  • 8/6/2019 Ops Gyann to Pgp1

    1/85

    PGP 1 SummersSession on OPS

    30/10/06

  • 8/6/2019 Ops Gyann to Pgp1

    2/85

    Where does OPS fit in?

  • 8/6/2019 Ops Gyann to Pgp1

    3/85

  • 8/6/2019 Ops Gyann to Pgp1

    4/85

    Process Analysis Terms

    Process : Is any part of an organizationthat takes inputs and transforms theminto outputsCycle Time : Is the average successivetime between completions of successiveunitsUtilization : Is the ratio of the time that aresource is actually activated relative tothe time that it is available for use

  • 8/6/2019 Ops Gyann to Pgp1

    5/85

    Process FlowchartingDefined

    Process flowcharting is the use of adiagram to present the major elements of a processThe basic elements can include tasks or operations, flows of materials or customers, decision points, and storageareas or queuesIt is an ideal methodology by which tobegin analyzing a process

  • 8/6/2019 Ops Gyann to Pgp1

    6/85

    O ther Process TerminologyBlocking O ccurs when the activities in a stage must stop

    because there is no place to deposit the item justcompleted

    If there is no room for an employee to place a unit of

    work down, the employee will hold on to it not able tocontinue working on the next unit

    Starving O ccurs when the activities in a stage must stop

    because there is no work If an employee is waiting at a work station and no

    work is coming to the employee to process, theemployee will remain idle until the next unit of workcomes

  • 8/6/2019 Ops Gyann to Pgp1

    7/85

    O ther Process Terminology (Continued)

    Bottleneck O ccurs when the limited capacity of a

    process causes work to pile up or becomeunevenly distributed in the flow of a process

    If an employee works too slow in a multi-stage process, work will begin to pile up infront of that employee. In this is case theemployee represents the limited capacity

    causing the bottleneck.Pacing Refers to the fixed timing of the movement of

    items through the process

  • 8/6/2019 Ops Gyann to Pgp1

    8/85

    Process Performance Metrics

    O peration time = Setup time + Run timeCycle time = Average time between completion of successive units

    Throughput time = Average time for a unit to movethrough the system ie entire processLead time = The total time it takes a customer to receivean order (includes time to process the order,throughput time and delivery time)Process Velocity = Throughput time

    (Throughput ratio) Value-added time

  • 8/6/2019 Ops Gyann to Pgp1

    9/85

    C OMPONENTS OF LEAD TIME

    Total Flow time spent in t h e system comprises:Processing TimeSetup TimeMove TimeW ait for Batc h TimeW ait for Matc h Time (for assemblies/ kits)

    Queue Time

    Allowed Lead Time = Average Flow Time + Safety Time

  • 8/6/2019 Ops Gyann to Pgp1

    10/85

    Process Performance Metrics(Continued)

    Throughput rate = 1 .Cycle time

    Efficiency = Actual outputStandard O utput

    Productivity = O utputInput

    Utilization = Time ActivatedTime Available

  • 8/6/2019 Ops Gyann to Pgp1

    11/85

    A Few 1-Dimensional Frameworks

    By Nature of Product :Discrete ------- Discrete ------ C ommodity

    Heterogeneous Homogeneous

    By Job Processing Requirements :Job S h op ------ Flow S h op

    By Layout Type :Process/ ------ Product LayoutFunctional

  • 8/6/2019 Ops Gyann to Pgp1

    12/85

    .. A Few 1-Dimensional Frameworks

    By Process Technology Type :Project ------- Intermittent ------ C ontinuous

    By Logistics PositioningTo Order -------------- To Stock

    ETO MTO ATO MTS

    Design Manufacture Assembly Delivery

  • 8/6/2019 Ops Gyann to Pgp1

    13/85

    IV.Continuous

    Flow

    III. Connected

    Flow (Line)

    II. DisconnectedFlow (Batch)

    I. Jumbled Flow(Job Shop)

    Low

    Volume,One of aKind

    Multiple

    Products,LowVolume

    FewMajor

    Products,Higher Volume

    HighVolume,

    HighStandard-ization

    Heavy/CustomizedMachinery

    Low-customizationLight/ Medium

    Machines

    Assembly of Autos, PCs,

    TVs etc.

