Page 1: OGX Management Presentation

MANAGEMENT PRESENTATION

Rio de Janeiro | May 2013 |

Page 2: OGX Management Presentation

AGENDA

1

2

3

4

OGX Overview

OGX Portfolio and Execution

OGX Operations

Financial Overview

Appendix

Last update: 05/07/2013

Page 3: OGX Management Presentation

OGX OVERVIEW

1

Page 4: OGX Management Presentation

OGX OVERVIEW

4

Highly successful and experienced management team, combining unique intellectual capital and

superior execution skills

Overall exploratory success rate around 80% with important advances in exploration campaign

World class E&P portfolio, mostly in shallow waters and onshore (low cost and off-the-shelf

technology)

Proven execution capability (from concept to oil in an unprecedented timing) with fully established

operations comprising more than 6,000 people

Solid cash position allows OGX to conduct the largest and most successful private sector exploratory

campaign in Brazil and to support production development (more than 100 wells spud since the

beginning of its exploratory campaign in Sep. 2009)

Brazil‟s historical under-exploration underpins massive growth opportunities for OGX

Page 5: OGX Management Presentation

OGX MAIN ACCOMPLISHMENTS

5

Proven Execution Capability (From Concept To First Oil in Unprecedented Timing) With Fully Established Operations Comprising More Than 6,000 People

OGX Creation

US$1.3 bnraised through an equity Private Placement

21 blocks acquired during the 9th

Bidding Round

Jul/07Nov/07

Jun/08

IPO: US$4.1 bn raised

Aug/09

Jun/10

Bond: US$ 2.6bn raised

Beginning of thedrilling campaign

Acquisition of 70% stake in the Parnaíba Assets

Survey and interpretation of the 3D seismic data

Procurement of all equipment and services necessary to initiate the drilling campaign

May/11

5 onshore blocks acquired in Colombia

Mar/12

Sep/09

Oct/11

Jan/12

Arrival of FPSO OSX-1

Total investments of ~ US$6.1 bn of

Drilling Capex and Signature Bonus +

~ US$810 M of Seismic Campaign

Total cash raised to date: US$9.4 bn

1st Oil

New Bond: US$1.1bn raised

Page 6: OGX Management Presentation

OGX OWNERSHIP AND CORPORATE STRUCTURE

Free Float

23 Blocks

5 - Campos (100%) (2)

2 - Campos (70%) (2)

3 - Santos (100%) (2)

3 - Espírito Santo (50%)

5 - PAMA (100%) (2)

5 - Colombia (100%) (2)

8 Blocks

7 - Parnaíba (70%) (2)

1 – Parnaíba (50%) (2)

(1) EBX represented through Centennial Asset Mining Fund LLC (Nevada, USA) (“CAMF”)(2) OGX as operator(3) Market data as of May 3rd, 2013(4) MPX S.A. holds 33.33%

Petróleo e Gás Participações S.A.(Market Capitalization (3): ~ US$ 3 Billion)

Petróleo e Gás S.A.

Maranhão Petróleo e Gás S.A.

Average daily traded volume (1 month): ~ US$150 million

~ 50 thousand investors

3rd most representative stock in Ibovespa index 5.4%

One of the most liquid common shares

61%¹ 39%

99.99% 66.67%4

International

OGX Austria

100.00%

100%

6

Page 7: OGX Management Presentation

Luis Carneiro (33)

Chief Executive Officer

Armando Ferreira (31)Reservoir & Reserves Executive

Manager

José Roberto Faveret

General Counsel

Roberto Monteiro

Chief Financial Officer

Paulo de Tarso Guimarães (35)

Exploration Officer

7

MANAGEMENT ORGANIZATION STRUCTURE(1)

Highly Successful And Committed Management Team,

Combining Unique Intellectual Capital and Superior Execution Skills

(1) Parentheses represent years of experience in the E&P industry

Dolores Carvalho (35)E&P Laboratory

Davilson Andrade (20)Exploration Campos & ES

Celso Martins (34)Onshore Basin

Ernani Porsche (33)International

Moacir Santos (38)Geological Operations

Marcos Amaral (28)Applied Technology

José Sartori (39)Exploratory Management

Paulo Otávio Gomes (25)Exploration Santos & PAMA

Joaquim Dib Cohen (32)Oil & Gas Commercialization

Olavo Foerch (32)Procurement

Ricardo Juiniti (27)Drilling and Completion

Billy Pinheiro (30)Logistics

Vilmar Barbosa (27)Production

Leandro Leme (31)HSE

Reinaldo Belotti (34)

Production Officer

Page 8: OGX Management Presentation

HIGHLY QUALIFIED EXPLORATION TEAM

Exploratory Team

Part of our team led the

Petrobras exploration team

from 2002 to 2007

Success index in excess of

60% on average offshore

Brazil from 2002-2007 whilst

at Petrobras

Over 9 billion boe and more

than 50 new fields discovered

PBR Success Index

Proven Track Record Having Opened Several New Oil Frontiers, Including The Pre-salt, and Discovering Over 50 New Oil Fields

8

Page 9: OGX Management Presentation

BRAZIL

Source: EIA-DOE, BP Statistical Review of World Energy 2010, Saudi Aramco, UPPSALA University, Petrobras, ANP and OGX analysis

Source: ANP

Still Significantly Under-explored

Oil & Gas in The World

Source: IHS

Largest Oil And Gas Discoveries In The World

Source: BP Statistical Review of World Energy 2010 & analyst estimates

New Provinces Could Propel Brazil Into Top Reserves Holders

Oil Resources - December 2009 (Bn bbl) % of sedimentary basins under concession

0 10 20 30 40

Bn Boe

Brazil

Turkmenistan

Iran

Kazakhstan

China

Russia

Australia

Kuwait

Israel

Saudi Arabia

India

Indonesia

Venezuela

Papua

New Guinea

Ghana

+ 35 bn boe

265

172

138

115

102

100

98

74

44

40

37

33

28

27

15

14

13

Saudi Arabia

Venezuela

Iran

Iraq

Kuwait

Brazil post Tupi

UAE

Russia

Libya

Kazakhstan

Nigeria

Canada

US

Qatar

China

Angola

Brazil

Unlicensed 96%

Licensed 4%

COUNTRYHISTORICAL O&GPROD.(BN BOE)

