![Page 2: Oakwood CSO Control Facility and Pump Station (PC-755)€¦ · Mark TenBroek, CDM Smith . Project Purpose •Address capacity issues in original sewer system: –Oakwood District](https://reader033.vdocuments.us/reader033/viewer/2022052012/6027c7dcbe371935887f177c/html5/thumbnails/2.jpg)
Project Purpose
• Address capacity issues in original sewer system: – Oakwood District sewers built by Oakwood Village
– DWSD inherited these sewers
– Sewers undersized for combined sewer flows
• Install relief sewers in Oakwood Sewer District: – Mitigate chronic basement and street flooding issue
– Address 140 flooding complaints from 1994-1996
• DWSD design process: – Began to evaluate district in 2000
– Determined street flooding caused drainage system
– DWSD has designed new relief sewer system
![Page 3: Oakwood CSO Control Facility and Pump Station (PC-755)€¦ · Mark TenBroek, CDM Smith . Project Purpose •Address capacity issues in original sewer system: –Oakwood District](https://reader033.vdocuments.us/reader033/viewer/2022052012/6027c7dcbe371935887f177c/html5/thumbnails/3.jpg)
Project Purpose
• Provide Combined Sewage Overflow (CSO) control:
– Treat water before discharge to Rouge River
– Improve Rouge River water quality
– Facility required by MDEQ
• Provide increased pumping capacity:
– Additional relief sewers under design for district (PCS-79)
– Current pump station - 650 cfs
– New pump station - 1,660 cfs
![Page 4: Oakwood CSO Control Facility and Pump Station (PC-755)€¦ · Mark TenBroek, CDM Smith . Project Purpose •Address capacity issues in original sewer system: –Oakwood District](https://reader033.vdocuments.us/reader033/viewer/2022052012/6027c7dcbe371935887f177c/html5/thumbnails/4.jpg)
Benefits from Project
• Improve Rouge River water quality
• Remain compliant with MDEQ permit
• Reduce street flooding in district
• Reduce basement flooding in district
• Convey sanitary wastewater to wastewater treatment plant
• Remove older obsolete pump station
![Page 5: Oakwood CSO Control Facility and Pump Station (PC-755)€¦ · Mark TenBroek, CDM Smith . Project Purpose •Address capacity issues in original sewer system: –Oakwood District](https://reader033.vdocuments.us/reader033/viewer/2022052012/6027c7dcbe371935887f177c/html5/thumbnails/5.jpg)
Ple
as
an
t Stre
et
Liddesdale
Liebold
Deacon Site Plan
Project Work Area
![Page 6: Oakwood CSO Control Facility and Pump Station (PC-755)€¦ · Mark TenBroek, CDM Smith . Project Purpose •Address capacity issues in original sewer system: –Oakwood District](https://reader033.vdocuments.us/reader033/viewer/2022052012/6027c7dcbe371935887f177c/html5/thumbnails/6.jpg)
Perspective view looking Northwest Perspective view looking Northeast
Perspective view looking North Perspective view looking Southeast
Design Rendering
![Page 7: Oakwood CSO Control Facility and Pump Station (PC-755)€¦ · Mark TenBroek, CDM Smith . Project Purpose •Address capacity issues in original sewer system: –Oakwood District](https://reader033.vdocuments.us/reader033/viewer/2022052012/6027c7dcbe371935887f177c/html5/thumbnails/7.jpg)
CSO Basin Pump Station
Facilities
Scre
ens
![Page 8: Oakwood CSO Control Facility and Pump Station (PC-755)€¦ · Mark TenBroek, CDM Smith . Project Purpose •Address capacity issues in original sewer system: –Oakwood District](https://reader033.vdocuments.us/reader033/viewer/2022052012/6027c7dcbe371935887f177c/html5/thumbnails/8.jpg)
Early Foundation Construction (2008)