    Sugar Refinery

    Unit Cost (High)Flexibility (High)

    Dependability (Low)

    Dependability (High)Flexibility (Low)

    Unit Cost (Low)

    Th e Product-Process Matrix(Hayes &Wh eelwrig h t)

    Inefficient Region

    Wasteful Region

    EffectivenessMeasures:

    From C h ase, Aquilano &Jacobs C h. 5

  • 8/6/2019 Ops Gyann to Pgp1

    14/85

    2 -D Framework: Volume-Specificity

    Volume

    C ustomer Specificity

    Design for C ustomer

    MassProduction

    C raft

    C oncurrent

    Response

  • 8/6/2019 Ops Gyann to Pgp1

    15/85

    2 -D Framework: Volume-Variety(in Discrete Manufacturing)

    Volume

    Variety

    NC JobS h op

    Flow/ Transfer Lines

    GT/C M

    FMS

  • 8/6/2019 Ops Gyann to Pgp1

    16/85

    FL OW LINES INMASS PR O DUCTI O N HIERARCHY

    MassProduction

    QuantityProduction

    FlowProduction

    FlowProcess

    Discrete ItemFlow Line

    AssemblyFlow Line

    Transfer Line

  • 8/6/2019 Ops Gyann to Pgp1

    17/85

    FMS Defined An integrated computer-controlled complex of Numerically C ontrolled mac h ine tools, wit h

    Automated Tool Management, and AutomatedMaterial Handling, t h at can simultaneouslyprocess a Medium-sized volume of a Moderatevariety of parts

  • 8/6/2019 Ops Gyann to Pgp1

    18/85

    Group Tec h nology A management approac h of recognizing andexploiting similarities, to break down a complex taskand obtain greater productivity in design andmanufacturing, by:

    Efficiently storing/ retrieving information aboutrecurring situations and problemsStandardizing similar tasksPerforming like activities toget h er

  • 8/6/2019 Ops Gyann to Pgp1

    19/85

    C ellular ManufacturingTh e organisation of manufacturing tasks into self-contained units or cells, comprising:Different kinds of manufacturing processes,

    Arranged in p h ysical proximity,To produce a limited range or family of items

    Attempts to combine flexibility of job s h op with efficiencyof flow lines

  • 8/6/2019 Ops Gyann to Pgp1

    20/85

  • 8/6/2019 Ops Gyann to Pgp1

    21/85

    Goal concepts

    Systems viewLocal optimization is not t h e best

    Bottleneck th e real targetLoss at bottleneck is loss for systemStatistical fluctuations ( CV )

    Use buffer on bot h sides of bottleneck

  • 8/6/2019 Ops Gyann to Pgp1

    22/85

  • 8/6/2019 Ops Gyann to Pgp1

    23/85

  • 8/6/2019 Ops Gyann to Pgp1

    24/85

    Supply C h ain Management

    S M W D R

    Product / Service

    Funds / Money

    Information

  • 8/6/2019 Ops Gyann to Pgp1

    25/85

    TopicsInventory Management P & Q Systems EO Q

    Risk Pooling Square Root Law RFID / Barcodes Bull Wh ip Effect Relations h ip with C ommunication Tec h nology

    Strategic Alliances - V MILogistics Dist Models / 3PL

  • 8/6/2019 Ops Gyann to Pgp1

    26/85

    Inventory Management

    CO ST ASS O CIATED W ITHINVENT O RY

    Holding / Carrying CostO rdering CostSet-up costShortage Cost

  • 8/6/2019 Ops Gyann to Pgp1

    27/85

    Demand

    C ertaintyRisk

    Uncertainty

  • 8/6/2019 Ops Gyann to Pgp1

    28/85

    Ordering

    Wh en to Order How Muc h to Order

  • 8/6/2019 Ops Gyann to Pgp1

    29/85

    P & Q SYSTEM

    W e h ave two general type of inventorysystem :

    Fixed

    Order Q

    uantity model (Q

    - System )Fixed Time Period Model ( P-System )

  • 8/6/2019 Ops Gyann to Pgp1

    30/85

    Q System

    Here, order quantity is fixed w h ich is equalto EO Q . Wh enever inventory level falls toa predetermined level, reorder point ,order is placed .

    Reorder point , R= Average demand over lead time +Safety Stock (S .S)

    Order quantity , q = Economic Order quantity Average Inventory = [ EO Q /2+safety stock ]

  • 8/6/2019 Ops Gyann to Pgp1

    31/85

    P System

    Here, review period is fixed and order sizevaries . Order size is calculated as :

    Replenishment level , R = average demand over leadtime & review period +safety stock .