USA (1900-2010) 440

EX-USSR (1900-2010)

335

SAUDI ARABIA (1938-2010)

145

BRAZIL(1941-2010)

14.5

Brazil’s Historical Under-Exploration Underpins Massive Growth Opportunities for OGX

9

Unlicensed96%

Oil and Gas Discovered Volumes

2000 – 2010 (Bn boe)

Vast Untapped Oil & Gas Potential

Page 10: OGX Management Presentation

OGX PORTFOLIO AND EXECUTION

2

Page 11: OGX Management Presentation

PO

RTFO

LIO

OGX PORTFOLIO

11

31 blocks: 26 blocks in 5 Brazilian sedimentary basins and 5 onshore blocks in 2 Colombian

sedimentary basins

Unique portfolio with 10.8 billion potential recoverable barrels of oil equivalent (boer)

OGX‟s business plan is based on 4.1 billion barrels already discovered in the shallow waters of the

Campos Basin

Page 12: OGX Management Presentation

Oil discoveries of 4.1 bn bbl are already under production development in the shallow waters of Campos Basin

OGX PORTFOLIO POTENTIAL

73%ShallowWater

8%Deep

Water

19%Onshore

79% Oil

21% Gas

Portfolio Breakdown

12

Breakdown

D&M Certified Volumes (Bnboe)

Note:

1 Does not include Parnaíba 3C contingent resources of 141 million boe

10.8

C1(4%)0.1

C2(19%)

0.6C3 (77%)2.33.0

1.3

4.8

6.7¹6.5

Mar-08 Sep-09 Dec-10

Contingent Delineation Prospective

Page 13: OGX Management Presentation

CAMPOS BASIN

OGX’s Discovered Accumulations Confirm a New Hydrocarbon Province

in the Southern Campos Basin

~400 MM bbl already declared commercial (Tubarão Azul and TubarãoMartelo Fields)

7 blocks operated by OGX

Total area of 1,035 km2

Average water depth of ~120m

73 wells drilled

~90% of success rate

Campos Basin

13

Low Risk, Shallow Water And Large Volumes

Page 14: OGX Management Presentation

Areas Update– Not including pre-salt and exploratory prospects

CAMPOS BASIN

14

Highlights

Successful appraisal campaign with 40 wells

drilled and a 87% hit ratio

Acquisition of incremental 20% participation

of blocks BM-C-37 and BM-C-38 from Maersk,

with OGX becoming the operator

Declaration of Commerciality of the Waikiki

accumulation and Development Plan (DP)

submitted to the ANP

Named as Tubarão Martelo Field with

expected total recoverable volume of

285 MMbbl

Declaration of Commerciality for a portion of

the Waimea Complex and Development Plan

(DP) submitted to the ANP

Named as Tubarão Azul Field with

expected total recoverable volume of

110 MMbbl

New discoveries in the 1H12: Itacoatiara and

HonoluluSource:

Area estimates based exclusively on OGX‟s studies

Waikiki ComplexWaimea / Pipeline and Vesuvio Complexes

Page 15: OGX Management Presentation

TUBARÃO AZUL FIELD (1ST MODULE)

OGX-3 Albian: 80mAptian/Barrem: 50m N.A.

OGX-21D/OGX-26HP Albian: 14mN.A.

OGX-50D/OGX-55HP Santonian: 1,7mAlbian: 52m

1C

OGX-53D/OGX-60HP Albian: 71m 1C

OGX-65D/OGX-68HP Albian: 97m 1C

15

Waimea Complex – Not including pre-salt and exploratory prospects

TAMBORA

OGX-52 Santonian: 5mAlbian: 96m

N.A.

OGX-58DP - N.A.

OGX-75 Albian: 49m N.A.

OGX-81 Albian: 62m N.A.

ILLIMANI

OGX-28D Albian: 24m N.A.

OGX-43D Albian: 50m Del.

OGX-61 Albian: 9m 3C

TUPUNGATO

OGX-20 Maastrich: 9m & 3mAlbian: 50mAptian: 42m

N.A.

OSORNO

OGX-31 Albian: 48mAptian: 23m

N.A.

OGX-73 Albian: 37m N.A.

FUJI

OGX-8 Albian: 43mAptian: 44m

N.A.

OGX-56D Albian: 60m 3C

OGX-69 Albian: 38m 3C

CHIMBORAZO

OGX-33 Albian: 42m N.A.

Waimea Complex¹

WELL UNDER EVALUATION

OGX-54 Albian: 24m Del.

Note:

1 Figures in “meters” illustrate net pays of oil columns

2 Discovered after D&M „s Dec 2010 contingent resources report

CAMPOS BASIN

Source:

Area estimates based exclusively on OGX‟s studies

Page 16: OGX Management Presentation

TUBARÃO MARTELO FIELD

OGX-25 Eocene: 8m (gas)Albocenomaniano: 145m

N.A.

OGX-35D Albocenomanian: 80m 3C

OGX-41D/OGX-44HP

Albian: 92m2C

16

INGÁ

OGX-18 Santonian: Oil ShowsAlbian: 12m (oil column) N.A.

OGX-62 Albocenomanian: 20mSantonian: 26m

2C

OGX-64DP Santonian: 23m 3C

OGX-67 - 3C

OGX-71 - 3C

ITACOATIARA

OGX-79 Albian: 64m N.A.

PERÓ

OGX-14 Albian: 35m & 27m N.A.

OGX-76² Albian: 6m 2C

Waikiki Complex¹WELLS UNDER EVALUATION

OGX-45D Maastrich: 5m Del.

OGX-29/32 Oil Shows N.A.

Waikiki Complex – Not including pre-salt and exploratory prospects

CAMPOS BASIN

Source:

Area estimates based exclusively on OGX‟s studies

Notes:

1 Figures in “meters” illustrate net pays of oil columns

Page 17: OGX Management Presentation

PIPELINE

OGX-2A Eocene: Oil showsCretac: Oil showsAlbian: 100mAptian: 50mBarremian: 15m

N.A.

