*. . .e* FeigteFtr so ° * of Nuclear Power January 28, 2015 ACO 15-0005 ATTN: Document Control Desk Ms. Catherine Haney, Director Office of Nuclear Material Safety and Safeguards U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 American Centrifuge Plant and American Centrifuge Lead Cascade Facility Docket Numbers 70-7004 and 70-7003; License Numbers SNM-2011 and SNM-7003 Annual Summary Report of Facility Changes Dear Ms. Haney: In accordance with 10 Code of Federal Regulations (CFR) 70.72(d)(2) and Nuclear Regulatory Commission Materials License Conditions 16.c.ii (SNM-7003) and 24.c.ii (SNM-201 1), American Centrifuge Operating, LLC hereby submits a brief summary of the changes to the records required by 10 CFR 70.62(a)(2) for facility changes made during calendar year 2014. Enclosure 1 provides the summary of facility changes for both the American Centrifuge Lead Cascade Facility and American Centrifuge Plant. If you have any questions regarding this matter, please contact me at (740) 897-3285. Sincerely, Mario Robles, Jr. Regulatory Manager Enclosure: As Stated cc: J. Hickey, NRC Region II (w/o enclosure) J. Downs, NRC HQ (w/o enclosure) L. Pitts, NRC Region II 0. Siurano-Perez, NRC HQ B. Smith, NRC HQ (w/o enclosure) American Centrifuge Operating, LLC 3930 U.S. Route 23 South - P.O. Box 628 Piketon, OH 45661

Upload: others

Post on 17-Sep-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: of Nuclear Power · 2020. 1. 5. · FCE 13-0384 1 Title: 5/1/2014 Yes ESO-2409-0047 No None of the criteria PCE 13-0152 1 Engineering Service Order ESO-2409-0047, Install Emergency

*. . .e* FeigteFtr

so ° * of Nuclear Power

January 28, 2015ACO 15-0005

ATTN: Document Control DeskMs. Catherine Haney, DirectorOffice of Nuclear Material Safety and SafeguardsU.S. Nuclear Regulatory CommissionWashington, DC 20555-0001

American Centrifuge Plant and American Centrifuge Lead Cascade FacilityDocket Numbers 70-7004 and 70-7003; License Numbers SNM-2011 and SNM-7003

Annual Summary Report of Facility Changes

Dear Ms. Haney:

In accordance with 10 Code of Federal Regulations (CFR) 70.72(d)(2) and Nuclear RegulatoryCommission Materials License Conditions 16.c.ii (SNM-7003) and 24.c.ii (SNM-201 1), AmericanCentrifuge Operating, LLC hereby submits a brief summary of the changes to the records required by10 CFR 70.62(a)(2) for facility changes made during calendar year 2014. Enclosure 1 provides thesummary of facility changes for both the American Centrifuge Lead Cascade Facility and AmericanCentrifuge Plant.

If you have any questions regarding this matter, please contact me at (740) 897-3285.

Sincerely,

Mario Robles, Jr.Regulatory Manager

Enclosure: As Stated

cc: J. Hickey, NRC Region II (w/o enclosure)J. Downs, NRC HQ (w/o enclosure)L. Pitts, NRC Region II0. Siurano-Perez, NRC HQB. Smith, NRC HQ (w/o enclosure)

American Centrifuge Operating, LLC3930 U.S. Route 23 South - P.O. Box 628

Piketon, OH 45661

Page 2: of Nuclear Power · 2020. 1. 5. · FCE 13-0384 1 Title: 5/1/2014 Yes ESO-2409-0047 No None of the criteria PCE 13-0152 1 Engineering Service Order ESO-2409-0047, Install Emergency

Enclosure 1 to ACO 15-0005

Summary of Facility Changes for the American Centrifuge Lead Cascade Facilityand American Centrifuge Plant for Calendar Year 2014

Information Contained WithinDoes Not Contain

Export Controlled Information

Reviewer R.S. LykowskiDate: 01/19/2015

Page 3: of Nuclear Power · 2020. 1. 5. · FCE 13-0384 1 Title: 5/1/2014 Yes ESO-2409-0047 No None of the criteria PCE 13-0152 1 Engineering Service Order ESO-2409-0047, Install Emergency

2014 Brief Summary of Changes for the American Centrifuge Lead Cascade Facility (LCF) andAmerican Centrifuge Plant (ACP)

ISAFCE Number Summary Reason NRCPCE Number Approval Change Documents Modified Update Preapproval Not

Date to SSC? Due to Change Required? Required/Comments

FCE - N/A Title: 1/27/2014 No ACP License Application Yes None of the criterialPCE 14-0001 0 (U) ACP Conditioning Activities Figure 1.1-3; ACP listed in 10 CFR

Description of Change: Emergency Plan Table A-4; 70.72(c) are met.Desciptin o Chage:ACP Integrated SafetyModified figures to include the movement of 12-inch cylinders into and out Analysis Summary Table ofof the process building; replaced dump carts or withdrawal units with Analysis ummaresowithdrawal carts; added a section to provide a brief discussion of process Contents, List of Figures,equipment conditioning; added a section to discuss process building D.2.4, D.2.131, D.7.1, D.7.5,conditioning equipment; added section to discuss feed and withdrawal E.4.1, E.4.2,Figures 2.2-1,carts; added figures to show basic operations of feed and withdrawal carts; 3.8-1, 3.8-2, Tables 6.1-1,added the maximum inventory of a 12-inch cylinder to the list ofinventories; revised process building accident analysis to reflect the 6.1-2, 6.1-3, 7.2-1, B-4, C-4,presence of conditioning cylinders and also the potential for non-fire D18.4, F-4, and Appendix G;related heated releases; and revised Appendices C, D, E, F, G, and J. DAC-3901-0002 Rev 0

Reason for the Change:During construction, it is anticipated that centrifuge cascades will bephysically installed in the process buildings prior to the Feed andWithdrawal facility being operational. It is desired to have the option tobegin conditioning these cascades with UF6 using feed and withdrawalcarts. Discussion and evaluation of this activity needed to be added to theIntegrated Safety Analysis Summary since this is an activity that is notcurrently addressed.

Removing events from Appendix G that do not contain any informationother than non-classified information repeated from elsewhere in theIntegrated Safety Analysis Summary is an administrative change and wasdone to eliminate the unnecessary repetition of unclassified information inAppendix G and to avoid having to make revisions to Appendix G that donot involve classified information. The other administrative changescorrect minor errors, provide consistency, or provide clarity.

NRC Report 2014 Page 1 of 99

Page 4: of Nuclear Power · 2020. 1. 5. · FCE 13-0384 1 Title: 5/1/2014 Yes ESO-2409-0047 No None of the criteria PCE 13-0152 1 Engineering Service Order ESO-2409-0047, Install Emergency

FCE - N/APCE 14-0002

Title:0 Delete Reference to a Follow-on Fire and Made Editorial and Format

ChangesDescription of Change:Revised table of contents; deleted the statement "A follow-on fire couldresult" from Event, PB6-5 described in the Integrated Safety AnalysisSummary, Appendix J, Table C-4; deleted the statement "A follow-on fireoccurs" from Event IP6-5 described in Addendum 1, Table C-1; deletedthe statement "A follow-on fire may result" from Event PB6-5 described inthe Integrated Safety Analysis Summary, Appendix G, Table G-1, andEvent IP6-5 described and made editorial and formatting changes.

Reason for the Change:The statement "Follow-on fire may occur" is not relevant to a fire event.The changes in the event description resulted from an NRC request foradditional information (FP-10), which requested information affecting thelikelihood of the sequences, such as the distance between the fuel tanksand buildings, tank sizes, tank protection measures, and expected heateffects on adjacent structures. In developing the response, the IntegratedSafety Analysis Team concluded the events would not be explosive innature because of the use of diesel fuel only, so the major concern wouldactually be a fire event. This was documented in USEC letter to the NRC,AET 05-0007, dated March 5, 2005. The description of events PB6-5 andIP6-5 were changed accordingly, but the deletion of the parentheticalstatement referring to a follow-on fire was not made. Formatting andeditorial changes were made to conform to document control standards.

1/16/2014 No ACP Integrated SafetyAnalysis Summary Table ofContents, Section 5.1,Appendices G and J; ACPIntegrated Safety AnalysisSummary Addendum 1Appendices C and G

Yes None of the criteriallisted in 10 CFR70.72(c) are met.

FCE - N/A Title: 2/24/2014 No ACP Integrated Safety Yes None of the criterialPCE 14-0002 1 Delete Reference to a Follow-on Fire and Made Editorial and Format Analysis Summary Table of listed in 10 CFR

Changes Contents, Section 5.1, 70.72(c) are met.Appendices G and J; ACPDescription of Change: Integrated Safety Analysis

Deleted the statement "A follow-on fire could result" from the Integrated Summary Addendum 1

Safety Analysis Summary, Appendix J Event PB6-5; and deleted the

statement "A follow-on fire occurs" from Appendix E of Addendum 1 of the Appendices C, E, and G

Integrated Safety Analysis Summary, Event IP6-5.

Reason for the Change:The deletion of the parenthetical statement referring to a follow-on fire wasinadvertently omitted from Revision 0 of the change evaluation.

FCE - N/A Title: 5/20/2014 Yes ESO-3101-0001 No None of the criterialPCE 14-0056 a Engineering Service Order ESO-3101-0001, ACP Feed Cart listed in 10 CFR

Description of Change: 70.72(c) are met.

Fabricate and use a UF6 feed cart in the ACP.

Reason for the Change:A means to condition machines and process piping may be requiredduring commercial plant operations while awaiting the availability of theplant's feed and withdrawal facility.

ARC Report 2014 Page 2 of 99

Page 5: of Nuclear Power · 2020. 1. 5. · FCE 13-0384 1 Title: 5/1/2014 Yes ESO-2409-0047 No None of the criteria PCE 13-0152 1 Engineering Service Order ESO-2409-0047, Install Emergency

ISAFCE Number Summary Reason NRC

PCE Number Rev. Approval Change Documents Modified Update Preapproval NotDate to SSC? Due to Change Required? Required/Comments

FCE - N/A Title: 9/17/2014 No ACP4-EG-703 Chg 2 No None of the criterialPCE 14-0088 o Revision to Procedure ACP4-EG-703, Nuclear Criticality Safety listed in 10 CFR

Calculations 70.72(c) are met.

Description of Change:The procedure change clarified the completion of form AC-435,Verification of NCS Software, and defined "Verification."

Reason for the Change:Clarify procedure requirements.

FCE 13-0247 0 Title: 8/23/2013 No ACP/LCF Security Program No NRC PreapprovalPCE 13-0092 0 Change to NR-3605-0004, Security Program for the American Centrifuge Sections 1.3, 2.2, 2.3, 2.22; Required.

Plant, and 331-06-161, American Centrifuge Program Operations Security American CentrifugePlan Program Operations Security

Description of Change: Plan Section 3.0

The Security Program was expanded to Include the ability to allow portionsof the plant to be temporarily fenced outside of the existing controlledaccess area during construction activities; expanded to include the abilityto temporarily sanitize security areas for construction activities under aseparate security plan; and revised to remove the requirement to developtraining plans on an annual basis and submit those with securityresponsibilities to the NRC for review and approval.

Additionally, the Security Program and the Operations Security Plan wererevised to remove the requirement to have cognizant security agency finalapproval of the Operations Security Plan.

Reason for the Change:This temporary exclusion would allow isolation of the area for constructionactivities to be performed by uncleared personnel without escorts andwithout the controlled access area access control requirements, which areunnecessary during this time. Additionally, as discussed with NRC andDOE staff on January 8, 2013, two commitments were incorporated intothe Security Program as approved by the NRC on February 8, 2013.

NRC Report 2014 Page 3 of 99

Page 6: of Nuclear Power · 2020. 1. 5. · FCE 13-0384 1 Title: 5/1/2014 Yes ESO-2409-0047 No None of the criteria PCE 13-0152 1 Engineering Service Order ESO-2409-0047, Install Emergency

FCE 13-0247 1PCE 13-0092 1

Title:Change to NR-3605-0004, Security Program for the American CentrifugePlant, and 331-06-161, American Centrifuge Program Operations SecurityPlanDescription of Change:Added the following commitment into the Security Program:The temporary security plans, developed specifically for a temporarilysanitized security area, will be provided to the NRC prior to implementationto allow for any necessary on-site reviews/walk-downs and/or inspectionsto occur.

3/13/2014 No ACP/LCF Security ProgramSections 1.3, 2.2, 2.3, 2.22;American CentrifugeProgram Operations SecurityPlan Section 3.0

No NRC PreapprovalRequired.

Reason for the Change:During a telephone conference call held on March 6, 2014 with the NRCand DOE staff, American Centrifuge Operating, LLC committed to reviseSecurity Program to ensure the process for implementation of temporarysecurity plans to support construction activities are clearly delineated.

FCE 13-0313 1 Title: 2/13/2014 Yes ESO-2500-0007 No None of the criteriaPCE 13-0116 1 Engineering Service Order ESO-2500-0007, X-112 Steam Humidifier for listed in 10 CFR

Room 135 Modifications for Interlocks 70.72(c) are met.

Description of Change:Added a second humidistat in series with the existing humidistat.

Reason for the Change:The addition of the second humidistat will provide for better coverage ofthe area plus there will be a redundancy in case one of the humidistatsfails.

FCE 13-0384 1 Title: 5/1/2014 Yes ESO-2409-0047 No None of the criteriaPCE 13-0152 1 Engineering Service Order ESO-2409-0047, Install Emergency Lighting in listed in 10 CFR

the X-6000 70.72(c) are met.

Description of Change:Installed battery back-up egress lights and egress/exit combo packs tobring the entire building's emergency lighting up to standards.

Reason for the Change:Revision 1 of this change evaluation completely replaces revision 0 as theengineering service order did not correctly state the work being requestedand the change evaluation did not adequately address the change.

NRC Report 2014 Page 4 of 99

Page 7: of Nuclear Power · 2020. 1. 5. · FCE 13-0384 1 Title: 5/1/2014 Yes ESO-2409-0047 No None of the criteria PCE 13-0152 1 Engineering Service Order ESO-2409-0047, Install Emergency

ISA

FCE Number Summary Reason NRC

PCE Number Rev. Approval Change Documents Modified Update Preapproval NotDate to SSC? Due to Change Required? Required/Comments

FCE 13-0402 0 Title: 1/3/2014 No AC4-OP-080 Chg 3 No None of the criteria

PCE - N/A Revision to Procedure AC4-OP-080, ODU Cart Operations listed in 10 CFR

Description of Change: 70.72(c) are met.

Added and clarified a step; and added a bullet to the applicability section.

Reason for the Change:A step was added to in order to allow technicians to move the operationsdiagnostic unit cart to different machines without completely shutting downthe operations diagnostic unit cart. Other changes were made to clarifyprocedure requirements.

FCE 14-0001 0 Title: 1/3/2014 No AC4-OP-1 12 Chg 4; AC4-OP- No None of the criteria

PCE - N/A Revision to Procedures AC4-OP-1 12, X-3012 ASG; AC4-OP-179, 1Q12- 179 Chg 4; AC4-OP-180 Chg listed in 10 CFRASG Operations; AC4-OP-180, 1Q34-ASG Operations 4 70.72(c) are met.

Description of Change:The following changes were made to AC4-OP-112, AC4-OP-179, and AC4-OP-1 80:Added a step; modified a note; deleted steps to enable or disable theauxiliary standby generator touchscreen.

The following changes were made to AC4-OP-1 12:Changed setpoints; deleted a step as it is located in another procedure;and deleted references to form.

Changed the cool down counter setpoint in AC4-OP-1180.

Reason for the Change:Clarify procedure requirements.

FCE 14-0002 0 Title: 2/20/2014 No ACD2-SH-015 Chg 14 No None of the criteria

PCE 14-0003 0 Revision to Procedure ACD2-SH-015, Instructions for Lockout/Tagout listed in 10 CFR

Description of Change: 70.72(c) are met.

Added alerting techniques; minimized the use of acronyms; addedadditional examples of energy isolating devices; clarified the requirementsfor agreement between the equipment owner, work supervisor and theauthorized employee(s) performing work under single source lockouttagout; revised form AC-1 27, LOTO Work Permit Form; and made editorialchanges.

Reason for the Change:Clarify procedure requirements.

NRC Report 2014 Page 5 of 99

Page 8: of Nuclear Power · 2020. 1. 5. · FCE 13-0384 1 Title: 5/1/2014 Yes ESO-2409-0047 No None of the criteria PCE 13-0152 1 Engineering Service Order ESO-2409-0047, Install Emergency

ISA

FCE Number Summary Reason NRC

PCE Number Rev. Approval Change Documents Modified Update Preapproval NotDate to SSC? Due to Change Required? Required/Comments

FCE 14-0003 0 Title: 2/20/2014 No ACD2-SH-014 Chg 14 No None of the criteria

PCE 14-0004 0 Revision to Procedure ACD2-SH-014, Electrical Safety Guidelines listed in 10 CFR

Description of Change: .70.72(c) are met.

Added sections on determination of hazards, alerting techniques, safework practices, and pre-job briefs; added additional requirements forverifying the circuit(s) is de-energized; removed reference to barricades;added use references; revised Appendix C; revised Attachment A; andmade editorial and formatting changes.

Reason for the Change:Clarify procedure requirements.

FCE 14-0004 0 Title: 1/9/2014 No ACD3-EO-064 Chg 1 No None of the criteria

PCE 14-0005 0 Revision to Procedure ACD3-EO-064, Valve Positioning Controls listed in 10 CFR

Description of Change: 70.72(c) are met.

Deleted "at this time" from a step; reorganized and added bullets; clarifieda definition; defined the valve lineup number format; added a cautionblock; divided actions; added the option of a physical walk-down; movednotes; clarified the two options of verification; divided concurrent andindependent verification actions into two separate steps; divided actionsfor re-verification; revised and combined forms; deleted references to aform; and made editorial and formatting changes.

Reason for the Change:Clarify procedure requirements.

FCE 14-0005 0 Title: 1/9/2014 No AC4-AR-1 11 Chg 4 No None of the criteria

PCE - N/A Revision to Procedure AC4-AR-1 11, CDC DCS System Alarms and listed in 10 CFRResponses 70.72(c) are met.

Description of Change:Added an alarm response and changed "contact technical personnel andmaintenance" to "contact Shift Supervisor".

Reason for the Change:The alarm response was added to alert operators in the event the airconditioning unit associated with a cabinet has a fault. Other changeswere made to clarify procedure requirements.

NRC Report 2014 Page 6 of 99

Page 9: of Nuclear Power · 2020. 1. 5. · FCE 13-0384 1 Title: 5/1/2014 Yes ESO-2409-0047 No None of the criteria PCE 13-0152 1 Engineering Service Order ESO-2409-0047, Install Emergency

FCE 14-0006

PCE - N/A

0 Title:New Test Plan TP-2101-0059, X-3001 Purge Vacuum System Pump GasBallast Data Collection Plan

Description of Change:The new Test Plan will be used to perform controlled purge vacuumsystem operational scenarios in order to monitor and trend systemparameters during operation of the purge vacuum system.

1/17/2014 No TP-2101-0059 Rev 0 No None of the criterialisted in 10 CFR70.72(c) are met.

Reason for the Change:A recent purge vacuum pump failure in the purge vacuum system resultedin a series of system process issues which were not fully understood. Theintent of this test plan was to define the exact nature of these systemprocess issues by recording data while using the purge vacuum system.

FCE 14-0007 0 Title: 1/15/2014 No None No None of the criteriaPCE 14-0006 0 Temporary Storage of Propane Powered Forklifts in X-3346 listed in 10 CFR

Description of Change: 70.72(c) are met.

Allow temporary storage of propane powered forklifts in the maintenancearea of the X-3346.

Reason for the Change:Three forklifts obtained for the support of certain off-site warehousingactivities require indoor storage. The off-site warehousing activities havebeen terminated; therefore, the forklifts will be stored temporarily in the X-3346.

FCE 14-0009 0 Title: 1/28/2014 No ACD2-MP-001 Chg 8 No None of the criteriaPCE 14-0007 0 Revision to Procedure ACD2-MP-001, Safety Review Committee listed in 10 CFR

Description of Change: 70.72(c) are met.

Deleted guidance from Appendix A that describes when a procedure isreviewed by the Safety Review Committee.

Reason for the Change:Guidance for determination of when a procedure is presented to theSafety Review Committee is detailed and revised in ACD2-TP-001,Procedure Process, utilizing form AC-009. To assure consistency withACD2-TP-001, and to avoid confusion, these instructions were deletedfrom ACD2-MP-001.

NRC Report 2014 Page 7 of 99

Page 10: of Nuclear Power · 2020. 1. 5. · FCE 13-0384 1 Title: 5/1/2014 Yes ESO-2409-0047 No None of the criteria PCE 13-0152 1 Engineering Service Order ESO-2409-0047, Install Emergency

FCE 14-0010 0 Title: 1/20/2014 No ACD2-QM-001 Chg 28 No None of the criteriaPCE 14-0008 0 Revision to Procedure ACD2-QM-001, Management Assessment Program listed in 10 CFR

Description of Change: 70.72(c) are met.

Removed unnecessary assessments; corrected typographical errors:revised reference requirement: revised the frequency and responsibleorganization/group for the configuration management program-relatedassessments; moved the safety conscious work environment assessmentto another procedure.

Reason for the Change:Clarify procedure requirements.

FCE 14-0011 0 Title: 2/20/2014 No ACD2-SH-019 Chg 13 No None of the criteria

PCE 14-0009 0 Revision to Procedure ACD2-SH-019, Safety and Health Work Permit listed in 10 CFR

Description of Change: 70.72(c) are met.

Revised applicability section; added section on safety and health workpermits; added job hazard analysis guidance; clarified when a safety andhealth work permit is required; developed a new form AC-630, Safety andHealth Work Permit Log; added guidance to inspect the area aftercompletion of work; added guidance to sign the original permit and enterdate to release the permit; added guidance for when a work order safetyand health work permit is needed; deleted flow chart for completing thesafety and health work permits and added the guidance to the body of theprocedure; and made editorial and formatting changes.

Reason for the Change:Clarify procedure requirements.

FCE 14-0012 0 Title: 1/16/2014 No AC4-ON-009 Chg 25 No None of the criteriaPCE - N/A Revision to Procedure AC4-ON-009, Response to Loss of Power listed in 10 CFR

Description of Change: 70.72(c) are met.

Added notes; added and modified steps; and deleted selecting "clear" froma step.

Reason for the Change:Clarify procedure requirements.

NRC Report 20)4 Page 8 of 99

Page 11: of Nuclear Power · 2020. 1. 5. · FCE 13-0384 1 Title: 5/1/2014 Yes ESO-2409-0047 No None of the criteria PCE 13-0152 1 Engineering Service Order ESO-2409-0047, Install Emergency

ISA

FCE Number Summary Reason NRC

PCE Number Rev. Approval Change Documents Modified Update Preapproval NotDate to SSC? Due to Change Required? Required/Comments

FCE 14-0013 0 Title: 1/16/2014 Yes ESO-2409-0053 No None of the criteria

PCE 14-0010 0 Engineering Service Order ESO-2409-0053, Modify Air Start System Air listed in 10 CFRSupply in the X-6000 70.72(c) are met.

Description of Change:Added a regulated bypass line and/or dry plant air line from the instrumentair header to the air start system.

Reason for the Change:The installation of the air start system modification Is necessary inpreventing air loss through the pressure relief valve. Preventing air loss isnecessary from an economic standpoint and to prevent excessivecompressor wear.

FCE 14-0014 0 Title: 1/17/2014 No TER-00479 Rev 0; TAR- No None of the criteria

PCE 14-0011 0 Column Damper Weld Non-Conformance 00136 Rev 0; EE-3201-0002 listed in 10 CFR

Description of Change: Rev 0 70.72(c) are met.

Evaluation of non-conformance of certain column damper welds and thedisposition of those parts.

Reason for the Change:There were two concerns with the non-conforming welds: 1) could thecolumn be damaged during shipment to Piketon, and 2) would thecolumns meet the design requirements during a wreck. The evaluationsconcluded that the non-conforming columns will not be damaged duringtransport, will meet the design requirements during operation and during awreck, and that continued operation was justified.

FCE 14-0015 0 Title: 1/24/2014 No ACD2-QM-002 Chg 12 No None of the criteria

PCE 14-0012 0 Revision to Procedure ACD2-QM-002, Quality Assurance Independent listed in 10 CFRAudit And Assessment Program 70.72(c) are met.

Description of Change:Moved the safety conscious work environment assessment from ACD2-QM-001, Management Assessment Program, to ACD2-QM-002: correctedtypographical errors; added references; combined quality assuranceelements; combined document control with records management;changed "Audits" to "Audits and Assessments"; added safety consciouswork environment in Appendix B; changed "Nuclear Safety" to "IntegratedSafety Analysis/Nuclear Safety"; changed "Chemical Safety" to "ChemicalProcess Safety"; and made editorial and formatting changes.

Reason for the Change:Clarify procedure requirements.

NRC Report 2014 Page 9 of 99

Page 12: of Nuclear Power · 2020. 1. 5. · FCE 13-0384 1 Title: 5/1/2014 Yes ESO-2409-0047 No None of the criteria PCE 13-0152 1 Engineering Service Order ESO-2409-0047, Install Emergency

FCE 14-0016 0 Title: 1/20/2014 No AC4-OP-049 Chg 57 No None of the criteriaPCE - N/A Revision to Procedure AC4-OP-049, Machine Acceleration & Deceleration listed in 10 CFR

Description of Change: 70.72(c) are met.

Added limitation for the maximum number of machines to be acceleratedat a time; added note box for when machine isolation valve motor valvescould close; revised Attachment B to include indications for the differentmachine drive unit codes; added the ability to coast and park machinesindividually or in a group; and added the ability to accelerate or deceleratethen park machines as a group.

Reason for the Change:Clarify procedure requirements.

FCE 14-0017 0 Title: 1/20/2014 Yes ESO-2201-0075 No None of the criteriaPCE 14-0013 0 Engineering Service Order ESO-2201-0075, Installation of Lockable Motor listed in 10 CFR

Start Push Button Cover on Dump Carts 70.72(c) are met.

Description of Change:Installed lockable motor start push button covers on the dump carts.

Reason for the Change:The covers will allow personnel to lock out each of the push buttonswitches for maintenance on the evacuation pumps of the dump carts.

FCE 14-0018 0 Title: 1/22/2014 No AC4-OP-031 Chg 16 No None of the criteriaPCE - N/A Revision to Procedure AC4-OP-031, Connecting/Disconnecting UF6 listed in 10 CFR

Cylinder to/from a Dump Cart 70.72(c) are met.

Description of Change:Added a bullet to allow installation of a UF6 cylinder into a dump cart perprocess area manager's approval.

Reason for the Change:Clarify procedure requirements.

FCE 14-0019 0 Title: 1/23/2014 Yes ESO-2901-0003 No None of the criteriaPCE 14-0014 0 Engineering Service Order ESO-2901-0003, X-7721 South Chiller listed in 10 CFR

Replacement 70.72(c) are met.

Description of Change:Removed the existing X-7721 south chiller and replaced with a surplusmachine cooling water Train 3 chiller. This work included pipingmodification and installation.

Reason for the Change:The south chiller could not provide the required comfort cooling topersonnel at the required areas.

NRC Report 2014 Page 10 of 99

Page 13: of Nuclear Power · 2020. 1. 5. · FCE 13-0384 1 Title: 5/1/2014 Yes ESO-2409-0047 No None of the criteria PCE 13-0152 1 Engineering Service Order ESO-2409-0047, Install Emergency

FCE 14-0020PCE - N/A

0 Title:Engineering Service Order ESO-2201-0076, Removal or Reposition of AirBypass Stub on Purge Vacuum System

Description of Change:Cutting and capping of existing unused air bypass stub on the inlet suctionline to four purge vacuum pumps.

1/23/2014 Yes ESO-2201-0076 No None of the criterialisted in 10 CFR70.72(c) are met.

Reason for the Change:A recent purge vacuum pump failure in the purge vacuum system resultedin a series of system process issues. The completion of ESO-2201-0076work will allow in-place disassembly of the vacuum pump for inspection ofthe vacuum pump screws.

FCE 14-0021 0 Title: 3/7/2014 No AC4-AO-006 Chg 10 No None of the criteriaPCE - N/A Revision to Procedure AC4-AO-006, (U) AC 100/1005000-1005100 listed in 10 CFR

Machine Assembly 70.72(c) are met.

Description of Change:Added step clarifying use of form during select repair/assembly; addedsteps for new approved tooling for assembly; made bump test optional andremoved related hold points: added step and hold point for verifyingmachine disconnect switch connections; clarified notification requirements;and made formatting changes.

Reason for the Change:Changes were made to reflect minor process improvements asdocumented In SWI-0160, (U) AC100/1005100 Machine AssemblyRevision 2.

FCE 14-0023 0 Title: 2/5/2014 No ACD2-QM-01 1 Chg 11 No None of the criteriaPCE 14-0016 0 Revision to Procedure ACD2-QM-01 1, Resolving Contractor Issues listed in 10 CFR

Description of Change: 70.72(c) are met.

