Objective ITY-AGDL ESSIP Plan 2015 Adriatik KOKONA DPS/PEPR 01.01.2015

Upload: kendis

Post on 08-Jan-2016

25 views

Category:

Documents


1 download

DESCRIPTION

Objective ITY-AGDL. ESSIP Plan 2014. Adriatik KOKONA DSS/EIPR 19.09.2014. Comprehensive Explanation (1/3). This OBJ covers the implementation of initial data link services based on air-ground (ATCO  Pilot) point-to-point data communications as specified by Regulation - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Objective ITY-AGDL

Objective ITY-AGDL

ESSIP Plan 2015

Adriatik KOKONADPS/PEPR

01.01.2015

Page 2: Objective ITY-AGDL

ESSIP Plan 2015 / Objective ITY-AGDL 2

Comprehensive Explanation (1/3)

This OBJ covers the implementation of initial data link services based on air-ground (ATCO Pilot) point-to-point data communications as specified by Regulation 29/2009 EC (data link services) and repealing

Implementing Regulation (EU) No 441/2014, laying down requirements on data link services for the single European sky .

Scope: EU+ States = EU+CH+NO+ECAA MIL: Only 1 non-mandatory SLoA on State a/c

equipage

Page 3: Objective ITY-AGDL

ESSIP Plan 2015 / Objective ITY-AGDL 3

Link to European ATM Master Plan

[AUO-0301] - Voice Controller-Pilot Communications (En Route) Complemented by Data Link;

[CTE-C02b] - A/G Datalink over ATN/OSI - Single frequency; [ER ATC154a] - Basic air-ground data link communications service

derived from the CM and CPDLC applications; [ER ATC154b ] - Enhance En-route ATC sub-systems (internal

processing, FDP and Controller Workstation) to enable CPDLC dialog with Pilot;

[PRO-044b] - ATC Procedures involving protocol for utilization of Data Link communications, message composition, receipt acknowledgement.

Page 4: Objective ITY-AGDL

ESSIP Plan 2015 / Objective ITY-AGDL 4

Finalisation Criteria and Closed Questions

Various – see detailed breakdown in ESSIP Plan 2015.

Page 5: Objective ITY-AGDL

ESSIP Plan 2015 / Objective ITY-AGDL 5

Supporting Material

Various – see ESSIP Plan 2015

Page 6: Objective ITY-AGDL

ESSIP Plan 2015 / Objective ITY-AGDL 6

ESSIP Report 2014

Page 7: Objective ITY-AGDL

ESSIP Plan 2015 / Objective ITY-AGDL 7

Links and contacts

Objective Coordinator: Adriatik Kokona, +32 2 729 3556

[email protected]

DNM Objective Expert(s): Soren Dissing , +32 2 729 3446 [email protected]