    1.Introduction

    1.1 GeneralThe Town of Smithtown has retained JGAS in October 2013 to conduct a

    Phase II ESA concerning the roert! "nown as 12 #ebe$ #oad% which is $ocatedin Smithtown% Ontario &Figure 1'( #ebe$ #oad is comrised of a )ormer )$eet*aintenance +ard that has since been abandoned( Se,era$ areas ha,e con-rmedsoi$ or groundwater contamination as a resu$t of the acti,ities erformed whi$ethe site was an oerating )$eet *aintenance +ard(

    In 2011 the Town of Smithtown re$ocated the .eet maintenance faci$it! toa new $ocation% since then the site has remained unde,e$oed( In 2012% theschoo$ board indicated interest in bui$ding a ub$ic schoo$ on the roert!( In thesring of 2012% the Town of Smithtown hired /$eanu /onsu$tants to conduct aPhase I En,ironmenta$ Site Assessment &ESA' to determine areas of otentia$concern $ocated on the #ebe$ #oad site% the resu$ts of which are shown in Tab$e1( ased on this information JGAS has determined a sam$ing $an

    1.2 Site Description

    The #ebe$ #oad site is $ocated in Smithtown% Ontario( The site is

    aroimate$! %000m2in si4e( The site is owned and managed current$! b!the Town of the Smithtown with the intention of de,e$oing a ub$ic schoo$ onthe roert!( Figure 1i$$ustrates the site $an for the former .eet maintenance!ard that wi$$ be a$icab$e to the Phase II assessment(

  • 8/11/2019 Our Phase II

    3/44

    Figure 1: Site Plan for 12 Rebel Road

    Note: Established property boundaries in Figure 1 are highlighted withbold lines.

  • 8/11/2019 Our Phase II

    4/44

    1.3 Property Ownership

    The #ebe$ #oad site is aroimate$! %000m2in si4e( The Town of Smithtownowns a$$ of the roert! e$igib$e for the Phase II site assessment( *a!or Iceman*a,eric"hunter has remained in contact with the 5ua$i-ed Person &5P'% PederGarberg( The contact information for *a!or Iceman is ro,ided be$ow6

    173 #ebe$ #oad 8ri,e% +79 3G:

    &:1;'

  • 8/11/2019 Our Phase II

    5/44

    #able 1Selection of Applicable Site Condition Standard

    Parameter Site Specific Findings Implications

    Area of Natural Significance

    Surface Soil pH Range

    Subsurface Soil pH Range

    Soils>1.5 m to be Disturbed

    Groundwater Use

    inimum !edroc" Dept#

    Distance to $atercourse

    %uture &and Use

    Soil 'e(ture

    No

    Surface soil pH )*+

    5,pH,11

    -es

    otable

    > 1/m

    >/0 m

    Residential

    oarse Grained

    'able 1 standards not re2uired

    'able 1 standards re2uired

    'able 1 standards not re2uired

    Stratified approac# not appropriate

    otable groundwater standards appropriate

    Not a s#allow soil propert34 'able * NA

    'ables 6 not appropriate since >/0 m

    Residential land use standards will be used

    oarse grained soil te(ture appropriate

    The #ebe$ road site is not within or ad>acent to an area of natura$signi-cance as de-ned b! O(#eg( 1:3B07 &as amended b! O(#eg( :11B0;'( A 5P

    has determined that this roert! does not -t the de-nition of anen,ironmenta$$! sensiti,e site as ro,ided in Section 71&1' of the EPA( aseduon these -ndings% the 5P has determined that the Tab$e 2 &)u$$ 8eth GenericSite /ondition Standards in a Potab$e Ground Fater /ondition' are aroriatefor this site(

    The factors that determine a sensiti,e area such as groundwater use% 9,a$ues% distance to water bodies% bedroc" deth% $and use% and soi$ teturewhich can aect the a$icab$e site condition standards are not re$e,ant to thissite( Thus for the urose of -$ing an #S/ for the #ebe$ #oad Site% the sitecondition standards wi$$ be6

    Table 2: )u$$ 8eth Generic Site /ondition Standards in a Potab$e GroundFater /ondition &See Attachment '

  • 8/11/2019 Our Phase II

    6/44

    2.$ac%"round Inor&ation

    2.1 Physical Settin"The Phase II ESA are bounded b! to the north% &under construction'

    to the east% &future etension' to the south% and to the east( Thetoograh! of the is re$ati,e$! .at( As -$$ has been $aced throughout thearea% it has been graded so that there is on$! minor $oca$ re$ief( Ground surfacerises gradua$$! to the northwest( Surface e$e,ations range between HHmas$and HHmas$ &refer to boreho$e $ogs for range' with a gent$e s$oe to the easttowards the and to the south towards a"e Ontario(

    )igure 3or surface water feature which drains into a"e

    Ontario(

    Pro,ide a descrition of the genera$ h!sica$ setting of the hase two roert!inc$uding%

    i( water bodies and areas of natura$ signi-cance within the hase one stud!area% and

    ii( the toograh! and surface water drainage features on the hase tworoert!(

    2.2 Past In'esti"ations

    The Phase I ESA reort &/92* 9i$$% 2010' for the stud! area re,iewed andro,ided detai$s of re,ious en,ironmenta$ in,estigations that ha,e beenconducted( 8ue to the ,o$ume of information and data co$$ected for the stud!area% summaries of these re,ious in,estigations ha,e been aendici4ed( Asummar! of the Phase I ESA -ndings is ro,ided in Aendi A( A summar! ofsite in,estigation wor" conducted rior to the 2010 Phase I ESA is ro,ided inAendi (

    Pro,ide%

    i( a summar! of an! re$e,ant ast in,estigations of the hase two roert!% and

    ii( documentation of the stes ta"en to con-rm that information or data whichare to be used from re,ious in,estigations are of adeuate ua$it! such that itcan be re$ied uon(

