OPERATION & MAINTENANCE OF SEPTIC SYSTEMS THE THREE IF’S: IF PROPERLY DESIGNED, IF PROPERLY INSTALLED, IF PROPERLY MAINTAINED! THE THIRD “IF” IS WEAK LINK OF BOTH STANDARD SYSTEMS AND ENHANCED SYSTEMS

Upload: hollie-stafford

Post on 30-Dec-2015

216 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: OPERATION & MAINTENANCE OF SEPTIC SYSTEMS THE THREE IF’S:  IF PROPERLY DESIGNED,  IF PROPERLY INSTALLED,  IF PROPERLY MAINTAINED!  THE THIRD “IF” IS

OPERATION & MAINTENANCE OF SEPTIC SYSTEMS

THE THREE IF’S:

IF PROPERLY DESIGNED, IF PROPERLY INSTALLED, IF PROPERLY MAINTAINED!

THE THIRD “IF” IS WEAK LINK OF BOTH STANDARD SYSTEMS AND ENHANCED SYSTEMS

Page 2: OPERATION & MAINTENANCE OF SEPTIC SYSTEMS THE THREE IF’S:  IF PROPERLY DESIGNED,  IF PROPERLY INSTALLED,  IF PROPERLY MAINTAINED!  THE THIRD “IF” IS

WHY THE PERCEIVED NEEDFOR ENHANCED SEPTIC SYSTEMS?

STAR VALLEY IS IMPACTED BY RURAL

SPRAWL GROWTH FROM JACKSON COMMUTERS WITH 1600 NEW RURAL HOMES IN LAST 10 YEARS, 650 IN LAST 3 YEARS.

VERY FEW CENTRAL SEWER CONNECTIONS AVAILABLE.

9,000 OF THE 11,000 PEOPLE IN STAR VALLEY ARE ON SEPTIC SYSTEMS.

Page 3: OPERATION & MAINTENANCE OF SEPTIC SYSTEMS THE THREE IF’S:  IF PROPERLY DESIGNED,  IF PROPERLY INSTALLED,  IF PROPERLY MAINTAINED!  THE THIRD “IF” IS

BUILDOUT SCENARIO WITH OLD RULES: ETNA TO ALPINE

Page 4: OPERATION & MAINTENANCE OF SEPTIC SYSTEMS THE THREE IF’S:  IF PROPERLY DESIGNED,  IF PROPERLY INSTALLED,  IF PROPERLY MAINTAINED!  THE THIRD “IF” IS

ETNA TO ALPINE: NEW DENSITY BASED ZONING

Page 5: OPERATION & MAINTENANCE OF SEPTIC SYSTEMS THE THREE IF’S:  IF PROPERLY DESIGNED,  IF PROPERLY INSTALLED,  IF PROPERLY MAINTAINED!  THE THIRD “IF” IS

LINCOLN COUNTY, TO DATE. . .

200 PLUS “MAJOR” SUBDIVISION LOTS RECOMMENDED TO USE ENHANCED SYSTEMS BY THE DEQ CHAPTER 23 REVIEW PROCESS.

50 PLUS “MINOR” SUBDIVISION LOTS REQUIRED TO USE ENHANCED SYSTEMS BY COUNTY REGULATIONS.

OVER 20 SYSTEMS HAVE BEEN INSTALLED.

Page 6: OPERATION & MAINTENANCE OF SEPTIC SYSTEMS THE THREE IF’S:  IF PROPERLY DESIGNED,  IF PROPERLY INSTALLED,  IF PROPERLY MAINTAINED!  THE THIRD “IF” IS

CONCLUSIONS

THE BAD NEWS IS THAT ENHANCED SYSTEMS REQUIRE MAINTENANCE EVERY SIX MONTHS,

THE GOOD NEWS, FOR GROUNDWATER, IS THAT ENHANCED SYSTEMS REQUIRE MAINTENANCE EVERY SIX MONTHS!

THE MAINTENANCE AGREEMENT RUNS WITH THE PROPERTY AND MAKES ONGOING MAINTENANCE ACTUALLY HAPPEN.

Page 7: OPERATION & MAINTENANCE OF SEPTIC SYSTEMS THE THREE IF’S:  IF PROPERLY DESIGNED,  IF PROPERLY INSTALLED,  IF PROPERLY MAINTAINED!  THE THIRD “IF” IS

JET BATT SYSTEM

Page 8: OPERATION & MAINTENANCE OF SEPTIC SYSTEMS THE THREE IF’S:  IF PROPERLY DESIGNED,  IF PROPERLY INSTALLED,  IF PROPERLY MAINTAINED!  THE THIRD “IF” IS
Page 9: OPERATION & MAINTENANCE OF SEPTIC SYSTEMS THE THREE IF’S:  IF PROPERLY DESIGNED,  IF PROPERLY INSTALLED,  IF PROPERLY MAINTAINED!  THE THIRD “IF” IS

RetroFAST™

Featured in the April 2003 issue

Popular Mechanics

Magazine

Page 10: OPERATION & MAINTENANCE OF SEPTIC SYSTEMS THE THREE IF’S:  IF PROPERLY DESIGNED,  IF PROPERLY INSTALLED,  IF PROPERLY MAINTAINED!  THE THIRD “IF” IS

MARCH 18, 2004 SAMPLING OF BIO MICROBICS SYSTEM

Page 11: OPERATION & MAINTENANCE OF SEPTIC SYSTEMS THE THREE IF’S:  IF PROPERLY DESIGNED,  IF PROPERLY INSTALLED,  IF PROPERLY MAINTAINED!  THE THIRD “IF” IS

2 CONTAINERS FILLED FOR TESTSCONTENTS ARE CLEAR AND ODORLESS

Page 12: OPERATION & MAINTENANCE OF SEPTIC SYSTEMS THE THREE IF’S:  IF PROPERLY DESIGNED,  IF PROPERLY INSTALLED,  IF PROPERLY MAINTAINED!  THE THIRD “IF” IS

AIR COMPRESSOR HOUSINGLOCATED NEXT TO FOUNDATION