OGX-36D/OGX-39HP

Albian: 60m3C

OGX-40D Albian: 107m 2C

OGX-42D Eocene: 6mAlbian: 82m

3C

OGX-48 Albian: 12m 3C

OGX-70 - 3C

OGX-72 Albian: 129m 3C

OGX-80³ Albian: 51m N.A.

17

SANTA HELENA (PIPELINE)

OGX-15 Albian: 32mAptian: 31m

N.A.

ETNA (PIPELINE)

OGX-6 Albian: 74mAptian: 17m

N.A.

Pipeline Complex¹

CARAMBOLA

MRK-5 Albian: 17m N.A.

RJS-105² Albian: 150m N.A.

CARAMBOLA A (PIPELINE)

MRK-3 Santonian: 14mAlbian: 43mAptian: 12m

N.A.

Pipeline Complex – Not including pre-salt and exploratory prospects

CAMPOS BASIN

Source:

Area estimates based exclusively on OGX‟s studies

Notes:

1 Figures in “meters” illustrate net pays of oil columns

2 RJS-105 well drilled by Petrobras

3 Discovered after D&M „s Dec 2010 contingent resources report

Page 18: OGX Management Presentation

VESUVIO

OGX-1 Eocene: 57m N.A.

OGX-9D Eocene: 60m 1C

OGX-13 Eocene: 10m 1C

18

KRAKATOA

OGX-5 Maastrich: Oil showsAlbian: 30mAptian: 20m

N.A.

KILAWEA

OGX-4 Eocene: 17m N.A.

Vesuvio Complex¹

POTOSI (VESUVIO)

OGX-37 Oil Shows N.A.

Note:

1 Figures in “meters” illustrate net pays of oil columns

Vesúvio Complex – Not including pre-salt and exploratory prospects

CAMPOS BASIN

Source:

Area estimates based exclusively on OGX‟s studies

Page 19: OGX Management Presentation

CAMPOS BASINProduction in the Tubarão Azul Field

19OGX First Oil Flowing Since January/12 Through EWT

Electrical submersible pump

BuoyOSX-1

Risers and Umbilicals

Flexible lines

Wet christmas tree OGX-26HP

Wet christmas tree OGX-68HP

Wet christmas treeTBAZ-1HP

Main characteristics:

Three producer wells on-stream:

OGX-26HP, OGX-68HP and TBAZ-1HP

4th producer well to be connected by 2013

2 injection wells planned

Oil quality of 20° API

Water depth of 140 meters

Wet christmas tree

Illustrative

Page 20: OGX Management Presentation

CAMPOS BASIN

Dec 23,

2011

Concluded the connection of

the flexible lines to the

detachable turret

Sep 16,

2011

Granting of the

preliminary and

installation license

by IBAMA

Sep 17,

2011

Beginning of the subsea

installation (piles,

moorings and MWA)

Dec 19,

2011Flexible lines launched

and connected to the

wet christmas tree

Dec 25,

2011

FPSO OSX-1 sets sail

from the port of Rio de

Janeiro

Jan 31,

2012

FPSO OSX-1 begins

production

Jan 12,

2012

Connection of the FPSO

OSX-1 to the turret

Dec 18,

2009

Discovery of

Waimea OGX-3Oct 4,

2011

Arrival of the

FPSO OSX-1 in

Rio de Janeiro 1st

Oil

20

From Discovery to 1st Oil in Waimea

Page 21: OGX Management Presentation

OPERATIONS UPDATE: Production

21

Production in Tubarão Azul and Gavião Real fields

Notes:

1 Average net production (OGX participation only) in the Gavião Real Field. Conversion factor considered: 6.29 kboe = 1 million cubic meters of natural gas

2 January 2013 refers to a production period of 12 days, since the beginning of the synchronization of the first turbine in the TPP Parnaíba I

OGX Average Monthly Production (kboepd)

Effective

Production DaysFeb-12 Mar-12 Apr-12 May-12 Jun-12 Jul-12 Aug-12 Sep-12 Oct-12 Nov-12 Dec-12 Jan-13 Feb-13 Mar-13 Apr-13

OGX-26HP 29 31 30 29 20 - 27 30 31 30 31 29 28 29 16

OGX-68HP - - - 17 30 31 31 30 31 30 31 29 28 16 -

TBAZ-1HP - - - - - - - - - - - 26 28 20 -

Total 29 31 30 46 50 31 58 60 62 60 62 84 84 65 16

Average per

offshore well

(kboepd)

11.6 10.3 9.1 6.1 5.5 7.0 5.7 5.2 5.2 5.1 5.1 4.9 3.8 3.9 3.4

11.610.3

9.1 9.0 9.27.0

10.6 10.4 10.3 10.1 10.1

13.211.3

8.3

1.8

3.25.5

6.8

12.1

11.6

10.3

9.1 9.0 9.2

7.0

10.6 10.4 10.3 10.1 10.1

16.4 16.8

15.1

13.9

Onshore¹ ²

Offshore

Page 22: OGX Management Presentation

CAMPOS BASIN

2222

OSX-2 and OSX-3 Production Schematic

Main characteristics:

OSX-2: 1st oil expected for 2H13

OSX-3: 1st oil expected for 2H13

4 subsea wells connected to each FPSO

Oil quality: 20-28° API

Water depth: ~120 meters

OSX-2/OSX-3

Flexible lines

WHP-1/WHP-2

Dry christmas tree

Wet christmas tree

Illustrative

Page 23: OGX Management Presentation

CAMPOS BASIN

23

1st oil expected for 2H13

EPC: MODEC

Shipyard: Jurong Shipyard (JSL) – Singapore

Technical specifications:

Production capacity: 100 kbbl/day

Storage capacity: 1.3 Mboe

OSX-2 and OSX-3 Engineering Status

OSX-2 Overview OSX-3 Overview

1st oil expected for 2H13

EPC: Single Buoy Moorings Inc (SBM)