    Ordered Quantity = Replenishment level Inventory

    on hand - Inventory on order.Average Inventory = Average Consumption during

    review period / 2 + S.S

  • 8/6/2019 Ops Gyann to Pgp1

    32/85

    A3

    ORDERINGPOINTS

    1 2 3 4 5 6 7 8 9 10 11 1 2 1 3Q SYSTEM FIXED ORDER QUANTITY SYSTEM

    ( ORDER QUANTITY = 500 )

    1000

    800

    600

    400

    200

    (100)

    (400)A1 A2

    ROP Level

    SS Level

  • 8/6/2019 Ops Gyann to Pgp1

    33/85

    P SYSTEM- FIXED PERIOD REVIEW SYSTEM

    L 2 4 6 L 8 10 12 14 R =6 R = 6 MONTHS

    1000

    800

    600

    400

    200SAFETY STOCK

    1100 ROP = 1100

  • 8/6/2019 Ops Gyann to Pgp1

    34/85

    W ithin the suggested classification, regularity of orders has beenconsidered to fix the review policy, replenishment frequency, review period

    & lead times

    Iegular Irregular poradic egular Irregular poradic egular Irregular poradic

    I

    I

    I

    I2

    lassification - eview /

    anual eview ystem eview

    Inventory Review Mec h anism

  • 8/6/2019 Ops Gyann to Pgp1

    35/85

    ITEMS ARE FEDFROM THIS

    WHEN BIN ISEMPTY , IT ISSIGNAL TOPLACE ORDER

    THIS CONTAINSITEMS = REORDER

    LEVEL, RTHIS IS USED

    WHEN 1 ST BIN ISEXHAUSTED

    THIS SYSTEM OBVIATESCONTINUOUS MONITORINGUSEFUL IN MANUAL SYSTEM

    1st BIN

    2nd BIN

  • 8/6/2019 Ops Gyann to Pgp1

    36/85

    Economic Order Q uantity (EO Q )

    Occurs w h en Ordering C ost equalsHolding C ost

    Assumptions Single Product Stable Demand Z ero Lead Time

  • 8/6/2019 Ops Gyann to Pgp1

    37/85

    Risk Pooling

    DEMAND VARIABILITY IS REDUCED IFIT IS AGGREGATED ACR O SSLO CATI O NS. HIGH DEMAND O F O NEMAY BE O FF-SET BY L OW DEMANDO F AN O THER. THIS LEADS T O REDUCED SAFETY ST O CK AND

    HENCE AVGE INVENT O RY.

  • 8/6/2019 Ops Gyann to Pgp1

    38/85

  • 8/6/2019 Ops Gyann to Pgp1

    39/85

  • 8/6/2019 Ops Gyann to Pgp1

    40/85

    BULL W HIP EFFECT

    Wh ile th e consumers consume t h eproduct at a steady state wit h minor

    fluctuations, t h e demand order variability inth e supply c h ains are amplified as t h ey

    move up t h e c h ain .

  • 8/6/2019 Ops Gyann to Pgp1

    41/85

    DEMAND VARIABILITY

    0

    4680

    1 2 3 4 5 6 7 8

    R ' W '

    0

    4

    6

    8

    0

    1 2 3 4 5 6 7 8

  • 8/6/2019 Ops Gyann to Pgp1

    42/85

  • 8/6/2019 Ops Gyann to Pgp1

    43/85

  • 8/6/2019 Ops Gyann to Pgp1

    44/85

    Demand forecast updatingOrder batc h ing

    Price fluctuationRationing and s h ortage gaming

    CAUSES OF BULL WHIP EFFECT

  • 8/6/2019 Ops Gyann to Pgp1

    45/85

    Communication Tec

    hnology

  • 8/6/2019 Ops Gyann to Pgp1

    46/85

    MAJOR ERP PLAYERS

    SAP : MARKET LEADER . DEV ELOPING ANALYTIC AL SOFT W AREFOR S U PPLY C HAIN PLANNNG

    O RACLE: INITIALLY ADDED FINANC IAL APPLIC ATINS TO ITSDATA BASE PROGRAMS NO W A LARGE ERP PRO V IDER

    PE O PLE S O FT: SAP STARTED W ITH MANU FAC TU RING APPLI C AIONS AND ORA C LE W ITH FINANC E, PEOPLESOFTSTARTED W ITH HU MAN RESO U RC ES APPLI C ATIONS .

