ogx management presentation

50
MANAGEMENT PRESENTATION Rio de Janeiro | June 2012 |

Upload: ogxriweb

Post on 24-Oct-2014

293 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: OGX Management Presentation

MANAGEMENT PRESENTATION

Rio de Janeiro | June 2012 |

Page 2: OGX Management Presentation

AGENDA

1

2

3

4

OGX Overview

OGX Portfolio and Execution

OGX Operations

Financial Overview

Appendix

Last update: 06/14/2012

Page 3: OGX Management Presentation

OGX OVERVIEW

1

Page 4: OGX Management Presentation

Highly successful and experienced management team, combining unique intellectual capital and

superior execution skills

Overall exploratory success rate exceeding 85% with high productivity reservoirs amongst the best in

Brazil

World class E&P portfolio, mostly in shallow waters and onshore (low cost and off-the-shelf technology)

OGX is among the largest pure E&P companies globally

Proven execution capability (from concept to oil in an unprecedented timing) with fully established

operations comprising more than 6,000 people

Solid cash position allows OGX to conduct the largest and most successful private sector exploratory

campaign in Brazil and to support production development (more than 90 wells spud since the beginning of

its exploratory campaign in Sep. 2009)

Brazil‟s historical under-exploration underpins massive growth opportunities for OGX

OGX OVERVIEW

4

Page 5: OGX Management Presentation

OGX MAIN ACCOMPLISHMENTS

5

Proven Execution Capability (From Concept To First Oil in Unprecedented Timing) With Fully Established Operations Comprising More Than 6,000 People

OGX Creation

US$1.3 bnraised through an equity Private Placement

21 blocks acquired during the 9th

Bidding Round

Jul/07Nov/07

Jun/08

IPO: US$4.1 bn raised

Aug/09

Jun/10

Bond: US$ 2.6bn raisedBeginning of the

drilling campaign

Acquisition of 70% stake in the Parnaíba Assets

Apr/11

Survey and interpretation of the 3D seismic data

Procurement of all equipment and services necessary to initiate the drilling campaign

May/11

5 onshore blocks acquired in Colombia

Sep/11

Mar/12

Sep/09

Updated OGX portfolio to 10.8 bn(1) boe of potential resources

(1) Calculated by OGX based on potential, prospective and contingent volumes contained in the DeGolyer and MacNaughton Reports

1 block acquired in Parnaíba (50% stake)

Oct/11

Jan/12

Arrival of FPSO OSX-1

Total investments of US$ 4.3bn of

Drilling Capex and Signature Bonus +

US$ 245 M of Seismic Campaign

Total cash raised to date: US$9.4 bn

1st Oil

New Bond: US$ 1.1bn raised

Page 6: OGX Management Presentation

OGX OWNERSHIP AND CORPORATE STRUCTURE

Free Float

26 Blocks

5 - Campos (100%) (2)

2 - Campos (70%) (2)

5 - Santos (100%) (2)

5 - Espírito Santo (50%)

5 - PAMA (100%) (2)

4 - Colombia (100%) (2)

8 Blocks

7 - Parnaíba (70%) (2)

1 – Parnaíba (50%) (2)

(1) EBX represented through Centennial Asset Mining Fund LLC (Nevada, USA) (“CAMF”)(2) OGX as operator(3) Market data as of May 31, 2012(4) MPX S.A. holds 33.33%

Petróleo e Gás Participações S.A.(Market Capitalization (3): ~ US$16 Billion)

Petróleo e Gás Ltda

Maranhão Petróleo e Gás S.A.

Average daily traded volume (1 month): ~ US$150 million

~ 35 thousand investors

3rd most representative stock in Ibovespa index 5.4%

One of the most liquid common shares

61%¹ 39%

99.99% 66.67%4

100%

International

OGX Austria

100.00%

100%

6

100%

Page 7: OGX Management Presentation

MANAGEMENT ORGANIZATION STRUCTURE(1)

Paulo Mendonça (38)

CEO

Joaquim Dib Cohen (32)Oil & Gas Commercialization

Paulo Ricardo (28)Exploration and Reservoir

Officer

José Roberto FaveretGeneral Counsel

Roberto MonteiroCFO

Reinaldo Belotti (34)Production Officer

Armando Ferreira (31)Production Development

Olavo Foerch (32)Procurement

Ricardo Juiniti (27)Drilling and Completion

Billy Pinheiro (30)Logistics

Ricardo Abiramia (24)Production

Leandro Leme (31)HSE

Edmundo Marques (24)Exploration Santos & Eq. Margin

Dolores Carvalho (35)E&P Laboratory

Paulo de Tarso Guimarães (34)Exploration Campos & ES

Roberto Toledo (31)Reservoir & Reserves

Celso Martins (34)Onshore Basin

Ernani Porsche (33)International

Moacir Santos (38)Geological Operations

Highly Successful And Committed Management Team,

Combining Unique Intellectual Capital and Superior Execution Skills 7(1) Parentheses represent years of experience in the E&P industry

Marcos Amaral (28)Applied Technology

Luiz Reis (45)Strategic Alliances

Nilton MonteiroStrategic Alliances

Page 8: OGX Management Presentation

HIGHLY QUALIFIED EXPLORATION TEAM

Exploratory Team

Paulo Mendonça led the

Petrobras exploration team

from 2002 to 2007

Success index in excess of

60% on average offshore

Brazil from 2002-2007 whilst

at Petrobras

Over 9 billion boe and more

than 50 new fields discovered

Pbr Success Index

Proven Track Record Having Opened Several New Oil Frontiers, Including The Pre-salt, and Discovering Over 50 New Oil Fields

8

Page 9: OGX Management Presentation

BRAZIL

Source: EIA-DOE, BP Statistical Review of World Energy 2010, Saudi Aramco, UPPSALA University, Petrobras, ANP and OGX analysis

