Issue 1 – 8/30/18 PHH

Before Renovations

After Renovations

Living Savior Lutheran Church Sanctuary Renovations and Parking Lot

Issue 2 – 9/02/18 PHH Page 2

Front Elevation:

This is the view from Pond Street.

Extension to the left is for restrooms and upstairs Youth Room.

Extension to the right is covered porch

Siding is Hardy Board throughout

Synthetic stone crawl space skirt with vents

Red brick steps to be repaired or replaced

New handrail added to right side of red brick steps

Window framing to be same as existing building

Round window to be retained

Tower to be repaired and new cupola and steeple added – probably fiberglass

Cupola and steeple design matches photo of 1908 church

Entry doors to match photo of 1908 church

Roof plan matches existing church

Living Savior Lutheran Church Sanctuary Renovations and Parking Lot

Issue 2 – 9/02/18 PHH Page 3

Right Side Elevation:

This is the view of the church from the parking lot.

Repair tower and install new cupola and steeple - Probably fiberglass.

Add 24 inch round panels to match round windows on photo of 1908 church

Run the roof line from existing roof straight to end of new building

Window framing to be the same as existing building

Siding to be hardy board throughout

Synthetic Stone crawl space skirt with vents

Remove existing overhead service entrance wiring and relocate to south side of building

Concrete walkway from parking will be a slight slope to porch level

Breeze Way connecting buildings

Living Savior Lutheran Church Sanctuary Renovations and Parking Lot

Issue 2 – 9/02/18 PHH Page 4

First Floor Plan:

Altar area moved to Pond Street side with Sacristy on south side for preparing

communion

Sacristy closet on north side

Old Narthex door to sanctuary revised to open into choir area

Choir area opened up with wall removed toward altar area and pillar removed

Organ area as existing (118 sq.ft.) with door to wardrobe/music storage for Choir (120

sq.ft.)

Nave expanded with new wood floor (1,671 sq.ft.)

Women’s restroom with three commodes and two sinks and changing station

Men’s restroom with two urinals and one commode and changing station

Vestry for Pastor and Acolyte robes and equipment.

Cry Room (Nursery) (130 sq.ft.)

Lobby (Narthex) with sink, refrigerator and cabinets for coffee station (375 sq.ft)

Porch with ramp access from parking and from existing covered porch (195 sq.ft.)

Stairs to second floor

Fire barrier wall to avoid installing sprinklers in both buildings

Living Savior Lutheran Church Sanctuary Renovations and Parking Lot

Issue 2 – 9/02/18 PHH Page 5

Second Floor Plan:

Enclosed stairway to second floor with sun tunnel for lighting

Audio Visual room with lockable door and extra A/C

AV room has sliding glass window so operators can view service and listen if needed

Storage room with shelves

Closet with door (100 Sq.ft.)

Office (Youth Room) (415 Sq.ft.)

Door into attic which will house AC and water heater with extra storage available

Living Savior Lutheran Church Sanctuary Renovations and Parking Lot

Issue 2 – 9/02/18 PHH Page 6

Seating Plan with Chairs:

Long Range Planning Committee recommends Chairs vs. Pews

With chairs we can seat 140 in nave and 40 in Choir area for 180

With pews we can seat 120 in nave and 40 in Choir area for 160

Chairs are more flexible. Can be arranged for Sunday School class, etc.

Chairs can be removed for wheel chair bound members.

Chairs will be hooked together to make them more stable for those who need support

for standing

Pews are not movable

Living Savior Lutheran Church Sanctuary Renovations and Parking Lot

Issue 2 – 9/02/18 PHH Page 7

Parking Lot:

Approximately 97 spaces

With total number of seats equal to 180 we need 120 spaces (at 1 space for 1.5)

With total number of seats equal to 180 we need 90 spaces (at 1 space for 2)

If we have just one row of spaces in front of church that will add about 10 spaces

No entry from Cemetery Street

Entries from Louisa Street and Caroline Street

Six handicap spaces

Sidewalk to door into Family Life Center

Pads for dumpster enclosure and storage shed

Enclosure and shed to be built by members

Remove overhead wiring and lighting

Install street lamps in keeping with historic City of Montgomery

Apply for grant to recoup 50% of cost of parking lot