OPERATION FACELIFT PROGRAM Revitalizing Corridors Through Rehabilitation of Commercial Properties

Upload: ncrprogram

Post on 13-Apr-2017

193 views

Category:

Government & Nonprofit


0 download

TRANSCRIPT

Page 1: Operation facelift program e book

OPERATION FACELIFT PROGRAMRevitalizing Corridors Through Rehabilitation of

Commercial Properties

Page 2: Operation facelift program e book

This book contains previous select grant projects assisted through the program. The images provide recipients an idea of what a limited budget and various resources can produce to improve a community.

Page 3: Operation facelift program e book

THE PROJECTS

Page 4: Operation facelift program e book

The Operation Facelift Program provides funding for small businesses in select target areas. Since 1998, grants have been provided to restore the exterior façade of innercity businesses.

Page 5: Operation facelift program e book

From it’s inception until 2015, the program has provided over $1 million in façade grants, created 3,471 jobs and leveraged $128 million in private funding.The following are some of the many projects the program has seen throughout the years

Page 6: Operation facelift program e book

Project Description: Brick Repair, Canopy, Paint, Window TrimTotal Cost: $20,693Grant Amount: $5,346.50

146 Jacobs

Before After

Page 7: Operation facelift program e book

Project Description: Awning, Stucco, Paint, Signage, LightingTotal Cost: $40,000Grant Amount: $15,000

1505 E Houston

Before After

Page 8: Operation facelift program e book

Project Description: Awning, Wood, Paint, Pressure WashTotal Cost: $31,000Grant Amount: $15,000

106 Heiman

Before After

Page 9: Operation facelift program e book

Project Description: Stucco, Tile, Lighting, SignageTotal Cost: $ 112,000 with three unitsGrant Amount: $45,000 (each unit received $15,000)

1401-1411 Bandera

Before After

Page 10: Operation facelift program e book

Project Description: Awning, Resurface Doors, Paint, Tile Base, Stucco, Lighting, Sign clutter removalTotal Cost: $19,750Grant Amount: $19,000

734 N New Braunfels

Before After

Page 11: Operation facelift program e book

Project Description: Awning, Resurface Doors, Paint, lighting, Sign clutter removal, new signs. Collaboration with TCI for right of way. Total Cost: $20,043Grant Amount: $19,000

1901 Cinncinati

Before After

Page 12: Operation facelift program e book

Project Description: New doors and windows. Stucco mansard for signs. Owner refinished parking lot, added signs to doors and windows. Total Cost: $30,000Grant Amount: $18,000

212 S. New Braunfels

Before After

Page 13: Operation facelift program e book

THE DESIGN PROCESS

Page 14: Operation facelift program e book

The Operation Facelift Program creates designs for select buildings in the REnewSA target areas. The following are images of some conceptual drawings…and their results