Source: ANP

Still Significantly Under-explored

Oil & Gas in The World

Source: IHS

Largest Oil And Gas Discoveries In The World

Source: BP Statistical Review of World Energy 2010 & analyst estimates

New Provinces Could Propel Brazil Into Top Reserves Holders

Oil Resources - December 2009 (Bn bbl) % of sedimentary basins under concession

0 10 20 30 40

Bn Boe

Brazil

Turkmenistan

Iran

Kazakhstan

China

Russia

Australia

Kuwait

Israel

Saudi Arabia

India

Indonesia

Venezuela

Papua

New Guinea

Ghana

+ 35 bn boe

265

172

138

115

102

100

98

74

44

40

37

33

28

27

15

14

13

Saudi Arabia

Venezuela

Iran

Iraq

Kuwait

Brazil post Tupi

UAE

Russia

Libya

Kazakhstan

Nigeria

Canada

US

Qatar

China

Angola

Brazil

Unlicensed 96%

Licensed 4%

COUNTRYHISTORICAL O&GPROD.(BN BOE)

USA (1900-2010) 440

EX-USSR (1900-2010)

335

SAUDI ARABIA (1938-2010)

145

BRAZIL(1941-2010)

14.5

Brazil’s Historical Under-Exploration Underpins Massive Growth Opportunities for OGX

9

Unlicensed96%

Oil and Gas Discovered Volumes

2000 – 2010 (Bn boe)

Vast Untapped Oil & Gas Potential

Page 10: OGX Management Presentation

OGX PORTFOLIO AND EXECUTION

2

Page 11: OGX Management Presentation

PO

RTFO

LIO

Deep water~1,000m

Shallow water~150m

Shallow water~120m

Shallow water~60m

OGX PORTFOLIO

34 blocks: 30 blocks in 5 Brazilian sedimentary basins and 4 onshore blocks in 2 Colombian

sedimentary basins

Unique portfolio with 10.8 billion potential recoverable barrels of oil equivalent (boer)

OGX‟s business plan is based on 4.1 billion barrels already discovered in the shallow waters of the

Campos Basin

11

Page 12: OGX Management Presentation

Oil discoveries of 4.1 bn bbl are already under production development in the shallow waters of Campos Basin

OGX PORTFOLIO POTENTIAL

73%ShallowWater

8%Deep

Water

19%Onshore

79% Oil

21% Gas

Portfolio Breakdown

12

Breakdown

D&M Certified Volumes (Bnboe)

Note:

1 Does not include Parnaíba 3C contingent resources of 141 million boe

10.8

C1(4%)0.1

C2(19%)

0.6C3 (77%)2.33.0

1.3

4.8

6.7¹6.5

Mar-08 Sep-09 Dec-10

Contingent Delineation Prospective

Page 13: OGX Management Presentation

CAMPOS BASIN

OGX’s Discovered Accumulations Confirm a New Hydrocarbon Province

in the Southern Campos Basin

~400 MM bbl already declared

commercial (Tubarão Azul and

Tubarão Martelo Fields)

7 blocks operated by OGX

Total area of 1,177 km2

Average water depth of ~120m

65 wells drilled

Up to 90% of success rate

Campos Basin

13

Low Risk, Shallow Water And Large Volumes

Page 14: OGX Management Presentation

Areas Update– Not including pre-salt and exploratory prospects

CAMPOS BASIN

14

Highlights

Successful appraisal campaign with 36 wells

drilled and a 92% hit ratio

Important new discovery in 1Q12

Itacoatiara, in block BM-C-39 which will be part of the Waikiki Complex

Acquisition of incremental 20% participation

of blocks BM-C-37 and BM-C-38 from Maersk,

with OGX becoming the operator

Declaration of Commerciality of the Waikiki

accumulation and Development Plan (DP)

submitted to the ANP

To be named as Tubarão Martelo Field

with expected total recoverable volume

of 285 MMbbl

Presentation of the Declaration of

Commerciality for a portion of the Waimea

Complex

To be named as Tubarão Azul Field with

expected total recoverable volume of

110 MMbblSource:

Area estimates based exclusively on OGX‟s studies

Waikiki ComplexWaimea / Pipeline and Vesuvio Complexes

Page 15: OGX Management Presentation

TUBARÃO AZUL FIELD (1ST MODULE)

OGX-3 Albian: 80mAptian/Barrem: 50m N.A.

OGX-21D/OGX-26HP Albian: 14mN.A.

OGX-50D/OGX-55HP Santonian: 1,7mAlbian: 52m

1C

OGX-53D/OGX-60HP Albian: 71m 1C

OGX-65D/OGX-68HP Albian: 97m 1C

15

Waimea Complex – Not including pre-salt and exploratory prospects

TAMBORA

OGX-52 Santonian: 5mAlbian: 96m

N.A.

OGX-58DP - N.A.

OGX-75 Albian: 49m N.A.

OGX-81 Albian: 62m N.A.

ILLIMANI

OGX-28D Albian: 24m N.A.

OGX-43D Albian: 50m Del.

OGX-61 Albian: 9m 3C

TUPUNGATO

OGX-20 Maastrich: 9m & 3mAlbian: 50mAptian: 42m

N.A.

OSORNO

OGX-31 Albian: 48mAptian: 23m

N.A.

OGX-73 Albian: 37m N.A.

FUJI

OGX-8 Albian: 43mAptian: 44m

N.A.

OGX-56D Albian: 60m 3C

OGX-69 Albian: 38m 3C

CHIMBORAZO

OGX-33 Albian: 42m N.A.

Waimea Complex¹

WELL UNDER EVALUATION

OGX-54 Albian: 24m Del.