Clarified responsibilities; added a definition for contractor deficiency noticeoriginator; added a new step to provide actions for acceptable contractorcorrective action response; added guidance for obtaining export controlledinformation reviews; added a use reference: and clarified the contractordeficiency notice originator responsibilities.

Reason for the Change:This change was made to provide additional guidance and clarifications toimprove the contractor deficiency notice process.

NRC Report 2014 Page 11 of 99

Page 14: of Nuclear Power · 2020. 1. 5. · FCE 13-0384 1 Title: 5/1/2014 Yes ESO-2409-0047 No None of the criteria PCE 13-0152 1 Engineering Service Order ESO-2409-0047, Install Emergency

ISA

FCE Number Summary Reason NRC

PCE Number Rev. Approval Change Documents Modified Update Preapproval NotDate to SSC? Due to Change Required? Required/Comments

FCE 14-0025 0 Title: 1/29/2014 No AC4-AR-002 Chg 26; AC4- No None of the criteria

PCE - N/A Revision to Procedures AC4-AR-002, Machine Cooling Water Alarms and ON-004 Chg 15 listed in 10 CFRResponses and AC4-ON-004, Loss of Machine Cooling Water (MCW) 70.72(c) are met.

Description of Change:Added notes describing the time delay associated with machine coolingwater pump startup following a restoration of power.

Reason for the Change:Engineering programmed a time delay in machine cooling water pumpstartup following restoration of power to limit the in rush of current felt bythe auxiliary substations from equipment restarting when power isrestored. This change was added for information as they have sectionsdealing with losing power to machine cooling water pumps.

FCE 14-0026 0 Title: 1/29/2014 No ACD2-RG-003 Chg 13; ACD2- No None of the criteria

PCE 14-0017 0 Revision to Procedures ACD2-RG-003, Regulatory Communications and RG-044 Chg 11 listed in 10 CFRACD2-RG-044, Nuclear Regulatory Event Reporting 70.72(c) are met.

Description of Change:Removed the monthly reporting of Impact Measurement Index level 4incidents.

Reason for the Change:The change in commitment related to NR-3605-0004, Security Programfor the American Centrifuge Plant, was previously approved by the NRC(TAC L34265) on December 20, 2013. Procedures ACD2-RG-003 andACD2-RG-044 were changed to eliminate the monthly reporting of lowinsignificant security incidents as outlined in the Impact MeasurementIndex 4 requirements.

FCE 14-0027 0 Title: 2/14/2014 No AC3-ST-005 Chg 2 No None of the criteria

PCE - N/A Revision to Procedure AC3-ST-005, Commercial Demonstration Cascade listed in 10 CFRMachine Isolation System and Secondary Isolation System Calibration 70.72(c) are met.

Description of Change:The procedure was re-written and re-arranged for better flow and to betterclarify steps performing calibrations on the instruments.

Reason for the Change:Clarify procedure requirements.

NRC Report 2014 Page 12 of 99

Page 15: of Nuclear Power · 2020. 1. 5. · FCE 13-0384 1 Title: 5/1/2014 Yes ESO-2409-0047 No None of the criteria PCE 13-0152 1 Engineering Service Order ESO-2409-0047, Install Emergency

ISA

FCE Number Summary Reason NRC

PCE Number Rev. Approval Change Documents Modified Update Preapproval NotDate to SSC? Due to Change Required? Required/Comments

FCE 14-0028 0 Title: 1/29/2014 No AC4-OP-101 Chg 8 No None of the criteriaPCE - N/A Revision to Procedure AC4-OP-101, Commercial Demonstration Cascade listed in 10 CFR

Purge Vacuum Operating Procedure 70.72(c) are met.

Description of Change:Added a section for gas ballast operations; added steps referring the userto gas ballast operations; modified steps and a note box; and addedexhaust pressure to the table in a step.

Reason for the Change:Gas ballast operations was added to provide the option of enabling thegas ballast on a pump or pumps while in service. Other changes weremade to clarify procedure requirements.

FCE 14-0029 0 Title: 2/1/2014 No AC4-OP-173 Chg 5 No None of the criteriaPCE - N/A Revision to Procedure AC4-OP-1 73, Cascade 131 Operations listed in 10 CFR

Description of Change: 70.72(c) are met.

Added optional use of an operations diagnostic unit to a section: revised astep to confirm the correct machine position; corrected loop reference;added a new section so a machine could be placed in service withminimum negative impact to cascade performance; and added a usereference and acronyms.

Reason for the Change:Clarify procedure requirements.

FCE 14-0030 0 Title: 2/8/2014 No AC4-OP-176 Chg 3 No None of the criteriaPCE - N/A Revision to Procedure AC4-OP-1 76, Cascade 131 Machine Conditioning listed in 10 CFR

Description of Change: 70.72(c) are met.

Added the use of an operations diagnostic unit cart; clarified steps andnote; moved the "On Gas" and "Cascade Configuration" block selectiondown in order; clarified that machine conditioning must be complete beforeadding inventory; added section to condition a machine while a cascade ison-line (in recycle); added sub-steps to ensure an additional machine isready for conditioning; changed the loop reference; and added a secondcondition requiring the user to isolate machine.

Reason for the Change:Clarify procedure requirements.

NRC Report 2014 Page 13 of 99

Page 16: of Nuclear Power · 2020. 1. 5. · FCE 13-0384 1 Title: 5/1/2014 Yes ESO-2409-0047 No None of the criteria PCE 13-0152 1 Engineering Service Order ESO-2409-0047, Install Emergency

FCE 14-0031 0 Title: 2/8/2014 No AC4-OP-178 Chg 4 No None of the criteriaPCE - N/A Revision to Procedure AC4-OP-178, Cascade 131 Charging with UF6 listed in 10 CFR

Description of Change: 70.72(c) are met.

Added a step limiting the addition of inventory to one machine at a time;added the option to close valve; added a use reference; added a section toadd inventory to a machine while the cascade is on recycle; and added asecond condition to isolate machine.

Reason for the Change:Clarify procedure requirements.

FCE 14-0032 0 Title: 2/4/2014 Yes ESO-2409-0054 No None of the criteriaPCE 14-0018 0 Engineering Service Order ESO-2409-0054, X-6000 Compressor listed in 10 CFR

Modifications 70.72(c) are met.

Description of Change:Incorporated logic changes into the programmable logic controllers; mademinor wiring changes and documentation updates for the X-6000 A, B, andC compressors.

Reason for the Change:The changes will result in the proper operation of the unload alarm. Thecurrent program configuration can result in a spurious alarm condition.

FCE 14-0033 0 Title: 2/19/2014 No AC4-AR-106 Chg 8 No None of the criteriaPCE - N/A Revision to Procedure AC4-AR-1 06, CDC Cascade Alarms and Responses listed in 10 CFR

Description of Change: 70.72(c) are met.

Added a reference; added loss of 120 Machine Isolation Valve power tothe list of possible causes; added a step to ensure a valve opens; added astep to ensure valves are closed; and removed performance of a stage 1dump, allowing only a cascade dump for inventory removal.

Reason for the Change:Clarify procedure requirements.

NRC Report 2014 Page 14 of 99

Page 17: of Nuclear Power · 2020. 1. 5. · FCE 13-0384 1 Title: 5/1/2014 Yes ESO-2409-0047 No None of the criteria PCE 13-0152 1 Engineering Service Order ESO-2409-0047, Install Emergency

ISA

FCE Number Summary Reason NRC

PCE Number Approval Change Documents Modified Update Preapproval NotDate to SSC? Due to Change Required? RequiredlComments

FCE 14-0034 0 Title: 2/19/2014 No AC4-AR-101 Chg 9 No None of the criteria

PCE - N/A Revision to Procedure AC4-AR-101, Cascade 131 Machine Alarms and listed in 10 CFRResponses 70.72(c) are met.

Description of Change:Added a step to reference procedure AC4-AR-1 06, CDC Cascade Alarmsand Responses, if the Service Module X Power Relay A or B is received;added steps to direct actions if a loss of 120V Machine Isolation Valvepower occurs; and added reference and the requirement to ProcessIsolate all machines when in a recycle configuration has been changed inapplicable alarm responses.

Reason for the Change:Clarify procedure requirements.

FCE 14-0035 0 Title: 2/7/2014 No TP-2201-0092 Rev 0 No None of the criteria

PCE - N/A New Test Plan TP-2201-0092, Survey of Cascade Operational Parameters listed in 10 CFRand Configuration 70.72(c) are met.

Description of Change:New Test Plan to operate the Commercial Demonstration Cascade at aminimum of twelve different cascade product and tails assays to gatherdata to evaluate how well the cascade produces enriched uranium over itsdesign operating range. The Test Plan also includes operation of thecascade with more than the expected number of centrifuges out of servicein order to determine the impact on cascade production when more thanthe expected number of centrifuges is off-line.

Reason for the Change:The purpose of the test was to gather data to demonstrate how well thecascade enriches uranium over its design product and tails assay rangeincluding variations in the number of centrifuges available for cascadeoperation.

FCE 14-0036 0 Title: 3/10/2014 No LCF Integrated Safety Yes None of the criteria

PCE 14-0019 0 Increased Presence of 12B UF6 Cylinders Analysis, LCF Integrated listed in 10 CFRSafety Analysis Summary, 70.72(c) are met.

Description of Change: LCF Integrated SafetyThe Lead Cascade Facility Integrated Safety Analysis was revised to Analysis Summaryaccount for up to 100 12B UF6 cylinders in use. [Redacted] Sections 4.4, 6.2,

Reason for the Change: Appendix E and FThe changes were made to the Lead Cascade Facility Integrated SafetyAnalysis Summary incorporate analyses that account for the presence ofup to 100 12B UF6 cylinders because it is unlikely that the noncompliantcylinders will be recertified in the near term due to cost and licensingissues. The Lead Cascade Facility does not have the capability to shiplicensed material. This capability would need to be in place to ship thecylinders for recertification.

NRC Report 2014 Page 15 of 99

Page 18: of Nuclear Power · 2020. 1. 5. · FCE 13-0384 1 Title: 5/1/2014 Yes ESO-2409-0047 No None of the criteria PCE 13-0152 1 Engineering Service Order ESO-2409-0047, Install Emergency

ISAFCE Number Summary Reason NRCPCE Number Rev. Approval Change Documents Modified Update Preapproval Not

Date to SSC? Due to Change Required? Required/Comments

FCE 14-0037 0 Title: 2/28/2014 No LCF Integrated Safety Yes None of the criteriaPCE 14-0021 0 Centrifuge Assembly Activities Analysis, LCF Integrated listed in 10 CFR

Description of Change: Safety Analysis Summary, 70.72(c) are met.Addesrdiptiona ofChge:m LCF Integrated SafetyAdded additional flexibility for the centrifuge assembly process; made the Analysis Summarycentrifuge motor bump test optional in its performance and location; and [Redacted] Sections 3.5;the order and location for installation of the diffusion pump was made ACP Integrated Safetyoptional. Analysis Section 2.2 and 3.8

Reason for the Change:The change was made to improve the efficiency of the centrifugeassembly process, to be able to meet the build rates required over thenext year or two, and reduce the centrifuge cost.

FCE 14-0038 0 Title: 2/12/2014 No TP-2101-0060 Rev 0 No None of the criteriaPCE - N/A New Test Plan TP-2101-0060, X-3001 Purge Vacuum System, High Pump listed in 10 CFR

Current Test Plan 70.72(c) are met.

Description of Change:New Test Plan to perform controlled purge vacuum system tests for "pumphigh current" alarm scenarios.

Reason for the Change:Several activities were performed as a result of the ongoing investigationinto the October 17, 2013 pump shutdown and secondary isolation systemactivation, including the decision to change the pump high current alarmprogram response. This test plan is required to test the response of thepump high current alarm.

FCE 14-0039 0 Title: 2/12/2014 No AC4-AR-104 Chg 4 No None of the criteriaPCE - N/A Revision to Procedure AC4-AR-104, Commercial Demonstration Cascade listed in 10 CFR

Purge Vacuum System Alarms and Responses 70.72(c) are met.

Description of Change:Added a step to supplemental actions; reworded supplemental action step5; changed alarms to urgent priority; revised automatic and immediateactions based on distributed control system program changes; addedvibration to supplemental action step 1; and made editorial and formattingchanges.

Reason for the Change:Clarify procedure requirements.

NRC Report 2014 Page 16 of 99

Page 19: of Nuclear Power · 2020. 1. 5. · FCE 13-0384 1 Title: 5/1/2014 Yes ESO-2409-0047 No None of the criteria PCE 13-0152 1 Engineering Service Order ESO-2409-0047, Install Emergency

FCE 14-0040 0 Title: 2/12/2014 No AC4-OP-017 Chg 33 No None of the criteria

PCE - N/A Revision to Procedure AC4-OP-017, Dump Cart Operation listed in 10 CFR

Description of Change: 70.72(c) are met.

Added a section; modified a section to allow for dump cart operation solong as a cylinder is not installed; and made editorial and formattingchanges.

Reason for the Change:Clarify procedure requirements.

FCE 14-0041 0 Title: 2/12/2014 No AC2-OP-033 Chg 6 No None of the criteria

PCE - N/A Revision to Procedure AC2-OP-033, Operation of the Portable Mini-Gulper listed in 10 CFR

Description of Change: 70.72(c) are met.

Added steps to allow the fan speed to be increased and to ensure the fanis returned to slow speed; modified note box to allow the use of anextension hose vice elevating the mini-gulper; modified steps for ease ofoperations and to allow for the use of a flexible hose; and added a warningbox to convey the risk of a HEPA filter failure.

Reason for the Change:Clarify procedure requirements.

FCE 14-0042 0 Title: 2/16/2014 No AC4-ON-015 Chg 13 No None of the criteriaPCE - N/A Revision to Procedure AC4-ON-015, Response to a Complete Loss of listed in 10 CFR

Purge Vacuum 70.72(c) are met.

Description of Change:Reworded entry condition and note; changed format of table; and revisedAppendices A and B.

Reason for the Change:Clarify procedure requirements.

FCE 14-0043 0 Title: 2/16/2014 No AC4-OP-101 Chg 9 No None of the criteria

PCE - N/A Revision to Procedure AC4-OP-101, Commercial Demonstration Cascade listed in 10 CFRPurge Vacuum Operating Procedure 70.72(c) are met.

Description of Change:Revised steps: revised the notes; added a reference; added Appendix C;modified the list of acronyms; and made formatting changes.

Reason for the Change:Clarify procedure requirements.

NRC Report 2014 Page 17 of 99

Page 20: of Nuclear Power · 2020. 1. 5. · FCE 13-0384 1 Title: 5/1/2014 Yes ESO-2409-0047 No None of the criteria PCE 13-0152 1 Engineering Service Order ESO-2409-0047, Install Emergency

FCE 14-0044 0 Title: 2/19/2014 No AC4-ON-009 Chg 26 No None of the criteriaPCE - N/A Revision to Procedure AC4-ON-009, Response to Loss of Power listed in 10 CFR

Description of Change: 70.72(c) are met.

Added a note describing the time delay associated with machine coolingwater pump startup following a restoration of power: added a section andnote: modified steps based on personal protective equipmentrequirements; changed time for auxiliary standby generator cool down inthe note box; and made formatting changes.

Reason for the Change:Clarify procedure requirements.

FCE 14-0045 0

PCE 14-0022 0

Title:Revision to Procedure ACD2-RG-004, Corrective Action Process

Description of Change:Changed the question posed to the condition notification screeningmanager in the corrective action database system to state, "Is theEquip/Component/Activity an IROFS- Or could theEquip/Component/Activity potentially affect an IROFS' ability to reliablyperform its intended safety function, in accordance with 10 CFR 70.61?"

3/5/2014 No ACD2-RG-004 Chg 10 No None of the criterialisted in 10 CFR70.72(c) are met.

Reason for the Change:The procedure was revised to ensure screening managers review acondition notification to determine if non-items relied on for safety(Equip/Component/Activity) could potentially affect an items relied on forsafety's ability to reliably perform its intended safety function, inaccordance with 10 CFR 70.61. This change will ensure that potentialdegradation of an items relied on for safety has been reviewed andreportability concems identified in a timely manner.

FCE 14-0046 0 Title: 2/20/2014 Yes OA-CS-131-14-001 Rev 0 No None of the criteriaPCE - N/A New Cascade Settings Document OA-CS-131-14-001, (U) Cascade 131 listed in 10 CFR

Centrifuge Operating Parameters 70.72(c) are met.

Description of Change:The cascade settings document was created to provide limits andinformation to support conditioning and filling centrifuges while thecascade is on recycle.

Reason for the Change:To provide equations and methodology that is utilized to compute thesettings for conditioning and filling activities.

NRC Report 2014 Page 18 of 99

Page 21: of Nuclear Power · 2020. 1. 5. · FCE 13-0384 1 Title: 5/1/2014 Yes ESO-2409-0047 No None of the criteria PCE 13-0152 1 Engineering Service Order ESO-2409-0047, Install Emergency

ISA

FCE Number Summary Reason NRC

PCE Number Rev. Approval Change Documents Modified Update Preapproval NotDate to SSC? Due to Change Required? Required/Comments

FCE 14-0047 0 Title: 2/20/2014 Yes OA-CS-131-14-003 Rev 0 No None of the criteria

PCE - N/A New Cascade Settings Document OA-CS-131-14-003, (U) Cascade 131 listed in 10 CFR

Cascade Operating Parameters 70.72(c) are met.

Description of Change:The cascade settings document was created to provide cascade set pointsfor the procedures used to operate centrifuges in a cascade recycleconfiguration to obtain performance data. The cascade settings documentalso documents the cascade operating limits and provides information oncascade operation that is used when executing procedures to operate thecascade on recycle.

Reason for the Change:The cascade settings document provide the settings necessary to gatherthe data required to demonstrate cascade operation per the testguidelines provided by DOE.

FCE 14-0048 0 Title: 2/20/2014 Yes ESO-2500-0013 No None of the criteria

PCE 14-0023 0 Engineering Service Order ESO-2500-0013, X-112, 120V Panel Re-Feed listed in 10 CFR

Description of Change: 70.72(c) are met.

Removed the feed for 120V panel "EM" and replaced it with the properlysized wire and breaker and in addition, the 120V panel "EM" as well as thesource panel Computer Power Distribution Center D was properly labeledand drawings were as-built.

Reason for the Change:The feed for 120V panel "EM" did not meet the National Electric Coderequirements; this change remedied the situation.

FCE 14-0048 1 Title: 5/7/2014 Yes ESO-2500-0013 No None of the criteria

PCE 14-0023 1 Engineering Service Order ESO-2500-0013, X-112, 120V Panel Re-Feed listed in 10 CFR

Description of Change: 70.72(c) are met.

Instead of installing a 30A breaker in Computer Power Distribution CenterD to supply Panel "EM", revision 1, changes the feed to Computer PowerDistribution Panel B.

Reason for the Change:Revision 1 was performed because it is infeasible to take Computer PowerDistribution Center D down in order to install the new breaker and wiringrequired.

NRC Report 2014 Page 19 of 99

Page 22: of Nuclear Power · 2020. 1. 5. · FCE 13-0384 1 Title: 5/1/2014 Yes ESO-2409-0047 No None of the criteria PCE 13-0152 1 Engineering Service Order ESO-2409-0047, Install Emergency

ISA

FCE Number Summary Reason NRC

PCE Number Rev. Approval Change Documents Modified Update Preapproval NotDate to SSC? Due to Change Required? Required/Comments

FCE 14-0049 0 Title: 2/20/2014 Yes ESO-2301-0046 No None of the criteria

PCE 14-0024 0 Engineering Service Order ESO-2301-0046, X-7725 Chiller Flow Switch listed in 10 CFRReplacement 70.72(c) are met.

Description of Change:Installed flow switch and abandon the current one in place.

Reason for the Change:The installation of a flow switch is necessary to restore the chiller safetyrun permissive for Chiller X-7725-C-1 021 in the event of a no-flowcondition. This is needed to prevent damage and failure to the chiller fromrunning with no coolant flow.

FCE 14-0050 0 Title: 4/28/2014 No ACD3-EO-001 Chg 0 No None of the criteria

PCE 14-0025 0 New Procedure ACD3-EO-001, Job Briefs listed in 10 CFR

Description of Change: 70.72(c) are met.

Provided an aid in performing a task preview; identifying and organizingpertinent information; and how to perform the job brief itself.

Reason for the Change:New procedure was developed to provide more guidance and clarificationfor pre-job briefs, including a tool to assist the shift supervisor indetermining what level of briefs are appropriate.

FCE 14-0051 0 Title: 3/3/2014 No AC4-AR-106 Chg 9 No None of the criteria

PCE - N/A Revision to Procedure AC4-AR-106, CDC Cascade Alarms and Responses listed in 10 CFR

Description of Change: 70.72(c) are met.

Deleted step to ensure all bypass motor valves closed; and added bypassmotor valves open to the list of possible causes.

Reason for the Change:Clarify procedure requirements.

FCE 14-0052 0 Title: 3/7/2014 Yes OA-CS-131-14-003 Rev 1 No None of the criteria

PCE - N/A Revision to Cascade Settings Document OA-CS-131-14-003, (U) Cascade listed in 10 CFR131 Cascade Operating Parameters 70.72(c) are met.

Description of Change:The cascade settings document was revised to incorporate changes to theset points.

Reason for the Change:The document was changed to incorporate changes to the set points forPart I of DOE Test Plan 9 resulting from changes that were made to thenumber of centrifuges available for operation as part of the cascade.

NRC Report 2014 Page 20 of 99

Page 23: of Nuclear Power · 2020. 1. 5. · FCE 13-0384 1 Title: 5/1/2014 Yes ESO-2409-0047 No None of the criteria PCE 13-0152 1 Engineering Service Order ESO-2409-0047, Install Emergency

ISAFCE Number Summary Reason NRC

PCE Number Rev. Approval Change Documents Modified Update Preapproval NotDate to SSC? Due to Change Required? Required/Comments

FCE 14-0054 0 Title: 3/12/2014 No ACD2-EG-003 Chg 10 No None of the criteria

PCE 14-0027 0 Revision to Procedure ACD2-EG-003, Nuclear & Commercial Modification listed in 10 CFRControls 70.72(c) are met.

Description of Change:Added criticality accident alarm system audibility reference; revisedAppendix G to include more document types, simplify form completion,and to allow more room to enter document data; added a use reference;added section to determine if a modification is a shared site activity; andadded note box to refer to form AC-631, Modification Package Checklist,for types of documents to be considered during the modification process.

Reason for the Change:Clarify procedure requirements.

FCE 14-0055 0 Title: 3/12/2014 No ACD2-EG-020 Chg 6 No None of the criteria

PCE 14-0028 0 Revision to Procedure ACD2-EG-020, CI Database Controls listed in 10 CFR

Description of Change: 70.72(c) are met.

Revised form AC-072, CI Database Change Record, to ensure thedatabase fields required by users are included and accurately identified;made editorial changes to clarify the configuration item databaseadministrator's responsibilities; and added the configuration item databaseuser access location.

Reason for the Change:The changes to this procedure were a result of feedback from users whichidentified that there was opportunity for misinterpretations by users of theprocedure and the AC-072 form in its present state.

FCE 14-0056 0 Title: 3/12/2014 No AC4-ON-110 Chg 4 No None of the criteria

PCE - N/A Revision to Procedure AC4-ON-1 10, CDC Loss of DCS listed in 10 CFR

Description of Change: 70.72(c) are met.

Added step to check for a blown fuse prior to gateway replacement; addedinformation to the note; added step; added a note to Appendices B and Cexplaining nomenclature in the table; and made formatting changes.

Reason for the Change:Clarify procedure requirements.

NRC Report 2014 Page 21 of 99

Page 24: of Nuclear Power · 2020. 1. 5. · FCE 13-0384 1 Title: 5/1/2014 Yes ESO-2409-0047 No None of the criteria PCE 13-0152 1 Engineering Service Order ESO-2409-0047, Install Emergency

ISA

FCE Number Summary Reason NRC

PCE Number Approval Change Documents Modified Update Preapproval NotDate to SSC? Due to Change Required? Required/Comments

FCE 14-0058 0 Title: 3/13/2014 No AC4-OP-024 Chg 36 No None of the criteria

PCE - N/A Revision to Procedure AC4-OP-024, Machine Pumpdown listed in 10 CFR

Description of Change: 70.72(c) are met.

Reworded steps to account for an evacuation vacuum pump being out ofservice; added information to the notes; and changed "final" level to "postpumpdown" leveling.

Reason for the Change:Clarify procedure requirements.

FCE 14-0059 0 Title: 3/13/2014 No AC4-OP-053 Chg 24 No None of the criteria

PCE - N/A Revision to Procedure AC4-OP-053, Machine Venting with the Backfill Unit listed in 10 CFR

Description of Change: 70.72(c) are met.

Reworded steps; added and modified notes; added step for diffusion pumpmaintenance or removal; added source reference; revised form AC-552,Machine Venting Check Sheet; and made editorial changes.

Reason for the Change:Clarify procedure requirements.

NRC Report 2014 Page 22 of 99

Page 25: of Nuclear Power · 2020. 1. 5. · FCE 13-0384 1 Title: 5/1/2014 Yes ESO-2409-0047 No None of the criteria PCE 13-0152 1 Engineering Service Order ESO-2409-0047, Install Emergency

ISA

FCE Number Summary Reason NRC

PCE Number Approval Change Documents Modified Update Preapproval NotDate to SSC? Due to Change Required? Required/Comments

FCE 14-0060 0 Title: 3/25/2014 No ACD2-RG-001 Chg 17 No None of the cntena

PCE 14-0029 0 Revision to Procedure ACD2-RG-001, Change Evaluation listed in 10 CFR

Description of Change: 70.72(c) are met.

Modified the section on sharing change evaluations and review of othersite resident plant change packages; clarified note on safety reviewcommittee's review of new procedures; clarified wording for when adecreased effectiveness evaluation is required; revised form AC-001,Change Evaluation: deleted form AC-1 68, Other Site Resident PlantChange Package Review; and changed wording from "Hummingbird" to"Electronic Document Management System."

Reason for the Change:Procedure ACD2-RG-001 and ACD2-MP-004, Shared Site AgreementCoordination (Piketon Site), requires review of specific changes byLicensee and other site residents to determine the impact of their changeon each other. Requiring the review of changes in the two procedureswas considered duplication of effort, therefore; ACD2-RG-001 was revisedto reference ACD2-MP-004 as it was the procedure that implements theshared site agreement. Form AC-168 was deleted as the review ofchanges will performed in accordance with ACD2-MP-004.

Clarified the note on the safety review committee's review of newprocedures to agree with the management determination that all newprocedures shall be reviewed by the safety review committee.

The wording for when a decreased effectiveness evaluation is requiredwas revised to ensure change evaluators know when to perform adecreased effectiveness evaluation. Form AC-001 was revised to agreewith this change.

FCE 14-0062 0 Title: 3/17/2014 Yes OA-CS-131-14-003 Rev 2 No None of the criteria

PCE - N/A Revision to Cascade Settings Document OA-CS-131-14-003, (U) Cascade listed in 10 CFR131 Cascade Operating Parameters 70.72(c) are met.

Description of Change:The cascade settings document was revised to incorporate changes to theset points.

Reason for the Change:The document was changed to incorporate changes to the set points forPart I of DOE Test Plan 9 resulting from changes that were made to thenumber of centrifuges available for operation as part of the cascade.

NRC Report 2014 Page 23 of 99

Page 26: of Nuclear Power · 2020. 1. 5. · FCE 13-0384 1 Title: 5/1/2014 Yes ESO-2409-0047 No None of the criteria PCE 13-0152 1 Engineering Service Order ESO-2409-0047, Install Emergency

ISAFCE Number Summary Reason NRC

PCE Number Rev. Approval Change Documents Modified Update Preapproval NotDate to SSC? Due to Change Required? Required/Comments

FCE 14-0063 0 Title: 3/17/2014 No TP-2201-0093 Rev 0 No None of the criteria

PCE - N/A New Test Plan TP-2201-0093, X-3001 Universal Gas Analysis Test Plan listed in 10 CFR

Description of Change: 70.72(c) are met.

New Test Plan collects contaminant data on a centrifuge machine prior tothe introduction of UF6.

Reason for the Change:The activities of the test plan are to be performed on a newlymanufactured centrifuge machine that has been brought down to machineworking pressures and has not been in UF6 service.

FCE 14-0064 0 Title: 3/19/2014 No AC4-OP-049 Chg 58 No None of the criteria

PCE - N/A Revision to Procedure AC4-OP-049, Machine Acceleration & Deceleration listed in 10 CFR

Description of Change: 70.72(c) are met.

Added steps to confirm the correct machine position and changed thecaution boxes to warning boxes.

Reason for the Change:Clarify procedure requirements.

FCE 14-0065 0 Title: 4/15/2014 No ACD4-CI-008 Chg 0 No None of the criteria

PCE 14-0030 0 New Procedure ACD4-CI-008, Inspection of Aboveground Storage Tanks listed in 10 CFR

Description of Change: 70.72(c) are met.