    BAAN:C

    ROSS FU

    NC

    TIONAL INTEGTRATED SYSTEMSW

    ITHENTIREPRISE W IDE BU SINESS V IEW. FO C U S ON MIDSI Z EMANU FAC TU RING C OMPANIES .

  • 8/6/2019 Ops Gyann to Pgp1

    47/85

  • 8/6/2019 Ops Gyann to Pgp1

    48/85

    Supplier Selection

  • 8/6/2019 Ops Gyann to Pgp1

    49/85

    ADVANTAGE OF SINGLE VERSUS MULTIPLE SOURCES

    MU LTIPLE SINGLE Assurance of supply in case

    of troubleLever to guard against priceincrease

    Some suppliers cant h andleallth e work

    Ability to call on unusedcapacity of several suppliers

    Easier to managecoordination and relations h ipLeverage over supplier is

    greater with volume purc h ase .

    Vendor feels fully responsible/total obligation

    Supplier more inclined to dospecial t h ings .

    Lesser tooling costFeasible to introduce JIT

  • 8/6/2019 Ops Gyann to Pgp1

    50/85

  • 8/6/2019 Ops Gyann to Pgp1

    51/85

  • 8/6/2019 Ops Gyann to Pgp1

    52/85

    ST O CK REPLENISHMENT RESP O NSIBILITY- S UPPLIER

    HOW MUCH TO SHIP

    TO WHICH STORE

    WHEN

    COST OF W/ HOUSING EXCESS STOCK

    LIMITED STORE SPACE AVAILABLE

    SUPPLIER PAYS F O R EVERYTHING INV O LVED IN

    MANAGING COTSCO,S INVENTORY EXCEPT

    ACTUAL SHELF-STOCKS

  • 8/6/2019 Ops Gyann to Pgp1

    53/85

    STRATEGY

    TEC HNOLOGY ENABLED SHARING OF POS DATA-REC O RDED SALE

    C OMMU NIC ATION W ITH LOADING POINTS/ TR U C KING AGENT/V EHIC LES ON THE MO V E .

    TO MEET DEMAND FL U C TU ATIONOPERATIONAL EXIGEN C IES

    -LEV ERGE LOGST C S

    S U PER V ISE STORES IN V ENTORYLEADTIME, SAFETY STO C K

    -INV.CARRYNG COST

  • 8/6/2019 Ops Gyann to Pgp1

    54/85

    PROD U C T SKU RATIONALISATION

    eg:U

    NISEX PRODU C

    T- RISK POOLING

    ENHANC ED C U STOMER SER V IC E

    S C OU TING STORES, PA C KGNG DESIGN,RANDOM STO C K V ERIFIC ATION, IN C OMPLETE I V ERY,W RONG DELI V ERY .

    ORDER- C U STOMER- C ONSIGNMENT LINK U P .

    - CUSTOMER

    SERVICE

  • 8/6/2019 Ops Gyann to Pgp1

    55/85

  • 8/6/2019 Ops Gyann to Pgp1

    56/85

  • 8/6/2019 Ops Gyann to Pgp1

    57/85

  • 8/6/2019 Ops Gyann to Pgp1

    58/85

    LOGISTIC S

  • 8/6/2019 Ops Gyann to Pgp1

    59/85

    OU TBOU ND DISTRIB U TION STRATEGIES

    DIREC

    T SHIPMENTW AREHO U SINGC ROSS DO C KINGTRANS-SHIPMENT

    DIREC T SHIPMENT:ELIMINATES EXPENSES OF OPERATING- DISTRIBU TION C ENTER- RED U C ED LEAD TIMES

    RISK POOLING EFFE C T NEGATED AS THERE IS- NO W AREHO U SEINC REASED MAFR . /DISTRB C OST D U E TOFRE QU ENT TRIPS TO MORE LO C ATIONS .

  • 8/6/2019 Ops Gyann to Pgp1

    60/85

    DIREC T SHIPMENT AS PREFERRED STRATEGY

    S U CC ESS STORY :J C PENNEY sells merc h andise t h roug h a t h ousand stores andmillions of catalogues . It deals in 200,000 items sourcing frommore t h an 20,000 suppliers . Eac h store retains totalaccountability for sales,inventory & profit and is responsible for sales forecast and release of orders .

    Orders are communicated to buyers w h o coordinate s h ipmentwith distribution personnel to ensure quick response and a

    tracking system is used to monitor flow of materials .