Note:

1 Figures in “meters” illustrate net pays of oil columns

2 Discovered after D&M „s Dec 2010 contingent resources report

CAMPOS BASIN

Source:

Area estimates based exclusively on OGX‟s studies

Page 16: OGX Management Presentation

TUBARÃO MARTELO FIELD

OGX-25 Eocene: 8m (gas)Albocenomaniano: 145m

N.A.

OGX-35D Albocenomanian: 80m 3C

OGX-41D/OGX-44HP

Albian: 92m2C

16

INGÁ

OGX-18 Santonian: Oil ShowsAlbian: 12m (oil column) N.A.

OGX-62 Albocenomanian: 20mSantonian: 26m

2C

OGX-64DP Santonian: 23m 3C

OGX-67 - 3C

OGX-71 - 3C

ITACOATIARA

OGX-79 Albian: 64m N.A.

PERÓ

OGX-14 Albian: 35m & 27m N.A.

OGX-76² Albian: 6m 2C

Waikiki Complex¹WELLS UNDER EVALUATION

OGX-45D Maastrich: 5m Del.

OGX-29/32 Oil Shows N.A.

Waikiki Complex – Not including pre-salt and exploratory prospects

CAMPOS BASIN

Source:

Area estimates based exclusively on OGX‟s studies

Notes:

1 Figures in “meters” illustrate net pays of oil columns

2 RJS-15 well drilled by Petrobras

Page 17: OGX Management Presentation

PIPELINE

OGX-2A Eocene: Oil showsCretac: Oil showsAlbian: 100mAptian: 50mBarremian: 15m

N.A.

OGX-36D/OGX-39HP

Albian: 60m3C

OGX-40D Albian: 107m 2C

OGX-42D Eocene: 6mAlbian: 82m

3C

OGX-48 Albian: 12m 3C

OGX-70 - 3C

OGX-72 Albian: 129m 3C

OGX-80³ Albian: 51m N.A.

17

SANTA HELENA (PIPELINE)

OGX-15 Albian: 32mAptian: 31m

N.A.

ETNA (PIPELINE)

OGX-6 Albian: 74mAptian: 17m

N.A.

Pipeline Complex¹

CARAMBOLA

MRK-5 Albian: 17m N.A.

RJS-105² Albian: 150m N.A.

CARAMBOLA A (PIPELINE)

MRK-3 Santonian: 14mAlbian: 43mAptian: 12m

N.A.

Pipeline Complex – Not including pre-salt and exploratory prospects

CAMPOS BASIN

Source:

Area estimates based exclusively on OGX‟s studies

Notes:

1 Figures in “meters” illustrate net pays of oil columns

2 RJS-15 well drilled by Petrobras

3 Discovered after D&M „s Dec 2010 contingent resources report

Page 18: OGX Management Presentation

VESUVIO

OGX-1 Eocene: 57m N.A.

OGX-9D Eocene: 60m 1C

OGX-13 Eocene: 10m 1C

18

KRAKATOA

OGX-5 Maastrich: Oil showsAlbian: 30mAptian: 20m

N.A.

KILAWEA

OGX-4 Eocene: 17m N.A.

Vesuvio Complex¹

POTOSI (VESUVIO)

OGX-37 Oil Shows N.A.

Note:

1 Figures in “meters” illustrate net pays of oil columns

Vesúvio Complex – Not including pre-salt and exploratory prospects

CAMPOS BASIN

Source:

Area estimates based exclusively on OGX‟s studies

Page 19: OGX Management Presentation

CAMPOS BASINProduction in the Tubarão Azul Field

19OGX First Oil Flowing Since January/12 Through EWT

Electricalsubmersiblepump

BuoyOSX-1

Risers andUmbilicals

Flexiblelines

WetchristmastreeOGX-26HP

Wet christmastreeOGX-68HP

Wet christmas tree

Main characteristics:

OGX-26HP and OGX-68HP under production

3rd production well to be connected by 2012

4th producer well to be connected by 2013

2 injection wells planned

1st by 2012

2nd by 2013

Oil quality of 20° API

Water depth of 140 meters

Wet christmas tree

Page 20: OGX Management Presentation

CAMPOS BASIN

Dec 23,

2011

Concluded the connection of

the flexible lines to the

detachable turret

Sep 16,

2011

Granting of the

preliminary and

installation license

by IBAMA

Sep 17,

2011

Beginning of the subsea

installation (piles,

moorings and MWA)

Dec 19,

2011Flexible lines launched

and connected to the

wet christmas tree

Dec 25,

2011

FPSO OSX-1 sets sail

from the port of Rio de

Janeiro

Jan 31,

2012

FPSO OSX-1 begins

production

Jan 12,

2012

Connection of the FPSO

OSX-1 to the turret

Dec 18,

2009

Discovery of

Waimea OGX-3Oct 4,

2011

Arrival of the

FPSO OSX-1 in

Rio de Janeiro 1st

Oil

20

From Discovery to 1st Oil in Waimea

Page 21: OGX Management Presentation

CAMPOS BASIN

21

FPSO OSX-1 Operational Efficiency

Tested production levels between 5-18 kbpd since beginning of

production

1st well, OGX-26HP, on-stream since Jan/31

2nd well, OGX-68HP, on-stream since May/15

After EWT results, intend to adopt a stable flow rate

Besides water injection technology should also use chemical

hydraulic fracturing and other well known techonologies in the

industry to optimize production

Production in the Waimea Complex

Average Monthly Production (kboepd)

11.6

10.4

9.1

Feb-12 Mar-12 Apr-12

95%

99%100%

Feb-12 Mar-12 Apr-12

Page 22: OGX Management Presentation

CAMPOS BASIN

2222

OSX-2 and OSX-3 Production Schematic

Main characteristics:

OSX-2: 1st oil expected for 2H13

OSX-3: 1st oil expected for 2H13

4 subsea wells connected to each FPSO

Oil quality: 20-28° API

Water depth: ~120 meters

OSX-2/OSX-3

Flexible lines

WHP-1/WHP-2

Dry christmas tree

Wet christmas tree

Page 23: OGX Management Presentation

CAMPOS BASIN

23

1st oil expected for 2H13

EPC: MODEC

Shipyard: Jurong Shipyard (JSL) – Singapore

Technical specifications:

Production capacity: 100 kbbl/day

Storage capacity: 1.3 Mboe

OSX-2 and OSX-3 Engineering Status

OSX-2 Overview OSX-3 Overview

1st oil expected for 2H13

EPC: Single Buoy Moorings Inc (SBM)

Shipyard: Keppel Fels - Singapore

Technical specifications:

Production capacity: 100 kbbl/day

Storage capacity: 1.3 Mboe

Both FPSOs Underway and On Schedule, Constructed in Top Tier Shipyards

Page 24: OGX Management Presentation

FPSOs WHPs

OSX-1:

Production capacity of 60 kbpdand storage of 950 kbbl

Average Day rate of US$ 263 k

Arrived in Oct/11

First oil in Jan/12

OSX-2:

Production capacity of 100 kbpd and storage of 1.3 Mbbl

Expected Average day rate of US$ 360 k

Contracted by OSX with SBM

Expected delivery: 2H13

OSX-3:

Production capacity of 100 kbpd and storage of 1.3 Mbbl

Expected Average day rate of US$ 360 k

Contracted by OSX with MODEC

Expected delivery: 2H13

WHP-1:

Capacity to drill up to 30 wells

Equipment on-stream by the 1H14

Detailed engineering ongoing (EPC awarded to Techint by OSX)

WHP-2:

Capacity to drill up to 30 wells

Equipment on-stream by 1H14

Detailed engineering ongoing (EPC awarded to Techint by OSX)

OSX-4:

Production capacity of 100 kbpd and storage of 1.3 Mbbl

Order placed for Leasing contract and EPCI under procurement

OSX-5:

Production capacity of 100 kbpd and storage of 1.3 Mbbl

Order placed for Leasing contract and EPCI under procurement

Two sister VLCC´s (Very Large Crude Oil Carriers) purchased on November, 2010 by OSX to be converted into FPSOs

SECURED PRODUCTION EQUIPMENT

2424

WHP-3 and WHP-4:

Order placed for charter and construction with OSX

Both WHPs will be built in the AçuSuperport

Page 25: OGX Management Presentation

Santos Basin is One of The Most Promising Exploratory Areas in Brazil, With Significant Potential For Gas and Light Oil

5 blocks operated by OGX (100%

owned)

Total area of 769 km²

Average water depth of ~150 m

11 wells drilled

Pre-salt potential in shallow

waters (OGX-63)

Up to 70% success rate

Santos Basin

SANTOS BASIN

25

High Potential

Page 26: OGX Management Presentation

SANTOS BASIN

Encouraging Results From 3 Drill-stem Tests Confirm Emergence of a New Oil, Gas and Condensate Center in The Region

Exploratory Campaign

2010 Activities

MRK-2B

OGX-11D

OGX-12

OGX-17

OGX-19

2011 Activities

OGX-23

OGX-24

OGX-30

OGX-47

OGX-63

Maceió (OGX – 47)

Gas and condensate (~20% with approx.

50° API)

AOF production potential results:

Vertical well: 1.0M m³/day of gas

Horizontal well: 2.5M m³/day of

gas

Natal (OGX-11D)

Gas and condensate (~25% with approx. 47° API)

AOF production potential results:

Vertical well: 1.0 M m³/day of gas and 1.2K bbl/day of condensate

Horizontal well: 5.0M m³/day of gas and 6K bbl/day of condensate

Drill-stem Tests Performed

26

2012 Activities

OGX-74

Illustrative

Positive Drill-Stem Test Results

Natal (OGX-74)

Light oil (38º API) confirmation

Sandstone reservoirs (Santonian age)

4 km distant from OGX-11D

Drill-stem Test for Fluid Identification

Page 27: OGX Management Presentation

SANTOS BASIN

27

Highlights Albian Gas Interval

Aptian Interval

Good porosity

Dolomitized layers with open fractures

MDT Dual-Packer Test collected 47º

API hydrocarbons

Pore

Dolomitized microbial

Connected vugular porosity

Light oil/condensate shows

Oil

Pre-salt Discovery In Shallow Waters

Albian reservoir

Approximately 1,000 meters of column and 110 meters of net pay

Good permoporosity and fractures

Shallow waters Pre-salt (Aptian reservoir)

Drilled up to 6,135 meters and thus far identified column of 150 meters

1st microbiolite Pre-salt discovery in shallow waters in Brazil

Same reservoir rock in pre-salt as only seen so far in deep and ultra-deep waters in the Santos and Campos Basins

Strong kick in the last drilled layer of the reservoir with shows of hydrocarbons

Page 28: OGX Management Presentation

New Frontier Basin With High Potential For Gas Production

1.1 Tcf (~200MM boe) already declared commercial (Gavião Real and Gavião Azul Fields)

Total area of 24,500 km²

Monetization of gas through thermoelectric plants to be developed by MPX/Petra (3,722 MW already licensed)

>70% success rate (12 wells drilled)

Parnaíba Basin

PARNAÍBA BASIN

28

Major Gas Province

Page 29: OGX Management Presentation

Gavião Real

Gavião Azul

Legend:

Seismic Lines

PARNAÍBA BASIN

29

More than 20 prospects identified

Initial production expected in 2H12

Available production capacity of up to ~6 M m³

per day in 2013

Gas to be sold to MPX Power Plants

MPX has obtained installation license of 3,722 MW

3 seismic crews working on the site

3 rigs operating simultaneously: 2 focused on the

production development and 1 for exploration

2 additional rigs contracted, one completion rig

and one for exploration, both expected in 1H12

Parnaíba Complex

Business Plan

Project 11st gas: 2H12

Page 30: OGX Management Presentation

PARNAÍBA BASIN

30

MPX + PetraOGX Maranhão (70%) + Petra (30%)

Parnaíba Development SchematicGas Thermal Power Plant Development

Notes:1 Facilities cost includes: gathering system (lines and manifolds), a production facility for dry gas and a very short pipeline2 Includes operating and maintenance of production facilities, lines, gas pipelines and wells

Capex

Total drilling cost:

US$ 340 M

Total facilities1

cost: US$ 110M

Opex field life

Less than US$

0.30/1,000 cubic

feet

30

Short Gas Pipeline(<2 km)

CAMPO DE GAVIÃO REAL

Poços

de p

rodução

Gasoduto2 x 18" - 4,1 km

Manifold de

produção

Gasoduto2 x 12" - 11,7 km

CAMPO DE GAVIÃO AZUL

Poços

de p

rodução

Manifold de

produção

SITE DA MPX

Planta de

Tratamento

UTE

Transferência de

custódia

Filtragem, controle e

medição

Recebimento, separação

e tratamento

Site UTG OGX Site UTE MPXManifold

Pro

du

cti

on

w

ell

s

GTU TPP

Project Development

Page 31: OGX Management Presentation

PARNAÍBA BASIN

31

Execution Highlights

Project Development

Environmental permits already granted (LP+LI)

7 producing wells already drilled and 2 wells in

progress

Drilled and tested the first production well GVR-1

Production potential of 5.0 M m³/day (AOF)

EPC contracted for the construction of the gas processing facility

Awarded to Valerus-Geogas

Civil engineering work advanced and on schedule

Prepared Gas Treatment Unit (GTU) site, with earthmoving at advanced stage

Launching of pipelines connecting the clusters to the GTU

Production expected to begin in the 2H12 with the commissioning of the GTU and the turbines

Commercial production expected to start in January 2013

Ongoing Works

Page 32: OGX Management Presentation

The New Frontier of Espírito Santo Has Proven to be a Very Active Petrolific System With Recent Important Discoveries in Neighboring Blocks

5 blocks operated by Perenco

(50% owned)

Total area of 3,620 km²

Average water depth of ~1,000 m

Espírito Santo Basin

ESPÍRITO SANTO BASIN

32

New Frontier In Deep Water

Page 33: OGX Management Presentation

New Frontier With Geological Model Similar to West Africa, Where Significant Discoveries Were Made Recently

5 blocks operated by OGX (100%

owned)

Total area of 960 km²

Average water depth of ~60m

1st well to be drilled in 2012

Pará-Maranhão Basin

PARÁ MARANHÃO BASIN

33

Promising New Frontier

Page 34: OGX Management Presentation

Balanced Portfolio of Exploratory Assets, Combining Production Regions With Less Explored Areas Next to The Maracaibo Basin, One of The Most Prolific Provinces in The World

4 blocks operated by OGX

(100% owned), 3 of which are

located close to Maracaibo Basin

(~80 bn boe discovered and

~50 bn boe already produced)

Beginning of the Seismic

Campaign in 1H12

First well to be drilled in 2012

Colombian Basins

COLOMBIA

34

Cesar-Ranchería and Lower Magdalena Valley Great Upside Potential

Page 35: OGX Management Presentation

OGX OPERATIONS

3

Page 36: OGX Management Presentation

EXPLORATION DRILLING CAMPAIGN

Ocean Lexington (Diamond):

Daily Rate: US$ 270k

Max. well depth: 20,000 ft

Contract Expires: Feb.2013

Ocean Ambassador (Diamond):

Daily Rate: US$ 260k

Max. well depth: 20,000 ft

Contract Expires: Sep.2012 (+ one optional year)

Ocean Quest (Diamond):

Daily Rate: US$ 265k

Max. well depth: 25,000 ft

Contract expires: Dec.2013

ENSCO 5002 (Ensco)

Daily Rate: US$ 220k

Max. well depth : 20,000 ft

Contract Expires: Nov.2013

Ocean Star (Diamond):

Daily Rate: US$ 300k

Max. well depth: 25,000 ft

Contract Expires: Feb.2014

ENSCO 5004 (Ensco):

Daily Rate: US$235k

Max. well depth: 20,000 ft

Contract Expires: Nov.2013

Offshore Drilling Onshore Drilling

36

WILDCAT+APPRAISAL WELLS 2009 2010 2011 2012 2013 TOTAL

Campos 5 18 31 12 2 68

Santos 1 6 3 4 1 15

Espírito Santo 0 0 2 1 2 5

Pará-Maranhão 0 0 0 2 3 5

Parnaíba 0 2 8 6 8 24

Colombia 0 0 0 1 3 4

Total 6 26 44 26 19 121

BCH-05E (BCH):

Daily Rate: US$ 32k

Max. well depth: 11,500 ft

Contract Expires: May 2012

QG-1 (Queiroz Galvão):

Daily Rate: US$ 34k

Max. well depth: 14,750 ft

Contract Expires: Fev.2013 (+ one optional year)

BCH-012 (BCH):

Daily Rate: US$ 33k

Max. well depth: 13,800 ft

Contract Expires: March 2015 (+ one optional year)

Two additional rigs contracted (Tuscany):

One completion rig

One rig for exploration

Both expected in 1H12

Page 37: OGX Management Presentation

OPERATIONAL CAPABILITIES AND STRUCTURE

OFFSHORE DRILLING First Class Suppliers

High Qualified Team

Logistics Operational

Support

PLATFORM SUPPLY VESSEL (PSV)