  • 8/11/2019 Our Phase II

    7/44

    3.Scope o the In'esti"ation

    3.1 O'er'iew o Site In'esti"ationAs discussed in the re,ious section% numerous en,ironmenta$ studies ha,e beenconducted at the site( It is noted that some discretion must be made when usingthese historica$ resu$ts as the o$der data wou$d not ha,e had the currentmethodo$og! and 5AB5/ rocedures as reuired for the current Standard &i(e(ho$ding times% temeratures% $aborator! rocedures% method detection $imits'(9istorica$ resu$ts ha,e been used with caution and ha,e been used to focus thecurrent Phase II ESA wor"(

    The additiona$ Phase II ESA wor" com$eted is reuired to suort and udatere,ious studies as we$$ as to meet current regu$ator! reuirements( This wor"

    consisted of boreho$e dri$$ing% soi$ sam$ing% monitoring we$$ insta$$ations%groundwater sam$ing% and a geoh!sica$ in,estigation(

    The current Phase II ESA -e$d wor" was conducted in three rounds( /92* 9Iconducted the -rst round of Phase II acti,ities from *a! 10 through

    June 22% 2010( Fithin the boundaries of the % the -e$d wor" inc$udedad,ancing HH boreho$es with HH of them con,erted into monitoring we$$s &HHo,erburden and H bedroc" we$$s'( The -rst round a$so inc$uded co$$ectinggroundwater sam$es from HH new$! insta$$ed and HH eisting monitoring we$$swithin the b$oc"s( 9istorica$ and current boreho$e and monitoring we$$$ocations are shown in )igure 7

  • 8/11/2019 Our Phase II

    8/44

    The third round of -e$d wor" in,estigated an! inferred buried meta$$ic ob>ectsidenti-ed during the geoh!sica$ sur,e! wor"% ro,ided de$ineation of /O/sidenti-ed in re,ious monitoring rounds% and a$so further re-ned and -$$ed in theremaining data gas( The third round of -e$d wor" consisted of a combination ofboreho$e dri$$ing &HH oreho$es'% monitoring we$$ insta$$ations &HH *onitoringwe$$s'% and test itting &HH Test its'(

    Pro,ide an o,er,iew of the site in,estigation conducted with resect to thehase two roert!(

    3.2 (edia In'esti"ated

    Soi$ and groundwater ua$it! were in,estigated during the re,ious and currentPhase II ESA wor" &in,estigation of sediment is not a$icab$e due to the absenceof surface water bodies'(

    Soi$ ua$it! at the site was determined using ,arious sam$ing techniuesinc$uding test itting% ho$$ow stem auger dri$$ing% and direct ush dri$$ing

    methods( The method se$ected was determined based on sam$e deth andwhether a monitoring we$$ was reuired at the sam$ing $ocation( O,erburdensoi$s from both the uer -$$ $a!er as we$$ as the under$!ing nati,e si$t $a!erswere co$$ected and submitted for $aborator! ana$!sis( )urther detai$s regardingsoi$ sam$ing methods are ro,ided in Section :(

    Groundwater sam$es from both re,ious$! and new$! insta$$ed monitoring we$$swere co$$ected and submitted for ana$!sis( Sam$ing methods inc$uded both high.ow &Faterra' and $ow .ow urging techniues based on the turbidit! of thesam$es and ana$!sis reuired( )urther detai$s regarding groundwater sam$ingmethods are ro,ided in Section :(

    Pro,ide%

    the rationa$e for whether to inc$ude in the -e$d in,estigation sam$ing andana$!sis of each of ground water and sediment on% in or under the hase tworoert!% and

    ii( an o,er,iew of the -e$d in,estigation of each medium for which sam$ing andana$!sis were done(

    3.3 Phase One Conceptual Site (odel

    The Phase One /oncetua$ *ode$ &/S*' ro,ided in the Phase I ESA Grou 1reort &/92* 9I% 2010' is summari4ed in Tab$e 7(1( Areas of Potentia$

    En,ironmenta$ /oncern &APE/s' are shown in )igure 7(1(

    Tab$e 7(16 Phase One /S*

    Phase ! "S# Ele$ent Su$$ary

    Eisting ui$dings andStructures

    1 ui$ding

    Identif! Onsite Kone onsite( ower #i,er is $ocated

  • 8/11/2019 Our Phase II

    9/44

    Faterbodies aroimate$! =0m to the south

    Areas of Katura$Signi-cance

    Kone

    Presence of 8rin"ing Fater

    Fe$$s

    Kone

    Identif! #oads Fithin thePhase 1 Stud! Area

    To the Fest6 9ighwa!

    To the Korth6 #oad

    To the East6

    To the South6

    )uture #oad A$$owances Fithin Area6 #1acent Proert! ses To the Fest6 /ommercia$

    To the Korth6 Dacant and

    To the East6 Dacant and

    To the South6 Dacant and &/r!sta$ /ree"'

    Identif! Potentia$$!/ontaminating Acti,ities

    se of ASTsBSTs% materia$ stoc"i$es% formermaintenance !ard% current dr!c$eaning ser,ice%autobod! sho% sra!ing of oi$ on former gra,e$ar"ing $ot% re,ious transformer(

    Identif! Areas of Potentia$En,ironmenta$ /oncern&APE/'

    :2H APE/s identi-ed in the Phase I ESA as shownon )igure HH

    /ontaminants of Potentia$/oncern &/OP/'

    *eta$s% PA9s% DO/s% P/s% and P9/s

    Presence of ndergroundti$ities

    nderground uti$ities ser,ice the bui$ding at #ebe$#oad and the ad>acent commercia$ com$e to theFest

    #egiona$Boca$9!drogeo$og!

