    Group Member:- Sushitra Nair

    Abhay Kumar Singh Jyotirmoy Chowdhury Kamal Vora Nitin Kr. Butolia T.S. Gopinath

  • 8/12/2019 operations- jaguar ppt

    2/12

    At the Jaguar car production plant in castle Bromwich,Birmingham the production line has been designed using the

    principles of lean production

    Previously, Jaguar production took up much more factory space because a lot of stocks and supplies were kept on the factory floor.

    Now all stocks are kept in a separate storage area where they are

    delivered just-in-time to feed the production process.

    On the production line operatives work with the minimum required quantity of stocks when more are needed, production lineworkers use a kanban signaling system to inform the stores that theyneed more supplies.

  • 8/12/2019 operations- jaguar ppt

    3/12

    Process of eliminating waste in production

    Maintain quality

    Maximize efficiency

    Standardization of work

    Cut out waste.

    Can be applied to all aspects of a business from design, production to distribution

  • 8/12/2019 operations- jaguar ppt

    4/12

    The most important aspects of lean production are as follows: Just in time production (JIT) Total Quality Management (TQM) and Zero Defect

    Production Time based management Simultaneous engineering Cell production Kaizen (Continuous improvement) Quality Circles

  • 8/12/2019 operations- jaguar ppt

    5/12

    Identify

    Production add value to the production process Process which do not add value can then be reduced or eliminated so

    that labour and machinery can focus on add value activities

    Established culture of quality

    Continuous quality improvement

  • 8/12/2019 operations- jaguar ppt

    6/12

    Cutting out waiting-time Reducing conveyance

    Eliminating over processing Cutting inventory Cutting down on wasteful movement

    Eliminating the need for repair Introducing CLIT (Cleaning, Lubricating, Inspection

    and Tightening)

  • 8/12/2019 operations- jaguar ppt

    7/12

    Just-in- time is a pull system of production, so actual orders provide a signal for when a product should be manufactured.

    Demand-pull enables a firm to produce only what is required, inthe correct quantity and at the correct time.

    Just In Time cuts out waste in a number of ways- Less floor space is required

    - Cells are able to work in an uncluttered work area- Walking (physically moving about between operations) is

    minimized.- Fewer components are damaged from standing around in

    batches on the workplace floor.

  • 8/12/2019 operations- jaguar ppt

    8/12

    Means to go see

    Managers are encouraged to gemba i.e. to go see to

    understand, grasp, and solve problems when they occur rather

    than sit in remote offices

    Develop a new approach to production management and

    supervision

  • 8/12/2019 operations- jaguar ppt

    9/12

    The responsibility of each worker is outlined in a series of work elements

    Value added activity

    By examining Yamazumi Board it is possible to reallocate some work

    elements from some production workers to others in order to create greater

    fairness of work distribution

    http://www.youtube.com/watch?feature=player_detailpage&v=IhO9oChjo

    V8

  • 8/12/2019 operations- jaguar ppt

    10/12

  • 8/12/2019 operations- jaguar ppt

    11/12

    Lean production is all about reducing waste

    It involves working more effectively with TAKT Tim

    Lean production has enabled Jaguar to cut out waste in the production of the Jaguar S-type at Castle Bromwich.

    Ford is now seeking to spread the message about lean production by incorporating a total of 400 of its Halewood employees intoworking at Castle Bromwich

    http://www.youtube.com/watch?v=voyWoIeEIHk

  • 8/12/2019 operations- jaguar ppt

    12/12