Shipyard: Keppel Fels - Singapore

Technical specifications:

Production capacity: 100 kbbl/day

Storage capacity: 1.3 Mboe

Both FPSOs Underway and On Schedule, Constructed in Top Tier Shipyards

Page 24: OGX Management Presentation

FPSOs WHPs

OSX-1:

Production capacity of 60 kbpdand storage of 950 kbbl

Average Day rate of US$ 263 k

Arrived in Oct/11

First oil in Jan/12

OSX-2:

Production capacity of 100 kbpd and storage of 1.3 Mbbl

Expected Average day rate of US$ 360 k

Contracted by OSX with SBM

Expected delivery: 2H13

OSX-3:

Production capacity of 100 kbpd and storage of 1.3 Mbbl

Expected Average day rate of US$ 360 k

Contracted by OSX with MODEC

Expected delivery: 2H13

WHP-1:

Capacity to drill up to 30 wells

Equipment on-stream by the 1H14

Detailed engineering ongoing (EPC awarded to Techint by OSX)

WHP-2:

Capacity to drill up to 30 wells

Equipment on-stream by 1H14

Detailed engineering ongoing (EPC awarded to Techint by OSX)

OSX-4:

Production capacity of 100 kbpd and storage of 1.3 Mbbl

Order placed for Leasing contract and EPCI under procurement

OSX-5:

Production capacity of 100 kbpd and storage of 1.3 Mbbl

Order placed for Leasing contract and EPCI under procurement

Two sister VLCC´s (Very Large Crude Oil Carriers) purchased on November, 2010 by OSX to be converted into FPSOs

SECURED PRODUCTION EQUIPMENT

2424

WHP-3 and WHP-4:

Order placed for charter and construction with OSX

Both WHPs will be built in the AçuSuperport

Page 25: OGX Management Presentation

Santos Basin is One of The Most Promising Exploratory Areas in Brazil, With Significant Potential For Gas and Light Oil

3 blocks operated by OGX

(100% owned)

Total area of ~417 km²

Average water depth of

~150 m

14 wells drilled

~75% success rate

Santos Basin

SANTOS BASIN

25

High Potential

Page 26: OGX Management Presentation

SANTOS BASIN

Encouraging Results From 3 Drill-stem Tests Confirm Emergence of a New Oil, Gas and Condensate Center in The Region

Exploratory Campaign

2010 Activities

MRK-2B

OGX-11D

OGX-12

OGX-17

OGX-19

2011 Activities

OGX-23

OGX-24

OGX-30

OGX-47

OGX-63

Maceió (OGX – 47)

Gas and condensate (~20% with approx.

50° API)

AOF production potential results:

Vertical well: 1.0M m³/day of gas

Horizontal well: 2.5M m³/day of

gas

Natal (OGX-11D)

Gas and condensate (~25% with approx. 47° API)

AOF production potential results:

Vertical well: 1.0 M m³/day of gas and 1.2K bbl/day of condensate

Horizontal well: 5.0M m³/day of gas and 6K bbl/day of condensate

Drill-stem Tests Performed

26

2012 Activities

OGX-74

OGX-85

OGX-89D

OGX-94DAIllustrative

Positive Drill-Stem Test Results

Natal (OGX-74)

Light oil (38º API) confirmation

Sandstone reservoirs (Santonian age)

4 km distant from OGX-11D

Drill-stem Test for Fluid Identification

Page 27: OGX Management Presentation

New Frontier Basin With High Potential For Gas Production

1.1 Tcf (~200MM boe) already declared commercial (Gavião Real and Gavião Azul Fields)

Total area of 24,500 km²

Commence of gas monetization through thermoelectric plants under development by MPX/Petra (3,722 MW already licensed)

~60% success rate (28 wells drilled)

Parnaíba Basin

PARNAÍBA BASIN

27

Major Gas Province

Page 28: OGX Management Presentation

Legend:

Seismic Lines

PARNAÍBA BASIN

28

8 blocks operated by OGX Maranhão

Total area of 24,500 km²

More than 20 prospects identified

Beginning of GTU commercial production in

January/13

MPX has obtained installation license of 3,722

MW

3 seismic crews working on the site

3 rigs operating simultaneously: 2 focused on

exploration and 1 completion rig on the

production development

Parnaíba Complex

Developing the Business Plan

Legend:

Seismic Lines

Page 29: OGX Management Presentation

PARNAÍBA BASIN

29

MPX + PetraOGX Maranhão (70%) + Petra (30%)

Parnaíba Development SchematicGas Thermal Power Plant Development

Notes:1 Facilities cost includes: gathering system (lines and manifolds), a production facility for dry gas and a very short pipeline2 Includes operating and maintenance of production facilities, lines, gas pipelines and wells

Capex

Total drilling cost:

US$ 340 M

Total facilities1

cost: US$ 110M

Opex field life

Less than US$

0.30/1,000 cubic

feet

29

Short Gas Pipeline(<2 km)

CAMPO DE GAVIÃO REAL

Poços

de p

rodução

Gasoduto2 x 18" - 4,1 km

Manifold de

produção

Gasoduto2 x 12" - 11,7 km

CAMPO DE GAVIÃO AZUL

Poços

de p

rodução

Manifold de

produção

SITE DA MPX

Planta de

Tratamento

UTE

Transferência de

custódia

Filtragem, controle e

medição

Recebimento, separação

e tratamento

Site UTG OGX Site UTE MPXManifold

Pro

du

cti

on

w

ell

s

GTU TPP

Project Development

Page 30: OGX Management Presentation

PARNAÍBA BASIN

30

Execution Highlights

Project Development

Achieved first gas production at the end

of Nov/12 with the commissioning of the

GTU in the Gavião Real Field

Revenue generation commenced in

January 2013

Four turbines synchronized since Apr/13

All environmental permits granted

Concluded drilling and completion of all

16 production wells planned for this

phase of the project

Future available production capacity of

up to 7.5 million cubic meters per day

GTU Site View

Page 31: OGX Management Presentation

The New Frontier of Espírito Santo Has Proven to be a Very Active Petrolific System With Recent Important Discoveries in Neighboring Blocks

3 blocks operated by

Perenco (OGX has 50%

W.I.)