Established the requirements for monthly and annual inspections ofaboveground storage tanks which contain oil (petroleum, fuel oil, syntheticoils, oil refuse or oil) mixed with wastes other than dredged spoil.

Reason for the Change:Management made a decision to move the responsibility for inspection ofthe aboveground tanks to an Environmental Safety & Health CodeInspector, which required the creation of a Code Inspection level 4procedure.

FCE 14-0066 0 Title: 4/15/2014 No ACD4-CI-009 Chg 0 No None of the criteria

PCE 14-0031 0 New Procedure ACD4-CI-009, Inspection of Tubular Welded Frame listed in 10 CFRScaffolding 70.72(c) are met.

Description of Change:Established the requirements for the inspection of scaffolding.

Reason for the Change:Established the requirements for the inspection of scaffolding as requiredby 29 CFR 1910.28, safety requirements for scaffolding.

NRC Report 2014 Page 24 of 99

Page 27: of Nuclear Power · 2020. 1. 5. · FCE 13-0384 1 Title: 5/1/2014 Yes ESO-2409-0047 No None of the criteria PCE 13-0152 1 Engineering Service Order ESO-2409-0047, Install Emergency

FCE 14-0067 0 Title: 4/15/2014 No ACD2-SH-026 Chg 2 No None of the criteriaPCE 14-0032 0 Revision to Procedure ACD2-SH-026, Scaffolds listed in 10 CFR

Description of Change: 70.72(c) are met.

Revised procedure to meet the requirements of OSHA 29 CFR 1910;removed requirements that were specific to the OSHA ConstructionStandard (OSHA 29 CFR 1926, Subpart L), i.e. Competent Person andScaffold Inspection Tag requirements; added general requirements fromthe scaffold user training module; added reference to annual inspectionrequirement; deleted Appendix A; moved definitions to a section; andmade editorial changes.

Reason for the Change:Clarify procedure requirements.

FCE 14-0068 0 Title: 4/15/2014 No ACD2-EC-011 Chg 1 No None of the criteriaPCE 14-0033 0 Revision of ACD2-EC-01 1, Compliance with the Spill Prevention, Control listed in 10 CFR

and Countermeasures (SPCC) Plan 70.72(c) are met.

Description of Change:Removed references to aboveground storage tank inspections.

Reason for the Change:The responsibility for aboveground tank inspections is being transferredfrom Environmental Compliance to Code Inspection. Therefore, theseresponsibilities are being transferred from ACD2-EC-01 1 to a newprocedure, ACD4-CI-008, Inspection of Aboveground Storage Tanks.

FCE 14-0069 0 Title: 3/21/2014 Yes OA-CS-131-14-003 Rev 3 No None of the criteriaPCE - N/A Revision to Cascade Settings Document OA-CS-131-14-003, (U) Cascade listed in 10 CFR

131 Cascade Operating Parameters 70.72(c) are met.

Description of Change:The cascade settings document was revised to change set points andsettings for DOE Test Plan 9, Parts I and II.

Reason for the Change:DOE Test Plan 9, Parts I and II require that the number of centrifugesoperating in each stage be changed to test differing tails and productsassay. This test configuration change requires a change to the operatingset points and settings.

NRC Report 2014 Page 25 of 99

Page 28: of Nuclear Power · 2020. 1. 5. · FCE 13-0384 1 Title: 5/1/2014 Yes ESO-2409-0047 No None of the criteria PCE 13-0152 1 Engineering Service Order ESO-2409-0047, Install Emergency

ISA

FCE Number Summary Reason NRC

PCE Number Rev. Approval Change Documents Modified Update Preapproval NotDate to SSC? Due to Change Required? Required/Comments

FCE 14-0070 0 Title: 4/11/2014 No ACD2-MA-003 Chg 5 No None of the criteria

PCE 14-0034 0 Revision to Procedure ACD2-MA-003, Calibration Program listed in 10 CFR

Description of Change: 70.72(c) are met.

Added definitions for calibration, as found data, as left data, and out oftolerance; and changed documentation requirements.

Reason for the Change:Clarify procedure requirements.

FCE 14-0072 0 Title: 3/31/2014 No AC4-OP-005 Chg 14 No None of the criteria

PCE - N/A Revision to Procedure AC4-OP-005, Lead Cascade Instrument Air listed in 10 CFROperations 70.72(c) are met.

Description of Change:Modified and added notes; changed the setpoint; re-arranged andreworded steps; deleted depressing the emergency stop on instrument aircompressor shutdown; changed the time reference for the amount of timethe compressor should be ran during the monthly load test to supportvendor recommendations; added use references; and added Appendix Bto reference the normal parameters of the compressor and time delaysbased on the number of starts per day.

Reason for the Change:Clarify procedure requirements.

FCE 14-0073 0 Title: 3/28/2014 No AC4-AR-005 Chg 20 No None of the criteria

PCE - N/A Revision to Procedure AC4-AR-005, Instrument Air and Vent Monitor listed in 10 CFRAlarms and Responses 70.72(c) are met.

Description of Change:Added Appendix A; added references; and revised the setpoints.

Reason for the Change:Clarify procedure requirements.

FCE 14-0074 0 Title: 3/28/2014 No AC4-ON-008 Chg 16 No None of the criteria

PCE - N/A Revision to Procedure AC4-ON-008, Loss Of Instrument Air (YA) listed in 10 CFR

Description of Change: 70.72(c) are met.

Reworded a note and steps; changed the pressure for when theinstrument air compressor turns on; and added an appendix andreferences to the appendix.

Reason for the Change:Clarify procedure requirements.

NRC Report 2014 Page 26 of 99

Page 29: of Nuclear Power · 2020. 1. 5. · FCE 13-0384 1 Title: 5/1/2014 Yes ESO-2409-0047 No None of the criteria PCE 13-0152 1 Engineering Service Order ESO-2409-0047, Install Emergency

ISA

FCE Number Summary Reason NRC

PCE Number Rev. Approval Change Documents Modified Update Preapproval NotDate to SSC? Due to Change Required? Required/Comments

FCE 14-0075 0 Title: 3/31/2014 No AC4-AR-003 Chg 18 No None of the criteria

PCE - N/A Revision to Procedure AC4-AR-003, Evacuation Vacuum System Alarms listed in 10 CFRand Responses 70.72(c) are met.

Description of Change:Nomenclature was corrected in fault alarms; deleted instruction to press areset button; and made formatting changes.

Reason for the Change:During construction of the Commercial Demonstration Cascade, auxiliarypower substations were upgraded. Procedure was corrected to reflectcurrent breaker nomenclature and operation. The new breakers no longerhave a reset button. Other changes were made to clarify procedurerequirements.

FCE 14-0076 0 Title: 3/31/2014 No AC4-AR-008 Chg 28 No None of the criteria

PCE - N/A Revision to Procedure AC4-AR-008, X-3001 Power System Alarms and listed in 10 CFRResponses 70.72(c) are met.

Description of Change:Modified air starter low low pressure responses for when cross connectingair systems to leave the air receiver tank included in the header; anddeleted references to personal protective equipment.

Reason for the Change:Isolation of the air receiver tank reduced the amount of volume for airsupply when the air compressor is not functioning properly. Isolation wasmoved to the inlet of the air receiver tank so this volume could still beutilized. As directed by management, personal protective equipmentreferences were removed to keep alarm response procedures clear.

FCE 14-0077 0 Title: 3/31/2014 No ACD2-PC-007 Chg 3 No None of the criteria

PCE 14-0036 0 Revision to Procedure ACD2-PC-007, Basic Procurement Procedure listed in 10 CFR

Description of Change: 70.72(c) are met.

Added and deleted references; added requirements to include statementof work information; added completion of form AC-498, Contractor ExitProcess Form; redefined quality and non-quality records; providedrequirement to identify the procurement specification method; providedrequirements for Oracle item number; added details for approval processof additional funding; provided requirements for requesting, procuring, andclosing augmented staff services; provided details on confidentialityagreement requirements; added definitions and acronyms; and madeeditorial and formatting changes.

Reason for the Change:Clarify procedure requirements.

NRC Report 2014 Page 27 of 99

Page 30: of Nuclear Power · 2020. 1. 5. · FCE 13-0384 1 Title: 5/1/2014 Yes ESO-2409-0047 No None of the criteria PCE 13-0152 1 Engineering Service Order ESO-2409-0047, Install Emergency

ISAFCE Number Summary Reason NRC

PCE Number Rev. Approval Change Documents Modified Update Preapproval NotDate to SSC? Due to Change Required? RequiredlComments

FCE 14-0078 0 Title: 3/28/2014 Yes OA-CS-131-14-003 Rev 4 No None of the criteria

PCE - N/A Revision to Cascade Settings Document OA-CS-131-14-003, (U) Cascade listed in 10 CFR131 Cascade Operating Parameters 70.72(c) are met.

Description of Change:The cascade settings document was revised to change set points andsettings for operating the current number of machines on cascade recycle.

Reason for the Change:The document was changed to incorporate changes to the set pointsrequired to operate with the current number of centrifuges at product andtails assay targets to gather data at those operating conditions.

FCE 14-0079 0 Title: 3/29/2014 Yes OA-CS-131-14-003 Rev 5 No None of the criteria

PCE - N/A Revision to Cascade Settings Document OA-CS-131-14-003, (U) Cascade listed in 10 CFR131 Cascade Operating Parameters 70.72(c) are met.

Description of Change:The cascade settings document was revised to change set points andsettings for operating the current number of machines on cascade recycle.

Reason for the Change:The document was changed to incorporate changes to the set pointsrequired to operate with the current number of centrifuges at product andtails assay targets to gather data at those operating conditions.

FCE 14-0080 0 Title: 4/1/2014 No AC4-AR-004 Chg 17 No None of the criteria

PCE - N/A Revision to Procedure AC4-AR-004, Purge Vacuum System Alarms and listed in 10 CFRResponses 70.72(c) are met.

Description of Change:Removed requirement to inform the Shift Supervisor from alarmresponses; deleted references to the 135 Cascade; and made editorialand formatting changes.

Reason for the Change:Informing the shift supervisor is a trained practice and does not constitutean action step to aid in the associated alarm response; the 135 Cascadeis no longer needed for operations; other changes were made to clarifyprocedure requirements.

FCE 14-0082 0 Title: 3/31/2014 No AC4-OP-008 Chg 5 No None of the criteria

PCE - N/A Revision to Procedure AC4-OP-008, Operation of X-3001 and X-7727H listed in 10 CFRHVP Systems 70.72(c) are met.

Description of Change:Revised tables; corrected breakers; added directions to operate Train 2and Train 4 locally operated fans; added personal protective equipmentprecautions; and added a source reference.

Reason for the Change:Clarify procedure requirements.

NRC Report 2014 Page 28 of 99

Page 31: of Nuclear Power · 2020. 1. 5. · FCE 13-0384 1 Title: 5/1/2014 Yes ESO-2409-0047 No None of the criteria PCE 13-0152 1 Engineering Service Order ESO-2409-0047, Install Emergency

FCE 14-0083 0 Title: 4/1/2014 No ACD2-EG-005 Chg 14 No None of the criteriaPCE 14-0037 0 Revision to Procedure ACD2-EG-005, Preparation of Statements of Work listed in 10 CFR

Description of Change: 70.72(c) are met.

Clarified the statement of work requirements; added acronyms; addedmore detail; added reference; and made editorial changes.

Reason for the Change:Clarify procedure requirements.

FCE 14-0084 0 Title: 6/4/2014 No AC2-RG-078 Chg 4 No None of the criteriaPCE - N/A Revision to Procedure AC2-RG-078, Lead Cascade Sample Control listed in 10 CFR

Description of Change: 70.72(c) are met.

Removed references to sample tubes and sample cart; revised notes;deleted the word "process"; clarified approved storage locations; clarifiedcontainer codes; deleted the definition for Gross, Tare, and Net; clarifiedcontacting security for assistance in packaging; deleted redundant action;revised use reference; and made editorial and formatting changes.

Reason for the Change:Procedure AC2-RG-078 was modified to allow lab personnel moreflexibility to obtain a sample from a mass spectrometer manifold in supportof the search for contaminants in the gas stream and to clarify procedurerequirements.

FCE 14-0085 0 Title: 4/2/2014 No AC4-OP-009 Chg 11 No None of the criteriaPCE - N/A Revision to Procedure AC4-OP-009, Operation of X-3001 Process Power listed in 10 CFR

Substations 70.72(c) are met.

Description of Change:Replaced words "verify" with "confirm"; added steps to confirm transformerand secondary breakers are available for double ended operations; addedstep to place the 43 device to the auto position; added sections to switchbetween the normal and altemate feeder breakers; and added steps toobtain personal protective equipment.

Reason for the Change:Clarify procedure requirements.

NRC Report 2014 Page 29 of 99

Page 32: of Nuclear Power · 2020. 1. 5. · FCE 13-0384 1 Title: 5/1/2014 Yes ESO-2409-0047 No None of the criteria PCE 13-0152 1 Engineering Service Order ESO-2409-0047, Install Emergency

ISAFCE Number Summary Reason NRCPCE Number RvAprvl Cag DouetMdied Update Preapproval Not

Date to SSC? Due to Change Required? RequiredlComments

FCE 14-0086 0 Title: 4/9/2014 No ACD2-EG-407 Chg 9 No None of the criteriaPCE 14-0039 0 Revision to Procedure ACD2-EG-407, Test Plans listed in 10 CFR

Description of Change: 70.72(c) are met.

Deleted Test Plan definition; removed quality level 1 and 2; removed testformat; added information on restoration of equipment; revised Test Planverification check sheet; revised table of contents; removed section onTest Plan general requirements; added "including alarm response and off-normal operations"; modified note; and made grammatical, editorial andformatting changes.

Reason for the Change:Clarify procedure requirements.

FCE 14-0089 0 Title: 4/11/2014 No TP-2201-0093 Rev 1 No None of the criteriaPCE - N/A Revision to Test Plan TP-2201-0093, X-3001 Universal Gas Analysis Test listed in 10 CFR

Plan 70.72(c) are met.

Description of Change:The Test Plan was revised to collect contaminant data on a centrifugeprior to the introduction of UF6; to collect contaminant data on 131Cascade UF6 feed, product, and tail streams at existing massspectrometers; and to collect contaminant data of a UF6 feed cylinderconnected to the feed cart.

Reason for the Change:The test plan was revised to collect contaminant data.

FCE 14-0089 1 Title: 8/15/2014 No TP-2201-0093 Rev 1 No None of the criteriaPCE - N/A Revision to Test Plan TP-2201-0093, X-3001 Universal Gas Analysis Test listed in 10 CFR

Plan 70.72(c) are met.

Description of Change:Made editorial corrections to the change evaluation's description ofchange.

Reason for the Change:This change evaluation was revised to allow for the Universal GasAnalysis testing to be completed on a centrifuge that had been used inUF6 operations, but has been backfilled at least once prior to UniversalGas Analysis testing in addition to a centrifuge that has not been placedinto UF6 operations.

NRC Report 2014 Page 30 of 99

Page 33: of Nuclear Power · 2020. 1. 5. · FCE 13-0384 1 Title: 5/1/2014 Yes ESO-2409-0047 No None of the criteria PCE 13-0152 1 Engineering Service Order ESO-2409-0047, Install Emergency

ISA

FCE Number Summary Reason NRC

PCE Number Approval Change Documents Modified Update Preapproval NotDate to SSC? Due to Change Required? Required/Comments

FCE 14-0090 0 Title: 4/24/2014 No FBP-FP-PRO-00004 Rev 4 No None of the criteria

PCE - N/A Revision to Procedure, FBP-FP-PRO-00004, Fire Protection Program listed in 10 CFR

Description of Change: 70.72(c) are met.

Revised references, added requirements for self-contained breathingapparatus, clarified maintenance group; revised the acronyms; and revisedthe procedure to the Fluor-B&W Portsmouth LLC template.

Reason for the Change:Clarify procedure requirements.

FCE 14-0091 0 Title: 4/17/2014 Yes ESO-2101-0076 No None of the criteria

PCE 14-0040 0 Engineering Service Order ESO-2101-0076, X-3001 Safety Railing listed in 10 CFR

Description of Change: 70.72(c) are met.

Added safety railing on the north mezzanine of the X-3001 ProcessBuilding.

Reason for the Change:The installation of the safety railing is needed to provide adequate fallprotection.

FCE 14-0092 0 Title: 4/14/2014 No AC4-OP-173 Chg 6 No None of the criteriaPCE - N/A Revision to Procedure AC4-OP-173, Cascade 131 Operations listed in 10 CFR

Description of Change: 70.72(c) are met.

Modified the list of in-hand sections; clarified precaution for when minimumnumber of machine requirement applies; provided steps to input and/orcheck nominal and minimum number of machines; deleted a duplicatestep; added steps to confirm machine position; and made editorial andformatting changes.

Reason for the Change:Clarify procedure requirements.

FCE 14-0093 0 Title: 4/14/2014 No AC4-OP-051 Chg 32 No None of the criteria

PCE - N/A Revision to Procedure AC4-OP-051, Inventory Removal listed in 10 CFR

Description of Change: 70.72(c) are met.

Clarified steps; added a note; reworded a step to give more options whenremoving inventory; changed a conditional step based on cascadeindications; added to a note box to explain option to change distributedcontrol system settings; changed "increasing/decreasing" to"raising/lowering"; and added all machine isolation valve hand valves to astep in case operations were branched from another step.

Reason for the Change:Clarify procedure requirements.

NRC Report 2014 Page 31 of 99

Page 34: of Nuclear Power · 2020. 1. 5. · FCE 13-0384 1 Title: 5/1/2014 Yes ESO-2409-0047 No None of the criteria PCE 13-0152 1 Engineering Service Order ESO-2409-0047, Install Emergency

ISA

FCE Number Summary Reason NRC

PCE Number Rev. Approval Change Documents Modified Update Preapproval NotDate to SSC? Due to Change Required? RequiredlComments

FCE 14-0094 0 Title: 4/15/2014 No AC4-OP-005 Chg 15 No None of the criteria

PCE - N/A Revision to Procedure AC4-OP-005, Lead Cascade Instrument Air listed in 10 CFROperations 70.72(c) are met.

Description of Change:Changed the valve nomenclature; added location of valves; addeddescription for emergency stop indication; added general alarm; andrevised Appendix B.

Reason for the Change:Clarify procedure requirements.

FCE 14-0095 0 Title: 4/17/2014 No AC4-ON-015 Chg 14 No None of the criteria

PCE - N/A Revision to Procedure AC4-ON-015, Response to a Complete Loss of listed in 10 CFRPurge Vacuum 70.72(c) are met.

Description of Change:Added and reworded a note box; and made formatting changes.

Reason for the Change:Clarify procedure requirements.

FCE 14-0096 0 Title: 4/21/2014 No ACD3-EG-408 Chg 4 No None of the criteria

PCE 14-0041 0 Revision to Procedure ACD3-EG-408, Job Field Instructions listed in 10 CFR

Description of Change:' 70.72(c) are met.

Added functional verification tasks; modified form AC-132, Job FieldInstruction (JFI); revised the instructions for completing the form; added atechnical review for Quality Level-1 and Quality Level-2 job fieldinstructions; removed superseded references; and made editorial changes.

Reason for the Change:Clarify procedure requirements.

FCE 14-0097 0 Title: 4/22/2014 No AC4-OP-180 Chg 5 No None of the criteria

PCE - N/A Revision to Procedure AC4-OP-1 80, 1 Q34-ASG Operations listed in 10 CFR

Description of Change: 70.72(c) are met.

Modified steps to allow the cross connect between auxiliary standbygenerator air systems; revised air system drawings; added personalprotective equipment to supplies list and acronyms; modified pressure ofinstrument air supplied to air compressor; and made editorial andformatting changes.

Reason for the Change:Clarify procedure requirements.

NRC Report 2014 Page 32 of 99

Page 35: of Nuclear Power · 2020. 1. 5. · FCE 13-0384 1 Title: 5/1/2014 Yes ESO-2409-0047 No None of the criteria PCE 13-0152 1 Engineering Service Order ESO-2409-0047, Install Emergency

ISA

FCE Number Summary Reason NRC

PCE Number Rev. Approval Change Documents Modified Update Preapproval NotDate to SSC? Due to Change Required? Required/Comments

FCE 14-0098 0 Title: 5/14/2014 No ACD4-CI-002 Chg 1 No None of the cntena

PCE 14-0042 0 Revision to Procedure ACD4-CI-002, Inspection of Aerial Work Platforms listed in 10 CFR

Description of Change: 70.72(c) are met.

Removed requirement for the code inspector to affix a warning tag tounacceptable equipment; removed requirement for the code inspector toinitiate a work request for needed repairs; added requirement to provide acopy of inspection report to equipment owner; added requirement for thecode inspector to initiate a condition notification for unacceptableequipment; revised use references; and revised inspection forms (AC-601,AC602, and AC-603).

Reason for the Change:Clarify procedure requirements.

FCE 14-0099 0 Title: 5/14/2014 No ACD4-CI-004 Chg 2 No None of the criteriaPCE 14-0043 0 Revision to Procedure ACD4-CI-004, Inspection of Fall Protection listed in 10 CFR

Equipment 70.72(c) are met.

Description of Change:Removed requirement for inspector to affix a warning tag to unacceptableequipment; added requirement to provide a copy of the inspection report toequipment owner; added requirement to initiate a condition notification forunacceptable equipment; added a use reference; and revised forms AC-604 through AC-613 to add a line for the manufacturer.

Reason for the Change:Clarify procedure requirements.

FCE 14-0100 0 Title: 5/14/2014 No ACD4-CI-005 Chg I No None of the criteriaPCE 14-0044 0 Revision to Procedure ACD4-CI-005, Inspection And Testing of Backflow listed in 10 CFR

Preventers 70.72(c) are met.

Description of Change:Added requirement to provide a copy of completed inspection report toequipment owner; added requirement to initiate a condition notification;and added a use reference.

Reason for the Change:Clarify procedure requirements.

NRC Report 2014 Page 33 of 99

Page 36: of Nuclear Power · 2020. 1. 5. · FCE 13-0384 1 Title: 5/1/2014 Yes ESO-2409-0047 No None of the criteria PCE 13-0152 1 Engineering Service Order ESO-2409-0047, Install Emergency

ISA

FCE Number Summary Reason NRCPCE Number Rev. Approval Change Documents Modified Update Preapproval Not

Date to SSC? Due to Change Required? RequiredlComments

FCE 14-0101 0 Title: 5/14/2014 No ACD4-CI-006 Chg 1 No None of the criteria

PCE 14-0045 0 Revision to Procedure ACD4-CI-006, Inspection of Powered Industrial listed in 10 CFRTrucks 70.72(c) are met.

Description of Change:Replaced Computerized Maintenance Management System/EnterpriseAsset Management with computerized maintenance management system;removed requirement for inspector to affix a waming tag to unacceptableequipment; removed requirement for inspector to initiate a work request forneeded repairs; added requirement to provide a copy of the inspectionreport to the equipment owner; added requirement to initiate a conditionnotification for unacceptable equipment; revised use references; andrevised form AC-532, Powered Industrial Truck Inspection Report.

Reason for the Change:Clarify procedure requirements.

FCE 14-0102 0 Title: 5/14/2014 No ACD4-CI-007 Chg 1 No None of the criteria

PCE 14-0046 0 Revision to Procedure ACD4-CI-007, Inspection of Cranes and listed in 10 CFRHoisting/Lifting Equipment 70.72(c) are met.

Description of Change:Removed requirement for inspector to affix a warning tag to unacceptableequipment; removed requirement for inspector to initiate a work request forneeded repairs; added requirement to provide a copy of inspection reportto equipment owner; added requirement for inspector to initiate a conditionnotification for unacceptable equipment; revised use references; andrevised forms AC-524, Manually Lever Operated Hoist Inspection Report.

Reason for the Change:Clarify procedure requirements.

FCE 14-0103 0 Title: 5/1/2014 Yes OA-CS-131-14-003 Rev 6 No None of the criteria

PCE - N/A Revision to Cascade Settings Document OA-CS-131-14-003, (U) Cascade listed in 10 CFR131 Cascade Operating Parameters 70.72(c) are met.

Description of Change:The cascade settings document was revised to change set points andsettings for operating the current number of machines on cascade recycle.

Reason for the Change:The document was changed to incorporate changes to the set pointsrequired to operate with the current number of centrifuges at product andtails assay targets to gather data at those operating conditions.

NRC Report 2014 Page 34 of 99

Page 37: of Nuclear Power · 2020. 1. 5. · FCE 13-0384 1 Title: 5/1/2014 Yes ESO-2409-0047 No None of the criteria PCE 13-0152 1 Engineering Service Order ESO-2409-0047, Install Emergency

ISAFCE Number Summary Reason NRC

PCE Number Rev. Approval Change Documents Modified Update Preapproval NotDate to SSC? Due to Change Required? Required/Comments

FCE 14-0104 0 Title: 5/5/2014 No AC4-OP-112 Chg 5; AC4-OP- No None of the criteria

PCE - N/A Revision to Procedures AC4-OP-112, X-3012 ASG, and AC4-OP-179, 179 Chg 5 listed in 10 CFR1Q12-ASG Operations 70.72(c) are met.

Description of Change:Modified precautions; added a warning box; added personal protectiveequipment to supplies, acronyms, and as reminders; and made editorialand formatting changes.

AC4-OP-1 12 only, deleted pressing the "immediate transfer" buttons asthe transfer will automatically occur when the five minute timer expires.

Reason for the Change:Clarify procedure requirements.

FCE 14-0106 0 Title: 5/19/2014 No ACD2-QM-107 Chg 9 No None of the criteria

PCE 14-0048 0 Revision to Procedure ACD2-QM-107, Control of Nonconforming Items listed in 10 CFR

Description of Change: 70.72(c) are met.

Revised acronyms; deleted steps; deleted the phrase "for released items";added statement to ensure all information entered is unclassified; removedthe text "or Conditional Release Tag"; and made editorial changes.

Reason for the Change:Clarify procedure requirements.

FCE 14-0107 0 Title: 5/23/2014 No None No None of the criteria

PCE 14-0049 0 Continuing Presence and Use of the XT-860B RUBB Tent listed in 10 CFR

Description of Change: 70.72(c) are met.

Continuing presence of the XT-860B RUBB Tent which is located on the X-7746W Cylinder Storage Yard and its use as a storage facility for materialthat will eventually be used for construction of the American CentrifugePlant.

Reason for the Change:The Licensee previously determined the XT-860B RUBB Tent needed tobe removed to allow use of the X-7746W Cylinder Storage Yard; however,the facility was never removed. The current and foreseeable economicconditions associated with the uranium enrichment industry will notsupport construction of the American Centrifuge Plant in the near term,and the economic conditions of the Licensee will no longer allow paymentof storage fees to the manufacturers of the American Centrifuge Plantrelated equipment; so a significant portion of the materials will be shippedto the site for storage. Therefore, management has determined the XT-860B RUBB Tent will be utilized as a temporary storage facility.

NRC Report 2014 Page 35 of 99

Page 38: of Nuclear Power · 2020. 1. 5. · FCE 13-0384 1 Title: 5/1/2014 Yes ESO-2409-0047 No None of the criteria PCE 13-0152 1 Engineering Service Order ESO-2409-0047, Install Emergency

ISA

FCE Number Summary Reason NRC

PCE Number Rev. Approval Change Documents Modified Update Preapproval NotDate to SSC? Due to Change Required? Required/Comments

FCE 14-0108 0 Title: 5/9/2014 No AC4-OP-017 Chg 34 No None of the cnteria

PCE - N/A Revision to Procedure AC4-OP-01 7, Dump Cart Operation listed in 10 CFR

Description of Change: 70.72(c) are met.

Modified steps to ensure the refrigeration unit chamber drain hose plug isremoved prior to initiating defrost and to replace the plug following defrost:changed steps to match equipment labeling; added a note; and madeeditorial and formatting changes.

Reason for the Change:Clarify procedure requirements.

FCE 14-0109 0 Title: 5/12/2014 No AC4-AR-012 Chg 5 No None of the criteria

PCE - N/A Revision to Procedure AC4-AR-012, X-3012 Power System Alarms and listed in 10 CFRResponses 70.72(c) are met.

Description of Change:Removed references to ACD2-SH-014, Electrical Safety Guidelines, andcategory 0 personal protective equipment; and added a step to isolate avalve if it is leaking.

Reason for the Change:Clarify procedure requirements.

FCE 14-0110 0 Title: 5/12/2014 No AC4-OP-013 Chg 16 No None of the criteria

PCE - N/A Revision to Procedure AC4-OP-013, Operation of the X-3001 Battery and listed in 10 CFRDC Power System 70.72(c) are met.

Description of Change:Revised acronyms; added and revised references and steps; modifiedsteps to allow flexibility in recommencing a uninterruptible power supplyequalizing battery charge; added warning boxes; revised form, AC-353,Annual Ventilation System Inspection; deleted Table 3 at the end ofAttachment B; added Attachment F; and made editorial and formattingchanges.