    IN MOST CASES PRODUCTS ARE SHIPPED DIRECT TOPENNEYS STORES .

  • 8/6/2019 Ops Gyann to Pgp1

    61/85

    CROSS DO

    CKINGIN 1979 KMART W AS ONE OF THE LEADING

    C OMPANIES IN THE RETAIL INDISTRY W ITH2000 STORES .

    W AL- MART W AS A SMALL NIC HE RETAILERW ITH 200 STORES . IN TEN YEARS W AL-MART BE C AME THE LARGEST AND THE

    HIGHEST PROFIT RETAILER IN THE W ORLD .

    HOW DID THEY DO IT?

  • 8/6/2019 Ops Gyann to Pgp1

    62/85

    STRATEGY:INV ENTORY REPLENISHMENT POLI C Y ASTHE C ENTER PIE C E OF STRATEGY

    KEY SU CC ESS FA C TOR:INNOV ATIV E LOGISTI C S TE C HNIQU E -C ROSS DO C KING

    C ROSS DO C KING

  • 8/6/2019 Ops Gyann to Pgp1

    63/85

    C ROSS DO C KING

    In C ROSS DO C KING a ware h ouse functions as

    inventory coordinator point.No inventory ismaintained except waiting for a few h ours . Goods

    arrive at t h e ware h ouse and are transferred tove h icles serving retailers as rapidly as possible . Th esystem reduces Inventory C osts and Lead Time .

    W ALL-MART delivers 85% of consignments t h roug h C ROSS DO C KING. S h ares POS data with its vendors

    th

    rough

    a private satellite communicating system. Has a dedicated fleet of 2000 trucks . Stocks are

    replenis h ed twice a week on average . Has ac h ievedEconomics Of Scale and reduced t h e need for safety stocks and cost for sale .

    TRANS SHIPMENT

  • 8/6/2019 Ops Gyann to Pgp1

    64/85

    TRANS SHIPMENT

    SHIPMENT OF ITEMS BET W EEN DIFFERENT FA C ILITIES AT THE SAME LE V EL IN THE S U PPLY C HAIN TO MEETSOME EMERGENT DEMAND .

    PRA C TIC ED MOSTLY AT THE RETAIL LE V EL. EAC HRETAILER M U ST HAV E ACC ESS TO THE INFORMATION OF

    INV ENTORY HELD BY OTHERS .IF ALL THE RETAIL O U TLETS HA V E THE SAME O W NER(?) ,INFORMATION SYSTEM IS STRONGLY INTEGRATED ANDPHYSI C AL TRANS SHIPMENT C OST REASONABLE .

    TARNS SHIPMENTC

    OMBINES THE ADV ANTAGE OF RISKPOOLING AS W ELL AS DE C ENTRALISED OPERATION .

    STRATEGI C ISS U ES IN 3 PL

  • 8/6/2019 Ops Gyann to Pgp1

    65/85

    STRATEGI C ISS U ES IN 3 PL

    C OMPARE W ITH C OST OF DOING IT INTERNALLY . AC TIV ITYBASED C OSTING HELPS IN TRA C ING OV ERHEADS AND DIRE C TC OST TO THE LE V EL OF SPE C IFIC PROD U C TS AND SER V IC ES .

    C U STOMER ORIENTATION OF 3PLTHE V ALU E OF A THIRD PARTY PRO V IDER IS DIRE C TLY RELATED

    TO ITS U NDERSTANDING OF THE NEEDS OF THE HIRING FIRM AND TO ADAPT ITS SER V IC ES TO S U IT THE SPE C IAL NEEDS OFTHE FIRM . C OST C ONSIDERATIONS C OME ONLY AFTER W ARDS .

    SPE C IALIZ ATION OF THE 3PL

    THE C ORE STRENGTH OF THE PRO V IDER IS THE MAINC ONSIDERATION .-SMALL PAC KAGE EXPERTISE-TRU STED C ORE C ARRIER-LTL C ARRIER-MU LTI MODAL

    3 PL C O NT

  • 8/6/2019 Ops Gyann to Pgp1

    66/85

    3 PL C O NT.

    ASSET O W NING V ERS U S NON-ASSET-O W NING 3 PL

    C OMPARATI V E ADV ANTAGES IN RESPE C T OFSIZ ERESO U RC ESEFFE C IENC Y OF DE C ISION MAKINGFLEXIBILITYOV ERHEAD C OSTSC U STOMER BASES C ALE OF OPERATIONSPE C IALISATIONINDU STRY EXPERTISE