![Page 9: Oakwood CSO Control Facility and Pump Station (PC-755)€¦ · Mark TenBroek, CDM Smith . Project Purpose •Address capacity issues in original sewer system: –Oakwood District](https://reader033.vdocuments.us/reader033/viewer/2022052012/6027c7dcbe371935887f177c/html5/thumbnails/9.jpg)
Unique Features
• Slurry Wall – Deep facility construction
• Pump Hydraulics – Physical model study
• Chemical Mixing – Reduced maintenance compared to mixers
typically used
• Ground Level Basin – Improved dewatering control
• Perforated Plate Screens – Six perforated plate screens
![Page 10: Oakwood CSO Control Facility and Pump Station (PC-755)€¦ · Mark TenBroek, CDM Smith . Project Purpose •Address capacity issues in original sewer system: –Oakwood District](https://reader033.vdocuments.us/reader033/viewer/2022052012/6027c7dcbe371935887f177c/html5/thumbnails/10.jpg)
Slurry Wall Construction
• Pump station proposed rectangular trench style wet well
• Wet well base slab slightly above underlying rock
• Artesian aquifer in rock, causing concerns with uplift forces
• Circular caisson construction not deemed feasible
• Slurry wall construction selected, while not commonly used in
Southeast Michigan
![Page 11: Oakwood CSO Control Facility and Pump Station (PC-755)€¦ · Mark TenBroek, CDM Smith . Project Purpose •Address capacity issues in original sewer system: –Oakwood District](https://reader033.vdocuments.us/reader033/viewer/2022052012/6027c7dcbe371935887f177c/html5/thumbnails/11.jpg)
Slurry Wall Excavator
![Page 12: Oakwood CSO Control Facility and Pump Station (PC-755)€¦ · Mark TenBroek, CDM Smith . Project Purpose •Address capacity issues in original sewer system: –Oakwood District](https://reader033.vdocuments.us/reader033/viewer/2022052012/6027c7dcbe371935887f177c/html5/thumbnails/12.jpg)
Slurry Supporting the Slot Excavation
![Page 13: Oakwood CSO Control Facility and Pump Station (PC-755)€¦ · Mark TenBroek, CDM Smith . Project Purpose •Address capacity issues in original sewer system: –Oakwood District](https://reader033.vdocuments.us/reader033/viewer/2022052012/6027c7dcbe371935887f177c/html5/thumbnails/13.jpg)
Reinforcement Dropped into Excavation
![Page 14: Oakwood CSO Control Facility and Pump Station (PC-755)€¦ · Mark TenBroek, CDM Smith . Project Purpose •Address capacity issues in original sewer system: –Oakwood District](https://reader033.vdocuments.us/reader033/viewer/2022052012/6027c7dcbe371935887f177c/html5/thumbnails/14.jpg)
Concrete is Tremie Placed and Slurry is Displaced
![Page 15: Oakwood CSO Control Facility and Pump Station (PC-755)€¦ · Mark TenBroek, CDM Smith . Project Purpose •Address capacity issues in original sewer system: –Oakwood District](https://reader033.vdocuments.us/reader033/viewer/2022052012/6027c7dcbe371935887f177c/html5/thumbnails/15.jpg)
Pump Station Work Area
![Page 16: Oakwood CSO Control Facility and Pump Station (PC-755)€¦ · Mark TenBroek, CDM Smith . Project Purpose •Address capacity issues in original sewer system: –Oakwood District](https://reader033.vdocuments.us/reader033/viewer/2022052012/6027c7dcbe371935887f177c/html5/thumbnails/16.jpg)
Wet Well Support During Construction
![Page 17: Oakwood CSO Control Facility and Pump Station (PC-755)€¦ · Mark TenBroek, CDM Smith . Project Purpose •Address capacity issues in original sewer system: –Oakwood District](https://reader033.vdocuments.us/reader033/viewer/2022052012/6027c7dcbe371935887f177c/html5/thumbnails/17.jpg)
Pump Station Hydraulics Required Physical Model
• Wet well relatively small compared to peak pumping capacity
– 1,660 cfs
– 8 vertical turbine pumps