QUANTITY:5

CONTRACTOR: EDISON CHOUEST/

TIDE WATER

ANCHOR HANDLING TUG SUPPLY (AHTS)

QUANTITY: 6

CONTRACTOR: EDISON CHOUEST/

NORSKAN/MAERSK

FAST SUPPLY VESSEL (FSV)

QUANTITY: 1

CONTRACTOR: EDISON

CHOUEST

MID SIZE HELICOPTER

QUANTITY: 4

CONTRACTOR: AERÓLEO

OGX Team: ~350 employees

Over 6,000 people dedicated

3D Room / IOSC

EFFICIENCY,

AGILITY AND

OPERATIONAL

SECURITY

37

Page 38: OGX Management Presentation

4FINANCIAL OVERVIEW

Page 39: OGX Management Presentation

STRONG CASH POSITION

Solid cash position of R$ 6.6 billion, or US$ 3.6

billion, to support exploration commitments,

development and initial production:

US$ 2.2 billion invested in offshore deposits

US$ 1.063 billion raised through a bond issue

in March 2012

Cash allocation in R$: R$ 2.6 billion (~40%)

Average cumulative gross return equivalent to

103.08% of the Interbank Deposit Rate (CDI), or

10.6% p.a.

Cash Allocation in US$: US$ 2.2 billion (~60%)

Average cumulative gross return equivalent to 1.72%

p.a.

Cash position in fixed income instruments allocated to most

solid financial institutions

R$ Billion

Cash Position Evolution Cash Allocation

39

0,0

2,0

4,0

6,0

8,0

4Q11 JAN FEB MAR

Cash in R$

Bradesco27%

Itaú Unibanco20%HSBC

15%

Votorantim12%

Morgan Stanley10%

BTG Pactual6%

Santander5%

CS4%

Others1%

Page 40: OGX Management Presentation

HIGH PROFITABILITY ON FPSO OSX-1 OPERATIONS

40

EWT Economics¹1st Cargo Delivered to Shell

Gross Revenue of R$ 118.0 million and EBITDA of R$ 56.4million, reflecting the asset‟s high value

EWT already profitable with only one well in production

Economies of scale will dilute costs per barrel

More wells on stream this year

Majority of costs are fixed: logistics, leasing and

operations

Sale of 1st Cargo

Extended Well Test

1st cargo (offloaded on 03/28/12) - in barrels (bbls) 547,376

R$ ('000)

Gross Revenue¹ 118,003

Sales taxes -

Royalties (10,687)

Leasing (24,078)

OSX Services (13,944)

Logistics (12,005)

Others (871)

EBITDA 56,418

% EBITDA / Gross Revenue 47.81

EBITDA / barrel - (R$/barrel) 103.07Note:1 Refers to the 51 days period (from beginning of production to 547 kbbls)

Page 41: OGX Management Presentation

APPENDIX

Page 42: OGX Management Presentation

ONGOING ACTIVITIES

1OGX Maranhão has 70% W.I

Well Block Accumulation Rig Coast Distance Water Depth Status Net Pay

CC OGX-78 BM-C-43 Honolulu ENSCO 5002 99 km 320m In progress since 03/25

CE OGX-79 BM-C-39 Itacoatiara ENSCO 5004 89 km 102m In progress since 04/04 Albian: 64m

CI OGX-63A BM-S-57 Fortaleza Ocean Quest 102 km 155m In progress since 04/29

CJ GVR-9 PN-T-68¹ Gavião Real BCH-12 Onshore Block In progress since 05/14

CK OGX-82 PN-T-85¹ Fazenda São Francisco BCH-5 Onshore Block In progress since 05/18

CL OGX-83D BM-C-41 Tupungato – 1D Ocean Lexington 86Km 132m In progress since 05/22

CM OGX-84 BM-C-40 Ingá-4 Ocean Ambassador 96 km 107m In progress since 05/31

CN GVR-10D PN-T-68¹ Gavião Real QG-1 Onshore Block In progress since 06/02

OGX Blocks Oil & Gas Fields

PARNAÍBA BASINCAMPOS BASIN SANTOS BASIN ESPÍRITO SANTO BASIN

42

Page 43: OGX Management Presentation

CONCLUDED WELLS (1 OF 6)

Well Block Accumulation Rig Coast Distance Water Depth Net Pay

A 1- MRK - 2B BM-S-29 Abacate Sovereign Explorer 130 km 100 m Oil &Gas shows

B OGX-1 BM-C-43 Vesúvio Ocean Ambassador 85 km 140 m Eocene: 57m

J OGX-9D BM-C-41 Vesúvio Direcional Ocean Ambassador 87 km 142 m Eocene: 60m

N OGX-13 BM-C-41 Vesúvio Vertical Ocean Lexington 87 Km 138m Eocene: 10m

C OGX-2A BM-C-41 Pipeline Ocean Ambassador 77 km 130 m

Eocene: ShowsCretac.: ShowsAlbian: 100mAptian: 50mBarremian: 15m

G OGX-6 BM-C-41 Etna Ocean Quest 82 km 137 mAlbian: 74mAptian: 17m

D OGX-3 BM-C-41 Waimea Sea Explorer 83 km 130 mAlbian: 80mApt./Barrem: 50m

I OGX-8 BM-C-41 Fuji Ocean Star 82 km 125 mAlbian: 43mAptian: 44m

E OGX-4 BM-C-42 Kilawea Ocean Quest 79 km 150 m Eocene: 17m

F OGX-5 BM-C-43 Krakatoa Ocean Ambassador 79 km 145 mMaastric.: ShowsAlbian: 30mAptian: 20m