Reason for the Change:Clarify procedure requirements.

NRC Report 2014 Page 36 of 99

Page 39: of Nuclear Power · 2020. 1. 5. · FCE 13-0384 1 Title: 5/1/2014 Yes ESO-2409-0047 No None of the criteria PCE 13-0152 1 Engineering Service Order ESO-2409-0047, Install Emergency

ISA

FCE Number Summary Reason NRC

PCE Number Rev. Approval Change Documents Modified Update Preapproval NotDate to SSC? Due to Change Required? Required/Comments

FCE 14-0112 0 Title: 11/6/2014 No FBP-ER-PRO-00196 Rev 1 No None of the criteria

PCE 14-0051 0 Revision to Procedure FBP-ER-PRO-00196, Operational Procedure for listed in 10 CFR

Continuous Vent Stack Samplers Equipped with Radiation Monitors 70.72(c) are met.

Description of Change:Minor procedure revision completes the periodic review, which includedupdating references and titles; incorporated hazards and controls; andmade editorial and formatting changes.

Reason for the Change:Clarify procedure requirements.

FCE 14-0113 0 Title: 5/19/2014 Yes ESO-2101-0080; ESO-2201- No None of the criteria

PCE 14-0052 0 Engineering Service Orders ESO-2101-0080 and ESO-2201-0080, Provide 0080 listed in 10 CFR

Essential Motor Control Center Power to X-3001 Train 3 Machine Control 70.72(c) are met.Cabinet

Description of Change:Added time delay relays to the pump control circuits and added anadditional circuit to the Train 3 Machine Control Panel.

Reason for the Change:The addition of the time delay relays will improve the reliability of theoverall system and provide additional capacity margin for the generator.The addition of essential power to the Train 3 Machine Control Cabinetventilation fan and air conditioner reduce the possibility of overheating ofthe cabinet components during loss of primary power.

FCE 14-0114 0 Title: 5/30/2014 No ACD4-ON-215 Chg 5 No None of the criteria

PCE 14-0053 0 Revision to Procedure ACD4-ON-215, Boiler Off-Normal Operations listed In 10 CFR

Description of Change: 70.72(c) are met.

Deleted natural gas line purge section and deleted Appendix A, BoilerNatural Gas Line Diagram.

Reason for the Change:A section and Appendix A were deleted because they were moved toprocedure ACD4-UW-001, Boiler Operations.

FCE 14-0115 0 Title: 5/19/2014 No JFI-2101-0052 Rev 0 No None of the criteria

PCE - N/A New Job Field Instruction JFI-2101-0052, Troubleshooting and Data listed in 10 CFRCollection Job Field Instructions for Abnormal Characteristics Exhibited 70.72(c) are met.During Centrifuge Drive-Up

Description of Change:Perform troubleshooting activities and collect data.

Reason for the Change:The objective of the job field instructions is to be used to performtroubleshooting activities and to collect data on the recent abnormalcharacteristics exhibited during centrifuge acceleration.

NRC Report 2014 Page 37 of 99

Page 40: of Nuclear Power · 2020. 1. 5. · FCE 13-0384 1 Title: 5/1/2014 Yes ESO-2409-0047 No None of the criteria PCE 13-0152 1 Engineering Service Order ESO-2409-0047, Install Emergency

ISA

FCE Number Summary Reason NRC

PCE Number Rev. Approval Change Documents Modified Update Preapproval NotDate to SSC? Due to Change Required? Required/Comments

FCE 14-0116 0 Title: 5/16/2014 Yes ESO-2518-0022 No None of the criteria

PCE 14-0055 0 Engineering Service Order ESO-2518-0022, Lift Station Moisture Sensor listed in 10 CFR

Description of Change: 70.72(c) are met.

The Engineering Services Order installs a jumper around the moisturesensor for lift station pumps.

Reason for the Change:Installation of the jumper across terminals 3 and 4 of the moisture sensor,will allow the indicator light to stay on so you know there is a problem, andyet allow the pump to run.

FCE 14-0117 0 Title: 5/21/2014 No AC4-OP-055 Chg 36 No None of the criteria

PCE - N/A Revision to Procedure AC4-OP-055, Machine Disconnect listed in 10 CFR

Description of Change: 70.72(c) are met.

Modified and added steps; removed torque range; deleted the use of redmachine tag; and revised references and a form AC-285, MachineDisconnect Check Sheet.

Reason for the Change:Clarify procedure requirements.

FCE 14-0118 0 Title: 5/19/2014 No AC4-OP-101 Chg 12 No None of the criteria

PCE - N/A Revision to Procedure AC4-OP-101, Commercial Demonstration Cascade listed in 10 CFRPurge Vacuum Operating Procedure 70.72(c) are met.

Description of Change:Added steps to restore instrument air; corrected valve nomenclature;deleted step; revised electrical safety precaution; and made editorial andformatting changes.

Reason for the Change:Clarify procedure requirements.

FCE 14-0119 0 Title: 5/19/2014 No AC4-OP-070 Chg 15 No None of the criteria

PCE - N/A Revision to Procedure AC4-OP-070, Machine Leveling listed in 10 CFR

Description of Change: 70.72(c) are met.

Added quality level to the list of acronyms; modified, added, and deletedsteps; changed 25 ft-lbs to 20 to 30 ft-lbs; and added a source reference.

Reason for the Change:Clarify procedure requirements.

NRC Report 2014 Page 38 of 99

Page 41: of Nuclear Power · 2020. 1. 5. · FCE 13-0384 1 Title: 5/1/2014 Yes ESO-2409-0047 No None of the criteria PCE 13-0152 1 Engineering Service Order ESO-2409-0047, Install Emergency

ISAFCE Number Summary Reason NRC

PCE Number Rev. Approval Change Documents Modified Update Preapproval NotDate to SSC? Due to Change Required? Required/Comments

FCE 14-0120 0 Title: 5/27/2014 No FBP-FS-PRO-00012 Rev 2 No None of the criteriaPCE - N/A Revision to Procedure FBP-FS-PRO-00012, Fire Services Inspection and listed in 10 CFR

Testing Frequency 70.72(c) are met.

Description of Change:Revised use and source references; and removed building X-343 fromAppendix A because that building's fire sprinkler system is no longerfunctional.

Reason for the Change:Clarify procedure requirements.

FCE 14-0121 0 Title: 5/20/2014 Yes JFI-2303-0021 Rev 0: TP- No None of the criteriaPCE - N/A Disassembly, Cleaning, and Assembly of CDC Centrifuges with Prototype 2201-0094 Rev 0 listed in 10 CFR

Components 70.72(c) are met.

Description of Change:New job field instructions and Test Plan to describe the disassembly,cleaning, assembly, and operation of centrifuges with prototypecomponents.

Reason for the Change:Testing is required to determine the source of contaminates which arecausing deposits within the centrifuge.

FCE 14-0121 1 Title: 5/21/2014 Yes JFI-2303-0021 Rev 1 No None of the criteriaPCE - N/A Disassembly, Cleaning, and Assembly of CDC Centrifuges with Prototype listed in 10 CFR

Components 70.72(c) are met.

Description of Change:Revision 1 to the change evaluation removes the reference to the TestPlan for operation of the centrifuges with the prototype componentsinstalled and changes the job field instructions revision to Revision 1.

Reason for the Change:All work will be performed using existing procedures or other approvedmethods.

NRC Report 2014 Page 39 of 99

Page 42: of Nuclear Power · 2020. 1. 5. · FCE 13-0384 1 Title: 5/1/2014 Yes ESO-2409-0047 No None of the criteria PCE 13-0152 1 Engineering Service Order ESO-2409-0047, Install Emergency

ISAFCE Number Summary Reason NRC

PCE Number Approval Change Documents Modified Update Preapproval NotDate to SSC? Due to Change Required? Required/Comments

FCE 14-0122 0 Title: 5/21/2014 No AC4-OP-067 Chg 12 No None of the criteria

PCE - N/A Revision to Procedure AC4-OP-067, Operations of the Distributed Control listed in 10 CFRSystem (DCS) 70.72(c) are met.

Description of Change:Added a note; made steps conditional steps; replaced use of LeadCascade 1 and Lead Cascade 3 with Cascade 132 and Cascade 135;made steps optional; deleted section and added the information to a newappendix; changed the title of section; revised the list of acronyms; revisedpower supply breakers and panel designations; and made editorial andformatting changes.

Reason for the Change:Clarify procedure requirements.

FCE 14-0123 0 Title: 5/21/2014 No AC4-ON-001 Chg 9 No None of the criteria

PCE - N/A Revision to Procedure AC4-ON-001, Post Wreck Machine Operations listed in 10 CFR

Description of Change: 70.72(c) are met.

Removed the reference to form AC-287, Red Machine Tag; addeddirection to initial form; corrected note box; and made editorial andformatting changes.

Reason for the Change:Clarify procedure requirements.

FCE 14-0124 0 Title: 5/21/2014 No AC4-OP-020 Chg 8 No None of the criteria

PCE - N/A Revision to Procedure AC4-OP-020, Machine Mount Hardware listed in 10 CFRInstallation/Removal 70.72(c) are met.

Description of Change:Removed unnecessary direction to pre-stage tools and equipment, andcleanup work area afterward; added information to cue the operator as tothe quality level of tasks the procedure directs when it is necessary toinitial form; revised note; and added references.

Reason for the Change:Clarify procedure requirements.

NRC Report 2014 Page 40 of 99

Page 43: of Nuclear Power · 2020. 1. 5. · FCE 13-0384 1 Title: 5/1/2014 Yes ESO-2409-0047 No None of the criteria PCE 13-0152 1 Engineering Service Order ESO-2409-0047, Install Emergency

FCE 14-0127 0 Title: 9/3/2014 No AC4-AR-003 Chg 19 No None of the criteria

PCE - N/A Revision to Procedure AC4-AR-003, Evacuation Vacuum System Alarms listed in 10 CFRand Responses 70.72(c) are met.

Description of Change:Revised to reword titles of groups of alarms to match the DistributedControl System descriptions; modified list of alerts; and made editorial andformatting changes.

Reason for the Change:Clarify procedure requirements.

FCE 14-0128 0 Title: 6/2/2014 No AC4-AR-008 Chg 30 No None of the criteria

PCE - N/A Revision to Procedure AC4-AR-008, X-3001 Power System Alarms and listed in 10 CFRResponses 70.72(c) are met.

Description of Change:Added awareness of process power loss to Cascade 132 as well asCascade 131; modified the order of operations for responding to theautomatic starting of a generator; and added confirmation of generatorshutdown in relation to the fuel oil supply emergency shutoff alarm.

Reason for the Change:The previous change to this procedure assumed that only Cascade 131machines would operate. This change provides for Cascade 132 actionsto be taken as well as Cascade 131 and clarifies procedure requirements.

FCE 14-0129 0 Title: 5/28/2014 Yes ESO-2201-0085; SPC-2101- No None of the criteria

PCE - N/A Engineering Service Order ESO-2201-0085, Update the Setpoints for the 0037 Rev 7; SPC-2101-0038, listed in 10 CFRHigh Pressure Switches Monitoring Pump Discharge Pressure on the 13 Rev 7; SPC-2101-0042 Rev 70.72(c) are met.Evacuation Vacuum System Pumps and 132 and 135 Purge Vacuum 5; SPC-2101-0043 Rev 5System Pumps

Description of Change:Revised the setpoints for the high pressure switches monitoring pumpdischarge pressure on the evacuation vacuum and purge vacuum systempumps.

Reason for the Change:Revised the appropriate documentation (configuration item databaseentries and setpoint accuracy documentation) to implement a high pumpdischarge pressure alarm at a setpoint of 1.76 PSIG opposed to thepresent setpoint of 2.2 PSIG.

NRC Report 2014 Page 41 of 99

Page 44: of Nuclear Power · 2020. 1. 5. · FCE 13-0384 1 Title: 5/1/2014 Yes ESO-2409-0047 No None of the criteria PCE 13-0152 1 Engineering Service Order ESO-2409-0047, Install Emergency

FCE 14-0131 0 Title: 913/2014 No AC4-ON-010 Chg 9 No None of the criteriaPCE - N/A Revision to Procedure AC4-ON-010, Loss of Distributed Control System listed in 10 CFR

(DCS) 70.72(c) are met.

Description of Change:Revised to clarify procedure applicability for Cascades 132 and 135 only;revised the panel labeling and power supplies to match actual equipment;reformatted to off-normal procedure format; and made editorial changes.

Reason for the Change:Clarify procedure requirements.

FCE 14-0132

PCE - N/A

0 Title:Revision to Procedure AC4-ON-009, Response to Loss of Power

Description of Change:Revised to account for previously unanticipated loss and recovery actionsfor power-related scenarios in Cascade 132; sections were clarified forapplicability between Cascades 131 and 132; added warning boxes for theexistence of potential arc flash and shock hazards; revised Appendices Band C to reflect the addition of Cascade 132 loads; added Appendix D tolist the essential breakers and power supplies in Cascade 132; and madeeditorial and formatting changes.

Reason for the Change:Clarify procedure requirements.

9/3/2014 No AC4-ON-009 Chg 27 No None of the criterialisted in 10 CFR70.72(c) are met.

FCE 14-0133 0 Title: 5/29/2014 Yes TP-2201-0094 Rev 0 No None of the criteria

PCE - N/A New Test Plan TP-2201-0094, Operation of Modified AC100 Centrifuges listed in 10 CFRwith Prototype Components in Cascades 131 or 132 70.72(c) are met.

Description of Change:A new Test Plan to install, accelerate to speed, condition, and operatemodified AC 100 centrifuges with prototype components as part of acascade.

Reason for the Change:Testing is required to determine the source of contaminates which arecausing deposits within the centrifuge.

NRC Report 2014 Page 42 of 99

Page 45: of Nuclear Power · 2020. 1. 5. · FCE 13-0384 1 Title: 5/1/2014 Yes ESO-2409-0047 No None of the criteria PCE 13-0152 1 Engineering Service Order ESO-2409-0047, Install Emergency

ISA

FCE Number Summary Reason NRC

PCE Number Rev. Approval Change Documents Modified Update Preapproval NotDate to SSC? Due to Change Required? Required/Comments

FCE 14-0134 0 Title: 5/29/2014 No AC4-OP-025 Chg 43 No None of the cnteria

PCE - N/A Revision to Procedure AC4-OP-025, Machine Connections listed in 10 CFR

Description of Change: 70.72(c) are met.

Added details on quality levels; deleted unnecessary caution block; addedoption to position tails scoop; provided for possibility of data acquisitionsystem being unavailable; added acronyms; and made formatting changes.

Reason for the Change:Clarify procedure requirements.

FCE 14-0135 0 Title: 5/30/2014 No AC4-OP-049 Chg 60 No None of the criteria

PCE - N/A Revision to Procedure AC4-OP-049, Machine Acceleration & Deceleration listed in 10 CFR

Description of Change: 70.72(c) are met.

Specified the number of machines per cascade.which may be acceleratedat once; added a precaution and required electrical personnel protectiveequipment; added warnings; specified deceleration and drag options;added reference; removed post-performance work activities; and madeeditorial and formatting changes.

Reason for the Change:Clarify procedure requirements.

FCE 14-0136 0 Title: 6/4/2014 Yes LCF License Application No None of the criteria

PCE - N/A ANSI N14.1-2001 Clarification for 12B Cylinder Upper Skirt Notches Section 1.4 listed in 10 CFR

Description of Change: 70.72(c) are met.

Revised Section 1.4.2 of the License Application for the Lead CascadeFacility to clarify the commitment to ANSI N14.1 - 2001, "UraniumHexafluoride- Packaging for Transport" to allow the use of 12B UF6cylinders that have a pair of notches in the upper skirt to allow for easierconnection of pigtails to the inlet and outlet valves.

Reason for the Change:The current inventory of 12B UF6 cylinders is approaching their five yeardate and new cylinders are necessary. To help address this concern, fourcylinders were obtained that were previously used in support of cold trapoperations for the former gaseous diffusion plant located in Piketon, Ohio.These cylinders were constructed approximately 12 years ago and werelast hydrostatically tested in 2012. With the exception of the upper skirtnotches, the cylinders are acceptable for use.

NRC Report 2014 Page 43 of 99

Page 46: of Nuclear Power · 2020. 1. 5. · FCE 13-0384 1 Title: 5/1/2014 Yes ESO-2409-0047 No None of the criteria PCE 13-0152 1 Engineering Service Order ESO-2409-0047, Install Emergency

ISA

FCE Number Summary Reason NRC

PCE Number Rev. Approval Change Documents Modified Update Preapproval NotDate to SSC? Due to Change Required? Required/Comments

FCE 14-0137 0 Title: 6/2/2014 No TP-2101-0061, Rev 0; TP- No None of the criteriaPCE - N/A New Test Plans TP-2101-0061, Cascade 132 Purge Vacuum System High 2201-0097, Rev 0 listed in 10 CFR

Pump Current Test Plan, and TP-2201-0097, Cascade 132 Purge Vacuum 70.72(c) are met.System, Pump Automatic Start-up Time Delay Test Upon 480 VAC PowerRestorationDescription of Change:New Test Plan TP-2201-0097 to test the time delay relay installed withinthe control panels for purge vacuum pumps.

New Test Plan TP-2101-0061 to perform controlled cascade purgevacuum system tests for pump current high alarm scenarios.

Reason for the Change:Test plan TP-2201-0097 was developed to test the proper operation of theaddition of power restoration timer.

Test plan TP-2101-0061 was developed to test the proper operation of thesoftware programming changes completed to implement the new pumpcurrent high alarm purge vacuum pumps.

FCE 14-0138 0 Title: 6/30/2014 No ACD3-EG-103 Chg 4 No None of the criteriaPCE 14-0059 0 Revision to Procedure ACD3-EG-103, Engineering Software Controls listed in 10 CFR

Description of Change: 70.72(c) are met.

Added post-maintenance testing, two party verification, and job fieldinstruction process as valid options for verifying software; added directionsregarding controlled copies of software baselines; and revised section forreviewing baseline packages for future retrievability.

Reason for the Change:Clarify procedure requirements.

FCE 14-0139 0 Title: 6/6/2014 No ACD4-UW-002 Chg 3 No None of the criteriaPCE 14-0060 0 Revision to Procedure ACD4-UW-002, Chemical Treatment for the Boilers listed in 10 CFR

Description of Change: 70.72(c) are met.

Added and deleted steps; moved facility log from quality records to non-quality records; and made editorial changes.

Reason for the Change:Clarify procedure requirements.

NRC Report 2014 Page 44 of 99

Page 47: of Nuclear Power · 2020. 1. 5. · FCE 13-0384 1 Title: 5/1/2014 Yes ESO-2409-0047 No None of the criteria PCE 13-0152 1 Engineering Service Order ESO-2409-0047, Install Emergency

ISA

FCE Number Summary Reason NRC

PCE Number Approval Change Documents Modified Update Preapproval NotDate to SSC? Due to Change Required? Required/Comments

FCE 14-0140 0 Title: 6/2/2014 No AC4-OP-051 Chg 33 No None of the criteria

PCE - N/A Revision to Procedure AC4-OP-051, Inventory Removal listed in 10 CFR

Description of Change: 70.72(c) are met.

Added steps to confirm machine position; added to steps to capturemachine isolation valve hand valves: deleted step to calculate inventory atend of controlled dump; added steps to facilitate gassing operations:modified steps directing bypassing mass spectrometer pumps; addedvalving configurations for cascade: added precautions; and modified stepsto check manual hand valve that isolates the dump header only if pressureis not lowering.

Reason for the Change:Clarify procedure requirements.

FCE 14-0141 0 Title: 6/4/2014 No AC4-AR-004 Chg 19 No None of the criteria

PCE - N/A Revision to Procedure AC4-AR-004, Purge Vacuum System Alarms and listed in 10 CFRResponses 70.72(c) are met.

Description of Change:Revised titles of alarms; added purge vacuum pump suction valve positionalarm responses; deleted purge vacuum pump high high current alarmresponse; revised purge vacuum pump high current alarm responses andrevised the high current alarm responses to urgent status; deleted purgevacuum pump isolation valve position alerts; and made formattingchanges.

Reason for the Change:Clarify procedure requirements.

FCE 14-0142 0 Title: 6/2/2014 No AC4-OP-031 Chg 17 No None of the criteria

PCE - N/A Revision to Procedure AC4-OP-031, Connecting/Disconnecting UF6 listed in 10 CFRCylinder to/from a Dump Cart 70.72(c) are met.

Description of Change:Reworded, added, deleted, and moved steps; added acronyms andreferences; added a note; modified forms AC-314, Dump Cart CylinderConnection, and AC-315, Dump Cart Cylinder Disconnection, to coincidewith procedure changes; and made editorial and formatting changes.

Reason for the Change:Clarify procedure requirements.

NRC Report 2014 Page 45 of 99

Page 48: of Nuclear Power · 2020. 1. 5. · FCE 13-0384 1 Title: 5/1/2014 Yes ESO-2409-0047 No None of the criteria PCE 13-0152 1 Engineering Service Order ESO-2409-0047, Install Emergency

ISAFCE Number Summary Reason NRCPCE Number Approval Change Documents Modified Update Preapproval Not

Date to SSC? Due to Change Required? RequiredlComments

FCE 14-0143 0 Title: 6/2/2014 No AC4-OP-032 Chg 11 No None of the criteria

PCE - N/A Revision to Procedure AC4-OP-032, Connecting/Disconnecting UF6 listed in 10 CFRCylinder to/from a Feed Cart 70.72(c) are met.

Description of Change:Revised the scope, applicability, and precautions and limitations toincorporate details related to items relied on for safety and quality levels;added definitions; revised acronyms; added a requirement to checkcalibration due date for torque wrenches; added user checks; revised note,caution, and warning boxes to passive tense; removed the requirement toinspect for a quality control inspection tag; added material balance arearepresentative notification to post-performance work activities; and addedreferences.

Reason for the Change:Clarify procedure requirements.

FCE 14-0144 0 Title: 6/3/2014 No AC4-AR-106 Chg 11 No None of the criteriaPCE - N/A Revision to Procedure AC4-AR-106, CDC Cascade Alarms and Responses listed in 10 CFR

Description of Change: 70.72(c) are met.

Added alarm response for pressure transmitters; added Appendix B; andrevised Appendix A to delete pressure transmitters now listed in AppendixB.

Reason for the Change:Clarify procedure requirements.

FCE 14-0145 0 Title: 6/3/2014 No AC4-AR-001 Chg 38 No None of the criteria

PCE - N/A Revision to Procedure AC4-AR-001, Machine Alarms and Responses listed in 10 CFR

Description of Change: 70.72(c) are met.

Revised note; added actions to isolate the cascade; added actions toremove machine inventory; revised references; added steps to performmachine diagnostics; changed name of "Accelerometer Temp High Highalarm" to "Accelerometer Temp High alarm"; revised note to addinformation on items relied on for safety; deleted alarm response; changed"Release Hold" to "Rel/Hold"; changed "Machine Drive" to "SpeedCommand"; and revised list of alerts.

Reason for the Change:Clarify procedure requirements.

NRC Report 2014 Page 46 of 99

Page 49: of Nuclear Power · 2020. 1. 5. · FCE 13-0384 1 Title: 5/1/2014 Yes ESO-2409-0047 No None of the criteria PCE 13-0152 1 Engineering Service Order ESO-2409-0047, Install Emergency

FCE 14-0146 0 Title: 6/3/2014 Yes OA-CS-132-14-001 Rev 0 No None of the criteria

PCE - N/A New Cascade Settings Document OA-CS-132-14-001, (U) Cascade 132 listed in 10 CFRCentrifuge Operating Parameters 70.72(c) are met.

Description of Change:The cascade settings document was created to develop operating limitsand guidance to accelerate, dry, and condition centrifuges in Cascade 132.

Reason for the Change:The document was created to support the procedures used to operatecentrifuges in Cascade 132.

FCE 14-0147 0 Title: 6/4/2014 No AC4-OP-178 Chg 7 No None of the criteriaPCE - N/A Revision to Procedure AC4-OP-178, Cascade 131 Charging with UF6 listed in 10 CFR

Description of Change: 70.72(c) are met.

Added step to ensure valve is open, since evolutions from procedure AC4-OP-016, Feed Cart Operations, will close this valve.

Reason for the Change:Clarify procedure requirements.

FCE 14-0149 0 Title: 6/4/2014 No AC4-OP-040 Chg 18 No None of the criteriaPCE - N/A Revision to Procedure AC4-OP-040, Cascade Conditioning listed in 10 CFR

Description of Change: 70.72(c) are met.

Revised acronyms list; added steps, precautions, and notes; removed stepfor wait time as evacuation will be done based off of pressure not time;modified tables; added operation valve; new options for different use offeed cart; removed steps to cycle machine isolation valve hand valves:removed ability to align feed header dump cart; added step to ensure feedcart is left in a desirable condition; modified valving tables; and revisedforms, AC-329, Conditioning With Nitrogen, and AC-330, ConditioningWith UF6.

Reason for the Change:Changes made to incorporate the ability to use the 6 inch Building FeedHeader while it is supporting operations; and to clarify procedurerequirements.

NRC Report 2014 Page 47 of 99

Page 50: of Nuclear Power · 2020. 1. 5. · FCE 13-0384 1 Title: 5/1/2014 Yes ESO-2409-0047 No None of the criteria PCE 13-0152 1 Engineering Service Order ESO-2409-0047, Install Emergency

ISAFCE Number Summary Reason NRC

PCE Number Approval Change Documents Modified Update Preapproval NotDate to SSC? Due to Change Required? RequiredlComments

FCE 14-0150 0 Title: 6/4/2014 Yes OA-CS-131-14-003 Rev 7 No None of the criteriaPCE - N/A Revision to Cascade Settings Document OA-CS-131-14-003, (U) Cascade listed in 10 CFR

131 Cascade Operating Parameters 70.72(c) are met.

Description of Change:The cascade settings document was revised to change set points andsettings for operating the current number of machines on cascade recycle.

Reason for the Change:The document was changed to incorporate changes to the set pointsrequired to operate with the current number of centrifuges at product andtails assay targets to gather data at those operating conditions.

FCE 14-0151 0 Title: 6/10/2014 No AC4-OP-050 Chg 34 No None of the criteria

PCE - N/A Revision to Procedure AC4-OP-050, Machine Conditioning, Tails Scoop listed in 10 CFRVerification, and Charging with UF6 70.72(c) are met.

Description of Change:Added acronyms and references; revised precautions and limitations;revised prerequisites; removed references to casing pressure; changedthe valve nomenclature; moved valve tables to an appendix; added newsection Machine Conditioning Shot: added steps to charge the headers;deleted section adding UF6 inventory to a cascade; and made editorialand formatting changes.

Reason for the Change:Clarify procedure requirements.

FCE 14-0152 0 Title: 6/10/2014 No AC4-AR-006 Chg 24 No None of the criteriaPCE - N/A Revision to Procedure AC4-AR-006, Cascade Alarms and Responses listed in 10 CFR

Description of Change: 70.72(c) are met.

Revised note; added references to inventory removal; and added alarmresponses and alerts.

Reason for the Change:Clarify procedure requirements.

NRC Report 2014 Page 48 of 99

Page 51: of Nuclear Power · 2020. 1. 5. · FCE 13-0384 1 Title: 5/1/2014 Yes ESO-2409-0047 No None of the criteria PCE 13-0152 1 Engineering Service Order ESO-2409-0047, Install Emergency

ISA

FCE Number Summary Reason NRC

PCE Number Rev. Approval Change Documents Modified Update Preapproval NotDate to SSC? Due to Change Required? Required/Comments

FCE 14-0153 0 Title: 6/12/2014 No AC4-OP-028 Chg 8 No None of the criteria

PCE - N/A Revision to Procedure AC4-OP-028, Transport of 12B UF6 Cylinders listed in 10 CFR

within the Process Building 70.72(c) are met.

Description of Change:Clarified 12B cylinders are UF6 cylinders; revised purpose statement;added an applicability statement to account for the transport of UF6cylinders that do not have significant UF6 inventory such that items reliedon for safety 7.3.5.3 and 7.3.5.6 do not apply; defined "acceptable heelquantity"; added a section to indicate the allowance for use of a forklift orpallet jack for movement of UF6 cylinders that are empty or contain anacceptable heel quantity; clarified when the use of a truck with a lift gate isrequired; revised note boxes; clarified what UF6 cylinders can be moved;added steps to address the need to ensure the UF6 cylinder transportationroute is clear for UF6 cylinders not in a dolly and to brief personnel; addedstep to address the need to move UF6 cylinders so they can be placed incylinder dollies; clarified that licensed material transfers and receipt are inaccordance with AC2-RG-071, Nuclear Material Control and Accountabilityfor the American Centrifuge Lead Cascade; revised form AC-347, UF6Cylinder Loading and Unloading Checklist; and revised and addedreferences.