    2o,erburden soi$ $a!ers consisting of -$$ &coarsegrained' o,er$!ing nati,e si$t! sandsBti$$s% organicsi$t( )i$$ and nati,e soi$ $a!ers ,ar! in thic"ness(8eth to sha$e bedroc" ranges from (= to 10mbgs(

    Sha$$ow &1 to 3 mbgs' groundwater .ow issoutheaster$!( 8eeer bedroc" groundwater .ow isa$so southeaster$!(

    ncertainties Aecting theDa$idit! of Phase I /S*

    STs on )IPs ma! ha,e been remo,ed

    ac" of sca$e and inaccuracies ossib$e in historicdocuments and mas when $ocating APE/s

  • 8/11/2019 Our Phase II

    10/44

    Soi$ and groundwater sam$ing and ana$!sisrotoco$s re,ious$! used do not com$! withcurrent standards

    Potentia$ historic fai$ure to reortBdocumentotentia$ contaminating

    Abi$it! of inter,iewees to accurate$! reca$$ asten,ironmenta$ issues

    Pro,ide a descrition of the hase one concetua$ site mode$ reared as art ofthe hase one en,ironmenta$ site assessment reort and of re$e,antsubseuent$! acuired information(

    3.4 De'iations Fro& Sa&plin" and Analysis Plan

    Prior to com$eting the Phase II ESA wor"% a For" P$an &FP' entit$ed LPre$iminar!Phase II En,ironmenta$ Site In,estigation For"$an &/92* 9I% Ju$! 2010' wasreared( The For" P$an &FP' detai$ed standard oerating rocedures &SOPs'and ro,ided the Sam$ing P$an &SP' for the site(

    Throughout com$etion of the Phase II ESA wor"% an! de,iations from SOPs% thero>ect For" P$an &FP' and the ro>ect Sam$ing P$an &SP' were discussed withthe ro>ect 5ua$i-ed Person &5P' or their designate% or con-rmed with the Senior

    Technica$ /onsu$tant for the ro>ect(

    The main de,iation from the For"$an during the -e$d in,estigation was toincrease the number of sam$es submitted for $aborator! ana$!sis as we$$ aseanding the ana$!tica$ arameter $ist for se$ected sam$e $ocations( The

    decision to increase the number of sam$es ana$!sed andBor to increase thenumber of arameters ana$!sed was based on -e$d obser,ations andBor -e$dscreening resu$ts( In some $ocations where uneected imacts &ie( staining% -$$materia$s' were obser,ed% the $ist of ana$!tica$ arameters was increasedaccording$!( The number of sam$es se$ected for ana$!sis at se$ect $ocations&were uneected imacts were obser,ed in the -e$d' was increased in order toro,ide adeuate ,ertica$ de$ineation of the imact(

    Pro,ide a descrition of an! de,iations from the sam$ing and ana$!sis $an(

    3. I&pedi&entsThe main imediment encountered during the com$etion of the Phase II ESA

    wor" was the resence of soi$ stoc"i$es o,er a signi-cant ortion of duringthe -rst round of dri$$ing in *a! 2010( 8ri$$ing was not ossib$e at certain$ocations due to the stoc"i$es(

    These stoc"i$es were subseuent$! remo,ed from the site for ositemanagement and disosa$ in the summer of 2010( Once the stoc"i$es were

  • 8/11/2019 Our Phase II

    11/44

    remo,ed% the reuired boreho$es and monitoring we$$s were insta$$ed during thesecond round of dri$$ing in August 2010(

    Pro,ide a descrition of an! h!sica$ imediments and documentation of an!denia$ of access(

  • 8/11/2019 Our Phase II

    12/44

    4.In'esti"ation (ethod

    4.1 GeneralDarious en,ironmenta$ -e$d methods were used to assess soi$ and groundwaterua$it! at this Site( The Phase II ESA wor" was commenced in *a! 2010 and wascom$eted in Setember 2010( Prior to the in,estigati,e -e$d wor"% a Phase IIESA For" P$an &/92* 9I% 2010' and a staged Sam$ing and Ana$!sis P$an&SAP' were de,e$oed( The Sam$ing and Ana$!sis P$an is detai$ed in Tab$e :(1and ro,ides sam$ing $ocations and freuenc!% media sam$ed% sam$e deths%

    ana$!tica$ arameters% and uroseB>usti-cation for the sam$e( Sam$ing$ocations are shown in )igure :(1(The fo$$owing sections detai$s the sitein,estigation methods used(

    Pro,ide a brief descrition of a$$ methods as seci-ed in the fo$$owing sections(Fhere the method diers from the associated standard oerating rocedure%ro,ide a detai$ed descrition of the method used% and a rationa$e for thechange in method(

    4.2 Drillin" and )*ca'atin"

    8ri$$ing wor" at the Site inc$uded the use of ho$$ow stem auger dri$$ing and directush dri$$ing techniues( Test its were a$so inc$uded in the in,estigation wor"(Prior to an! subsurface in,estigati,e wor"% uti$it! $ocates were com$eted( Each

    of these comonents of the subsurface in,estigation are discussed searate$!be$ow(

    +.,.1 Utility -ocates

    Prior to initiating an! subsurface in,estigations in the % *u$tiDIEF ocates Inc($ocated in *ississauga% Ontario% contacted Ontario One /a$$ and arranged forc$earance of a$$ ub$ic ser,ices &inc$uding% but not necessari$! $imited to%te$ehone% cab$e te$e,ision% natura$ gas% h!dro% water% and sewer' and c$earanceof a$$ soi$ boring and test it $ocations b! using radio detection and or e$ectrica$iso$ation for uti$ities &inc$uding% but not $imited to% te$ehone% cab$e te$e,ision%natura$ gas% and water'( Each subsurface sam$ing $ocation was c$eared ofunderground uti$ities rior to conducting intrusi,e wor"(

    +.,., ollow Ste& Au"er Drillin"

    The ho$$ow stem auger dri$$ing wor" for the Phase II ESA commenced in *a!2010 and was com$eted b! Ko,ember 2010( 9o$$ow stem auger dri$$ing wascom$eted b! three dri$$ing subcontractors% Pro-$e 8ri$$ing of Toronto% Ontario%Geo En,ironmenta$ 8ri$$ing Inc( of *i$ton Ontario% and Atcost 8ri$$ing of /oncord%Ontario( 8ue to schedu$ing reuirements% u to :H dri$$ rigs were usedconcurrent$!( These dri$$ rigs inc$uded the fo$$owing6

  • 8/11/2019 Our Phase II

    13/44

    /*E :