H OGX-7A BM-C-42 Huna Ocean Lexington 86 km 152 mAlbian: >17mAptian: 35m

K OGX-10 BM-C-42 Hawaii Sea Explorer 79 km 158 mCenomanian: 11mAlbian: >13m Aptian: 40m

L OGX-11D BM-S-59 Natal Ocean Quest 84 km 180m Santonian: 75m

M OGX-12 BM-S-57 Niterói Ocean Star 95 Km 150m -

O OGX-14 BM-C-40 Peró Ocean Lexington 96 Km 104m Albian: 35m & 27m

P OGX-15 BM-C-41 Santa Helena Ocean Ambassador 78km 130mAlbian: 32mAptian: 31m

43

Page 44: OGX Management Presentation

CONCLUDED WELLS (2 OF 6)

4444

Well Block Accumulation Rig Coast Distance Water Depth Net Pay

Q OGX-16 PN-T-681 California QG-1 Onshore BlockDevonian: Gas shows, 23m & 25m (column)

R OGX-17 BM-S-56 Belém Ocean Star 85 Km 136m Albian: 43m

S OGX-18A BM-C-40 Ingá Ocean Lexington 95 Km 105mSantonian: Oil showsAlbian: 12m (Oil column)

T OGX-19 BM-S-58 Aracaju Ocean Quest 112 Km 172m Santonian: 40m

U OGX-20 BM-C-41 Tupungato Ocean Ambassador 84 Km 132mMaastrichtian: 9m & 3mAlbian: 50mAptian: 42m

V OGX-21D BM-C-41 Waimea Direcional Sea Explorer 84 Km 134m Albian: 14m

W OGX-22 PN-T-681 Fazenda São José QG-1 Onshore BlockUpper Devonian: 49m Lower Devonian: 47m

X OGX-23 BM-S-58 Ilhéus Ocean Quest 107 Km 152m -

Y OGX-24 BM-S-56 Itagi Ocean Star 94 Km 140m -

Z MRK-3/4P BM-C-372 Carambola – A Blackford Dolphin 74 Km 134mSantonian: 14mAlbian: 43mAptian: 12m

AA OGX-25/27P BM-C-39 Waikiki Pride Venezuela 94 Km 105mEocene: 8m (gas)Albian-cenomanian: 145m

V OGX-26HP BM-C-41 Waimea Horizontal Sea Explorer 84 Km 134m Albian: 1,000m (horizontal section)

AB OGX-28D BM-C-41 Illimani Ocean Star 80 Km 126m Albian: 24m

AC OGX-29/32 BM-C-39 Itaipu Ocean Lexington 86 Km 104m Oil shows

AE OGX-31 BM-C-41 Osorno Ocean Ambassador 79 Km 136mAlbian: 48mAptian: 23m

Page 45: OGX Management Presentation

CONCLUDED WELLS (3 OF 6)

¹ OGX Maranhão has 70% W.I. ² OGX has 50% W.I. and Maersk is the operator 45

Well Block Accumulation Rig Coast Distance Water Depth Net Pay

AJ OGX-36D BM-C-41 Pipeline D Ocean Star 77 Km 128m Albian: 60m

AH OGX-35D BM-C-39 Waikiki Direcional Ocean Lexington 89 Km 104m Albian-Cenomanian: 80m

AG MRK-5 BM-C-37 2 Carambola B Blackford Dolphin 80 Km 130m Albian: 17m

AF OGX-33 BM-C-41 Chimborazo Pride Venezuela 84 Km 127m Albian: 42m

AK OGX-37 BM-C-43 Potosi Ocean Ambassador 87 Km 140m Oil Shows

AO OGX-41DBM-C-39 / BM-C-40

Waikiki - 2D Ocean Lexington 90 Km 110m Albian: 92m

AN OGX-40D BM-C-41 Pipeline - 2D Sea Explorer 79 Km 130m Albian: 107m

AD OGX-30 BM-S-58 Salvador Ocean Quest 105 Km 151m Albian: 50m

AI OGX-34 PN-T-68 1 Bom Jesus QG-1 Onshore Block Devonian: 23m

AQ OGX-43D BM-C-41 Illimani - 1D Ocean Ambassador 80 km 140 m Albian: 50m

AO OGX-44HPBM-C-39/BM-C- 40

Waikiki Ocean Lexington 90 Km 110mAlbian-Cenomanian: 1,063m (horizontal section)

AL OGX-38 PN-T-68 1 Fazenda São José BCH-05 Onshore Block Devonian: 43m

AS OGX-46D PN-T-68 1 Califórnia – D QG-1 Onshore Block Devonian: 15m

AU OGX-48 BM-C-41 Pipeline – 4 Ocean Ambassador 75 Km 128m Albian: 12m

AP OGX-42D BM-C-41 Pipeline - 3D Pride Venezuela 78 km 120mEocene: 6mAlbian: 82m

AW OGX-50D BM-C-41 Waimea – 3D Sea Explorer 84 Km 131mSantonian: 1.7mAlbian: 52m

Page 46: OGX Management Presentation

CONCLUDED WELLS (4 OF 6)

¹ OGX Maranhão has 70% W.I. ² OGX has 50% W.I. and Maersk is the operator 46

Well Block Accumulation Rig Coast Distance Water Depth Net Pay

AR OGX-45D BM-C-40 Waikiki – 3D Ocean Lexington 96 Km 109m Maastrichtian: 5m

AM OGX-39HP BM-C-41 Pipeline Horizontal Ocean Star 77 Km 128m Albian: 1,000m (horizontal section)