Reason for the Change:The 12B UF6 cylinders were in use in the Lead Cascade Facility werereaching the end of their five year inspection period so they needed to beremoved from service and replaced with ANSI N14.1 compliant UF6cylinders. There were six 12B UF6 cylinders available from the K-1600facility in Oak Ridge, Tennessee that contained small quantities ofdepleted UF6. In order to use these cylinders, this procedure had to berevised. Other changes were made to clarify procedure requirements.

FCE 14-0154 0 Title: 6/13/2014 No AC-325 Rev 38 No None of the criteria

PCE - N/A Revision to Form AC-325, Auxiliary Check Sheet listed in 10 CFR

Description of Change: 70.72(c) are met.

Form AC-325 does not have a driver procedure. Changed nomenclaturefor dump carts to feed header dump cart and east auxiliary cascade dumpcart respectively; added the west auxiliary cascade dump cart; identifiedthe temperature range for all dump carts; and specified programmedmachine drive units and machine instrument packages to be counted.

Reason for the Change:Clarify form requirements.

NRC Report 2014 Page 49 of 99

Page 52: of Nuclear Power · 2020. 1. 5. · FCE 13-0384 1 Title: 5/1/2014 Yes ESO-2409-0047 No None of the criteria PCE 13-0152 1 Engineering Service Order ESO-2409-0047, Install Emergency

FCE 14-0155 0 Title: 6/19/2014 Yes ESO-2409-0030 No None of the criteriaPCE 14-0062 0 Engineering Service Order ESO-2409-0030, Install Air Filters on North & listed in 10 CFR

South Air Header Dew Point Monitor Lines 70.72(c) are met.

Description of Change:The Engineering Service Order evaluates the installation of inline filtersbefore the dew point sensors and allows the relocation of the north andsouth dew point monitoring devices to a panel with the new inline filter andflow control indicating valve.

Reason for the Change:The installation of the inline filters is recommended by the manufacturer ofthe dew point sensors. The panel design with the filter and flow controlindicating valve will allow for more accurate dew point monitoring results.

FCE 14-0156 0 Title: 6/23/2014 No ACD2-PS-001 Chg 9 No None of the criteria

PCE 14-0063 0 Revision to Procedure ACD2-PS-001, Document Control Process listed in 10 CFR

Description of Change: 70.72(c) are met.

Clarified procedure related to human performance error traps; clarifieddocument requirements for Regulatory documents: clarified "ControlledCopy" and "Working Copy" and how to create these documents; clarifiedsecurity procedures to be used; added classroom training modules toperiodic review dates; explained form AC-050, Document Control ServicesRequest; and made editorial and formatting changes.

Reason for the Change:Clarify procedure requirements.

FCE 14-0157 0 Title: 6/17/2014 No ACD2-SP-038 Chg 3 No None of the criteria

PCE 14-0064 0 Revision to Procedure ACD2-SP-038, Classified Item Control and Inventory listed in 10 CFR

Description of Change: 70.72(c) are met.

Changed to include double verification of data entry for hard-copy forms;annual 100% reconciliation of the database; and inventory of Items storedlong term in B-25 boxes.

Reason for the Change:Clarify procedure requirements.

FCE 14-0158 0 Title: 6/19/2014 No AC4-OP-026 Chg 12 No None of the criteriaPCE - N/A Revision to Procedure AC4-OP-026, Machine Connections Leak Checking listed in 10 CFR

Description of Change: 70.72(c) are met.

Added to the acronyms section; added steps; and made formattingchanges.

Reason for the Change:Clarify procedure requirements.

NRC Report 2014 Page 50 of 99

Page 53: of Nuclear Power · 2020. 1. 5. · FCE 13-0384 1 Title: 5/1/2014 Yes ESO-2409-0047 No None of the criteria PCE 13-0152 1 Engineering Service Order ESO-2409-0047, Install Emergency

FCE 14-0159 0 Title: 6/20/2014 No AC4-OP-034 Chg 8 No None of the criteriaPCE - N/A Revision to Procedure AC4-OP-034, Inspection and Rejection of 12B UF6 listed in 10 CFR

Cylinders 70.72(c) are met.

Description of Change:Revised the scope and applicability statements; revised conditions forwhen inspections are performed; added steps: and made formattingchanges.

Reason for the Change:Clarify procedure requirements.

FCE 14-0160 0 Title: 6/30/2014 No AC4-AR-106 Chg 13 No None of the criteriaPCE - N/A Revision to Procedure AC4-AR-106, CDC Cascade Alarms and Responses listed in 10 CFR

Description of Change: 70.72(c) are met.

Deleted portions of this procedure pertaining to operation of the massspectrometers for inclusion in a separate procedure, AC4-AR-01 3, MassSpectrometer Alarms and Responses.

Reason for the Change:New procedure AC4-AR-013 was developed to create an alarm responseprocedure for the mass spectrometers that can be used without referenceto a specific cascade. As such, the applicable portions of the alarmresponse procedure for the Commercial Demonstration Cascade for themass spectrometers were removed.

FCE 14-0161 0 Title: 6/24/2014 No AC4-AR-013 Chg 0 No None of the criteriaPCE - N/A New Procedure AC4-AR-013, Mass Spectrometer Alarms and Responses listed in 10 CFR

Description of Change: 70.72(c) are met.

New procedure was developed to contain mass spectrometer relatedalarms and responses that were previously located in cascade specificprocedures.

Reason for the Change:Mass spectrometer alarms and responses were previously contained inprocedure AC4-AR-106, CDC Cascade Alarms and Responses, and inprevious changes of procedure AC4-AR-006, Cascade Alarms andResponses. Operations are now in progress that will lead to placingCascade 132 in recycle and mass spectrometers will be operated tosupport both Cascades 131 and 132. To prevent confusion as to whichprocedure to use when responding to mass spectrometer related alarms,a new procedure was developed.

NRC Report 2014 Page 51 of 99

Page 54: of Nuclear Power · 2020. 1. 5. · FCE 13-0384 1 Title: 5/1/2014 Yes ESO-2409-0047 No None of the criteria PCE 13-0152 1 Engineering Service Order ESO-2409-0047, Install Emergency

ISA

FCE Number Summary Reason NRC

PCE Number Rev. Approval Change Documents Modified Update Preapproval NotDate to SSC? Due to Change Required? RequiredlComments

FCE 14-0162 0 Title: 7/2/2014 No ACD2-PS-002 Chg 9 No None of the criteria

PCE 14-0065 0 Revision to Procedure ACD2-PS-002, Records Management Process listed in 10 CFR

Description of Change: 70.72(c) are met.

Revised process for records turnover agreements and clarified procedurefor handling of classified records.

Reason for the Change:Clarify procedure requirements.

FCE 14-0163 0 Title: 6/27/2014 Yes OA-CS-131-14-003 Rev 8 No None of the criteriaPCE - N/A Revision to Cascade Settings Document OA-CS-131-14-003, (U) Cascade listed in 10 CFR

131 Cascade Operating Parameters 70.72(c) are met.

Description of Change:The cascade settings document was revised to change cascade set pointsand settings for Cascade 131 operating in a cascade recycleconfiguration. The impact of the change in the mass spectrometeravailability associated with the startup of Cascade 132 on optimizingcascade operation was also documented in the document.

Reason for the Change:The change in the number of centrifuges available for cascade operationrequired changes to the cascade set points to maintain optimumproduction for the available cascade configuration.

FCE 14-0164 0 Title: 6/30/2014 No AC4-OP-015 Chg 26 No None of the criteria

PCE - N/A Revision to Procedure AC4-OP-015, Sample Cart Operation listed in 10 CFR

Description of Change: 70.72(c) are met.

Deleted references to "LC" within the procedure and made procedureformatting changes.

Reason for the Change:Clarify procedure requirements.

FCE 14-0165 0 Title: 6/30/2014 No AC4-ON-015 Chg 17 No None of the criteria

PCE - N/A Revision to Procedure AC4-ON-015, Response to a Complete Loss of listed in 10 CFRPurge Vacuum 70.72(c) are met.

Description of Change:Added action to restore the evacuation vacuum/purge vacuum crossconnect to normal after operation following use of the off-normal procedureand the restoration of at least one purge vacuum pump; and madeformatting changes.

Reason for the Change:Clarify procedure requirements.

NRC Report 2014 Page 52 of 99

Page 55: of Nuclear Power · 2020. 1. 5. · FCE 13-0384 1 Title: 5/1/2014 Yes ESO-2409-0047 No None of the criteria PCE 13-0152 1 Engineering Service Order ESO-2409-0047, Install Emergency

ISAFCE Number Summary Reason NRCPCE Number Rev. Approval Change Documents Modified Update Preapproval Not

Date to SSC? Due to Change Required? Required/Comments

FCE 14-0166 0 Title: 7/18/2014 No ACD2-RG-007 Chg 4 No None of the criteriaPCE 14-0066 0 Revision to Procedure ACD2-RG-007, Operating Experience Review listed in 10 CFR

Program 70.72(c) are met.

Description of Change:Added a point of contact in each organization who is responsible forperforming an impact analysis of operating experience information anddisseminating it to people within their respective organizations; and addedthe requirement that lessons learned generated from intemal issues bevetted by the corrective action review team prior to dissemination.

Reason for the Change:Clarify procedure requirements.

FCE 14-0166 1 Title: 11/11/2014 No ACD2-RG-007 Chg 4 No None of the criterialPCE 14-0066 1 Revision to Procedure ACD2-RG-007, Operating Experience Review listed in 10 CFR

Program 70.72(c) are met.Description of Change:Revised the change evaluation to clarify the corrective action reviewteam's involvement in the lessons learned process as previouslyaddressed in ACD2-RG-007 Change 4. No additional changes were madeto the procedure.

Reason for the Change:Clarify change evaluation's description of change.

FCE 14-0167 0 Title: 7/7/2014 No AC4-OP-066 Chg 19 No None of the criteriaPCE - N/A Revision to Procedure AC4-OP-066, Mass Spectrometer Operation listed in 10 CFR

Preparation 70.72(c) are met.Description of Change:Added steps to ensure cascade and evacuation header are isolated priorto de-isolating mass spectrometers from the gas stream; and madegrammatical and formatting changes.

Reason for the Change:Clarify procedure requirements.

NRC Report 2014 Page 53 of 99

Page 56: of Nuclear Power · 2020. 1. 5. · FCE 13-0384 1 Title: 5/1/2014 Yes ESO-2409-0047 No None of the criteria PCE 13-0152 1 Engineering Service Order ESO-2409-0047, Install Emergency

ISA

FCE Number Summary Reason NRC

PCE Number Rev. Approval Change Documents Modified Update Preapproval NotDate to SSC? Due to Change Required? RequiredlComments

FCE 14-0168 0 Title: 7/7/2014 No ACD4-UW-003 Chg 7 No None of the criteriaPCE 14-0067 0 Revision to Procedure ACD4-UW-003, Recirculating Heating Water listed in 10 CFR

Operations 70.72(c) are met.

Description of Change:Added set points and specific parameters for operation of the recirculatingheating water system.

Reason for the Change:Clarify procedure requirements.

FCE 14-0169 0 Title: 7/8/2014 No AC2-OP-033 Chg 7 No None of the criteria

PCE - N/A Revision to Procedure AC2-OP-033, Operation of the Portable Mini-Gulper listed in 10 CFR

Description of Change: 70.72(c) are met.

Clarified procedure wording and made formatting changes.

Reason for the Change:Clarify procedure requirements.

FCE 14-0170 0 Title: 7/7/2014 No ACD4-UP-002 Chg 4 No None of the criteriaPCE 14-0068 0 Revision to Procedure ACD4-UP-002, Removing and Restoring 345kV listed in 10 CFR

Lines 501, 502, and 503 70.72(c) are met.

Description of Change:Added arc-flash analysis and made formatting changes as a result ofperiodic review.

Reason for the Change:Clarify procedure requirements.

FCE 14-0171 0 Title: 7/7/2014 No AC4-OP-016 Chg 36 No None of the criteria

PCE - N/A Revision to Procedure AC4-OP-016, Feed Cart Operations listed in 10 CFR

Description of Change: 70.72(c) are met.

Clarified actions to be taken on release of hydrogen fluoride gas whilemaking or breaking process connections; and made editorial, grammatical,and formatting changes.

Reason for the Change:Clarify procedure requirements.

NRC Report 2014 Page 54 of 99

Page 57: of Nuclear Power · 2020. 1. 5. · FCE 13-0384 1 Title: 5/1/2014 Yes ESO-2409-0047 No None of the criteria PCE 13-0152 1 Engineering Service Order ESO-2409-0047, Install Emergency

ISA

FCE Number Summary Reason NRC

PCE Number Rev. Approval Change Documents Modified Update Preapproval NotDate to SSC? Due to Change Required? Required/Comments

FCE 14-0172 0 Title: 7/7/2014 No AC4-OP-173 Chg 7 No None of the criteria

PCE - N/A Revision to Procedure AC4-OP-173, Cascade 131 Operations listed in 10 CFR

Description of Change: 70.72(c) are met.

Added steps to align mass spectrometers for multiple cascade sampling;and made grammatical changes.

Reason for the Change:The procedure was changed to allow the use of the mass spectrometersfor multiple cascade sampling. Cascades 131 and 132 will both be oncascade recycle, and may require simultaneous sampling.

FCE 14-0173 0 Title: 7/7/2014 No AC4-OP-044 Chg 21 No None of the criteria

PCE - N/A Revision to Procedure AC4-OP-044, Lead Cascade 1 Operations listed in 10 CFR

Description of Change: 70.72(c) are met.

Merged, deleted, and renamed sections for procedure clarification; revisedthe cascade recycle lineup for use in the Cascade 132 testing; and madeformatting changes.

Reason for the Change:Clarify procedure requirements.

FCE 14-0174 0 Title: 7/8/2014 No TP-2101-0062 Rev 0 No None of the criteria

PCE - N/A New Test Plan TP-2101-0062, Operator Diagnostic Unit (ODU) Upgrades listed in 10 CFRper Change Request CR-2327 Test Plan 70.72(c) are met.

Description of Change:This Test Plan was created to evaluate the upgraded design of operatordiagnostic units in Train 3, per change request CR-2327.

Reason for the Change:Test the proper operation of the design changes to operator diagnosticunits per change request CR-2327.

FCE 14-0175 0 Title: 7/9/2014 No ACD2-EG-005 Chg 15 No None of the criteria

PCE 14-0069 0 Revision to Procedure ACD2-EG-005, Preparation of Statements of Work listed in 10 CFR

Description of Change: 70.72(c) are met.

Changed training requirements and added reviews of statements of workby the quality assurance organization.

Reason for the Change:Changed training requirements due to a module not meeting therequirements of 29 CFR 1926. Also, increased quality assuranceorganization oversight of statements of work to ensure proper applicationof graded quality levels.

NRC Report 2014 Page 55 of 99

Page 58: of Nuclear Power · 2020. 1. 5. · FCE 13-0384 1 Title: 5/1/2014 Yes ESO-2409-0047 No None of the criteria PCE 13-0152 1 Engineering Service Order ESO-2409-0047, Install Emergency

FCE 14-0176PCE - N/A

0 Title:Revision to Cascade Settings Document OA-CS-131-14-003, (U) Cascade131 Operating Parameters

Description of Change:The cascade settings document was revised to change settings and limitsfor cascade operations.

Reason for the Change:Changed the settings and limits due to changes in cascade configurationand testing conditions.

7/9/2014 Yes OA-CS-131-14-003 Rev 9 No None of the criterialisted in 10 CFR70.72(c) are met.

FCE 14-0178 0 Title: 7/15/2014 Yes OA-CS-132-14-003 Rev 0 No None of the criteria

PCE - N/A New Cascade Settings Document OA-CS-132-14-003, (U) Cascade 132 listed in 10 CFR

Cascade Operating Parameters 70.72(c) are met.

Description of Change:The cascade settings document was created to add configuration andcontrol valve set point requirements for cascade recycle operations andadd guidance for use of mass spectrometers and standards in Cascade132.

Reason for the Change:Changes to the configuration of Cascade 132 require that the set pointsand limits be changed for cascade recycle operation.

FCE 14-0179 0 Title: 11/18/2014 No AC2-RG-071 Chg 9 No None of the criteria

PCE - N/A Revision to Procedure AC2-RG-071, Nuclear Material Control and listed in 10 CFRAccountability (NMC&A) for the American Centrifuge Lead Cascade Facility 70.72(c) are met.

Description of Change:Clarified roles and responsibilities; clarified confirmatory measurementrequirements for items other than cylinders; clarified verification of MaterialBalance Area Administrator and Representatives training on form AC-239,American Centrifuge Lead Cascade Material Balance Area (MBA)Management Team Update; and made administrative, editorial, andformatting changes.

Reason for the Change:Clarify procedure requirements as a result of various Nuclear MaterialControl and Accountability program audit findings and periodic reviewrequirements.

NRC Report 2014 Page 56 of 99

Page 59: of Nuclear Power · 2020. 1. 5. · FCE 13-0384 1 Title: 5/1/2014 Yes ESO-2409-0047 No None of the criteria PCE 13-0152 1 Engineering Service Order ESO-2409-0047, Install Emergency

ISA

FCE Number Summary Reason NRC

PCE Number Rev. Approval Change Documents Modified Update Preapproval NotDate to SSC? Due to Change Required? Required/Comments

FCE 14-0180 0 Title: 7/11/2014 No ACD4-UP-003 Chg 4 No None of the criteria

PCE 14-0071 0 Revision to Procedure ACD4-UP-003, Removing and Restoring an X-5000 listed in 10 CFR345 kV Power Transformer 70.72(c) are met.

Description of Change:Added steps to verify the positions of breakers within the X-530 and alsoincluded arc-flash analysis.

Reason for the Change:Clarify procedure requirements.

FCE 14-0181 0 Title: 7/14/2014 No ACD4-AR-201 Chg 7 No None of the criteria

PCE 14-0072 0 Revision to Procedure ACD4-AR-201, X-6000/X-6001 Tower Water listed in 10 CFRCooling System and Associated Equipment 70.72(c) are met.

Description of Change:Deleted sections referencing annunciators that are currently disabled; andmade formatting changes.

Reason for the Change:Clarify procedure requirements.

FCE 14-0182 0 Title: 7/14/2014 No AC4-OP-044 Chg 22 No None of the criteriaPCE - N/A Revision to Procedure AC4-OP-044, Lead Cascade 1 Operations listed in 10 CFR

Description of Change: 70.72(c) are met.

Made minor formatting changes.

Reason for the Change:Clarify procedure requirements.

FCE 14-0183 0 Title: 7/14/2014 No AC4-AR-006 Chg 25 No None of the criteria

PCE - N/A Revision to Procedure AC4-AR-006, Cascade Alarms and Responses listed in 10 CFR

Description of Change: 70.72(c) are met.

Added an alert and alarm response for Back Pressure Control ValvePosition; and clarified steps of the alarm response.

Reason for the Change:Clarify procedure requirements.

NRC Report 2014 Page 57 of 99

Page 60: of Nuclear Power · 2020. 1. 5. · FCE 13-0384 1 Title: 5/1/2014 Yes ESO-2409-0047 No None of the criteria PCE 13-0152 1 Engineering Service Order ESO-2409-0047, Install Emergency

ISA

FCE Number Summary Reason NRC

FCE Number Approval Change Documents Modified Update Preapproval NotDate to SSC? Due to Change Required? Required/Comments

FCE 14-0184 0 Title: 7/14/2014 No AC4-OP-180 Chg 6 No None of the criteria

PCE - N/A Revision to Procedure AC4-OP-180, 1Q34 ASG Operations listed in 10 CFR

Description of Change: 70.72(c) are met.

Added steps to prevent electronic initiation of the auxiliary standbygenerator while maintenance is being performed.

Reason for the Change:Clarify procedure requirements.

FCE 14-0185 0 Title: 7/14/2014 No AC4-OP-179 Chg 6 No None of the criteria

PCE - N/A Revision to Procedure AC4-OP-1 79, 1Q12 ASG Operations listed in 10 CFR

Description of Change: 70.72(c) are met.

Added steps to prevent electronic initiation of the auxiliary standbygenerator while maintenance is being performed.

Reason for the Change:Clarify procedure requirements.

FCE 14-0186 0 Title: 7/14/2014 No AC4-OP-112 Chg 6 No None of the criteria

PCE - N/A Revision to Procedure AC4-OP-112, X-3012 ASG listed in 10 CFR

Description of Change: 70.72(c) are met.

Added steps to prevent electronic Initiation of the auxiliary standbygenerator while maintenance is being performed.

Reason for the Change:Clarify procedure requirements.

FCE 14-0187 0 Title: 7/16/2014 Yes TP-2101-0063 Rev 0 No None of the criteria

PCE - N/A New Test Plan TP-2101-0063, Machine Drive Unit (MDU) Software listed in 10 CFRRevision #10.6 Test within Cascade 131 70.72(c) are met.

Description of Change:The new Test Plan was used to install the software and to test the properoperation of the cascade.

Reason for the Change:To mitigate recent changes in machine characteristics.

NRC Report 2014 Page 58 of 99

Page 61: of Nuclear Power · 2020. 1. 5. · FCE 13-0384 1 Title: 5/1/2014 Yes ESO-2409-0047 No None of the criteria PCE 13-0152 1 Engineering Service Order ESO-2409-0047, Install Emergency

ISAFCE Number Summary Reason NRCPCE Number Rev. Approval Change Documents Modified Update Preapproval Not

Date to SSC? Due to Change Required? Required/Comments

FCE 14-0188 0 Title: 7/14/2014 No AC4-OP-060 Chg 4 No None of the criteria

PCE - N/A Revision to Procedure AC4-OP-060, Helium Leak Detector listed in 10 CFR

Description of Change: 70.72(c) are met.

Added a section for use of helium leak detector as a vacuum source forcascade configuration changes; and made formatting changes.

Reason for the Change:Clarify procedure requirements.

FCE 14-0189 0 Title: 7/29/2014 No AC4-AO-006 Chg 11 No None of the criteria

PCE - N/A Revision to Procedure AC4-AO-006, (U) AC100/1005000-1005100 listed in 10 CFRMachine Assembly 70.72(c) are met.

Description of Change:Clarified component alignment requirements and form AC-580,AC100/11005000-1005100 Final Assembly Build Book.

Reason for the Change:Clarify procedure requirements.

FCE 14-0190 0 Title: 7/29/2014 No AC4-AO-007 Chg 6 No None of the criteria

PCE - N/A Revision to Procedure AC4-AO-007, (U) AC100/1005000-1005100 listed in 10 CFRMachine Disassembly 70.72(c) are met.

Description of Change:Clarified component alignment requirements and form AC-581,AC100/1005000-1005100 Disassembly Log.

Reason for the Change:Clarify procedure requirements.

FCE 14-0191 0 Title: 8/11/2014 No FBP-EM-PRO-00028 Rev 5 No None of the criteria

PCE - N/A Review of Procedure FBP-EM-PRO-00028, Maintenance of Emergency listed in 10 CFRFacilities and Equipment 70.72(c) are met.

Description of Change:Clarified specific administrative duties and requirements for the handling ofrecords associated with the required inspections and surveillances.

Reason for the Change:Clarify procedure requirements.

NRC Report 2014 Page 59 of 99

Page 62: of Nuclear Power · 2020. 1. 5. · FCE 13-0384 1 Title: 5/1/2014 Yes ESO-2409-0047 No None of the criteria PCE 13-0152 1 Engineering Service Order ESO-2409-0047, Install Emergency

ISA

FCE Number Summary Reason NRC

PCE Number Rev. Approval Change Documents Modified Update Preapproval NotDate to SSC? Due to Change Required? RequiredlComments

FCE 14-0192 0 Title: 8/11/2014 No FBP-EM-PRO-00013 Rev 5 No None of the critena

PCE - N/A Review of Procedure FBP-EM-PRO-0001 3, Notification for Classified listed in 10 CFREmergencies 70.72(c) are met.

Description of Change:Made editorial changes as a result of periodic review.

Reason for the Change:Clarify procedure requirements.

FCE 14-0193 0 Title: 8/11/2014 No FBP-EM-PRO-00023 Rev 3 No None of the criteria

PCE - N/A Revision to Procedure FBP-EM-PRO-00023, Monitoring Station listed in 10 CFR

Description of Change: 70.72(c) are met.

Added a signature line to forms documenting acknowledgement ofpersonnel exposure.

Reason for the Change:Ensure personnel are aware of exposure received in a casualty and clarifyprocedure requirements.

FCE 14-0195 0 Title: 7/16/2014 Yes ESO-2201-0087 No None of the criteria

PCE - N/A Engineering Service Order ESO-2201-0087, Cascade 132/135 Distributed listed in 10 CFRControl System Control Module Modification 70.72(c) are met.

Description of Change:The Engineering Service Order modifies the Cascades 132 and 135distributed control system to allow the machines to be process de-isolatein recycle mode. A timer was added to the Cascade 132 control module toturn off the configuration interlock and leave it off for five seconds uponpressing the process de-isolate button.

Reason for the Change:This modification allows Cascade 132 to operate in the same manner asCascade 131.

FCE 14-0196 0 Title: 7/23/2014 Yes OA-CS-131-14-003 Rev 10 No None of the criteria

PCE - N/A Revision to Cascade Settings Document OA-CS-131-14-003, (U) Cascade listed in 10 CFR131 Cascade Operating Parameters 70.72(c) are met.

Description of Change:The cascade settings document was revised to change the cascadeoperating settings due to changes in cascade configuration and changesin test conditions.

Reason for the Change:Changed the cascade operating settings due to the changes in thenumber of centrifuges available for cascade configuration.

NRC Report 2014 Page 60 of 99

Page 63: of Nuclear Power · 2020. 1. 5. · FCE 13-0384 1 Title: 5/1/2014 Yes ESO-2409-0047 No None of the criteria PCE 13-0152 1 Engineering Service Order ESO-2409-0047, Install Emergency

ISA

FCE Number Summary Reason NRC

PCE Number Rev. Approval Change Documents Modified Update Preapproval NotDate to SSC? Due to Change Required? Required/Comments

FCE 14-0198 0 Title: 7/28/2014 No ACD4-UP-001 Chg 4 No None of the criteria

PCE 14-0074 0 Revision to Procedure ACD4-UP-001, Removing and Restoring a 13.8kV listed in 10 CFRX-5000 Bus 70.72(c) are met.

Description of Change:Added instructions that form AC-448 is an In-Hand procedure, and madeother minor procedure clarifications.

Reason for the Change:Revised to be consistent with other balance of plant switching operationprocedures and for procedure clarification.

FCE 14-0199 0 Title: 7/28/2014 No AC4-OP-030 Chg 13 No None of the criteria

PCE - N/A Revision to Procedure AC4-OP-030, Operation of the Cylinder Scale listed in 10CFR

Description of Change: 70.72(c) are met.

Added post-performance work activity; provided a loop to weigh more thanone cylinder; added acronyms; clarified direction on end of shift checks;provided directions on calculating and documenting net weights, andcompleting tag T-185 and form AC-341, Weight Recording Card - ScaleID; deleted references, deleted direction to complete form AC-288, IROFSSurveillance; and made grammatical, editorial, and formatting changes.

Reason for the Change:Clarify procedure requirements.

FCE 14-0200 0 Title: 8/1/2014 No TP-2101-0064 Rev 0 No None of the criteria

PCE - N/A New Test Plan TP-2101-0064, Machine Drive Unit (MDU) Software listed in 10 CFRRevision #11 Test Within Cascade 131 70.72(c) are met.

Description of Change:New Test Plan was developed to test the proper operation of MachineDrive Unit Software Revision #11 within Cascade 131. This Test Plan willbe performed in concurrence with the appropriate operations proceduresand cascade settings documents to verify the proper operation of theMachine Drive Unit Software Revision #11.

Reason for the Change:New test plan tests Machine Drive Unit Software Revision #11 to mitigaterecent abnormal characteristics exhibited within Cascade 131.

NRC Report 2014 Page 61 of 99

Page 64: of Nuclear Power · 2020. 1. 5. · FCE 13-0384 1 Title: 5/1/2014 Yes ESO-2409-0047 No None of the criteria PCE 13-0152 1 Engineering Service Order ESO-2409-0047, Install Emergency

ISA

FCE Number Summary Reason NRC

PCE Number Approval Change Documents Modified Update Preapproval NotDate to SSC? Due to Change Required? Required/Comments

FCE 14-0201 0 Title: 8/15/2014 No ACD2-QM-005 Chg 21; No None of the criteria

PCE 14-0075 0 Revision to Procedures ACD2-QM-005, Supplier Control Program and ACD2-QM-012 Chg 4 listed in 10 CFR

ACD2-QM-012, Commercial Grade Surveys 70.72(c) are met.

Description of Change:Removed redundancy In required information for supplier evaluation.

Reason for the Change:Clarify procedure requirements.

FCE 14-0202 0 Title: 8/25/2014 No ACD2-EC-007 Chg 8 No None of the criteria

PCE 14-0076 0 Revision to Procedure ACD2-EC-007, Waste Management listed in 10 CFR

Description of Change: 70.72(c) are met.

Added and clarified requirements to close and secure containers instorage; revised references; and improved the universal waste and lowlevel radioactive waste details.

Reason for the Change:Clarify procedure requirements.