    HH

    )or boreho$es that were ad,anced with ho$$ow stem augers and s$it soons% thedri$$ers uti$i4ed either a truc"Btrac" mounted dri$$ing rig caab$e of turning 10mm I8 &inside diameter' ho$$ow stem augers &20: mm outside diameter'( Soi$borings were ad,anced dee enough to intercet the water tab$e and to a$$ow a3

  • 8/11/2019 Our Phase II

    14/44

    be co$$ected uti$i4ing a 7

  • 8/11/2019 Our Phase II

    15/44

    euiment was remo,ed with a sho,e$ andBor brush and co$$ected and stored indrums or other suitab$e storage ,esse$s for subseuent management(

    Pro,ide for each boreho$e dri$$ed or test it eca,ated%

    i( the name of the contractor%

    ii( a descrition of the euiment used%

    iii( a descrition of the measures ta"en to minimi4e the otentia$ for crosserr! cans' and transferred to the 200 drums $ocated ha$f wa! down t Street

    on the south side(

    +.3., ater -e'el and Free Product -e'el (easure&ents

    Fater $e,e$s and deth to free roduct were ta"en at a$$ reuired $ocations o,er ashort time duration &water $e,e$ sna shot' to aid in groundwater .ow directiondetermination(

    A decontaminated water $e,e$ meter was used to measure the deth ofgroundwater be$ow the to of the monitoring we$$ casing or other referenceoint( The water $e,e$ meter was ca$ibrated to read within B< : mi$$imetres(#ecorded groundwater $e,e$s were con,erted to sur,e!ed $e,e$s abo,e sea $e,e$b! subtracting the measured groundwater deth from the sur,e!ed to of casinge$e,ation(

    In the e,ent that etro$eum h!drocarbons% $ight non

  • 8/11/2019 Our Phase II

    21/44

    sam$e( Po$!c!c$ic aromatic h!drocarbon groundwater sam$es% other thanben4o&a'!rene% must not be -$tered( )ie$d -$tering of sam$es was documentedin the -e$d boo"(

    Groundwater sam$es at each we$$ were co$$ected in order of $east &DO/s' tomost stab$e &meta$s'( DO/ sam$e containers were com$ete$! -$$ed with no

    headsace a$$owed(

    +.3.5 Sa&ple Pac%a"in"4 Stora"e4 and #ransport to -aboratory

    Once -$$ed sam$e containers were $aced in coo$ers containing iceob number

    sam$e I8

    arameters for chemica$ ana$!sis

    date and ti$e of 'olle'tion

    Sam$es were transorted to AS aboratories at the end of each wor"ing da!( Achain of custod! form was com$eted and accomanied a$$ sam$e shiments tothe $aborator!(

    Pro,ide a descrition of the methods used to conduct ground water sam$es(

    4.( Sedi&ent0 Sa&plin"

    Sediment sam$es were not reuired for the Phase II ESA #A Grou $oc"s(

    4.) Analytical #estin"

    AS aboratories of Fater$oo% Ontario erformed the soi$ and groundwaterana$!sis for the recent Phase II ESA wor" conducted b! /92* 9I in 2010(Kumerous $aboratories were used for the ESA wor" com$eted rior to 2010(

    Pro,ide the names of a$$ $aboratories used for ana$!sis of soi$% sediment orground water sam$es(

    4.1* !esidue (ana"e&ent ProceduresSoi$ cuttings co$$ected from the dri$$ing wor" are contained onsite in 200 $itredrums( /ontained soi$s wi$$ be disosed with contaminated soi$s that areremo,ed from the site in rearation for de,e$oment of the (

    Groundwater co$$ected during we$$ de,e$oment and urging% as we$$ aseuiment c$eaning so$utions were a$so $aced in 200 $itre containers andcurrent$! remain onsite( This containeri4ed water wi$$ be managed in the same

  • 8/11/2019 Our Phase II

    22/44

    manner as contaminated groundwater that is co$$ected during the remediation ofsoi$s within the footrint(

    Pro,ide detai$ed documentation of rocedures used for the management ofresidues from the -e$d in,estigation inc$uding%

    i( soi$ cuttings from dri$$ing and eca,ations%

    ii( water from we$$ de,e$oment and urging% and

    iii( .uids from euiment c$eaning(

    4.11 )le'ation Sur'eyin"

    )o$$owing the com$etion of a$$ monitoring we$$s% to of casing e$e,ations weremeasured using an automatic $e,e$( The benchmar" used during the e$e,ationsur,e! was HHHHHHH and has an e$e,ation of HHHHHHHmas$(

    Pro,ide an accurate seci-cation of the $ocation of an! benchmar" used in

    sur,e!ing of e$e,ations(

    4.12 2uality Assurance and 2uality Control 2A62C7(easures

    The fo$$owing sam$e ac"aging% storage and transortation were fo$$owedduring the in,estigation(

    1( Chec Sam!les6 #e,iew the ro>ect sam$ing $an to ensure sam$es for a$$the reuired chemica$ arameters ha,e been co$$ected and submitted( Ensurea$$ sam$es $isted on the /hain of /ustod! &/O/' are inc$uded in the sam$e

    shiment and that the correct ana$!sis has been reuested( /$ear$! mar"L9O8 net to sam$es that are not reuested to be ana$!4ed( Sam$es$aced on ho$d ma! be ana$!4ed at a $ater date ending the initia$ ana$!tica$resu$ts to aid in ,ertica$ de$ineation(

    2( Pacin" of Coolers6 P$ace one $a!er of bubb$e wra on the bottom of a dr!c$ean coo$er &decon with water and $iuinoBa$cono if needed'( se sea$ab$eZi$oc bags and bubb$e wra to wraBcontain the sam$e containers tore,ent brea"age for the g$ass >ar shiments(

    3( P$ace a$$ sam$es for ana$!sis of ,o$ati$e organics &DO/s% TEC% P9/ )1' insearate coo$ers( Inc$ude one $aborator! reared tri b$an" in e,er! coo$ercontaining ,o$ati$e organics sam$es( Preare a searate /O/ for the coo$er

    containing ,o$ati$e organics ensuring the tri b$an" is $isted on the /O/(

    7( A fu$$ $a!er of fresh$! doub$e

  • 8/11/2019 Our Phase II

    23/44

    :( P$ace a co! of the origina$ /O/ in a Zi$oc bag taed to the underside of the$id of the coo$er( It is recommended that a searate /O/ be rearedseci-ca$$! for the contents of each coo$er(

