submitted to the Loan Department of the World Bank in Manilla only after official clearance of the World Bank Task Team Leader has been received, and will reflect the amounts that have been found acceptable to the World Bank for the given quarter.
No. CommuneSubsidy Amount requested for the
periodDistrictProvince
* Cumulating Investment Costs (EMWF Line Item Cost of Construction + Implementation Cost + Financial Cost) and Financial Contribution from the Beneficiary (i.e. excluding Estimated Value of In-Kind Contribution and Estimated Value of Land Provided).
Project ID
Number of eligible GPOBA connections submitted for payment during the period
Some Examples
Morroco Social Priorities Program Basic Education Project (P005501)
Mexico Decentralized Infrastructure Reform Loan (P0800149)
Albania Health System Modernization Project (P082814)
Link to OBA - www.gpoba.org
Salient Challenges
Complexity in determining and monitoring unit costs
Joint capacity assessments in OBA Project involving other Donors
Using the borrower’s fiduciary systems Securing agreement among stakeholders
(Service Providers, CBO/NGO) Elaborate FM Guidance note for OBA
Conclusion
OBA operations are responsive to the Bank’s heightened focus on beneficiary ownership, stronger partnerships and results, while continuing to meet the Bank’s fiduciary obligations.
Challenge is to scale up and implement in collaboration with borrowers and development partners in ways that will support a country´s poverty reduction agenda.
Some Outputs of Senegal OBAShower+TCM
Shower
TCM: Manual
Discharge
Toilet
ToiletShower+BALP
Thank you.Thank you.