FCE 14-0203 0 Title: 8/1/2014 No ACD4-UW-001 Chg 12 No None of the criteria

PCE 14-0077 0 Revision to Procedure ACD4-UW-001, Boiler Operations listed in 10 CFR

Description of Change: 70.72(c) are met.

Clarified, revised, deleted, and added steps and sections as a result ofcreating natural gas flowmeters preventative maintenance that coverEnvironmental Safety and Health requirements; deleted Appendix C andform AC-542, Natural Gas Meter Functional Check Sheet; revised formsAC-541, Alternate Heat System Log, and AC-705, Heat System Log; andmade grammatical, editorial, and formatting changes.

Reason for the Change:Clarify procedure requirements.

FCE 14-0204 0 Title: 8/5/2014 No AC4-OP-050 Chg 38 No None of the criteria

PCE - N/A Revision to Procedure AC4-OP-050, Machine Conditioning, Tail Scoop listed in 10 CFRVerification, and Charging with UF6 70.72(c) are met.

Description of Change:Clarified procedure based upon work experience related to better order ofoperation wording of steps, interface with forms, use of engineeringspreadsheets, and modification of valving tables; and made editorial andformatting changes.

Reason for the Change:Clarify procedure requirements.

NRC Report 2014 Page 62 of 99

Page 65: of Nuclear Power · 2020. 1. 5. · FCE 13-0384 1 Title: 5/1/2014 Yes ESO-2409-0047 No None of the criteria PCE 13-0152 1 Engineering Service Order ESO-2409-0047, Install Emergency

ISAFCE Number Summary Reason NRCPCE Number Rev. Approval Change Documents Modified Update Preapproval Not

Date to SSC? Due to Change Required? Required/Comments

FCE 14-0205 0 Title: 8/6/2014 No AC4-AR-006 Chg 26 No None of the criteriaPCE - N/A Revision to Procedure AC4-AR-006, Cascade Alarms and Responses listed in 10 CFR

Description of Change: 70.72(c) are met.

Added additional supplementary actions to several alarm responses due tothe cascade configuration changes.

Reason for the Change:Clarify procedure requirements.

FCE 14-0206 0 Title: 8/6/2014 No ACD4-CO-076 Chg 2 No None of the criteria

PCE 14-0078 0 Revision to Procedure ACD4-CO-076, Operation of the X-3012 HVAC listed in 10 CFRSystem 70.72(c) are met.

Description of Change:Added scope, acronyms, and electrical safety precautions; added steps tocheck pump discharge pressure in summer mode; added form AC-393, X-3012 Chiller Checks, and applicable instructions for completion; revisednomenclature for summer mode hot water circulating pumps; and madeeditorial and formatting changes.

Reason for the Change:Clarify procedure requirements.

FCE 14-0208 0 Title: 8/11/2014 No AC4-OP-044 Chg 23 No None of the criteria

PCE - N/A Revision to Procedure AC4-OP-044, Lead Cascade 1 Operations listed in 10 CFR

Description of Change: 70.72(c) are met.

Changed cascade nomenclature to be consistent with other proceduresand refer only to the physical location of the cascade within the processbuilding.

Reason for the Change:Clarify procedure requirements.

FCE 14-0210 0 Title: 8/15/2014 No ACD2-PS-003 Chg 5 No None of the criteria

PCE 14-0081 0 Revision to Procedure ACD2-PS-003, Forms Control listed in 10 CFR

Description of Change: 70.72(c) are met.

Clarified the use of tags that must be controlled as forms.

Reason for the Change:Clarify procedure requirements.

NRC Report 2014 Page 63 of 99

Page 66: of Nuclear Power · 2020. 1. 5. · FCE 13-0384 1 Title: 5/1/2014 Yes ESO-2409-0047 No None of the criteria PCE 13-0152 1 Engineering Service Order ESO-2409-0047, Install Emergency

FCE 14-0211 0 Title: 8/15/2014 Yes CR-2328 Rev 0; ESO-2201- No None of the criteriaPCE 14-0082 0 Machine Drive Unit Control Software C000087 Upgrade 0090: OA-CS-131-14-001 listed in 10 CFR

Rev 1; OA-CS-132-14-001 70.72(c) are met.Description of Change: Rev 1The change request and Engineering Service Order authorizes theMachine Drive Unit software upgrade for installation and unrestrictedoperation as part of the Lead Cascade Facility and American CentrifugePlant. Additionally, cascade settings documents were revised to thecurrent Machine Drive Unit software and revisions.

Reason for the Change:The software upgrade is used to mitigate recent abnormal characteristicsexhibited during centrifuge operation.

FCE 14-0211 1 Title: 8/18/2014 Yes CR-2328 Rev 0; ESO-2201- No None of the criteriaPCE 14-0082 1 Machine Drive Unit Control Software C000087 Upgrade 0090: OA-CS-131-14-001 listed in 10 CFR

Rev 1; OA-CS-132-14-001 70.72(c) are met.Description of Change: Rev 1The cascade settings to clarified the operating parameter tables.Also, included provisions to permit the progressive implementation to thesoftware revision #11 and allow the continued operation of software

revision #10.5 Commercial Plant Machine Drive Unit.

Reason for the Change:Clarify cascade settings.

FCE 14-0212 0 Title: 10/31/2014 No AC4-ST-002 Chg 0 No None of the criteriaPCE - N/A New Procedure AC4-ST-002, Surveillance and Adjustment of Battery listed in 10 CFR

Room Hydrogen Detectors 70.72(c) are met.

Description of Change:Established the annual surveillance of battery room hydrogen detectorsand paired it with the manufacturer's recommended set point adjustmentprocess.

Reason for the Change:Define requirements for the performance of IS-039, Annual Surveillance ofBattery Room Hydrogen Detectors, and subsequent adjustment, ifnecessary.

FCE 14-0213 0 Title: 8/15/2014 No AC4-OP-070 Chg 16 No None of the criteriaPCE - N/A Revision to Procedure AC4-OP-070, Machine Leveling listed in 10 CFR

Description of Change: 70.72(c) are met.

Clarified detail related to torqueing of the hold down dogs is a Quality-Level 2 task; added and deleted notes pertaining to Quality-Level 2 tasks;and corrected loop references.

Reason for the Change:Clarify procedure requirements.

NRC Report 2014 Page 64 of 99

Page 67: of Nuclear Power · 2020. 1. 5. · FCE 13-0384 1 Title: 5/1/2014 Yes ESO-2409-0047 No None of the criteria PCE 13-0152 1 Engineering Service Order ESO-2409-0047, Install Emergency

FCE 14-0214 0 Title: 8114/2014 Yes ESO-2400-0018 No None of the criteria

PCE 14-0083 0 Engineering Service Order ESO-2400-0018, Sediment Separator listed in 10 CFRAutomatic Drain Valve 70.72(c) are met.

Description of Change:The Engineering Service Order applies to the installation of an isolationball valve and its associated piping on the drain for the RecirculatingHeating Water sediment separator that is located in the X-3002 ProcessBuilding.

Reason for the Change:Allow the performance of maintenance on the sediment separator withoutshutting down the boilers for the recirculating heating water system.

FCE 14-0216 0 Title: 8/15/2014 No AC4-OP-014 Chg 16 No None of the criteriaPCE - N/A Revision to Procedure AC4-OP-014, Operations of the Lead Cascade listed in 10 CFR

Uninterruptible Power Supply 70.72(c) are met.

Description of Change:Added necessary steps to return the uninterruptible power supply to itsnormal operating mode following maintenance.

Reason for the Change:Clarify procedure requirements.

FCE 14-0217 0 Title: 9/4/2014 No ACD2-SP-019 Chg 7 No None of the criteriaPCE 14-0084 0 Revision to Procedure ACD2-SP-019, Classified Information Systems listed in 10 CFR

Security Administration 70.72(c) are met.

Description of Change:Procedure revised to reformat form AC-588, Stand-Alone ClassifiedComputer Checklist (Win XP), and to remove services that cannot bedisabled due to anti-virus functionality.

Reason for the Change:Clarify form requirements based upon NRC comments received during theinspection period.

FCE 14-0218 0 Title: 8/21/2014 No FBP-EM-PRO-00019 Rev 2 No None of the criteriaPCE - N/A Revision to Procedure FBP-EM-PRO-00019, Emergency Operations listed in 10 CFR

Center Concept of Operations 70.72(c) are met.

Description of Change:Changes to the Fluor-B&W Portsmouth LLC procedure clarified steps dueto the annual periodic review process; revised use and source references;and made editorial and formatting changes.

Reason for the Change:Clarify procedure requirements.

NRC Reort204 Pag 65of9NRC Report 2014 Page 65 of 99

Page 68: of Nuclear Power · 2020. 1. 5. · FCE 13-0384 1 Title: 5/1/2014 Yes ESO-2409-0047 No None of the criteria PCE 13-0152 1 Engineering Service Order ESO-2409-0047, Install Emergency

FCE 14-0219 0 Title: 8/21/2014 No FBP-EM-PRO-00003 Rev 2 No None of the criteriaPCE - N/A Revision to Procedure FBP-EM-PRO-00003, Mobile Communications listed in 10 CFR

Vehicle 70.72(c) are met.

Description of Change:Changes to the Fluor-B&W Portsmouth LLC procedure revised a note boxthat clarified the default location and secondary default location whenactivating the mobile communications vehicle as an altemate EmergencyOperations Center.

Reason for the Change:Clarify procedure requirements.

FCE 14-0220 0 Title: 8/21/2014 No FBP-EM-PRO-00012 Rev 2 No None of the criteriaPCE - N/A Review of Procedure FBP-EM-PRO-00012, Recovery listed in 10 CFR

Description of Change: 70.72(c) are met.

Changes to the Fluor-B&W Portsmouth LLC procedure made editorial andformatting changes due to the annual periodic review process.

Reason for the Change:Clarify procedure requirements.

FCE 14-0221 0 Title: 8/21/2014 No FBP-EM-PRO-00017 Rev 4 No None of the criteriaPCE - N/A Revision to Procedure FBP-EM-PRO-00017, Activation of the Emergency listed in 10 CFR

Response Organization 70.72(c) are met..

Description of Change:Changes to the Fluor-B&W Portsmouth LLC procedure revised actionssteps and sections; and made editorial and formatting changes identifiedduring the annual periodic review process.

Reason for the Change:Clarify procedure requirements.

FCE 14-0222 0 Title: 8/25/2014 No AC4-OP-079 Chg 8 No None of the criteriaPCE - N/A Revision to Procedure AC4-OP-079, MDU and PQF Operations listed in 10 CFR

Description of Change: 70.72(c) are met.

Revised personal protective equipment requirements for handling circuitboards.

Reason for the Change:Clarify procedure requirements.

NRC Report 2014 Page 66 of 99

Page 69: of Nuclear Power · 2020. 1. 5. · FCE 13-0384 1 Title: 5/1/2014 Yes ESO-2409-0047 No None of the criteria PCE 13-0152 1 Engineering Service Order ESO-2409-0047, Install Emergency

ISA

FCE Number Summary Reason NRC

PCE Number Rev. Approval Change Documents Modified Update Preapproval NotDate to SSC? Due to Change Required? Required/Comments

FCE 14-0223 0 Title: 8/25/2014 No AC4-ON-006 Chg 27 No None of the criteria

PCE - N/A Revision to Procedure AC4-ON-006, MDU and PQF Replacement at an listed in 10 CFROperating Position 70.72(c) are met.

Description of Change:Added warning boxes for potential arc flash.

Reason for the Change:Clarify procedure requirements.

FCE 14-0224 0 Title: 9/3/2014 No ACD2-RG-002 Chg 8 No None of the criteria

PCE 14-0085 0 Revision to Procedure ACD2-RG-002, Application Change Control and listed in 10 CFRLicense Amendment Requests 70.72(c) are met.

Description of Change:Added a step to enter into the tracking system any changes to or additionsof a new material license condition; generalized terminology; addedacronyms; and made editorial and formatting changes.

Reason for the Change:Clarify procedure requirements.

FCE 14-0225 0 Title: 9/10/2014 No ACD2-RG-004 Chg 11 No None of the criteria

PCE 14-0086 0 Revision to Procedure ACD2-RG-004, Corrective Action Process listed in 10 CFR

Description of Change: 70.72(c) are met.

Clarified procedure steps, timeliness, and roles/responsibilities ofpersonnel involved in the corrective action process.

Reason for the Change:Clarify procedure requirements.

FCE 14-0226 0 Title: 9/5/2014 No ACD4-UP-028 Chg 4 No None of the criteria

PCE 14-0087 0 Revision to Procedure ACD4-UP-028, X-6000 Diesel Transfer System listed in 10 CFR

Operation 70.72(c) are met.

Description of Change:Revised to complete the periodic review process and to comply withprocedure writing guidelines; steps revised, added, and deleted based onoperating experience to provide clarifications and to reduce error likelysituations; added precaution to reduce the likelihood of spill; revisedreferences, Appendix B, and Attachment A; and made editorial andformatting changes.

Reason for the Change:Clarify procedure requirements.

NRC Report 2014 Page 67 of 99

Page 70: of Nuclear Power · 2020. 1. 5. · FCE 13-0384 1 Title: 5/1/2014 Yes ESO-2409-0047 No None of the criteria PCE 13-0152 1 Engineering Service Order ESO-2409-0047, Install Emergency

ISA

FCE Number Summary Reason NRC

PCE Number Rev. Approval Change Documents Modified Update Preapproval NotDate to SSC? Due to Change Required? RequiredlComments

FCE 14-0227 0 Title: 8/28/2014 No FBP-EM-PRO-00036 Rev 2 No None of the criteria

PCE - N/A Revision to Procedure FBP-EM-PRO-00036, Development, Maintenance, listed in 10 CFRand Inspection of Facility Emergency Packets and Emergency Action Plans 70.72(c) are met.

Description of Change:Clarified responsibilities and added note boxes to address an IntegratedSafety Management System finding related to controlled copy distributionof Emergency Action Plans.

Reason for the Change:Clarify procedure requirements.

FCE 14-0227 1 Title: 11/4/2014 No FBP-EM-PRO-00036 Rev 2 No None of the criteria

PCE - N/A Revision to Procedure FBP-EM-PRO-00036, Development, Maintenance, listed in 10 CFRand Inspection of Facility Emergency Packets and Emergency Action Plans 70.72(c) are met.

Description of Change:Revised the change evaluation to correct the procedure title references.

Reason for the Change:Correction of minor administrative errors within the change evaluation.

FCE 14-0228 0 Title: 8/29/2014 Yes ESO-2415-0028 No None of the criteria

PCE 14-0089 0 Engineering Service Order ESO-2415-0028, Changes to X-3001, X-3012, listed In 10 CFRand X-7726 Process Controls Software 70.72(c) are met.

Description of Change:The Engineering Service Order involves changes to the softwareassociated with the Distributed Control System and controllers within the X-3001, X-3012 buildings, and X-7726 facility.

Reason for the Change:Software changes are often needed to support operation of the variouscontrol systems. ESO-2415-0028 allows the necessary software changesto be made to existing process control systems in the X-3001, X-3012buildings, and X-7726 facility to continue to support and optimize operationof the cascades in accordance with approved plant procedures.

NRC Report 2014 Page 68 of 99

Page 71: of Nuclear Power · 2020. 1. 5. · FCE 13-0384 1 Title: 5/1/2014 Yes ESO-2409-0047 No None of the criteria PCE 13-0152 1 Engineering Service Order ESO-2409-0047, Install Emergency

ISA

FCE Number Summary Reason NRC

PCE Number Rev. Approval Change Documents Modified Update Preapproval NotDate to SSC? Due to Change Required? RequiredlComments

FCE 14-0229 0 Title: 8/29/2014 Yes JFI-2303-0022 Rev 0; ESO- No None of the criteria

PCE - N/A Engineering Service Order ESO-2201-0092, Scoop Decontamination and 2201-0092 listed in 10 CFRThermocouple Removal 70.72(c) are met.

Description of Change:Change made to allow decontamination of selected AC100 centrifuge tailsscoops and removal of thermocouple installed on the tails scoops.

Reason for the Change:Decontamination of selected AC100 centrifuge tails scoops to removedeposits will allow future re-use of the tails scoop. The thermocouplesprovide little to no value; therefore, are being removed from the tailsscoops.

FCE 14-0230 0 Title: 9/25/2014 No AC4-MS-001 Chg 5 No None of the criteria

PCE - N/A Revision to Procedure AC4-MS-001, Operation and Maintenance listed in 10 CFRProcedure for American Centrifuge Gas Mass Spectrometers 70.72(c) are met.

Description of Change:Added a step to be able to temporarily waive performance specificationsafter maintenance was performed or during troubleshooting of the massspectrometer when deemed necessary; changed the allowable resolutionand minimum drop out percentages of the operating mass spectrometer tomatch American Society for Testing and Materials standard; and madeeditorial and formatting changes.

Reason for the Change:Clarify procedure requirements.

FCE 14-0231 0 Title: 9/5/2014 Yes OA-CS-131-14-003 Rev 11 No None of the criteria

PCE - N/A Revision to Cascade Settings Document OA-CS-131-14-003, (U) Cascade listed in 10 CFR131 Cascade Operating Parameters 70.72(c) are met.

Description of Change:The cascade settings document was revised due to changes in thecascade configuration.

Reason for the Change:A change in the number of centrifuges available for cascade operationrequired a change to the cascade set points to maintain desired operatingconditions.

NRC Report 2014 Page 69 of 99

Page 72: of Nuclear Power · 2020. 1. 5. · FCE 13-0384 1 Title: 5/1/2014 Yes ESO-2409-0047 No None of the criteria PCE 13-0152 1 Engineering Service Order ESO-2409-0047, Install Emergency

ISA

FCE Number Summary Reason NRC

PCE Number Rev. Approval Change Documents Modified Update Preapproval NotDate to SSC? Due to Change Required? Required/Comments

FCE 14-0232 0 Title: 12/5/2014 No AC4-OP-015 Chg 28 No None of the criteria

PCE - N/A Revision to Procedure AC4-OP-015, Sample Cart Operation listed in 10 CFR

Description of Change: 70.72(c) are met.

Revised to include tools and supplies needed to make dry ice in Section6.0; add steps to Section 7.11 for use of the dry ice machine; update useand sources references; add driver procedure information to forms AC-318, Sample Cart Check Sheet, AC-464, Sample Cart Connection andRestoration Sheet, and AC-465, Sample Cart Remove From ServiceCheck Sheet; and made editorial and formatting changes.

Reason for the Change:Clarify procedure requirements.

FCE 14-0233 0 Title: 9/12/2014 Yes ESO-2518-0025 No None of the criteria

PCE 14-0090 0 Engineering Service Order ESO-2518-0025, Flushing of the 10-inch listed in 10 CFRRecirculating Heating Water Makeup Supply Piping 70.72(c) are met.

Description of Change:The Engineering Service Order applies to the installation of a temporarycleanout the piping connected to the deadheaded makeup water supplyheader located in the X-3002 Boiler System which is accumulating loosescale and rust effecting valves and boiler operations.

Reason for the Change:Flushing the makeup water piping will reduce scale accumulation andimprove boiler performance. After complete flushing, the temporaryinstallation will be removed and the system will retum to its normalconfiguration.

FCE 14-0234 0 Title: 9/29/2014 No ACD2-SH-021 Chg 5 No None of the criteria

PCE 14-0091 0 Revision to Procedure ACD2-SH-021, User Inspection listed in 10 CFR

Description of Change: 70.72(c) are met.

Revised to include inspection criteria for fixed and portable ladders; todefine 'designated person'; deleted un-used acronyms; and made editorialand formatting changes.

Reason for the Change:Clarify procedure requirements based upon NRC observation made duringthe inspection period.

NRC Report 2014 Page 70 of 99

Page 73: of Nuclear Power · 2020. 1. 5. · FCE 13-0384 1 Title: 5/1/2014 Yes ESO-2409-0047 No None of the criteria PCE 13-0152 1 Engineering Service Order ESO-2409-0047, Install Emergency

ISAFCE Number Summary Reason NRCPCE Number Rev. Approval Change Documents Modified Update Preapproval Not

Date to SSC? Due to Change Required? Required/Comments

FCE 14-0235 0 Title: 10/10/2014 Yes ESO-2101-0084 No None of the criteriaPCE 14-0092 0 Engineering Service Order ESO-2101-0084, Make the non-programmable listed in 10 CFR

logic controller ventilation components easier for Operations to Utilize 70.72(c) are met.Description of Change:The Engineering Service Order modifies the controls for the Process AreaVentilation System and the Process Area Heating and PressurizationSystem to be controlled by operating manual valves to open or close thesupply and return louvers to the system equipment.

Reason for the Change:Currently only part of the X-3001 Trains 3 and 4 Process Area VentilationSystem and the Process Area Heating and Pressurization Systems arecontrolled by a programmable logic controller system that uses automaticcontrols to operate the louvers on all of the air handling equipment withinthose two trains. The modification allows existing Process AreaVentilation System and the Process Area Heating and PressurizationSystem dampers and louvers within the X-3001 to operate locally byOperations personnel.

FCE 14-0236 0 Title: 9/12/2014 Yes ESO-2409-0068 No None of the criteriaPCE 14-0093 0 Engineering Service Order ESO-2409-0068, Cooling Tower Deluge Air listed in 10 CFR

Compressor Moisture Filter 70.72(c) are met.

Description of Change:The Engineering Service Order modifies the piping for the X-6001 CoolingTower deluge fire protection system compressor in order to install aDesiccant Air Filter and Dryer and an automatic drain valve.

Reason for the Change:The installation of a Desiccant Air Filter and Dryer and an automatic drainvalve will remove the condensate being produced from the air compressorwithin the X-6001A Valve House to maintain the air activation piping.

FCE 14-0237 0 Title: 9/29/2014 Yes ESO-2201-0081 No None of the criteriaPCE 14-0094 0 Engineering Service Order ESO-2201-0081, Install Process Telephones at listed in 10 CFR

131 Machine Isolation System and Secondary Isolation System Cabinet 70.72(c) are met.and 131 Purge Vacuum Human Machine Interface Station

Description of Change:The Engineering Service Order installs two new process area telephonesin the Train 3 area near the 131 Machine Isolation System and SecondaryIsolation System Cabinet and the 131 Purge Vacuum Human MachineInterface Panel.

Reason for the Change:Installing telephones at these two identified locations will allow moreeffective communications and operational support of Cascade 131.

NRC Report 2014 Page 71 of 99

Page 74: of Nuclear Power · 2020. 1. 5. · FCE 13-0384 1 Title: 5/1/2014 Yes ESO-2409-0047 No None of the criteria PCE 13-0152 1 Engineering Service Order ESO-2409-0047, Install Emergency

ISA

FCE Number Summary Reason NRC

PCE Number Rev. Approval Change Documents Modified Update Preapproval NotDate to SSC? Due to Change Required? RequiredlComments

FCE 14-0238 0 Title: 9/19/2014 Yes ESO-2415-0027 No None of the criteria

PCE 14-0095 0 Engineering Service Order ESO-2415-0027, X-3012 Switchgear Room listed in 10 CFRPower Receptacles 70.72(c) are met.

Description of Change:The Engineering Service Order Installs a weld receptacle on the end of theMotor Control Center N003A (PSB12-A1-MC1).

Reason for the Change:This weld receptacle is necessary in the switchgear room to provide powerfor back-up heat.

FCE 14-0239 0 Title: 9/19/2014 Yes ESO-2415-0018; ESO-2101- No None of the criteria

PCE 14-0096 0 Engineering Service Orders ESO-2415-0018, ESO-2101-0077, and ESO- 0077; and ESO-2415-0026 listed in 10 CFR2415-0026, Install Exit and Egress Lighting in X-3001 and X-3012 70.72(c) are met.

Description of Change:The Engineering Service Orders installs or appropriately removes exit andegress lighting in areas identified within the X-3001 and X-3012 buildings.

Reason for the Change:The identified areas within the X-3001 and X-3012 buildings never hadlighted exit signs, the signs were inadequate, or the signs were located inareas where one was not needed. Additional egress lighting was neededin the identified areas where the available lights are inadequate.

FCE 14-0240 0 Title: 9/19/2014 Yes ESO-2501-0015 No None of the criteria

PCE 14-0097 0 Engineering Service Order ESO-2501-0015, X-1 107E Pedestrian Portal listed in 10 CFRBaseboard Heating 70.72(c) are met.

Description of Change:The Engineering Service Order installs baseboard heaters and anadditional 120 volt receptacle in two offices located within the X-1 107EPedestrian Portal.

Reason for the Change:As originally designed, this area was not intended for office use. Basedupon current needs, this area has been converted into office space and isbeing provided the appropriate heating and electrical outlets.

NRC Report 2014 Page 72 of 99

Page 75: of Nuclear Power · 2020. 1. 5. · FCE 13-0384 1 Title: 5/1/2014 Yes ESO-2409-0047 No None of the criteria PCE 13-0152 1 Engineering Service Order ESO-2409-0047, Install Emergency

ISAFCE Number Summary Reason NRC

PCE Number Rev. Approval Change Documents Modified Update Preapproval NotDate to SSC? Due to Change Required? Required/Comments

FCE 14-0240 1 Title: 11/11/2014 Yes ESO-2501-0015 No None of the criteriaPCE 14-0097 1 Engineering Service Order ESO-2501-0015, X-1107E Pedestrian Portal listed in 10 CFR

Baseboard Heating 70.72(c) are met.

Description of Change:The Engineering Service Order installs split units rather than baseboardheaters to cover both heating and cooling and allow the existing roof topunit to be removed. Additionally, a window will be replaced with a wall-likestructure.

Reason for the Change:As originally designed, this area was not intended for office use. Basedupon current needs, this area has been converted into office space and isbeing provided the appropriate heating and cooling means. Constructionto be conducted within the controlled access area; therefore, no securityconcerns exist.

FCE 14-0242 0 Title: 11/5/2014 No ESO-2201-0091: LCF Yes None of the criteriaPCE - N/A Consolidation of UF6 and Use of a Transfer Cart Integrated Safety Analysis, listed in 10 CFR

LCF Integrated Safety 70.72(c) are met.Description of Change: Analysis Summary, LCFThe Engineering Service Order addresses the development of a process Analyi Summay lyito consolidate UF6 located within multiple 12B cylinders. The UF6 will be Summary [Redacted]combined using a transfer cart to transfer the material to a 12B cylinder Sections Table of Contentslocated in a dump cart. The transfer cart is a repurposed feed cart thatwas designed and constructed for initial startup of the American Centrifuge and 3.5Plant for conditioning of equipment. Test Plan, TP-2201-0098, will beused to leak test the transfer cart and connecting piping, condition thepiping and valves with UF6, and provide instructions to transfer the UF6from a 12B cylinder located in the transfer cart to a 12B cylinder located inthe dump cart.

Reason for the Change:Over the course of the Lead Cascade Facility operations, a number of 12Bcylinders have been used as dump cylinders and accumulated smallquantities of UF6. A means is needed to remove as much of the UF6 aspossible in an effort to consolidate, recover for continued use within theLead Cascade Facility, and prepare the 12B cylinders for recertification.

FCE 14-0243 0 Title: 10/1/2014 No AC3-ST-005 Chg 3 No None of the criteriaPCE - N/A Revision to Procedure AC3-ST-005, Commercial Demonstration Cascade listed in 10 CFR

Machine Isolation System and Secondary Isolation System Calibration 70.72(c) are met.

Description of Change:Clarified the calibration and testing of Machine Isolation System and theSecondary Isolation System which are designated as items relied on forsafety to better align with approved Operations procedures.

Reason for the Change:Clarify procedure requirements.

NRC Report 2014 Page 73 of 99

Page 76: of Nuclear Power · 2020. 1. 5. · FCE 13-0384 1 Title: 5/1/2014 Yes ESO-2409-0047 No None of the criteria PCE 13-0152 1 Engineering Service Order ESO-2409-0047, Install Emergency

ISAFCE Number Summary Reason NRCPCE Number Rev. Approval Change Documents Modified Update Preapproval Not

Date to SSC? Due to Change Required? Required/Comments

FCE 14-0244 0 Title: 10/22/2014 No AC3-ST-001 Chg 13 No None of the criteriaPCE - N/A Revision to Procedure AC3-ST-001, Cascade 132 Machine Isolation listed in 10 CFR

System and Secondary Isolation System Calibration 70.72(c) are met.

Description of Change:Clarified the calibration and testing of Machine Isolation System and theSecondary Isolation System which are designated as Items Relied On ForSafety; added, revised, and re-arranged steps to enhance procedure flowfor clarify in operating equipment; and made formatting changes.

Reason for the Change:Clarify procedure requirements.

FCE 14-0245 0 Title: 9/26/2014 No ACD2-TP-002 Chg 16 No None of the criteriaPCE 14-0099 0 Revision to Procedure ACD2-TP-002, Training Program listed in 10 CFR

Description of Change: 70.72(c) are met.