    =( Sea$ the coo$er with a custod! sea$( Sea$ the custod! sea$ to the coo$er withstraing or ac"ing tae( AX a mai$ing $abe$ to the to of the coo$er if

    being shied b! courier(

    ( Vee a co! of the /O/ for the ro>ect records(

    ( Kotif! the $aborator! in ad,ance if acce$erated turnaround time is beingreuested(

    ;( If a coo$er is being shied for Saturda! de$i,er! N ma"e sure the $ab "nows itis coming in ad,ance and has someone at the $ab to recei,e it% and theroer shiing arrangements ha,e been ro,ided with the courier orshier(

    5AB5/ sam$es were co$$ected as reuired in O(#eg( 1:3B07( 8u$icate soi$ andgroundwater sam$es were co$$ected at a freuenc! of one du$icate for each 10sam$es submitted( 8u$icate soi$ sam$es were co$$ected b! ,ertica$$! s$ittingthe core sam$es into two eua$ ,o$umes rior to $acing in the aroriatesam$e container( 8u$icate groundwater sam$es were co$$ected b! -$$ing thedu$icate sam$e container immediate$! fo$$owing sam$e co$$ection( A$$du$icate sam$es were submitted Lb$ind to the $aborator! and -e$d stadocumented in their -e$d boo" each du$icate sam$e $ocation(

    Tri b$an"s were co$$ected for coo$ers containing sam$es being submitted for,o$ati$e ana$!sis at a freuenc! of one sam$e er each coo$er shied to the$abHHHH( 8edicated sam$ing euiment was used for a$$ groundwater sam$esand euiment rinse b$an"s were not reuired( )ie$d b$an"s &$aborator! rearedcontainers of disti$$ed water' were used during the groundwater sam$ing at a

    freuenc! of one -e$d b$an" for e,er! 10HH sam$es( )ie$d b$an" containers wereoened as c$ose to the monitoring we$$ being sam$ed as ractica$ during theco$$ection of the groundwater sam$e( Once the sam$e had been $aced into thesam$e containers% the -e$d b$an" container was caed% $abe$ed% and $aced inthe sam$e coo$er(

    Pro,ide%

    i( a descrition of sam$e containers% reser,ation% $abe$$ing% hand$ing andcustod! for sam$es submitted for $aborator! ana$!sis% inc$uding an! de,iationsfrom the sam$ing and ana$!sis $an%

    ii( a descrition of euiment c$eaning rocedures fo$$owed during a$$ sam$ing%

    a descrition of how the -e$d ua$it! contro$ measures referred to in subsection 3&3' were carried out% and

    i,( a descrition of% and rationa$e for% an! de,iations from the rocedures set outin the ua$it! assurance and ua$it! contro$ rogram set out in the sam$ing andana$!sis $an(

  • 8/11/2019 Our Phase II

    24/44

    .!e'iew and )'aluation

    .1 !e"ional Geolo"y

    $edroc%

    edroc" within the F8 consists of sha$e of the Georgian a! )ormation( TheGeorgian )ormation was formed during the er Ordo,ician age ofaroimate$! 770 to 7=0 mi$$ion !ears ago( It is estimated to be at an a,eragethic"ness of 100 m and is under$ain b! the gre! to b$ac" sha$es of the/o$$ingwood )ormation( The Georgian a! )ormation is de-ned as a b$ue

  • 8/11/2019 Our Phase II

    25/44

    The uer -$$ $a!er forms the sha$$ow uncon-ned auifer at the site(Groundwater in this $a!er is erched abo,e the under$!ing nati,e si$tBc$a! ti$$$a!er described be$ow( Groundwater $e,e$s% .ow direction% and ,e$ocit! in the -$$$a!er is discussed in Section =(3(

    Nati-e Silt"lay ,ayer

    nder$!ing the uer -$$ $a!er is a nati,e si$tBc$a! ti$$ $a!er( This nati,e $a!er isthe resu$t of sediments deosited b! g$acia$% .u,ia$% and $acustrine rocesseso,er the $ast 13:%000 !ears( ased on the -,e dee boreho$es & ' ad,ancedb! *acarentech & '% the thic"ness of the nati,e si$tBc$a! ti$$ $a!er ranges fromranges between : m to ( m( The to of the nati,e si$tBc$a! $a!er is t!ica$$!encountered at an e$e,ation of between : and = mas$( The nati,e si$tBc$a!$a!er etends down to the sha$e bedroc" which is encountered at an e$e,ation ofbetween =;(0 and =;( mas$(

    The nati,e si$tBc$a! $a!er acts as a con-ning $a!er which searates the uer -$$and under$!ing sha$e bedroc" $a!ers( Groundwater .ow in this $a!er is discussedin Section =(3(

    Shale /edro'0

    Across most of the F8% the bedroc" is re$ati,e$! .at% at deths of to 10 mbgs(At the eastern end of the F8% near the #i,er% bedroc" occurs at deths to30 mbgs% corresonding to an o$d bedroc" drainage channe$ &historica$ $ocationof the #i,er'( Seci-c to the % a weathered sha$e bedroc" formationwas encountered at deths ranging between (0 mbgs and ;(27 mbgs & 'during a dri$$ing rogram com$eted b! *acarentech Inc( in Setember 1;(

    The corresonding e$e,ations of the sha$e bedroc" surface ranged between =;(0and =;( mas$( The detai$s re$ated to the bedroc" were $imited% but thedescrition noted that the bedroc" was Lweathered% gre! sha$e( It aears thatmonitoring we$$s were insta$$ed within the o,erburden% c$ose to the bedroc"(

    The uer 3 to : m of the bedroc" is weathered and has been obser,ed to befractured( /$a! is resent in some seams in the uer 1orit! of groundwater .ow in the sha$e bedroc" occurs in the uer 3 to :metre thic" fractured ortion of the formation( Groundwater .ow in the sha$ebedroc" is discussed in Section =(3