Total area of ~2,172 km²

Average water depth of

~1,000 m

Espírito Santo Basin

ESPÍRITO SANTO BASIN

31

New Frontier In Deep Water

Page 32: OGX Management Presentation

New Frontier With Geological Model Similar to West Africa, Where Significant Discoveries Were Made Recently

5 blocks operated by OGX

(100% owned)

Total area of 960 km²

Average water depth of

~60m

Pará-Maranhão Basin

PARÁ MARANHÃO BASIN

32

Promising New Frontier

Page 33: OGX Management Presentation

Balanced Portfolio of Exploratory Assets, Combining Production Regions With Less Explored Areas Next to The Maracaibo Basin, One of The Most Prolific Provinces in The World

5 blocks operated by OGX

(100% owned), 3 of which

are located close to

Maracaibo Basin (~80 bn

boe discovered and ~50 bn

boe already produced)

Colombian Basins

COLOMBIA

33

Cesar-Ranchería and Lower Magdalena Valley Great Upside Potential

Page 34: OGX Management Presentation

OGX OPERATIONS

3

Page 35: OGX Management Presentation

OPERATIONAL CAPABILITIES AND STRUCTURE

OFFSHORE DRILLING First Class Suppliers

High Qualified Team

Logistics Operational

Support

PLATFORM SUPPLY VESSEL (PSV)

QUANTITY:5

CONTRACTOR: EDISON CHOUEST/

TIDE WATER

ANCHOR HANDLING TUG SUPPLY (AHTS)

QUANTITY: 3

CONTRACTOR: EDISON CHOUEST/

NORSKAN/MAERSK

FAST SUPPLY VESSEL (FSV)

QUANTITY: 1

CONTRACTOR: EDISON

CHOUEST

MID SIZE HELICOPTER

QUANTITY: 3

CONTRACTOR: AERÓLEO

OGX Team: ~380 employees

Over 6,000 people dedicated

3D Room / IOSC

EFFICIENCY,

AGILITY AND

OPERATIONAL

SECURITY

35

Page 36: OGX Management Presentation

4FINANCIAL OVERVIEW

Page 37: OGX Management Presentation

Cash position of R$3.4 billion, or US$1.7 billion (as of

December 31, 2012), to support exploration

commitments, development and production ramp-up

OGX has the option to require controlling

shareholder, Eike Batista, to purchase up to

US$1.0 billion of new common shares of OGX

at a price of R$6.30 per share

Cash allocation in R$: R$1 billion (~29%)

Average cumulative gross return equivalent to 103%

of the Interbank Deposit Rate (CDI), or 8.66% p.a.

Cash Allocation in US$: US$1.2 billion (~71%)

Average cumulative gross return equivalent to 1.32%

p.a.

Cash position in fixed income instruments allocated to most

solid financial institutions

R$ billion

Cash Position Evolution Cash Allocation

37

Itaú

Unibanco24%

Santander

22%

Morgan

Stanley17%

BTG Pactual

16%

Votorantim

12%

CS

8%

Others

1%

0.0

2.0

4.0

6.0

3Q12 OCT NOV 4Q12

Cash in R$

CASH POSITION

Page 38: OGX Management Presentation

38

FPSO OSX-1 FINANCIAL RESULTS

Total Sales Revenues of R$754

million and total EBITDA of R$286

million, reflecting the asset‟s high

value

Economies of scale will reduce

costs per barrel

Note:

¹ Sales occurred during the Extended Well Test and before the declaration of commerciality - not accounted in Results and recorded

as a reduction of "Fixed Assets”

Pro Forma EBITDA

1st ¹ 2nd ¹ 3rd 4th Total 2012 5th 6thOverall

Total

Delivery Date 03/28/2012 4/21/2012 07/26/2012 10/15/2012 1/5/2013 2/7/2013

Operation Period 51 days 27 days 98 days 80 days 73 days 39 days

Production related to the

shipments - in barrels (bbls)547,376 246,809 789,774 809,495 2,393,454 779,110 425,313 3,597,877

R$ ('000)

Sales Revenues 118,003 55,996 150,686 174,707 499,392 165,000 89,634 754,026

Sales Taxes - - - - - - - -

Royalties (10,687) (4,938) (14,842) (15,772) (46,239) (15,351) (8,685) (70,275)

Leasing (24,078) (13,222) (52,708) (41,998) (132,006) (39,116) (20,868) (191,990)

OSX Services (13,944) (7,236) (28,071) (22,499) (71,750) (25,194) (12,471) (109,415)

Logistics (12,005) (7,410) (27,795) (18,405) (65,615) (8,355) (4,310) (78,280)

Freight cost on sales - - - (5,831) (5,831) (3,877) (1,577) (11,285)

Others (871) 36 (1,183) (1,529) (3,547) (2,394) (1,200) (7,141)

EBITDA 56,418 23,226 26,087 68,673 174,404 70,713 40,523 285,640

% EBITDA / Revenues 47.81% 41.48% 17.31% 39.31% 34.92% 42.86% 45.21% 37.88%

EBITDA / barrel - (R$/barrel) 103.07 94.11 33.03 84.83 72.87 90.76 95.28 79.39

2012 2013

Delivered cargos

1st cargo 2nd cargo 3rd cargo 4th cargo Avg. 2012 5th cargo 6th cargo Overall

Average

Leasing (268) (262) (268) (259) (264) (263) (263) (264)

OSX Services (155) (143) (143) (139) (145) (169) (157) (151)

Logistics (134) (147) (141) (113) (134) (56) (54) (108)

Others (10) 1 (6) (9) (6) (16) (15) (9)

Total (567) (551) (557) (520) (549) (504) (489) (531)

Daily Cost (USD '000)