Clarified that subject matter experts are required to provide classroominstruction for training modules under their ownership; added a checklistas an aid for use when performing periodic reviews of training modulesand associated verbiage in the procedure; added directions for handlingattendance sheets that are used outside of corporate boundaries; revisedform AC-197, Post Training OJT Instructor/Evaluator Interview, to tailor theinterview process and questions for conducting on-the-job training; andmade administrative, editorial and formatting changes.

Reason for the Change:Clarify procedure requirements.

FCE 14-0246 0 Title: 9/25/2014 No ACD4-UT-003 Chg 0 No None of the criteriaPCE 14-0100 0 Conversion to a New Procedure ACD4-UT-003, Liquid Effluent Collection listed in 10 CFR

System 70.72(c) are met.

Description of Change:Converted the procedure number from ACD2-EC-005 (Information Use) toACD4-UT-003 (Reference Use); revised the purpose and scope; addednote boxes and revised steps; deleted unnecessary steps; revised formAC-591, Monthly Liquid Effluent Collection Tanks; and made editorial andformatting changes.

Reason for the Change:Clarify procedure requirements.

NRC Report 2014 Page 74 of 99

Page 77: of Nuclear Power · 2020. 1. 5. · FCE 13-0384 1 Title: 5/1/2014 Yes ESO-2409-0047 No None of the criteria PCE 13-0152 1 Engineering Service Order ESO-2409-0047, Install Emergency

ISA

FCE Number Summary Reason NRC

PCE Number Rev. Approval Change Documents Modified Update Preapproval NotDate to SSC? Due to Change Required? Required/Comments

FCE 14-0247 0 Title: 9/26/2014 No AC4-OP-035 Chg 9 No None of the criteria

PCE - N/A Revision to Procedure AC4-OP-035, Operation of Mettler Toledo XS2002S listed in 10 CFR

Sample Scale 70.72(c) are met.

Description of Change:Clarified the use of XS2002S Sample Scale for weighing of small items asdefined by NR-2603-0003, Fundamental Nuclear Material Control Plan forthe American Centrifuge Lead Cascade Facility, in addition to UF6samples; added definitions, acronyms, note boxes, and use references;and made editorial and formatting changes.

Reason for the Change:Clarify procedure requirements.

FCE 14-0248 0 Title: 10/10/2014 No AC4-OP-017 Chg 37 No None of the criteria

PCE - N/A Revision to Procedure AC4-OP-017, Dump Cart Operation listed in 10 CFR

Description of Change: 70.72(c) are met.

Added instructions for dump cart refrigeration unit defrosting; revisedreferences; and made editorial and formatting changes.

Reason for the Change:Clarify procedure requirements.

FCE 14-0249 0 Title: 10/2/2014 Yes ESO-2201-0093; ESO-2201- No None of the criteria

PCE 14-0101 0 Engineering Service Orders ESO-2201-0093 and ESO-2201-0094, 0094 listed in 10 CFRMachine Cooling Water System Modification 70.72(c) are met.

Description of Change:The Engineering Service Orders addresses the modification of themachine cooling water filtration system and the analysis, and modificationas necessary, of the machine cooling water chemical treatment protocoland/or the chemical composition of the machine cooling water.

Reason for the Change:The modification removes particulate non-radiological contamination foundinside the machine cooling water system that may clog or restrict the flowcreating centrifuge machine or centrifuge machine component failures ordamage. The removal of the particulate will allow adequate cooling waterflow quantity, pressure, and/or pressure differential.

NRC Report 2014 Page 75 of 99

Page 78: of Nuclear Power · 2020. 1. 5. · FCE 13-0384 1 Title: 5/1/2014 Yes ESO-2409-0047 No None of the criteria PCE 13-0152 1 Engineering Service Order ESO-2409-0047, Install Emergency

FCE 14-0250 0 Title: 9/29/2014 No ACD2-EG-009 Chg 7 No None of the criteriaPCE 14-0102 0 Revision to Procedure ACD2-EG-009, Processing Modification & Project listed in 10 CFR

Changes 70.72(c) are met.

Description of Change:Clarified Appendix B in order to define the two documents lists associatedwith an Engineering Change Record; revised form AC-044, EngineeringChange Record, to include a new section for Engineering PackageDocuments; and made editorial and formatting changes.

Reason for the Change:Clarify and enhance the procedure requirements and form AC-044 toeliminate the potential for interpretation issues associated with theEngineering Change Record process.

FCE 14-0251 0 Title: 10/7/2014 Yes ESO-2201-0093 No None of the criteria

PCE 14-0103 0 Engineering Service Order ESO-2201-0093, Removal of Orifice 3001-80- listed in 10 CFRFO-04101 From Train 4 Machine Cooling Water Filter Bypass Line 70.72(c) are met.

Description of Change:The Engineering Service Order addresses the removal of orifice 3001-80-FO-04101 from Train 4 machine cooling water filter bypass line.

Reason for the Change:The orifice in the bypass Train 4 machine cooling water is installed in the 1inch line and connecting to a larger pipe causing particulate material toaccumulate around the valve body. Removal will allow the desired designof constant flow around the valve and piping.

FCE 14-0252 0 Title: 10/2/2014 No AC4-OP-025 Chg 44 No None of the criteriaPCE - N/A Revision to Procedure AC4-OP-025, Machine Connections listed in 10 CFR

Description of Change: 70.72(c) are met.

Revised to allow flushing of the centrifuge machine cooling water linesfrom the supply and return sides to ensure air and particulate are flushedfrom the lines; revised form AC-247, Machine Connections Checklist, toadd the driver procedure number; revised references and acronyms; andmade editorial and formatting changes.

Reason for the Change:Clarify procedure requirements.

NRC Report 2014 Page 76 of 99

Page 79: of Nuclear Power · 2020. 1. 5. · FCE 13-0384 1 Title: 5/1/2014 Yes ESO-2409-0047 No None of the criteria PCE 13-0152 1 Engineering Service Order ESO-2409-0047, Install Emergency

ISA

FCE Number Summary Reason NRC

PCE Number Rev. Approval Change Documents Modified Update Preapproval NotDate to SSC? Due to Change Required? Required/Comments

FCE 14-0253 0 Title: 10/3/2014 No AC4-ON-004 Chg 18 No None of the criteria

PCE - N/A Revision to Procedure AC4-ON-004, Loss of Machine Cooling Water listed in 10 CFR(MCW) 70.72(c) are met.

Description of Change:Revised to allow back flushing of machine cooling water lines for theLower Suspension and Drive Assembly and diffusion pump and to allowmultiple flushes of the machine cooling water lines; and made editorial andformatting changes.

Reason for the Change:Clarify procedure requirements.

FCE 14-0254 0 Title: 10/20/2014 Yes ESO-2301-0057 No None of the criteria

PCE 14-0104 0 Engineering Service Order ESO-2301-0057, X-7725 Recycle/Assembly listed in 10 CFRFacility (East Side) (HW) Heating Water Drain Valve Addition 70.72(c) are met.

Description of Change:The Engineering Service Order addresses the removal of existingRecirculating Heating Water piping that currently feeds two air handlingunits located on the outside of the east wall of the X-7725 building. Thepiping will be re-configured to circulate hot water without flowing to or fromthe air handling units. Additionally, a drain ball valve, along with a gatevalve, is to be installed in the Recirculating Heating Water piping to allowremoval of water from the system on an as needed basis.

Reason for the Change:This modification will allow the water to be circulated by connecting thesupply and return lines together rather than running the hot water throughthe non-functional air handling units.

FCE 14-0255 0 Title: 10/22/2014 No ACD2-SP-024 Chg 8 No None of the criteria

PCE 14-0105 0 Revision to Procedure ACD2-SP-024, Identification and Control of Export listed in 10 CFRControlled information 70.72(c) are met.

Description of Change:Revised to update the requirements for handling, storage, and shipping ormailing Export Controlled Information; clarified the general requirementsfor marking of Export Controlled Information; and updated the generalExport Controlled Information definitions.

Reason for the Change:Clarify procedure requirements to align with the requirements contained inUCP 01-2007, USEC Inc. Unclassified Information Identification andProtection Policy.

NRC Report 2014 Page 77 of 99

Page 80: of Nuclear Power · 2020. 1. 5. · FCE 13-0384 1 Title: 5/1/2014 Yes ESO-2409-0047 No None of the criteria PCE 13-0152 1 Engineering Service Order ESO-2409-0047, Install Emergency

ISA

FCE Number Summary Reason NRC

PCE Number Rev. Approval Change Documents Modified Update Preapproval NotDate to SSC? Due to Change Required? Required/Comments

FCE 14-0256 0 Title: 10/15/2014 No FBP-EM-PRO-00010 Rev 4 No None of the criteria

PCE - N/A Revision to Procedure FBP-EM-PRO-00010, Accountability listed in 10 CFR

Description of Change: 70.72(c) are met.

Completed the periodic review, which included updating flow down charts,contact information, and made formatting changes.

Reason for the Change:Clarify procedure requirements.

FCE 14-0257 0 Title: 10/10/2014 No FBP-EM-PRO-00015 Rev 3 No None of the criteria

PCE - N/A Revision to Procedure FBP-EM-PRO-00015, Emergency Management listed in 10 CFRTraining 70.72(c) are met.

Description of Change:Completed the periodic review, which included updating references andacronyms; and made formatting changes.

Reason for the Change:Clarify procedure requirements.

FCE 14-0258 0 Title: 10/15/2014 No FBP-EM-PRO-00022 Rev 4 No None of the criteria

PCE - N/A Revision to Procedure FBP-EM-PRO-00022, Bomb Threat listed in 10 CFR

Description of Change: 70.72(c) are met.

Completed the periodic review, which included updating references, addedsteps, and made formatting changes.

Reason for the Change:Clarify procedure requirements.

FCE 14-0259 0 Title: 10/10/2014 No FBP-EM-PRO-00011 Rev 2 No None of the criteria

PCE - N/A Revision to Procedure FBP-EM-PRO-0001 1, Evacuation listed in 10 CFR

Description of Change: 70.72(c) are met.

Completed the periodic review, which included adding definitions andmade formatting changes.

Reason for the Change:Clarify procedure requirements.

NRC Report 2014 Page 78 of 99

Page 81: of Nuclear Power · 2020. 1. 5. · FCE 13-0384 1 Title: 5/1/2014 Yes ESO-2409-0047 No None of the criteria PCE 13-0152 1 Engineering Service Order ESO-2409-0047, Install Emergency

ISA

FCE Number Summary Reason NRC

PCE Number Rev. Approval Change Documents Modified Update Preapproval NotDate to SSC? Due to Change Required? Required/Comments

FCE 14-0260 0 Title: 10/20/2014 No AC3-ST-003 Chg 5 No None of the criteriaPCE - N/A Revision to Procedure AC3-ST-003, Surveillance, Test, and Inspection of listed in 10 CFR

the Feed Cart Cylinder Unit Fire Suppression System 70.72(c) are met.

Description of Change:Clarified procedure steps to enhance performance of the procedure by thetechnician; correct forms AC-355, Monthly Feed Cart Dry ChemicalSystem Inspection Report, AC-356, Semi-Annual Feed Cart Dry ChemicalSystem Inspection/Test Report, and AC-357, Annual Feed Cart DryChemical System Inspection/Test Report, to match the procedurechanges; and made editorial and formatting changes.

Reason for the Change:Clarify procedure requirements.

FCE 14-0261 0 Title: 10/21/2014 No AC4-OP-067 Chg 14 No None of the criteriaPCE - N/A Revision to Procedure AC4-OP-067, Operations of the Distributed Control listed in 10 CFR

System (DCS) 70.72(c) are met.

Description of Change:Added steps on how to reboot the Distributed Control Systemworkstations; clarified steps for ease of operations; and made editorial andformatting changes.

Reason for the Change:Clarify procedure requirements.

FCE 14-0262 0 Title: 10/21/2014 No AC4-OP-167 Chg 2 No None of the criteriaPCE - N/A Revision to Procedure AC4-OP-167, CDC Operation of DCS listed in 10 CFR

Description of Change: 70.72(c) are met.

Added steps on how to reboot the Distributed Control Systemworkstations; clarified steps for ease of operations; and made editorial andformatting changes.

Reason for the Change:Clarify procedure requirements.

NRC Report 2014 Page 79 of 99

Page 82: of Nuclear Power · 2020. 1. 5. · FCE 13-0384 1 Title: 5/1/2014 Yes ESO-2409-0047 No None of the criteria PCE 13-0152 1 Engineering Service Order ESO-2409-0047, Install Emergency

ISAFCE Number Summary Reason NRCPCE Number Approval Change Documents Modified Update Preapproval Not

Date to SSC? Due to Change Required? RequiredlComments

FCE 14-0263 0 Title: 11/10/2014 No ACD2-MA-002 Chg 13 No None of the criteria

PCE 14-0106 0 Revision to Procedure ACD2-MA-002, Work Control Process listed in 10 CFR

Description of Change: 70.72(c) are met.

Clarified the process of work requests; deleted form AC-21 9, Measuringand Test Equipment Data Sheet; modified form AC-220, Pre-Job Brief, toinclude human performance improvements; and made formatting changes.

Reason for the Change:Clarify procedure requirements.

FCE 14-0264 0 Title: 10/24/2014 No ACD2-SH-001 Chg 7 No None of the criteriaPCE 14-0107 0 Revision to Procedure ACD2-SH-001, Hazard Communication Program listed in 10 CFR

Description of Change: 70.72(c) are met.

Added the biennial assessment frequency for chemical container labeling;clarified where hard copies of Safety Data Sheets are located and thefrequency in which they are revised; and clarified references.

Reason for the Change:Clarify procedure requirements.

FCE 14-0265 0 Title: 12/4/2014 Yes ESO-2201-0095 No None of the criteria

PCE 14-0108 0 Engineering Service Order ESO-2201-0095, Install Electrical Quick listed in 10 CFRConnectors on Allen Bradley MicroLogix Ethernet Interface Modules 70.72(c) are met.

Description of Change:The Engineering Service Order authorizes the Installation of electricalconnectors on the Allen Bradley MicroLogic Ethemet interface modulesassociated with the Train 3 Machine Cooling Water system, Cascade 132Purge Vacuum system, and Train 3 Evacuation Vacuum system.

Reason for the Change:The installation of electrical connectors on the Allen Bradley MicroLogicEthemet Interface modules is being completed to make the EthemetInterface modules line replacement items. Making the Ethernet interfacemodules line replaceable items will minimize the loss of remote monitoringand control of each of these systems in the event of a component failure.

NRC Report 2014 Page 80 of 99

Page 83: of Nuclear Power · 2020. 1. 5. · FCE 13-0384 1 Title: 5/1/2014 Yes ESO-2409-0047 No None of the criteria PCE 13-0152 1 Engineering Service Order ESO-2409-0047, Install Emergency

FCE 14-0266 0 Title: 10/22/2014 No AC4-OP-178 Chg 11 No None of the criteriaPCE - N/A Revision to Procedure AC4-OP-178, Cascade 131 Charging with UF6 listed in 10 CFR

Description of Change: 70.72(c) are met.

Re-arranged the order of steps for operations to work more efficiently;added a section to provide detailed instructions on how the operator usesan engineering spreadsheet to calculate the time a machine is opened tothe process headers in order to add inventory to a machine while thecascade is on recycle; and made formatting changes.

Reason for the Change:Clarify procedure requirements.

FCE 14-0267 0 Title: 10/28/2014 No ACD2-QM-107 Chg 10 No None of the criteriaPCE 14-0109 0 Revision to Procedure ACD2-QM-107, Control of Nonconforming Items listed in 10 CFR

Description of Change: 70.72(c) are met.

Clarified the disposition process; revised Appendix A to remove examplesof items that do not require a condition notification; and removed anincorrect reference.

Reason for the Change:Clarify procedure requirements.

FCE 14-0268 0 Title: 10/27/2014 No ACD2-EC-001 Chg 4 No None of the criteriaPCE 14-0110 0 Revision to Procedure ACD2-EC-001, Hazardous Material and Toxic listed in 10 CFR

Substance Control 70.72(c) are met.

Description of Change:Completed the periodic review, which included updating organizationaltitles; added hazardous material inventory guidance; updated to the newterminology of Safety Data Sheet; and made editorial changes.

Reason for the Change:Clarify procedure requirements.

FCE 14-0270 0 Title: 10/30/2014 Yes ESO-2500-0017 No None of the criteriaPCE 14-0112 0 Engineering Service Order ESO-2500-0017, Removal of Fencing and listed in 10 CFR

Air/Electrical Drops from X-7721 Storage Area 70.72(c) are met.

Description of Change:The Engineering Service Order addresses the modifications to remove theair and electrical drops located in the X-7721 High Bay storage area, aswell as removal of fencing from the area.

Reason for the Change:These modifications will prepare the area for receipt and storage ofequipment from various vendors until installation.

NRC Report 2014 Page 81 of 99

Page 84: of Nuclear Power · 2020. 1. 5. · FCE 13-0384 1 Title: 5/1/2014 Yes ESO-2409-0047 No None of the criteria PCE 13-0152 1 Engineering Service Order ESO-2409-0047, Install Emergency

ISA

FCE Number Summary Reason NRC

PCE Number Rev. Approval Change Documents Modified Update Preapproval NotDate to SSC? Due to Change Required? Required/Comments

FCE 14-0271 0 Title: 10/28/2014 No ACD2-SP-016 Chg 6 No None of the criteriaPCE 14-0113 0 Revision to Procedure ACD2-SP-016, Protection and Control of listed in 10 CFR

Unclassified Controlled Nuclear Information (UCNI) 70.72(c) are met.

Description of Change:Revised the requirements for packaging and transporting unclassifiedcontrolled nuclear information outside the controlled access area; clarifiedlimited access requirements; added an attachment which included theunclassified controlled nuclear information marking requirements forcentrifuge systems; and made editorial and formatting changes.

Reason for the Change:Clarify procedure requirements.

FCE 14-0272 0 Title: 11/19/2014 No 331-06-161 Rev 7 No None of the criteriaPCE 14-0114 0 Annual review of 331-06-161, American Centrifuge Program Operations listed in 10 CFR

Security Plan 70.72(c) are met.

Description of Change:Changed the company name from USEC Inc. to Centrus Energy Corp.,and made administrative, editorial, and formatting changes.

Reason for the Change:As required by NR-3605-0004, Security Program for the AmericanCentrifuge Plant, the Operations Security Plan is reviewed and revisedannually for submittal to the Cognizant Security Agency.

FCE 14-0273 0 Title: 10/28/2014 No FBP-EM-PRO-00020 Rev 2 No None of the criteriaPCE - N/A Revision to Procedure FBP-EM-PRO-00020, Emergency Classification listed in 10 CFR

Description of Change: 70.72(c) are met.

Completed the periodic review with no changes being made to theprocedure.

Reason for the Change:Complete periodic procedure review process.

NRC Report 2014 Page 82 of 99

Page 85: of Nuclear Power · 2020. 1. 5. · FCE 13-0384 1 Title: 5/1/2014 Yes ESO-2409-0047 No None of the criteria PCE 13-0152 1 Engineering Service Order ESO-2409-0047, Install Emergency

ISAFCE Number Summary Reason NRC

PCE Number Rev. Approval Change Documents Modified Update Preapproval NotDate to SSC? Due to Change Required? Required/Comments

FCE 14-0274 0 Title: 10/30/2014 Yes OA-CS-131-14-001 Rev 2; No None of the criteria

PCE - N/A Revision to Cascade Settings Documents OA-CS-131-14-001, (U) OA-CS-132-14-001 Rev 2 listed in 10 CFRCascade 131 Centrifuge Operating Parameters, and OA-CS-132-14-001, 70.72(c) are met.

(U) Cascade 132 Centrifuge Operating Parameters

Description of Change:The cascade settings documents were revised to clarify the end pointcriteria for withdrawing inventory from process equipment when performinga physical inventory. Additionally, OA-CS-131-14-001 was revised toclarify when the tails scoops need to be moved on centrifuges returnedfrom maintenance.

Reason for the Change:The change in the number of centrifuges available for cascade operationrequired changes to the cascade set points to maintain optimumproduction for the available cascade configuration.

FCE 14-0275 0 Title: 10/31/2014 No ACD4-CI-010 Chg 0 No None of the criteria

PCE 14-0115 0 New Procedure ACD4-CI-010, Inspection, Service and Issuance of listed in 10 CFRPortable Eyewashes 70.72(c) are met.

Description of Change:New procedure establishes the guidelines for the inspection of portableeyewashes prior to issuance and establishes the requirements forpreparing portable eyewashes for issuance.

Reason for the Change:It was discovered that the lines that provide sanitary water for theemergency eyewashes/safety showers are dedicated lines with no othersanitary sources running from them. Water that lies within thesededicated lines for an extended period of time allows for the formation ofmethylene chloride, in turn the eyewashes/safety showers are determinedto be unsafe and removed from service. A final management decisionmade was to procure an adequate number of portable eyewashes andestablish a program for their extended use.

NRC Report 2014 Page 83 of 99

Page 86: of Nuclear Power · 2020. 1. 5. · FCE 13-0384 1 Title: 5/1/2014 Yes ESO-2409-0047 No None of the criteria PCE 13-0152 1 Engineering Service Order ESO-2409-0047, Install Emergency

ISAFCE Number Summary Reason NRCPCE Number Rev. Approval Change Documents Modified Update Preapproval Not

Date to SSC? Due to Change Required? Required/Comments

FCE 14-0276 0 Title: 11/10/2014 Yes ESO-2409-0070 No None of the criteriaPCE 14-0116 0 Engineering Service Order ESO-2409-0070, Valve Pit "B" Encasement of listed in 10 CFR

Concrete 70.72(c) are met.

Description of Change:The Engineering Service Order removes electrical panels and boxes fromValve Pit "B" to eliminate potential water pockets; removes debris andsludge from the bottom of the pit; de-scales two Recirculating HeatingWater flanges and apply sealant for protection; apply Polyken 954insulation wrap to Recirculating Heating Water return and supply lines;extends current vent pipe to 1 inch above final grade of concrete; andpours concrete in two layers with a crown placed on top of final pour toallow for run-off of water.

Reason for the Change:Over the past several months there have been multiple patches made toboth Recirculating Heating Water headers within Valve Pit "B".Calculations have been completed on dispersion of weight and thermalexpansion that provides a high confidence level there will be no structuralissues upon the pit being encapsulated with concrete.

FCE 14-0277 0 Title: 11/12/2014 No AC4-OP-1 16 Chg 0 No None of the criteriaPCE - N/A New Procedure AC4-OP-1 16, Transfer Cart Operations listed in 10 CFR

Description of Change: 70.72(c) are met.

New procedure establishes the guidelines on the use of the transfer cart inthe X-3001 and implements associated forms AC-650, Transfer CartConnection Check Sheet, AC-651, Transfer Cart Restoration CheckSheet, AC-652, Transfer Cart Instrumentation Check Sheet, and AC-653,Remove Transfer Cart from Service Check Sheet.

Reason for the Change:New procedure defines requirements for the connection and disconnectionof the transfer cart, as well as, evacuation of the cart following transferoperations.

NRC Report 2014 Page 84 of 99

Page 87: of Nuclear Power · 2020. 1. 5. · FCE 13-0384 1 Title: 5/1/2014 Yes ESO-2409-0047 No None of the criteria PCE 13-0152 1 Engineering Service Order ESO-2409-0047, Install Emergency

FCE 14-0279 0PCE 14-0118 0

Title:Revision to Procedure ACD2-SH-018, Emergency Eyewash and ShowerEquipmentDescription of Change:Provided guidance for obtaining portable eyewashes; clarify inspectioncriteria for installed emergency showers and eyewashes; added criteria tothe weekly inspection of portable eyewashes; added responsibilities forFacility Custodian/Responsible Manager regarding portable eyewashes;added guidance to notify Industrial Safety/Code Inspection if portableeyewash is tagged out of service and relocated added, deleted, andrevised definitions, acronyms, and references; and made editorial andformatting changes.

Reason for the Change:Clarify procedure requirements.

11/6/2014 No ACD2-SH-018 Chg 2 No None of the criterialisted in 10 CFR70.72(c) are met.

FCE 14-0280 0 Title: 11/10/2014 Yes OA-CS-131-14-003 Rev 12 No None of the criteriaPCE - N/A Revision to Cascade Settings Document OA-CS-131-14-003, (U) Cascade listed in 10 CFR

131 Cascade Operating Parameters 70.72(c) are met.

Description of Change:The cascade settings document was revised due to changes in thecascade configuration and changes in test conditions.

Reason for the Change:A change in the number of centrifuges available for cascade operationrequired a change to the cascade set points to maintain optimumproduction for the available cascade configuration. The Cascade Settingsare within the established operating envelope for the centrifuges, thecascade, and comply with regulatory requirements.

FCE 14-0282 0 Title: 11/17/2014 No ACD2-PM-001 Chg 8 No None of the criteriaPCE 14-0119 0 Revision to Procedure ACD2-PM-001, Preventive Maintenance Program listed in 10 CFR

Description of Change: 70.72(c) are met.

Added requirements for ensuring like equipment have equivalentpreventive maintenance tasks; added a section to describe the process fordetermining preventive maintenance tasks for existing and newequipment; clarified responsibilities for submitting preventativemaintenance requests; clarified delinquent task requirements; added aprocess for permanently removing equipment from service; revised formsAC-067, Preventive Maintenance / Surveillance Addition / Deletion /Change Request, and AC-068, Preventive Maintenance Deferral Request;and made administrative, editorial, and formatting changes.

Reason for the Change:Clarify procedure requirements.

NRC Report 2014 Page 85 of 99

Page 88: of Nuclear Power · 2020. 1. 5. · FCE 13-0384 1 Title: 5/1/2014 Yes ESO-2409-0047 No None of the criteria PCE 13-0152 1 Engineering Service Order ESO-2409-0047, Install Emergency

ISA

FCE Number Summary Reason NRC

PCE Number Rev. Approval Change Documents Modified Update Preapproval NotDate to SSC? Due to Change Required? Required/Comments

FCE 14-0283 0 Title: 11/14/2014 No ACD2-MM-001 Chg 10 No None of the criteria

PCE 14-0120 0 Revision to Procedure ACD2-MM-001, Control of Material listed in 10 CFR

Description of Change: 70.72(c) are met.

Revised to adequately describe controlling material at the delivery point;added a section to describe handling and delivery of demobilizationinventory; revised steps to clarify packing requirements for classifieditems; updated to the new terminology of Safety Data Sheet; revised formAC-030, Oracle Item Number Addition, Deletion or Change, clarifiedinstructions for quality levels and engineering review requirements; andmade editorial and formatting changes.

Reason for the Change:Clarify procedure requirements.

FCE 14-0284 0 Title: 11/10/2014 Yes ESO-2301-0049 No None of the criteria

PCE 14-0121 0 Engineering Service Order ESO-2301-0049, X-7725 Hot Water System listed in 10 CFR

Description of Change: 70.72(c) are met.

The Engineering Service Order relocates the push button and switchesthat open and a close the breakers to run the X-7725 Heating WaterCirculating Pumps. A new field mounted box will be installed outside thearc flash boundary of the breakers. Conduit and wire will be installed fromthe new box to the existing terminal strips.

Reason for the Change:The current arrangement presents a potential safety issue, as an operatoris in close proximity to the breaker(s) when closed directly onto a highload. Relocating the buttons and switches will enable the operator toactuate the breaker(s) from outside the arc flash boundary.

FCE 14-0285 0 Title: 11/13/2014 No ACD4-UP-005 Chg 4 No None of the criteria

PCE 14-0122 0 Revision to Procedure ACD4-UP-005, Operation of X-5000/X-6000 listed in 10 CFRTransformer and X-6001 Cooling Tower Water Spray Deluge Systems 70.72(c) are met.

Description of Change:Revised to include the X-6000 transformer and X-6001 cooling towerdeluge system where applicable within the procedure; added AttachmentA that contains the new in-hand portion of this procedure which is form AC-640, Transformer/Cell Deluge System Checklist; and made editorial andformatting changes.

Reason for the Change:Clarify procedure requirements.

NRC Report 2014 Page 86 of 99

Page 89: of Nuclear Power · 2020. 1. 5. · FCE 13-0384 1 Title: 5/1/2014 Yes ESO-2409-0047 No None of the criteria PCE 13-0152 1 Engineering Service Order ESO-2409-0047, Install Emergency

ISA

FCE Number Summary Reason NRC

PCE Number Approval Change Documents Modified Update Preapproval NotDate to SSC? Due to Change Required? Required/Comments

FCE 14-0286 0 Title: 12/3/2014 No ACD2-RG-004 Chg 12 No None of the criteria

PCE 14-0123 0 Revision to Procedure ACD2-RG-004, Corrective Action Process listed in 10 CFR

Description of Change: 70.72(c) are met.

Clarified when a condition notification involving a non-compliance by acontractor is generated, that a contractor deficiency notice should also beinitiated; clarified condition notification screening questions to require plantshift superintendent reportability screening for Lead Cascade items reliedon for safety only; removed references to the Management Advisory Groupsince the Corrective Action Review Team will be responsible for review ofissues that meet the requirements of Step 4.3.1; clarified guidance forassignment of regulatory priorities; revised form AC-634, Template for UseWhen CATSWeb System is not Available, to align with electronicCATSWeb; and made editorial and formatting changes.