    Soil #e*ture

    nder O( #eg( 1:3B07% Lcoarse tetured soi$ means soi$ that contains more than:0 er cent b! mass of artic$es that are : micrometres or $arger in meandiameter( If at $east 1B3 of the soi$ at the roert! consists of coarse teturedsoi$% the coarse tetured soi$ standards a$! to the Site otherwise themediumB-ne soi$ standards ma! a$!( ased on resu$ts of grain

  • 8/11/2019 Our Phase II

    26/44

    ii( e$e,ations% re$ati,e to a geodetic benchmar" or other ermanent andreco,erab$e benchmar"% of the to and bottom of each geo$ogic unit%

    iii( geo$ogica$ and other materia$ in each geo$ogica$ unit%

    i,( the roerties of each auifer and auitard% and

    ,( the rationa$e for the choice of auifers and auitards in,estigated as it re$atesto identi-cation of the $ocation% resence% re$ease% concentration% migration orretention of a contaminant(

    .3 Site ydro"eolo"y

    ased on the site geo$og! information resented in the re,ious section% threemain h!drogeo$ogic units are de-ned as fo$$ows6

    \ er )i$$ a!er

    \ Kati,e Si$tB/$a! a!er

    \ Feathered Sha$e edroc"(

    The site h!drogeo$og! is discussed be$ow in terms of these three h!droge$ogicunits(

    +pper Fill ,ayer

    The uer -$$ $a!er forms the sha$$ow uncon-ned auifer at the site(Groundwater in this $a!er is erched abo,e the under$!ing nati,e si$tBc$a! ti$$$a!er described be$ow( To assess current groundwater .ow directions andgradients in this $a!er% /92* 9I conducted a round of groundwater $e,e$measurements on recent$! insta$$ed monitoring we$$s on October 13% 2010( Tab$e=

  • 8/11/2019 Our Phase II

    27/44

    /edro'0 uifer

    Groundwater .ow in the bedroc" was interreted genera$$! to the south to a"eOntario and $oca$$! to the east to the #i,er &8/S% 200= Intera% 200:'( Theh!drau$ic conducti,it! was reorted on the order of 7(:10

  • 8/11/2019 Our Phase II

    28/44

    anticiated that imacted groundwater wou$d tend to .ow hori4onta$$! in the -$$%abo,e the ti$$ auitard(

    Pro,ide%

    i( a descrition of the hori4onta$ h!drau$ic gradient for each auifer in,estigated%inc$uding minimum% maimum and a,erage hori4onta$ h!drau$ic gradients% and

    ii( a descrition of ,ertica$ h!drau$ic gradients in auifers where a contaminant isresent at a concentration greater than the a$icab$e site condition standard forthe contaminant% inc$uding minimum% maimum and a,erage ,ertica$ h!drau$icgradients(

    . Fine8(ediu& Soil #e*ture

    nder O( #eg( 1:3B07 as amended b! O(#eg( :11B0;% Lcoarse tetured soi$means soi$ that contains more than :0 ercent b! mass of artic$es that are :

    micrometres or $arger in mean diameter( According to the regu$ation% if one

  • 8/11/2019 Our Phase II

    29/44

    used to identif! worst case sam$es that were submitted for $aborator! ana$!sis(PI8 measurements were recorded on the boreho$e $ogs &refer to Aendi HH' foreach of sam$es co$$ected( )or the stud! area% PI8 measurements ranged from 0m to a maimum of HH m at $ocation HH at a deth of HH mbgs(

    Pro,ide a discussion of soi$ -e$d screening resu$ts(

    .& Soil 2uality

    This section discusses the soi$ ua$it! in the ,arious stratigrahic $a!ers andcomares the ana$!tica$ resu$ts to the a$icab$e site condition standards( Thesoi$ ua$it! is assessed using both historica$ and current data( Section 3(2(1discusses the use and re$iabi$it! of historica$ data in assessing the soi$ ua$it!(

    ased on the co$$ected and re,iewed information to date% there are identi-ed soi$imacts anticiated to be a resu$t of the historica$ industr! resent and the -$$materia$ on Site( The 200; *OE Tab$e 1 Standards were deemed to be thea$icab$e Site /ondition Standards &S/S' for the roert! as 9 resu$ts from HH

    surface soi$ sam$es &^1(: mbgs' were abo,e a 9 of ;% therefore considering theroert! en,ironmenta$$! sensiti,e(

    )igure =

  • 8/11/2019 Our Phase II

    30/44

    i,( contaminants re$ated to chemica$ and bio$ogica$ transformations that ha,e orma! ha,e occurred%

    ,( whether the resu$ts indicate soi$ ser,es as a source of contaminant masscontributing to ground water or sediment% and

    ,i( whether the resu$ts indicate the resence of $ight or dense non

  • 8/11/2019 Our Phase II

    31/44

    ,i( whether the resu$ts indicate soi$ ser,es as a source of contaminant masscontributing to ground water or sediment% and

    ,ii( whether the resu$ts indicate the resence of $ight or dense non

  • 8/11/2019 Our Phase II

    32/44

    shied in ice -$$ed coo$ers to maintain temeratures at $ess than 10 degrees/e$sius a$ong with a chain of custod! record to ASRs $aborator! in Fater$oo%Ontario( AS is accredited b! the /anadian Association for aborator!Accreditation Inc( &/AA'( AS erformed the chemica$ ana$!sis in com$iancewith the *inistr! of the En,ironment% aborator! Ser,ices ranch% Protocol for

    Anal#tical $ethods Used in the Assessment of Pro!erties under Past XV.1 of the

    Environmental Protection Act, as amended(

    Soi$ and groundwater certi-cates of ana$!sis were recei,ed from ASe$ectronica$$! to reduce the ossibi$it! of transcrition errors and were comi$edinto a database( The automation of data transfers from $aborator! instruments to$aborator! information management s!stems &I*S' a$so reduced the ossibi$it!of transcrition errors( A$$ resu$ts reorted b! AS were interna$$! 5AB5/Rd b! aro>ect chemist before being u$oaded to the database( Ana$!tica$ resu$ts werere,iewed and ,a$idated b! the ro>ect chemist( The data re,iew and ,a$idationin,o$,ed6