2012 2013

Page 39: OGX Management Presentation

APPENDIX

Page 40: OGX Management Presentation

ONGOING ACTIVITIES

Well Block Accumulation Rig Coast Distance Water Depth Status Net Pay

PERN-3 BM-ES-39³ Caju Ocean Star 105 km 1,428m In progress since Mar/31

OGX-68HP BM-C-41Tubarão Azul Field

(Workover)ENSCO-5004 83 km 135m In progress since Apr/19 Development well

OGX-111 PN-T-68¹ SE Bom Jesus BCH-12 Onshore Block In progress since Apr/26

GVR-18 PN-T-68¹ Gavião Real Field BCH-5 Onshore Block In progress since Apr/29 Development well

OGX-94DA BM-S-58Curitiba

(Drill-Stem Test)Ocean Quest 101 km 143m In progress since May/01

Campanian: 23.5mSantonian: 9m

GVR-17 PN-T-68¹Gavião Real Field

(Completion)TUS-106 Onshore Block In progress since May/03 Development well

40¹ OGX Maranhão has 70% W.I. ² OGX has 70% W.I. and Maersk 30% ³OGX has 50% W.I. and Perenco is the operator

Page 41: OGX Management Presentation

CONCLUDED WELLS (1 OF 7)

Well Block Accumulation Rig Coast Distance Water Depth Net Pay

1- MRK - 2B BM-S-29 Abacate Sovereign Explorer 130 km 100 m Oil &Gas shows

OGX-1 BM-C-43 Vesúvio Ocean Ambassador 85 km 140 m Eocene: 57m

OGX-9D BM-C-41 Vesúvio Direcional Ocean Ambassador 87 km 142 m Eocene: 60m

OGX-13 BM-C-41 Vesúvio Vertical Ocean Lexington 87 Km 138m Eocene: 10m

OGX-2A BM-C-41 Pipeline Ocean Ambassador 77 km 130 m

Eocene: ShowsCretac.: ShowsAlbian: 100mAptian: 50mBarremian: 15m

OGX-6 BM-C-41 Etna Ocean Quest 82 km 137 mAlbian: 74mAptian: 17m

OGX-3 BM-C-41 Waimea Sea Explorer 83 km 130 mAlbian: 80mApt./Barrem: 50m

OGX-8 BM-C-41 Fuji Ocean Star 82 km 125 mAlbian: 43mAptian: 44m

OGX-4 BM-C-42 Kilawea Ocean Quest 79 km 150 m Eocene: 17m

OGX-5 BM-C-43 Krakatoa Ocean Ambassador 79 km 145 mMaastric.: ShowsAlbian: 30mAptian: 20m

OGX-7A BM-C-42 Huna Ocean Lexington 86 km 152 mAlbian: >17mAptian: 35m

OGX-10 BM-C-42 Hawaii Sea Explorer 79 km 158 mCenomanian: 11mAlbian: >13m Aptian: 40m

OGX-11D BM-S-59 Natal Ocean Quest 84 km 180m Santonian: 75m

OGX-12 BM-S-57 Niterói Ocean Star 95 km 150m -

OGX-14 BM-C-40 Peró Ocean Lexington 96 km 104m Albian: 35m & 27m

OGX-15 BM-C-41 Santa Helena Ocean Ambassador 78 km 130mAlbian: 32mAptian: 31m

41

Page 42: OGX Management Presentation

CONCLUDED WELLS (2 OF 7)

4242

Well Block Accumulation Rig Coast Distance Water Depth Net Pay

OGX-16 PN-T-681 California QG-1 Onshore BlockDevonian: Gas shows, 23m & 25m (column)

OGX-17 BM-S-56 Belém Ocean Star 85 Km 136m Albian: 43m

OGX-18A BM-C-40 Ingá Ocean Lexington 95 Km 105mSantonian: Oil showsAlbian: 12m (Oil column)

OGX-19 BM-S-58 Aracaju Ocean Quest 112 Km 172m Santonian: 40m

OGX-20 BM-C-41 Tupungato Ocean Ambassador 84 Km 132mMaastrichtian: 9m & 3mAlbian: 50mAptian: 42m

OGX-21D BM-C-41 Waimea Direcional Sea Explorer 84 Km 134m Albian: 14m

OGX-22 PN-T-681 Fazenda São José QG-1 Onshore BlockUpper Devonian: 49m Lower Devonian: 47m

OGX-23 BM-S-58 Ilhéus Ocean Quest 107 Km 152m -

OGX-24 BM-S-56 Itagi Ocean Star 94 Km 140m -

MRK-3/4P BM-C-372 Carambola – A Blackford Dolphin 74 Km 134mSantonian: 14mAlbian: 43mAptian: 12m

OGX-25/27P BM-C-39 Waikiki Pride Venezuela 94 Km 105mEocene: 8m (gas)Albian-cenomanian: 145m

OGX-26HP BM-C-41 Waimea Horizontal Sea Explorer 84 Km 134m Albian: >1,000m (horizontal section)

OGX-28D BM-C-41 Illimani Ocean Star 80 Km 126m Albian: 24m

OGX-29/32 BM-C-39 Itaipu Ocean Lexington 86 Km 104m Oil shows

OGX-31 BM-C-41 Osorno Ocean Ambassador 79 Km 136mAlbian: 48mAptian: 23m

OGX-36D BM-C-41 Pipeline D Ocean Star 77 Km 128m Albian: 60m

OGX-35D BM-C-39 Waikiki Direcional Ocean Lexington 89 Km 104m Albian-Cenomanian: 80m

¹ OGX Maranhão has 70% W.I. ² OGX has 70% W.I. and Maersk 30%

Page 43: OGX Management Presentation

CONCLUDED WELLS (3 OF 7)