AX OGX-52 BM-C-41 Tambora Ocean Ambassador 93 Km 128m Santonian: 5m

Albian: 96m

AS OGX-51DP PN-T-68¹ Califórnia - 2DP QG-1 Onshore Block Devonian: 8m

AV OGX-49 PN-T-68¹ Fazenda São José BCH-05 Onshore Block -

AY OGX-53D BM-C-41 Waimea – 2D Pride Venezuela 84 Km 132m Albian: 71m

BB OGX-57 PN-T-68¹ Fazenda São José - 2 QG-1 Onshore Block -

AT OGX-47 BM-S- 59 Maceió Ocean Quest 110Km 185m Santonian: 51m

AZ OGX-54 BM-C-41 Fuji - 2 Ocean Lexington 81Km 136m Albian: 24

BC OGX-58DP BM-C-41 Tambora Ocean Ambassador 93Km 128m -

BA OGX-56D BM-C-41 Fuji – 1D Ocean Star 77Km 128m Albian: 60m

BD OGX-59 PN-T-49¹ Fazenda Torrão BCH-05 Onshore Block Devonian: 9m

BG OGX-62 BM-C-40 Ingá - 1 Ocean Lexington 93Km 105mAlbian-Cenomanian: 20mSantonian: 26m

AW OGX-55HP BM-C-41 Waimea – 3HP Sea Explorer 84Km 131m Albian: >1,000m (horizontal section)

BE GVR-1D PN-T-68¹ Gavião Real QG-1 Onshore Block Development well

BF OGX-61 BM-C-41 Illimani – 2 Ocean Ambassador 87 Km 124m Albian: 9m

Page 47: OGX Management Presentation

CONCLUDED WELLS (5 OF 6)

¹ OGX Maranhão has 70% W.I. ² OGX has 50% W.I. and Maersk is the operator ³ Waiting for a new rig 4OGX has 50% W.I. and Perenco is the operator 47

Well Block Accumulation Rig Coast Distance Water Depth Net Pay

BJ OGX-66 PN-T-67¹ Angical BCH-05 Onshore Block -

BI OGX-65D BM-C-41 Waimea – 4D ENSCO 5002 83 km 135m Albian: 97m

BG OGX-64DP BM-C-40 Ingá – 1DP Ocean Lexington 93 km 105m Santonian: 23m

BM PERN-1 BM-ES-374 Moriche Ocean Star 52 km 1,148m -

BP OGX-69 BM-C-41 Fuji - 4 ENSCO 5002 81 km 125m Albian: 38m

BN GVR-3D PN-T-68¹ Gavião Real QG-1 Onshore Block Development well

BO GVR-2D PN-T-68¹ Gavião Real BCH-05 Onshore Block Development well

BQ OGX-70 BM-C-41 Pipeline - 5 Ocean Lexington 80 km 123m -

AY OGX-60HP BM-C-41 Waimea – 2D ENSCO 5004 84 km 132m Albian: >1,000m (horizontal section)

BH OGX-63³ BM-S-57 Fortaleza Ocean Quest 102 km 155mAlbian: 110mAptian: 150m (column)

BL OGX-67 BM-C-40 Ingá - 2 Ocean Ambassador 93 km 111m -

BS OGX-71 BM-C-40 Ingá - 3 Ocean Ambassador 93 km 112m -

BX OGX-73 BM-C-41 Osorno – 1 Ocean Ambassador 78 km 130m Albian: 37m

BT GVR-4D PN-T-681 Gavião Real QG-1 Onshore Block Development well

BR PERN-2 BM-ES-384 Guarapari Ocean Star 110 km 823m -

BU GVR-5D PN-T-681 Gavião Real BCH-05 Onshore Block Development well

BV OGX-72 BM-C-41 Pipeline – 7 Ocean Lexington 78 km 130m Albian: 129m

BZ GVR-6D PN-T-68¹ Gavião Real QG-1 Onshore Block Development well

BI OGX-68HP BM-C-41 Waimea – 4HP ENSCO 5004 83 km 135mAlbian: > 1,000m (horizontal section)

Page 48: OGX Management Presentation

CONCLUDED WELLS (6 OF 6)

¹ OGX Maranhão has 70% W.I. ² OGX has 50% W.I. and Maersk is the operator ³ Waiting for a new rig 4OGX has 50% W.I. and Perenco is the operator 48

Well Block Accumulation Rig Coast Distance Water Depth Net Pay

CA OGX-76 BM-C-40 Peró - 1 Ocean Lexington 96 km 103m Albian: 6m

BY OGX-75 BM-C-41 Tambora – 3 Ocean Ambassador 86 km 130m Albian: 49m

CB OGX-77 PN-T-85¹ Fazenda Axixá BCH-05 Onshore Block Devonian: 2m

BW OGX-74 BM-S-59 Natal – 1 Ocean Quest 115 km 196m Santonian: 6m

CD GVR-8D PN-T-68¹ Gavião Real BCH-12 Onshore Block Development well

CG OGX-80 BM-C-41 Pipeline – 6 Ocean Lexington 76 km 128m Albian: 51m

CH OGX-81 BM-C-41 Tambora – 2 Ocean Ambassador 87 km 139mEocene: 6mAlbian: 62m

CF GVR-7DA PN-T-68¹ Gavião Real QG-1 Onshore Block Development well

Page 49: OGX Management Presentation

TPPs

TPP Maranhão III

PARNAÍBA BASIN

Revenue Schematic

CONTRACT CONDITIONS:

The contract should provide a 15% ROE for the TPP (Thermal Power Plant)

Gas producers should receive “remaining” revenue, guaranteeing extraordinary margins (“net back”)

— $ Fixed revenue (gas plant rental)

— $ Variable revenue (varies according to plant‟s dispatch)

(OGX Maranhão and Petra)

$

$

$

(by Jan/1420 year contract

50% take-or-pay)

(by Jan/1315 year contract0% take-or-pay)

(MPX and Petra)

TPPMaranhão

IV + V

Future Projects

Gas Producers

49

Gas Sale Contract with MPX

Page 50: OGX Management Presentation