    Deri-cation that sam$es were ana$!4ed for the methods reuested

    Deri-cations that the aroriate methods as out$ined in the Protocol forAnal#tical $ethods Used in the Assessment of Pro!erties under Past XV.1 ofthe Environmental Protection Act &as amended'% were erformed

    #e,iew of the data for out$iers and anoma$ies and

    #e,iew of the $aborator! case narrati,e for e,ents in the $aborator! that ma!ha,e aected the accurac! or recision of the data(

    The data re,iew and ,a$idation erformed b! the ro>ect chemist is documentedin the 8ata 5ua$it! E,a$uation reort ro,ided in Attachment HHH( It shou$d benoted that the data contained in the 85E inc$udes data from outside of the

    Grou 1 $oc" in,estigation area( The 85E assessed the ua$it! of the ana$!tica$resu$ts for a$$ sam$es submitted in batches with the Grou 1 $oc" in,estigationsam$es(

    The goa$ of the 85E was to demonstrate that a suXcient number ofreresentati,e sam$es were co$$ected and the resu$ting ana$!tica$ data can beused to suort the decision ma"ing rocess( The fo$$owing summar! high$ightsthe -ndings for the Grou 1 $oc" in,estigation 85E6

    Precision of the data was ,eri-ed through the re,iew of the $aborator! dataua$it! indicators that inc$ude matri si"eBmatri si"e du$icates &*SB*S8'%-e$d du$icates and $aborator! du$icate re$ati,e ercent dierences(Precision was genera$$! accetab$e with the ecetion -e$d du$icate

    recision which suggests that the sam$e matri is heterogeneous(

    Accurac! of the data was ,eri-ed through the re,iew of the ca$ibration%$aborator! contro$ sam$es &/S'% *SB*S8% and surrogate reco,eries% as we$$as the e,a$uation of methodB-e$d b$an" data( Accurac! was genera$$!accetab$e with a few DO/ ana$!tes and meta$s being ua$i-ed as estimatednon

  • 8/11/2019 Our Phase II

    33/44

    #eresentati,eness of the data was ,eri-ed through the sam$esR co$$ection%storage% and reser,ation rocedures and the ,eri-cation of ho$dingect use( A$$ data used for the uroses of this Phase II ESA are considered

    ,a$id( The com$eteness goa$ of ;0 ercent was met for a$$ methodBana$!tecombinations(

    Pro,ide%

    i( a descrition of the t!es of ua$it! contro$ sam$es co$$ected and resu$ts ofan! other ua$it! assurance and ua$it! contro$ measures ta"en during the -e$din,estigation% inc$uding the t!es of ua$it! contro$ sam$e% the media sam$ed%and the imortance of the resu$ts with resect to ensuring the data are usefu$%aroriate and accurate in the determination of whether the hase tworoert!% or an! #S/ roert! within it% meets the a$icab$e site condition

    standards and an! standards seci-ed in a ris" assessment%

    ii( a descrition of each instance where a sam$e was not hand$ed in accordancewith the Ana$!tica$ Protoco$ with resect to%

    A( ho$ding time%

    ( reser,ation method

    /( storage reuirement or

    8( container t!e%

    iii( a statement% with resect to subsection 7 &3' of the regu$ation that%

    A( a$$ certi-cates of ana$!sis or ana$!tica$ reorts recei,ed ursuant to c$ause 7&2' &b' of the regu$ation com$! with subsection 7& 3'%

    ( a certi-cate of ana$!sis or ana$!tica$ reort has been recei,ed for each sam$esubmitted for ana$!sis% and

    /( a$$ certi-cates of ana$!sis or ana$!tica$ reorts recei,ed ha,e been inc$uded infu$$ in an aendi to the hase two en,ironmenta$ site assessment reort%

  • 8/11/2019 Our Phase II

    34/44

    i,( a descrition of each instance where a $aborator! ua$i-ed an! resu$ts ormade remar"s in a certi-cate of ana$!sis or ana$!tica$ reort about a sam$e%inc$uding% a discussion of the ,a$idit! of an! resu$ts ua$i-ed% and

    ,( a discussion of the o,era$$ ua$it! of the -e$d data from the in,estigation withresect to the data ua$it! ob>ecti,es% to demonstrate that%

    A( decision

  • 8/11/2019 Our Phase II

    35/44

    ( the contaminants associated with each of the areas referred to insubaragrah A%

    /( each medium in which a contaminant associated with an area referred to insubaragrah is resent%

    8( a descrition and assessment of Fhat is "nown about each of the areasreferred to in subaragrah A%

    E( the distribution% in each of the areas referred to in subaragrah A% of eachcontaminant resent in the area at a concentration greater than the a$icab$esite condition standard% for each medium in which the contaminant is resent%together with -gures showing the distribution%

    )( an!thing "nown about the reason for the discharge of the contaminantsresent on% in or under the hase two roert! at a concentration greater thanthe a$icab$e site condition standard into the natura$ en,ironment%

    G( an!thing "nown about migration of the contaminants resent on% in or underthe hase two roert! at a concentration greater than the a$icab$e sitecondition standard awa! from an! area of otentia$ en,ironmenta$ concern%inc$uding the identi-cation of an! referentia$ athwa!s%

    9( c$imatic or meteoro$ogica$ conditions that ma! ha,e in.uenced distributionand migration of the contaminants% such as temora$ .uctuations in groundwater $e,e$s% and

    I( if a$icab$e% information concerning soi$ ,aour intrusion of the contaminantsinto bui$dings inc$uding%

    1( re$e,ant construction features of a bui$ding% such as a basement or craw$sace%

    2( bui$ding heating% ,enti$ating and air conditioning design and oeration% and

    3( subsurface uti$ities%

    i,( where contaminants on% in or under the hase two roert! are resent atconcentrations greater than the a$icab$e site condition standard% one or morecross