¹ OGX Maranhão has 70% W.I. ² OGX has 70% W.I. and Maersk 30% 43

Well Block Accumulation Rig Coast Distance Water Depth Net Pay

MRK-5 BM-C-37 2 Carambola B Blackford Dolphin 80 Km 130m Albian: 17m

OGX-33 BM-C-41 Chimborazo Pride Venezuela 84 Km 127m Albian: 42m

OGX-37 BM-C-43 Potosi Ocean Ambassador 87 Km 140m Oil Shows

OGX-41DBM-C-39 / BM-C-40

Waikiki - 2D Ocean Lexington 90 Km 110m Albian: 92m

OGX-40D BM-C-41 Pipeline - 2D Sea Explorer 79 Km 130m Albian: 107m

OGX-30 BM-S-58 Salvador Ocean Quest 105 Km 151m Albian: 50m

OGX-34 PN-T-68 1 Bom Jesus QG-1 Onshore Block Devonian: 23m

OGX-43D BM-C-41 Illimani - 1D Ocean Ambassador 80 km 140 m Albian: 50m

OGX-44HPBM-C-39/BM-C- 40

Waikiki Ocean Lexington 90 Km 110mAlbian-Cenomanian: 1,063m (horizontal section)

OGX-38 PN-T-68 1 Fazenda São José BCH-05 Onshore Block Devonian: 43m

OGX-46D PN-T-68 1 Califórnia – D QG-1 Onshore Block Devonian: 15m

OGX-48 BM-C-41 Pipeline – 4 Ocean Ambassador 75 Km 128m Albian: 12m

OGX-42D BM-C-41 Pipeline - 3D Pride Venezuela 78 km 120mEocene: 6mAlbian: 82m

OGX-50D BM-C-41 Waimea – 3D Sea Explorer 84 Km 131mSantonian: 1.7mAlbian: 52m

OGX-45D BM-C-40 Waikiki – 3D Ocean Lexington 96 Km 109m Maastrichtian: 5m

OGX-39HP BM-C-41 Pipeline Horizontal Ocean Star 77 Km 128m Albian: 1,000m (horizontal section)

OGX-52 BM-C-41 Tambora Ocean Ambassador 93 Km 128m Santonian: 5mAlbian: 96m

OGX-51DP PN-T-68¹ Califórnia - 2DP QG-1 Onshore Block Devonian: 8m

OGX-49 PN-T-68¹ Fazenda São José BCH-05 Onshore Block -

Page 44: OGX Management Presentation

CONCLUDED WELLS (4 OF 7)

44

Well Block Accumulation Rig Coast Distance Water Depth Net Pay

OGX-53D BM-C-41 Waimea – 2D Pride Venezuela 84 Km 132m Albian: 71m

OGX-57 PN-T-68¹ Fazenda São José - 2 QG-1 Onshore Block -

OGX-47 BM-S- 59 Maceió Ocean Quest 110Km 185m Santonian: 51m

OGX-54 BM-C-41 Fuji - 2 Ocean Lexington 81Km 136m Albian: 24

OGX-58DP BM-C-41 Tambora Ocean Ambassador 93Km 128m -

OGX-56D BM-C-41 Fuji – 1D Ocean Star 77Km 128m Albian: 60m

OGX-59 PN-T-49¹ Fazenda Torrão BCH-05 Onshore Block Devonian: 9m

OGX-62 BM-C-40 Ingá - 1 Ocean Lexington 93Km 105mAlbian-Cenomanian: 20mSantonian: 26m

OGX-55HP BM-C-41 Waimea – 3HP Sea Explorer 84Km 131m Albian: >1,000m (horizontal section)

GVR-1D PN-T-68¹ Gavião Real QG-1 Onshore Block Development well

OGX-61 BM-C-41 Illimani – 2 Ocean Ambassador 87 Km 124m Albian: 9m

OGX-66 PN-T-67¹ Angical BCH-05 Onshore Block -

OGX-65D BM-C-41 Waimea – 4D ENSCO 5002 83 km 135m Albian: 97m

OGX-64DP BM-C-40 Ingá – 1DP Ocean Lexington 93 km 105m Santonian: 23m

PERN-1 BM-ES-37³ Moriche Ocean Star 52 km 1,148m -

OGX-69 BM-C-41 Fuji - 4 ENSCO 5002 81 km 125m Albian: 38m

GVR-3D PN-T-68¹ Gavião Real QG-1 Onshore Block Development well

GVR-2D PN-T-68¹ Gavião Real BCH-05 Onshore Block Development well

OGX-70 BM-C-41 Pipeline - 5 Ocean Lexington 80 km 123m -

¹ OGX Maranhão has 70% W.I. ² OGX has 70% W.I. and Maersk 30% ³OGX has 50% W.I. and Perenco is the operator

Page 45: OGX Management Presentation

CONCLUDED WELLS (5 OF 7)

¹ OGX Maranhão has 70% W.I. ² OGX has 70% W.I. and Maersk 30% ³OGX has 50% W.I. and Perenco is the operator45

Well Block Accumulation Rig Coast Distance Water Depth Net Pay

OGX-60HP BM-C-41 Waimea – 2D ENSCO 5004 84 km 132m Albian: >1,000m (horizontal section)

OGX-63 BM-S-57 Fortaleza Ocean Quest 102 km 155mAlbian: 110mAptian: 150m (column)

OGX-67 BM-C-40 Ingá - 2 Ocean Ambassador 93 km 111m -

OGX-71 BM-C-40 Ingá - 3 Ocean Ambassador 93 km 112m -

OGX-73 BM-C-41 Osorno – 1 Ocean Ambassador 78 km 130m Albian: 37m

GVR-4D PN-T-681 Gavião Real QG-1 Onshore Block Development well

PERN-2 BM-ES-38³ Guarapari Ocean Star 110 km 823m -

GVR-5D PN-T-681 Gavião Real BCH-05 Onshore Block Development well

OGX-72 BM-C-41 Pipeline – 7 Ocean Lexington 78 km 130m Albian: 129m

GVR-6D PN-T-68¹ Gavião Real QG-1 Onshore Block Development well

OGX-68HP BM-C-41 Waimea – 4HP ENSCO 5004 83 km 135m Albian: > 1,000m (horizontal section)

