Directed Inspection & Maintenance: AnOverview of Gas STAR Practices

Technology Transfer WorkshopJune 8, 2005Midland , Texas

Page 2: Outline

Outline

Background

Phase I - Study

Pipeline Leak Study

Monument Gas Plant

Phase II - Study

Page 3: Outline

Background

GRI Study – D I & M

D I & M - BMP

Dynegy’s experience with D I & M

Page 4: Outline

Phase I Study

Two DMS facilities in study

Cost was $ 30 K

Amount methane saved = 100 MMSCF/yr

($700K @ $7/MSCF)

Savings Realized within 18 Months – Largest

Cost-Effective Leaks Repaired

Page 5: Outline

Chico Gas Plant

Page 6: Outline

Chico Gas Plant – Old Flares

Page 7: Outline

Chico Gas Plant – New Flare

Page 8: Outline

Lost and Unaccounted For ProductPotential $ Savings

Equating Pure Methane Leak Rate to Dollars

$0.00

$500.00

$1,000.00

$1,500.00

$2,000.00

$2,500.00

0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1

Cubic Feet Per Minute

An

nu

al $

In L

os

t P

rod

uc

t

At $4 Per 1000 CubicFeet

0.238 cu ft/min Estimated Economical to Repair

Economics of LAUF

Page 9: Outline

Optical Remote Leak Detection

Infrared Differential AbsorptionMid wave Infrared - 3 to 5 µmLong wave Infrared - 8 to 11 µmVisible - 0.4 to 1.0 MicronsNear IR -0.9 to 1.6 Microns

Remote sensing is the science and art of obtaining information about an object, area, or phenomenon through the analysis of data acquired by a device that is not in contact with the object, area, or phenomenon under investigation.

From Remote Sensingand Image Interpretation,

Lilles and and Kiefer, 1987

Page 10: Outline

Similar to Gas Chromatography

NIST

0

0.2

0.4

0.6

0.8

1

1.2

3.1 3.2 3.3 3.4 3.5 3.6 3.7

Wavelength (microns)

Abs

orba

nce

butane

ethane

propane

methane

water

CO2

3.31µm

Page 11: Outline

Active vs. Passive Imaging

Active techniques employ an artificial radiation source (e.g. a microwave transmitter, a laser, a thermal heater, etc.) for illumination of the target area

Passive techniques utilize the naturally occurring ambient radiation

Page 12: Outline

Passive Remote Optical Infrared Leak Detection, Quantification, and Speciation

LSILSI

Page 13: Outline

LSI Camera Visualizes Gasoline Vapor

Field PortableRuggedReliableRepeatableSensitivityEase of Use - Doesn’t

Require Frequent AdjustmentCapable of Identifying

“Inaccessible” Leaks

Page 14: Outline

LSI Leak Surveys Video Imagery

Flange Leak Buried Pipeline Leak

Page 15: Outline

Infrared LSI Camera

Page 16: Outline

High Volume Sampler

Page 17: Outline

Pipeline Leak Study

Driving – visible signs (e.g. vegetation

stress)

Driving with sniffer trucks twice a year

25 – 40 miles per day

Page 18: Outline

Pipeline Leak Study

Mass Balance Discrepancy Identified Need for

Survey

Infrared Remote Sensing from helicopter

200-400 miles per day

Amount of methane estimated at ~146 MM SCF /yr

or (0.5 MMSCFD)

Page 19: Outline

Monument Gas Plant

Page 20: Outline

Monument Gas Plant

Infrared survey conducted to identify sources of

leakage

~200 leaking sources identified

Largest opportunities - blow down vents and valve

packing

Amount of methane saved is ~146 MMSCF/yr $1022K

@ $7/MSCF

Page 21: Outline

Monument Gas Plant

26 engines to be replaced with integral

electric compression

18, 500 HP Replaced

Amount of fuel saved is 1.5 BCF/yr and

Corresponding CO2 Reductions

Page 22: Outline

Monument Gas Plant

Page 23: Outline

Monument Gas Plant

Page 24: Outline

Monument Gas Plant

Cost of this project $ 8.3 MM

Amount of fugitive methane losses saved is

~41 MMSCF/yr

Ancillary Benefit - Criteria (e.g. NOx) and

HAPs pollutant reduction

Page 25: Outline

Phase II Study

Eunice Gas Plant and upstream compressors

Chico Gas Plant Retest and upstream compressors

Included the LSI Infra red camera ( tool kit )

Page 26: Outline

Eunice Plant – Engine Room

Page 27: Outline

Eunice Plant

Page 28: Outline

Eunice Plant

Page 29: Outline

Eunice Plant

Page 30: Outline

Eunice Plant

Page 31: Outline

Chico Plant

Page 32: Outline

Future Plans

Coordinated Efforts for Sharing BMPs with Field

Operations and Maintenance Personnel in 2005.

Increase management commitment through

awareness of cost effective opportunities

Dynegy is evaluating implementing D, I & M system

wide

Page 33: Outline

Contact Information

Shankar Ananthakrishna

Senior Environmental Engineer

Dynegy Midstream Services, L.P.

Phone #: (713)-507-6753

Email: [email protected]

Jeffrey A. Panek

Principal

Innovative Environmental Solutions, Inc.

P.O. Box 177

Cary, Il 60013-0177

(847)516-3658

[email protected] FurryLeak Surveys Inc.P.O. Box 30661102 Early Blvd.Early, Texas 76802-2261(325) 641-8147Website: http://www.leaksurveysinc.com/