operation build progress what once was a dream, is now becoming reality. with the grace of god, work...

45
Operation Build Operation Build Progress Progress What once was a dream, is now becoming reality. What once was a dream, is now becoming reality. With the Grace of God, work on the Renovations and With the Grace of God, work on the Renovations and Educational wing of Second Baptist Church is Educational wing of Second Baptist Church is underway. Outside demolition began immediately underway. Outside demolition began immediately after we vacated the church. The steps and ramp after we vacated the church. The steps and ramp were removed to make room for the Atrium and new were removed to make room for the Atrium and new fellowship hall. fellowship hall. With the onset of snow in late January and With the onset of snow in late January and February, work moved inside to the old fellowship February, work moved inside to the old fellowship hall, kitchen and pastor’s office. Everything was hall, kitchen and pastor’s office. Everything was demolished so we can build new administrative demolished so we can build new administrative offices and add an elevator. Once the weather offices and add an elevator. Once the weather improved, work resumed outside, digging and improved, work resumed outside, digging and pouring concert for the foundation. Once the pouring concert for the foundation. Once the foundation is completed, brick work on the walls foundation is completed, brick work on the walls will begin. will begin. Praise God for his continued blessings. Praise God for his continued blessings.

Upload: olivia-dean

Post on 17-Dec-2015

217 views

Category:

Documents


1 download

TRANSCRIPT

Operation Build ProgressOperation Build Progress What once was a dream, is now becoming reality. With the What once was a dream, is now becoming reality. With the

Grace of God, work on the Renovations and Educational Grace of God, work on the Renovations and Educational wing of Second Baptist Church is underway. Outside wing of Second Baptist Church is underway. Outside demolition began immediately after we vacated the church. demolition began immediately after we vacated the church. The steps and ramp were removed to make room for the The steps and ramp were removed to make room for the Atrium and new fellowship hall. Atrium and new fellowship hall.

With the onset of snow in late January and February, work With the onset of snow in late January and February, work moved inside to the old fellowship hall, kitchen and pastor’s moved inside to the old fellowship hall, kitchen and pastor’s office. Everything was demolished so we can build new office. Everything was demolished so we can build new administrative offices and add an elevator. Once the administrative offices and add an elevator. Once the weather improved, work resumed outside, digging and weather improved, work resumed outside, digging and pouring concert for the foundation. Once the foundation is pouring concert for the foundation. Once the foundation is completed, brick work on the walls will begin.completed, brick work on the walls will begin.

Praise God for his continued blessings. Praise God for his continued blessings.