OGX-76 BM-C-40 Peró - 1 Ocean Lexington 96 km 103m Albian: 6m

OGX-75 BM-C-41 Tambora – 3 Ocean Ambassador 86 km 130m Albian: 49m

OGX-77 PN-T-85¹ Fazenda Axixá BCH-05 Onshore Block Devonian: 2m

OGX-74 BM-S-59 Natal – 1 Ocean Quest 115 km 196m Santonian: 6m

GVR-8D PN-T-68¹ Gavião Real BCH-12 Onshore Block Development well

OGX-80 BM-C-41 Pipeline – 6 Ocean Lexington 76 km 128m Albian: 51m

OGX-81 BM-C-41 Tambora – 2 Ocean Ambassador 87 km 139mEocene: 6mAlbian: 62m

GVR-7DA PN-T-68¹ Gavião Real QG-1 Onshore Block Development well

Page 46: OGX Management Presentation

CONCLUDED WELLS (6 OF 7)

46

Well Block Accumulation Rig Coast Distance Water Depth Net Pay

OGX-79 BM-C-39 Itacoatiara ENSCO 5004 89 km 102m Albian: 64m

OGX-82 PN-T-85¹ Fazenda São Francisco BCH-5 Onshore Block Devonian: 3m

OGX-84 BM-C-40 Ingá-4 Ocean Ambassador 96 km 107m -

GVR-9 PN-T-68¹ Gavião Real BCH-12 Onshore Block Development well

OGX-78 BM-C-43 Honolulu ENSCO 5002 99 km 320m Aptian: 67m

OGX-83D BM-C-41 Tupungato - 1D Ocean Lexington 86 km 132m Albian: 83m

GVR-10D PN-T-68¹ Gavião Real QG-1 Onshore Block Development well

OGX-86 BM-C-39 Camboinhas ENSCO 5004 84 km 101m -

OGX-87 BM-C-42 Villarrica Ocean Ambassador 87 km 138mMaastrichtian: 8mPaleocene: 2m

OGX-88 PN-T-68¹ Bom Jesus - 1 BCH-5 Onshore Block Carboniferous: 36m

GVR-12D PN-T-68¹ Gavião Real BCH-12 Onshore Block Development well

GVR-14D PN-T-68¹ Gavião Real QG-1 Onshore Block Development well

GVR-11D PN-T-68¹ Gavião Real BCH-12 Onshore Block Development well

OGX-89D BM-S-59 Natal – 2D Ocean Quest 111 km 170m Santonian: 7m

OGX-90D BM-C-41 Fuji - 3D ENSCO 5004 82 km 128m Albian: 2m

OGX-91D PN-T-67¹ SW Bom Jesus BCH-5 Onshore Block Carboniferous: 23m

OGX-95 PN-T-67¹ NW Bom Jesus BCH-5 Onshore Block Carboniferous: 4m

GVR-13D PN-T-68¹ Gavião Real BCH-12 Onshore Block Development well

OGX-85 BM-S-57 Fortaleza – 1 Ocean Star 85 km 155m Under analysis

OGX-92 PN-T-84¹ Faz. Santa Maria TUS-125 Onshore Block -

OGX-93 PN-T-84¹ Rio Corda QG-1 Onshore Block -

GVR-15D (Disposal)

PN-T-68¹ Gavião Real TUS-125 Onshore Block Disposal well

TBMT-1D/2HP BM-C-39 Tubarão Martelo Field Ocean Lexington 90 km 105m Development well

¹ OGX Maranhão has 70% W.I. ² OGX has 70% W.I. and Maersk 30% ³OGX has 50% W.I. and Perenco is the operator

Page 47: OGX Management Presentation

CONCLUDED WELLS (7 OF 7)

47

Well Block Accumulation Rig Coast Distance Water Depth Net Pay

OGX-97 PN-T-67¹ Basílios BCH-12 Onshore Block Gas shows

OGX-98 PN-T-68¹ N California QG-1 Onshore Block -

OGX-96 PN-T-50¹ Peritoró BCH-5 Onshore Block -

TBMT-3D/4HP BM-C-39 Tubarão Martelo Field Ocean Star 89 km 106m Development well

GVR-16D (Disposal)

PN-T-68¹ Gavião Real TUS-125 Onshore Block Disposal well

OGX-100 BM-C-38² Viedma Ocean Lexington 75 km 139m Upper Cretaceous: 52m

TBAZ-1HP BM-C-41 Tubarão Azul Field ENSCO 5002 84 km 133m Development well

OGX-99 BM-C-37² Cozumel ENSCO 5004 67 km 134m -

OGX-101 PN-T-68¹ Roncador QG-01 Onshore Block -

OGX-102 PN-T-67¹ Esperantinópolis BCH-12 Onshore Block Devonian: 3m

OGX-103 PN-T-50¹ Peritoró-2 BCH-5 Onshore Block -

OGX-104 BM-C-37² Tulum Ocean Lexington 69 km 123m Santonian: 35.5

OGX-105 PN-T-85¹ Rocha Lima QG-1 Onshore Block -

OGX-106 BM-C-37² Cancun ENSCO-5004 62 km 130m -

OGX-107 PN-T-49¹ Fazenda Chicote BCH-12 Onshore Block Devonian: 66m

OGX-108 PN-T-49¹ Fazenda Santa Isabel BCH-5 Onshore Block Carboniferous: 24m

OGX-109 BM-C-37² Viedma-1 ENSCO-5004 70 km 133m Santonian: 6m

TBMT-10H BM-C-39 Tubarão Martelo Field Ocean Star 89 km 106m Development well

TBMT-8H BM-C-39 Tubarão Martelo Field ENSCO-5002 90 km 107m Development well

OGX-110 PN-T-67¹ São Raimundo BCH-12 Onshore Block Carboniferous: 27m

¹ OGX Maranhão has 70% W.I. ² OGX has 70% W.I. and Maersk 30% ³OGX has 50% W.I. and Perenco is the operator

Page 48: OGX Management Presentation

TPPs

Parnaíba II

PARNAÍBA BASIN

Revenue Schematic

(OGX Maranhão and Petra)

$

$

$

(by Jan/1420 year contract

50% take-or-pay)

(by Jan/1315 year contract0% take-or-pay)

(MPX and Petra)

Parnaíba I

Future Projects

Gas Producers

48

Gas Sale Contract with MPX

Page 49: OGX Management Presentation