  • 8/11/2019 Our Phase II

    36/44

    A( the re$ease mechanisms%

    ( contaminant transort athwa!%

    /( the human and eco$ogica$ recetors $ocated on% in or under the hase tworoert!%

    8( recetor eosure oints% and

    E( routes of eosure(

  • 8/11/2019 Our Phase II

    37/44

    %.3. Conclusions

    (

    Pro,ide a summar! of the information about the fo$$owing6

    i( the $ocation and concentration of contaminants in the $and or water on% in orunder the hase two roert!%

    ii( en,ironmenta$ conditions in the $and or water on% in or under the hase tworoert! where it is necessar! to underta"e a ris" assessment with resect toone or more contaminants of concern% and

    iii( whether a$icab$e site condition standards and standards seci-ed in a ris"

    assessment for contaminants on% in or under the hase two roert! were metas of the certi-cation date(

    %.1 Si"natures

    Pro,ide%

    i( origina$ signatures of the ua$i-ed erson who conducted or suer,ised thehase two en,ironmenta$ site assessment% and

    ii( a statement b! the ua$i-ed erson con-rming the carr!ing out of the hasetwo en,ironmenta$ site assessment and the -ndings and conc$usions of thereort(

  • 8/11/2019 Our Phase II

    38/44

    &.!eerences

  • 8/11/2019 Our Phase II

    39/44

    (.Fi"ures and #ables

    Tab$es

    *onitoring Fe$$ Insta$$ation

    &ocation 7le8ation

    9$1S /05./:;

    9$1D /05.//;

    9$:a /0;.1

    9$:b /0;.:01

    9$/ /05.

  • 8/11/2019 Our Phase II

    40/44

  • 8/11/2019 Our Phase II

    41/44

    i( area of natura$ signi-cance that inc$udes the hase two roert!% that isad>acent to the hase two roert! or that is $ocated% who$$! or art$!% on thehase two roert! or within 30 metres of the hase two roert! or art of thehase two roert!% andii( water bod! $ocated ad>acent to the hase two roert! or% who$$! or art$!% onthe hase two roert! or within 30 metres of the hase two roert! or art of

    the hase two roert!(

    Proert! efore Actions Ta"en to #educe the /oncentration of /ontaminantsPro,ide a -gure showing% in a $an ,iew% a$$ features re$e,ant to the hase twoen,ironmenta$ site assessment rior to an! actions being ta"en to reduce theconcentration of contaminants inc$uding%i( areas where a contaminant is resent at a concentrations greater than thea$icab$e site condition standards for the contaminant% andii( the $ocations of bui$dings% storage tan"s% drainage features and -$$ areas on orunder the hase two roert!(

    Interreted /ontours of Ground Fater E$e,ations

  • 8/11/2019 Our Phase II

    42/44

    /ontaminants in Soi$ efore Actions Ta"en to #educe the /oncentration of/ontaminantsFhere one or more contaminants in soi$ at or under the hase two roert! areresent at a concentration greater than the a$icab$e site condition standard forthe contaminant rior to an! actions ta"en to reduce concentration ofcontaminants% ro,ide one or more -gures in $an ,iew of the hase tworoert! that show the concentration of contaminants as ana$!4ed in an

  • 8/11/2019 Our Phase II

    43/44

    accredited $aborator!% in a$$ boreho$es% test ho$es% test its and an! other soi$sam$ing $ocations(

    /ontaminants in Ground Fater efore Actions Ta"en to #educe the/oncentration of /ontaminantsFhere one or more contaminants in ground water at or under the hase two

    roert! are greater than the a$icab$e site condition standard rior to an!actions ta"en to reduce concentration of contaminants% ro,ide one or more-gures in $an ,iew of the hase two roert! that show the concentration ofcontaminants% as ana$!4ed in an accredited $aborator!% in a$$ monitoring we$$sand test ho$es(

    /ontaminants in Sediment efore Actions Ta"en to #educe the /oncentration of/ontaminantsFhere one or more contaminants in sediment at or under the hase tworoert! are greater than the a$icab$e site condition standard rior to an!actions ta"en to reduce concentration of contaminants% ro,ide one or more-gures in $an ,iew of the hase two roert! that show the concentration of

    contaminants% as ana$!4ed in an accredited $aborator!% in a$$ sediment sam$e$ocations(

    8e$ineationPro,ide -gures showing the hase two roert! in a $an ,iew and i$$ustratingthe de$ineation of the $atera$ and ,ertica$ etent of contaminants of concern insoi$% ground water or sediment for each area contaminants of concern inc$uding%i( sam$ing $ocations%ii( sam$e identi-cation number%iii( sam$ing oint%i,( sam$ing deths%,( sam$ing deth inter,a$s%,i( concentrations of contaminants as ana$!4ed in an accredited $aborator!% and,ii( the a$icab$e site condition standard or standard seci-ed in a ris"assessment for each contaminant ana$!4ed(

    /ontaminants of /oncern in Areas of Potentia$ En,ironmenta$ /oncernPro,ide cross

  • 8/11/2019 Our Phase II

    44/44

    ).Appendices

    eneral

    Sam$ing and Ana$!sis P$an

    Pro,ide the sam$ing and ana$!sis $an for the site in,estigation(

    )ina$i4ed )ie$d ogsPro,ide a$$ -na$i4ed -e$d $ogs(

    /erti-cates of Ana$!sis or Ana$!tica$ #eorts from aboratoriesPro,ide $aborator! certi-cates of ana$!sis or ana$!tica$ reorts for a$$ sam$esana$!4ed(

    #esidue *anagementPro,ide coies of a$$ ermits% aro,a$s and the $i"e obtained from municia$%ro,incia$ or federa$ go,ernments or agencies for hand$ing% treating% dischargingand disosing of soi$% sediment and ground water

    Sur,e! of Phase Two Proert!Pro,ide a sur,e! of the hase two roert! which has been reared% signed andsea$ed b! a sur,e!or or% where the hase two roert! consists of $and that isadministered b! the *inistr! of Katura$ #esources under the Pub$ic ands Act% adescrition of the hase two roert! aro,ed b! the Sur,e!or Genera$(

    See Reg for other appli'able appendi'es