Reason for the Change:Clarify procedure requirements.

FCE 14-0287 0 Title: 11/13/2014 No ACD4-UP-037 Chg 7 No None of the criteria

PCE 14-0124 0 Revision to Procedure ACD4-UP-037, Operation of the X-6000 Auxiliary listed in 10 CFRStandby Generator (ASG) 70.72(c) are met.

Description of Change:Clarified and added steps that were discovered to be needed for safe andproper operation of auxiliary standby generator; realigned steps andsections for better human performance; revised drawings and sketches;deleted references to valves PH-YA-HV3YB and PH-YA-HV2B, as theyare part of the system that was disconnected and/or blanked off; revisedform AC-585, Generator Rounds; corrected references and acronyms; andmade editorial and formatting changes.

Reason for the Change:Clarify procedure requirements.

FCE 14-0288 0 Title: 12/4/2014 No ACD2-MP-007 Chg 1 No None of the criteria

PCE 14-0125 0 Revision to Procedure ACD2-MP-007, Conduct of Operations listed in 10 CFR

Description of Change: 70.72(c) are met.

Added new human performance error reduction tools; clarified elementsand use of the corrective action and event reporting processes; addedreferences; and made editorial and formatting changes.

Reason for the Change:Clarify procedure requirements.

NRC Report 2014 Page 87 of 99

Page 90: of Nuclear Power · 2020. 1. 5. · FCE 13-0384 1 Title: 5/1/2014 Yes ESO-2409-0047 No None of the criteria PCE 13-0152 1 Engineering Service Order ESO-2409-0047, Install Emergency

ISAFCE Number Summary Reason NRCPCE Number Rev. Approval Change Documents Modified Update Preapproval Not

Date to SSC? Due to Change Required? RequiredlComments

FCE 14-0289 0 Title: 11/13/2014 No AC4-ON-004 Chg 19 No None of the criteriaPCE - N/A Revision to Procedure AC4-ON-004, Loss of Machine Cooling Water listed in 10 CFR

(MCW) 70.72(c) are met.

Description of Change:Clarified and corrected symptoms of a loss of Machine Cooling Water to acentrifuge; added a section to flush purge and evacuation vacuum pumpmachine cooling water strainers; deleted unnecessary valves; addedelectrical personal protective equipment requirements where applicable;and made editorial and formatting changes.

Reason for the Change:Clarify procedure requirements.

FCE 14-0290 0 Title: 11/24/2014 No FBP-EM-PRO-00038 Rev 3 No None of the criteriaPCE - N/A Revision to Procedure FBP-EM-PRO-00038, Mutual Aid listed in 10 CFR

Description of Change: 70.72(c) are met.

Completed the periodic review, which made administrative, editorial, andformatting changes.

Reason for the Change:Clarify procedure requirements.

FCE 14-0291 0 Title: 11/14/2014 Yes TP-2201-0100 Rev 0 No None of the criteriaPCE - N/A New Test Plan TP-2201-0100, Testing Changes to the Backfill/Evacuation listed in 10 CFR

Methodology 70.72(c) are met.Description of Change:The Test Plan increases the time allotted for HF to desorb from interiorsurfaces prior to final evacuation by taking into account the operatinghistory of the equipment.

Reason for the Change:Test Plan is designed to evaluate proposed changes to the methodologyused to reduce HF and UF6 concentrations in centrifuges to acceptablelevels for maintenance.

NRC Report 2014 Page 88 of 99

Page 91: of Nuclear Power · 2020. 1. 5. · FCE 13-0384 1 Title: 5/1/2014 Yes ESO-2409-0047 No None of the criteria PCE 13-0152 1 Engineering Service Order ESO-2409-0047, Install Emergency

ISA

FCE Number Summary Reason NRC

PCE Number Rev. Approval Change Documents Modified Update Preapproval NotDate to SSC? Due to Change Required? Required/Comments

FCE 14-0292 0 Title: 11/25/2014 No ACD4-OP-071 Chg 10 No None of the criteria

PCE - N/A Revision to Procedure ACD4-OP-071, Centrifuge Machine Transporter listed in 10 CFR(CMT) 70.72(c) are met.

Description of Change:Clarified and reorganized steps to be more efficient and reduce theprobability of human performance errors; revised and/or expand theprecautions and limitations section based upon manufacture's technicalmanual and operational experiences; removed the pre-operationinspection section and disbursed pre-operation checks to relevant sectionsof the procedure: removed the battery change-out section as it is amaintenance activity covered by work package; added a section to checkfor flat spots on the tires; and made administrative, editorial, andformatting changes.

Reason for the Change:Clarify procedure requirements.

FCE 14-0293 0 Title: 11/21/2014 No ACD3-EG-205 Chg 7 No None of the criteria

PCE 14-0126 0 Revision to Procedure ACD3-EG-205, Engineering Evaluations listed in 10 CFR

Description of Change: 70.72(c) are met.

Clarified that a Responsible Engineer/Designer may self-identify a need foran engineering evaluation; added a list of recommended sections thatshould be included within an engineering evaluation; distinguished QualityLevel-3 non-fissile material operations engineering evaluations from otherQuality Level-3 engineering evaluations; simplified the process for usingengineering evaluations to disposition non-conforming items; added asection to separate and enhance the engineering evaluation completionsteps and expectations; revised the flowchart to add details and simplifythe process; revised form AC-086, Engineering Evaluation Coversheet;and made administrative, editorial, and formatting changes.

Reason for the Change:Clarify procedure requirements as a result of identified processimprovements.

FCE 14-0294 0 Title: 11/21/2014 Yes OA-CS-131-14-003 Rev 13 No None of the criteria

PCE - N/A Revision to Cascade Settings Document OA-CS-131-14-003, (U) Cascade listed in 10 CFR131 Cascade Operating Parameters 70.72(c) are met.

Description of Change:The cascade settings document was revised to change the settings due tochanges in cascade configuration and changes in test conditions.

Reason for the Change:The change in the number of centrifuges available for cascade operationrequired changes to the cascade set points to maintain optimumproduction for the available cascade configuration.

NRC Report 2014 Page 89 of 99

Page 92: of Nuclear Power · 2020. 1. 5. · FCE 13-0384 1 Title: 5/1/2014 Yes ESO-2409-0047 No None of the criteria PCE 13-0152 1 Engineering Service Order ESO-2409-0047, Install Emergency

ISA

FCE Number Summary Reason NRC

PCE Number Rev. Approval Change Documents Modified Update Preapproval NotDate to SSC? Due to Change Required? Required/Comments

FCE 14-0295 0 Title: 11/24/2014 No AC4-OP-051 Chg 34 No None of the criteria

PCE - N/A Revision to Procedure AC4-OP-051, Inventory Removal listed in 10 CFR

Description of Change: 70.72(c) are met.

Re-arranged the alignment of MIV hand valves; added step to confirmmachine position; added, revised, and deleted notes for consistency andclarity; revised steps to uncheck "on gas" box in applicable locations;revised steps based on engineering recommendations that are applicableto cascade recycle; and made administrative, editorial, and formattingchanges.

Reason for the Change:Clarify procedure requirements.

FCE 14-0297 0 Title: 12/5/2014 No ACD2-SH-016 Chg 6 No None of the criteria

PCE 14-0128 0 Revision to Procedure ACD2-SH-016, Reporting Occupational Fatalities, listed in 10 CFRInjuries and Illnesses 70.72(c) are met.

Description of Change:Clarified applicability; revised reporting criteria to match changes to 29Code of Federal Regulations 1904 that become effective on January 1,2015; revised references and acronyms; clarified reporting requirementsrelated to precautionary check and/or medical evaluation for anoccupational injury, illness, or involvement in a hazardous incident;clarified form AC-148, Supervisor's Initial Investigation Report; and madeeditorial and formatting changes.

Reason for the Change:Clarify procedure requirements.

FCE 14-0298 0 Title: 12/1/2014 No None No None of the criteria

PCE 14-0129 0 Changing the hours of operation at the X-1107BN Interconnecting Portal listed in 10 CFR

Description of Change: 70.72(c) are met.

The operational hours of the X-1 107BN portal were changed. When the X-1107BN portal is closed, it will only be opened by the Fluor-B&WProtective Force personnel to support emergencies and movement ofclassified and waste shipments between the gaseous diffusion plant andAmerican Centrifuge. When necessary, other approved plant site portalsare available for ingress/egress use.

Reason for the Change:Shared Site Activity Screening in order to optimize facility access betweenthe former gaseous diffusion plant and American Centrifuge.

NRC Report 2014 Page 90 of 99

Page 93: of Nuclear Power · 2020. 1. 5. · FCE 13-0384 1 Title: 5/1/2014 Yes ESO-2409-0047 No None of the criteria PCE 13-0152 1 Engineering Service Order ESO-2409-0047, Install Emergency

ISA

FCE Number Summary Reason NRC

PCE Number Approval Change Documents Modified Update Preapproval NotDate to SSC? Due to Change Required? Required/Comments

FCE 14-0299 0 Title: 11/26/2014 Yes OA-CS-131-14-003 Rev 14 No None of the criteriaPCE - N/A Revision to Cascade Settings Document OA-CS-131-14-003, (U) Cascade listed in 10 CFR

131 Cascade Operating Parameters 70.72(c) are met.

Description of Change:The cascade settings document was revised to change the settings due tochanges in cascade configuration and changes in test conditions.

Reason for the Change:The change in the number of centrifuges available for cascade operationrequired changes to the cascade set points to maintain optimumproduction for the available cascade configuration.

FCE 14-0300 0 Title: 12/2/2014 No AC-325 Chg 39 No None of the criteriaPCE - N/A Revision to Form AC-325, Auxiliary Check Sheet listed in 10 CFR

Description of Change: 70.72(c) are met.

Form AC-325 does not have a driver procedure. Revised to change theformatting of the refrigeration unit temperature; changed the wording of theindicating light check for the auxiliary power substations; added astatement to ensure that auxiliary standby generator runtime hours arerecorded to the nearest tenth; removed the machine cooling water flowcheck for purge and evacuation vacuum pumps; added a check for SP-Guard oil temperature and SP-Guard vibration for purge and evacuationvacuum pumps; modify engine and Switchgear Engine Control Switch notin auto check for each auxiliary standby generator; extended thedifferential pressure band for the Train 4 machine cooling water/towerwater cooling strainer; add indication for the Trains 3 and 4 machinecooling water side stream filter differential pressure; and added atemperature indication range for the X-7727H Transfer Corridor.

Reason for the Change:Clarify form requirements.

FCE 14-0301 0 Title: 12/4/2014 No ACD4-UW-020 Chg 3 No None of the criteriaPCE 14-0130 0 Revision to Procedure ACD4-UW-020, Operation of Outlying Facility listed in 10 CFR

Heating Systems 70.72(c) are met.

Description of Change:Added sections covering the operation of the X-1 12 facility Hot WaterBoilers and for conducting area checks of unoccupied facilities by Balanceof Plant Operations personnel; prerequisites were moved to action steps toreduce error likely situations; unnecessary information contained withinAppendix B was replaced with new X-1 12 information; and made editorialand formatting changes.

Reason for the Change:Clarify procedure requirements.

NRC Report 2014 Page 91 of 99

Page 94: of Nuclear Power · 2020. 1. 5. · FCE 13-0384 1 Title: 5/1/2014 Yes ESO-2409-0047 No None of the criteria PCE 13-0152 1 Engineering Service Order ESO-2409-0047, Install Emergency

FCE 14-0302 0 Title: 12/3/2014 No AC4-OP-040 Chg 20 No None of the criteriaPCE - N/A Revision to Procedure AC4-OP-040, Cascade Conditioning listed in 10 CFR

Description of Change: 70.72(c) are met.

Added a step for operation of valves, which removed the need to branch toother procedures for action; revised forms AC-329, Conditioning withNitrogen, and AC-330, Conditioning with UF6, to add driver procedureinformation; and made editorial and formatting changes.

Reason for the Change:Clarify procedure requirements.

FCE 14-0303 0 Title: 12/4/2014 Yes OA-CS-131-14-003 Rev 15 No None of the criteriaPCE - N/A Revision to Cascade Settings document OA-CS-131-14-003, (U) Cascade listed in 10 CFR

131 Operating Parameters 70.72(c) are met.

Description of Change:The cascade settings document was revised to change the settings due tochanges in cascade configuration and changes in test conditions.

Reason for the Change:The change in the number of centrifuges available for cascade operationrequired changes to the cascade set points to maintain optimumproduction for the available cascade configuration.

FCE 14-0304 0 Title: 12/9/2014 Yes ESO-2201-0093 No None of the criteria

PCE 14-0131 0 Engineering Service Order ESO-2201-0093, Removal of Orifice From listed in 10 CFRTrain 4 Machine Coiling Water Filter Bypass Line 70.72(c) are met.

Description of Change:The Engineering Service Order addresses the removal of flow orifices andstrainers from Train 4 machine cooling water piping system.

Reason for the Change:The orifice in the bypass Train 4 machine cooling water is installed in the 1inch line and connecting to a larger pipe causing particulate material toaccumulate around the valve body. The strainers were installedtemporarily to provide cleanup during startup and flushing the system.Removal of the flow orifices and strainers will allow the desired design ofconstant flow around the valve and piping.

NRC Report 2014 Page 92 of 99

Page 95: of Nuclear Power · 2020. 1. 5. · FCE 13-0384 1 Title: 5/1/2014 Yes ESO-2409-0047 No None of the criteria PCE 13-0152 1 Engineering Service Order ESO-2409-0047, Install Emergency

ISA

FCE Number Summary Reason NRC

PCE Number Rev. Approval Change Documents Modified Update Preapproval NotDate to SSC? Due to Change Required? Required/Comments

FCE 14-0306 0 Title: 12/10/2014 No ACP2-EG-021 Chg 8 No None of the criteria

PCE 14-0133 0 Revision to Procedure ACP2-EG-021, Evaluating and Reporting Defects listed in 10 CFRand Noncompliances per 10 CFR Part 21 70.72(c) are met.

Description of Change:Clarified form AC-165, 10 CFR Part 21 Evaluation Checklist; and madeeditorial and formatting changes.

Reason for the Change:Clarify procedure requirements.

FCE 14-0307 0 Title: 12/10/2014 Yes ESO-2420-0004 No None of the criteria

PCE 14-0134 0 Engineering Service Order ESO-2420-0004, X7727H Automatic listed in 10 CFRPedestrian Doors 70.72(c) are met.

Description of Change:The Engineering Service Order addresses the deactivation of the motiondetectors for automatic pedestrian bypass doors in the X-7727H andinstallation of manual push button switches; the middle bypass door will bedeactivated; and a section of the fencing near the X-3001 Train 8 will beremoved.

Reason for the Change:These changes will help to prevent the risks and hazards associated withthe automatic pedestrian bypass doors and allow better traffic flow.

FCE 14-0308 0 Title: 12/10/2014 No AC4-ON-004 Chg 20 No None of the criteriaPCE - N/A Revision to Procedure AC4-ON-004, Loss of Machine Cooling Water listed in 10 CFR

(MCW) 70.72(c) are met.

Description of Change:Added a step to allow manual control of Train 4 machine cooling watertemperature.

Reason for the Change:Clarify procedure requirements.

NRC Report 2014 Page 93 of 99

Page 96: of Nuclear Power · 2020. 1. 5. · FCE 13-0384 1 Title: 5/1/2014 Yes ESO-2409-0047 No None of the criteria PCE 13-0152 1 Engineering Service Order ESO-2409-0047, Install Emergency

ISA

FCE Number Summary Reason NRC

PCE Number Rev. Approval Change Documents Modified Update Preapproval NotDate to SSC? Due to Change Required? Required/Comments

FCE 14-0309 0 Title: 12/10/2014 No AC4-AR-002 Chg 29 No None of the critena

PCE - N/A Revision to Procedure AC4-AR-002, Machine Cooling Water Alarms and listed in 10 CFR

Responses 70.72(c) are met.

Description of Change:Added steps to place both heat exchangers in service for Trains 3 and 4under the high temperature responses, which provides the ability toIncrease cooling of machine cooling water; added wording to check thatthe set point is entered correctly; and made editorial and formattingchanges.

Reason for the Change:Clarify procedure requirements.

FCE 14-0310 0 Title: 12/12/2014 Yes ESO-2409-0059 No None of the criteria

PCE 14-0135 0 Engineering Service Order ESO-2409-0059, X-6000 Underground Storage listed in 10 CFRTank Alarms 70.72(c) are met.

Description of Change:The Engineering Service Order installs "Leak" and "Low Level" alarms forthe X-6000 Underground Diesel Fuel Storage Tank into Annunciator 11within the X-6000 control room.

Reason for the Change:This change will improve monitoring and alarming of the X-6000underground diesel fuel storage tank.

FCE 14-0311 0 Title: 12/11/2014 No ACD4-UP-016 Chg 3 No None of the criteria

PCE 14-0136 0 Revision to Procedure ACD4-UP-016, Operation of the X-1020 Electrical listed in 10 CFRDistribution System 70.72(c) are met.

Description of Change:Added steps for the operator for restoring the generator and for performingthe monthly generator inspection; added equipment identifiers to matchequipment in the field; changed the breaker nomenclature to match thebreakers in the field: changed the monthly generator inspection and loadtest frequency to allow flexibility in scheduling; relocated form AC-587, X-1020 Emergency Generator Inspection and Load Test, from an appendixto an attachment; revised various steps to provide further clarification forthe operator; and made editorial and formatting changes.

Reason for the Change:Clarify procedure requirements.

NRC Report 2014 Page 94 of 99

Page 97: of Nuclear Power · 2020. 1. 5. · FCE 13-0384 1 Title: 5/1/2014 Yes ESO-2409-0047 No None of the criteria PCE 13-0152 1 Engineering Service Order ESO-2409-0047, Install Emergency

ISAFCE Number Summary Reason NRC

PCE Number Approval Change Documents Modified Update Preapproval NotDate to SSC? Due to Change Required? Required/Comments

FCE 14-0313 0 Title: 12/30/2014 Yes ESO-2500-0019 No None of the criteria

PCE 14-0139 0 Engineering Service Order ESO-2500-0019, X-3002 Fence Removal-NE listed in 10 CFRComer 70.72(c) are met.

Description of Change:The Engineering Service Order removes existing fencing located outsidethe Northeast comer of the X-3002 Process Building; removes fencinglocated West of the X-7727H Transfer Corridor and Southeast of the X-7725 Recycle/Assembly Facility; removes fencing located near theSoutheast comer of the X-3002 Process Building; and creation of anaccess opening in the fence at the West side of the X-7727H TransferCorridor.

Reason for the Change:The sections of non-security fencing proposed for removal are no longerfunctional, as other sections have been removed, leaving the existingremnants which no longer provide a functional barrier. Fencing changesare contained within the Controlled Access Area and do not impact anycredited security fencing.

FCE 14-0314 0 Title: 12/18/2014 Yes CR-2327 Rev 0; ESO-2101- No None of the criteria

PCE 14-0138 0 Change Request CR-2327, (U) Operator Diagnostic Unit Software 0089 listed in 10CFRUpgrades, and Engineering Service Order ESO-2101-0089, 70.72(c) are met.Implementation of Operator Diagnostic Unit (ODU) Hardware/SoftwareUpgrades

Description of Change:The Operator Diagnostic Unit upgrades were implemented to mitigate thepotential loss of data by preempting the storage of the completed fiveminute data record (two and a half minutes before and after the trigger).Additionally, "generic" shared variables were added to enable localmachine variables accessible to the Distributed Control System, along withthe facility parameters, without having to hand port the data. Thekeyboard, video, and mouse switch on the Operator Diagnostic Unit Carts#1 and #2 were also upgraded.

Reason for the Change:Engineering Service Order and Change Request authorizes theimplementation of the Operator Diagnostic Unit hardware and LabViewsoftware upgrades for unrestricted operation at the American Centrifugeproject in Piketon, Ohio.

NRC Report 2014 Page 95 of 99

Page 98: of Nuclear Power · 2020. 1. 5. · FCE 13-0384 1 Title: 5/1/2014 Yes ESO-2409-0047 No None of the criteria PCE 13-0152 1 Engineering Service Order ESO-2409-0047, Install Emergency

FCE 14-0315 0 Title: 12/16/2014 Yes OA-CS-132-14-002 Rev 0; No None of the criteria

PCE - N/A Cascade Settings document OA-CS-132-14-002, (U) Cascade 132, TP-2201-0101 Rev 0 listed in 10 CFR

Cascade Operating Parameters (Single Stage), and Test Plan TP-2201- 70.72(c) are met.

0101, Configuring Cascade 132 for Single Stage Centrifuge Operation

Description of Change:The cascade settings document was created to change the Cascade 132operating parameters to configure and operate the cascade inconfiguration. The Test Plan provided the valve lineup that permitsCascade 132 to be operated in a cascade recycle configuration.

Reason for the Change:Cascade Settings document and Test Plan provides the set points andconfiguration necessary to gather data over a range of operatingconditions within the centrifuge design envelope.

FCE 14-0316 0 Title: 12/24/2014 Yes ESO-2400-0019 No None of the criteria

PCE 14-0140 0 Engineering Service Order ESO-2400-0019, X-5001 Transformer Water listed in 10 CFRDeluge Systems Duplex Basket Strainer Installation 70.72(c) are met.

Description of Change:The Engineering Service Order installs a double basket strainer system inline of the X-5001 Fire Deluge System piping.

Reason for the Change:This change will enable the screening and removal of particulate materialbefore it has a chance to block the Water Deluge System spray headspositioned around the transformers, which extinguish detected fires.

FCE 14-0317 0 Title: 12/23/2014 No AC4-ST-002 Chg 0 No None of the criteria

PCE - N/A New Procedure AC4-ST-002, Surveillance and Adjustment of Battery listed in 10 CFRRoom Hydrogen Detectors 70.72(c) are met.

Description of Change:Performance of the first use validation of this new procedure identifiedcorrections required to enhance performance and correct gas flow times.

Reason for the Change:Clarify procedure requirements.

NRC Report 2014 Page 96 of 99

Page 99: of Nuclear Power · 2020. 1. 5. · FCE 13-0384 1 Title: 5/1/2014 Yes ESO-2409-0047 No None of the criteria PCE 13-0152 1 Engineering Service Order ESO-2409-0047, Install Emergency

ISAFCE Number Summary Reason NRC

PCE Number Rev. Approval Change Documents Modified Update Preapproval NotDate to SSC? Due to Change Required? RequiredlComments

FCE 14-0318 0 Title: 12/29/2014 No AC4-OP-006 Chg 16 No None of the criteria

PCE - N/A Revision to Procedure AC4-OP-006, MCW Chemical Addition listed in 10 CFR

Description of Change: 70.72(c) are met.

Revised to include both Train 3 and 4 machine cooling water side streamfilter and corrosion coupon rack systems; changed the terminology ofMaterial Safety Data Sheets to Safety Data Sheets; Plant ShiftSuperintendent was added where the Shift Supervisor is informed of a leakor spill associated with the chemical addition system; added new Section7.8 to add chemicals via the side stream filter; revised form AC-342, MCWChemical Addition Log, to organize the logging of chemicals added; andmade editorial and formatting changes.

Reason for the Change:Clarify procedure requirements.

FCE 14-0319 0 Title: 12/23/2014 Yes OA-CS-131-14-003 Rev 16 No None of the criteria

PCE - N/A Revision to Cascade Settings document OA-CS-131-14-003, (U) Cascade listed In 10 CFR131 Cascade Operating Parameters 70.72(c) are met.

Description of Change:The cascade settings document was revised to change the settings due tochanges in cascade configuration and changes in test conditions.

Reason for the Change:The change in the number of centrifuges available for cascade operationrequired changes to the cascade set points to maintain optimumproduction for the available cascade configuration.

FCE 14-0320 0 Title: 12/24/2014 No AC4-OP-1 16 Chg 0 No None of the criteria

PCE - N/A New Procedure AC4-OP-1 16, Transfer Cart Operations listed in 10 CFR

Description of Change: 70.72(c) are met.

Performance of the first use validation of this new procedure identifiedsimple changes which include: nomenclature of valves listed in theprocedure were corrected to match in-field labelling; reordered proceduressteps to provide clarity; corrected the pressure reading of PI-20; stepswere modified for easier performance; steps were added for actions totake if a UF6 deposit is indicated; warning boxes were corrected; revisedassociated forms AC-650, Transfer Cart Connection Check Sheet, AC-651, Transfer Cart Restoration Check Sheet, AC-652, Transfer CartInstrumentation Check Sheet, and AC-653, Remove Transfer Cart fromService Check Sheet, to coincide with procedure changes; and madeformatting changes.

Reason for the Change:Clarify procedure requirements.

NRC Report 2014 Page 97 of 99

Page 100: of Nuclear Power · 2020. 1. 5. · FCE 13-0384 1 Title: 5/1/2014 Yes ESO-2409-0047 No None of the criteria PCE 13-0152 1 Engineering Service Order ESO-2409-0047, Install Emergency

FCE 14-0321 0 Title: 12/29/2014 No AC4-OP-003 Chg 22 No None of the criteria

PCE - N/A Revision to Procedure AC4-OP-003, Machine Cooling Water Normal listed in 10 CFROperations 70.72(c) are met.

Description of Change:Procedure changed from Reference Use to In-Hand; added references,acronyms, tools, and Personal Protective Equipment requirements;revised, added, and deleted sections/steps, caution and note boxes;added tables for operating Essential Motor Control Center breakers andpump inlet and outlet valves; added new section to clarify how the controlvalves should be operated; added new section for side stream filteroperations; added new section for corrosion coupon rack systemoperation; added a new Appendix D to depict Train 3 and 4 side streamfilter and corrosion coupon rack systems; and made editorial andformatting changes.

Reason for the Change:Clarify procedure requirements.

FCE 14-0322 0 Title: 12/29/2014 No AC4-OP-080 Chg 7 No None of the criteriaPCE - N/A Revision to Procedure AC4-OP-080, ODU Cart Operations listed in 10 CFR

Description of Change: 70.72(c) are met.

Revised to add steps describing how to connect/disconnect the OperatorDiagnostic Unit cart and machine computer when a machine is connectedto the Data Acquisition System; added a step which provides direction ifan error occurs during tails scoop positioning; and made editorial andformatting changes.

Reason for the Change:Clarify procedure requirements.

FCE 14-0323 0 Title: 12/29/2014 No AC4-OP-025 Chg 45 No None of the criteriaPCE - N/A Revision to Procedure AC4-OP-025, Machine Connections listed in 10 CFR

Description of Change: 70.72(c) are met.

Revised to move the action of connecting the 37-pin Data AcquisitionSystem connector; clarified a step to be performed if directed by the ShiftSupervisor, as this step may not be required if the Data AcquisitionSystem is not in service; and made formatting changes.

Reason for the Change:Clarify procedure requirements.

NRC Report 2014 Page 98 of 99

Page 101: of Nuclear Power · 2020. 1. 5. · FCE 13-0384 1 Title: 5/1/2014 Yes ESO-2409-0047 No None of the criteria PCE 13-0152 1 Engineering Service Order ESO-2409-0047, Install Emergency

ISA

FCE Number Summary Reason NRC

PCE Number Rev. Approval Change Documents Modified Update Preapproval NotDate to SSC? Due to Change Required? Required/Comments

FCE 14-0324 0 Title: 12/29/2014 No AC4-OP-044 Chg 26 No None of the criteria

PCE - N/A Revision to Procedure AC4-OP-044, Lead Cascade 1 Operations listed in 10 CFR

Description of Change: 70.72(c) are met.

Added applicable steps dependent if the cascade was on recycle to PCV-401 and 403 and provide direction to change Distributed Control Systemcontrol to manual; added direction to return Distributed Control Systemcontrol to Pressure Control Valves to AUTO; and made formattingchanges.

Reason for the Change:Clarify procedure requirements.

FCE 14-0325 0 Title: 12/29/2014 No AC4-OP-013 Chg 17 No None of the criteria

PCE - N/A Revision to Procedure AC4-OP-01 3, Operation of the X-3001 Battery and listed in 10 CFRDC Power System 70.72(c) are met.

Description of Change:Deleted acronyms, tools, steps, and form AC-354, Battery Room H2Monitoring System Testing and Adjustment, used to perform thesurveillance of the annual H2 Monitoring system since new procedure AC4-ST-002 was developed and implemented; revised forms AC-352, BatteryRoom Daily/Weekly Surveillance, and AC-353, Annual Ventilation SystemInspection, with driver procedure information; and made editorial andformatting changes.

Reason for the Change:Clarify procedure requirements.

FCE 14-0327 0 Title: 12/31/2014 No AC4-AR-006 Chg 28 No None of the criteriaPCE - N/A Revision to Procedure AC4-AR-006, Cascade Alarms and Responses listed in 10 CFR

Description of Change: 70.72(c) are met.

Consolidated and modified steps; added to the list of alerts; and madeformatting changes.

Reason for the Change:Clarify procedure requirements.

NRC Report 2014 Page 99 of 99