  • 8/6/2019 Ops Gyann to Pgp1

    67/85

  • 8/6/2019 Ops Gyann to Pgp1

    68/85

    IN-HOUSE SPECIALIST3 PL

    GENERAL3rd PARTYCONTRACTOR

    N/A

    CR

    ITICALITY

    LO W HIGH

    HIGH

    COMPLEXITY

    COMPLEXITY-CRITICALITY MATRIX

    REASONS FOR CONTRACTING OUT DISTRIBUTION

  • 8/6/2019 Ops Gyann to Pgp1

    69/85

  • 8/6/2019 Ops Gyann to Pgp1

    70/85

    Q uality

  • 8/6/2019 Ops Gyann to Pgp1

    71/85

  • 8/6/2019 Ops Gyann to Pgp1

    72/85

    Quality Specifications

    Design quality : Inherent value of theproduct in the marketplace

    Dimensions include: Performance, Features,Reliability, Durability, Serviceability,Response, Aesthetics, and Reputation.

    Conformance quality : Degree to which theproduct or service design specificationsare met

  • 8/6/2019 Ops Gyann to Pgp1

    73/85

    Costs of Quality

    External FailureCosts

    Appraisal Costs

    Prevention Costs

    Internal FailureCosts

    Costs of Quality

  • 8/6/2019 Ops Gyann to Pgp1

    74/85

    Six Sigma Quality

    A philosophy and set of methods companiesuse to eliminate defects in their products andprocesses

    Seeks to reduce variation in the processesthat lead to product defectsThe name, six sigma refers to the variationthat exists within plus or minus threestandard deviations of the process outputs

  • 8/6/2019 Ops Gyann to Pgp1

    75/85

    Six Sigma Quality (Continued)Six Sigma allows managers to readily

    describe process performance using acommon metric: Defects Per MillionO pportunities (DPM O )

    1 ,000 ,000x

    unitsof No.xunit

    per error for iesopportunit of Number

    defectsof Number

    ! DPMO

  • 8/6/2019 Ops Gyann to Pgp1

    76/85

    Six Sigma Quality: DMAIC Cycle

    Define, Measure, Analyze, Improve, andControl (DMAIC)Developed by General Electric as a

    means of focusing effort on qualityusing a methodological approachO verall focus of the methodology is tounderstand and achieve what thecustomer wantsDMAIC consists of five steps.

  • 8/6/2019 Ops Gyann to Pgp1

    77/85

  • 8/6/2019 Ops Gyann to Pgp1

    78/85

    O ther Six Sigma ToolsO pportunity Flow Diagram used tographically show those activities that addvalue from those that are performed (andmaybe could be reduced or removed) thatdo not add value to the finished productFailure Mode and Effect Analysis (DMEA) isa structured approach to identify, estimate,prioritize, and evaluate risk of possible

    failures at each stage in the processDesign of Experiments (DO E) a statisticaltest to determine cause-and-effectrelationships between process variablesand output

  • 8/6/2019 Ops Gyann to Pgp1

    79/85

  • 8/6/2019 Ops Gyann to Pgp1

    80/85

    IS O 9

    Series of standards agreed upon by theInternational O rganization for Standardization (IS O )

    Adopted in 19 7

    More than 1 countries

    A prerequisite for global competition?IS O 9 directs you to "document whatyou do and then do as you documented"

  • 8/6/2019 Ops Gyann to Pgp1

    81/85

    Kaizen

    to take it apart and put back toget h er in abetter way

    Th e goals of kaizen include t h e eliminationof waste ("activities t h at add cost but donot add value"), production load leveling of amount and types, standardized work,paced moving lines, rig h t-sized equipment,

  • 8/6/2019 Ops Gyann to Pgp1

    82/85

  • 8/6/2019 Ops Gyann to Pgp1

    83/85

    Q uality Gurus

    DemingJuranC

    rosby

    Exh ibit 7.1 (C h ase Jacobs Aquilano book)

  • 8/6/2019 Ops Gyann to Pgp1

    84/85

    Sources

    Prof RKS notesC h ase Aquilano Jacobs

    SC

    M notesOM2 notesMatman Notes

    \\192 .168 .1 .199/profiles .. /oig

  • 8/6/2019 Ops Gyann to Pgp1