• Concerned with swirl that could cause pump problems
• Commissioned physical model
– Initial during design
– Updated during construction when inlet conditions changed
• Resulted in small modifications to protect pumps
![Page 18: Oakwood CSO Control Facility and Pump Station (PC-755)€¦ · Mark TenBroek, CDM Smith . Project Purpose •Address capacity issues in original sewer system: –Oakwood District](https://reader033.vdocuments.us/reader033/viewer/2022052012/6027c7dcbe371935887f177c/html5/thumbnails/18.jpg)
Model Included Both Pump Station Wet Wells and Inlets from the Upstream Junction Chamber
![Page 19: Oakwood CSO Control Facility and Pump Station (PC-755)€¦ · Mark TenBroek, CDM Smith . Project Purpose •Address capacity issues in original sewer system: –Oakwood District](https://reader033.vdocuments.us/reader033/viewer/2022052012/6027c7dcbe371935887f177c/html5/thumbnails/19.jpg)
The Model Incorporates All Important Physical Features
![Page 20: Oakwood CSO Control Facility and Pump Station (PC-755)€¦ · Mark TenBroek, CDM Smith . Project Purpose •Address capacity issues in original sewer system: –Oakwood District](https://reader033.vdocuments.us/reader033/viewer/2022052012/6027c7dcbe371935887f177c/html5/thumbnails/20.jpg)
Dye Used to Identify Problem Swirl and Determine Corrective Actions
![Page 21: Oakwood CSO Control Facility and Pump Station (PC-755)€¦ · Mark TenBroek, CDM Smith . Project Purpose •Address capacity issues in original sewer system: –Oakwood District](https://reader033.vdocuments.us/reader033/viewer/2022052012/6027c7dcbe371935887f177c/html5/thumbnails/21.jpg)
Pump Arrival
![Page 22: Oakwood CSO Control Facility and Pump Station (PC-755)€¦ · Mark TenBroek, CDM Smith . Project Purpose •Address capacity issues in original sewer system: –Oakwood District](https://reader033.vdocuments.us/reader033/viewer/2022052012/6027c7dcbe371935887f177c/html5/thumbnails/22.jpg)
Pumps Placed in Wet Well
![Page 23: Oakwood CSO Control Facility and Pump Station (PC-755)€¦ · Mark TenBroek, CDM Smith . Project Purpose •Address capacity issues in original sewer system: –Oakwood District](https://reader033.vdocuments.us/reader033/viewer/2022052012/6027c7dcbe371935887f177c/html5/thumbnails/23.jpg)
Pump Station Motor Floor
![Page 24: Oakwood CSO Control Facility and Pump Station (PC-755)€¦ · Mark TenBroek, CDM Smith . Project Purpose •Address capacity issues in original sewer system: –Oakwood District](https://reader033.vdocuments.us/reader033/viewer/2022052012/6027c7dcbe371935887f177c/html5/thumbnails/24.jpg)
Completed Motor Floor
![Page 25: Oakwood CSO Control Facility and Pump Station (PC-755)€¦ · Mark TenBroek, CDM Smith . Project Purpose •Address capacity issues in original sewer system: –Oakwood District](https://reader033.vdocuments.us/reader033/viewer/2022052012/6027c7dcbe371935887f177c/html5/thumbnails/25.jpg)
Disinfection Solution Added at Pump Discharge
• Most CSO basins add chemical using mixers to properly distribute
disinfectant
• Oakwood places disinfectant in the pump discharge lines
• Simplified chemical application control since each storm pump is
matched with a chemical pump
![Page 26: Oakwood CSO Control Facility and Pump Station (PC-755)€¦ · Mark TenBroek, CDM Smith . Project Purpose •Address capacity issues in original sewer system: –Oakwood District](https://reader033.vdocuments.us/reader033/viewer/2022052012/6027c7dcbe371935887f177c/html5/thumbnails/26.jpg)
Pump Station Intermediate Level
![Page 27: Oakwood CSO Control Facility and Pump Station (PC-755)€¦ · Mark TenBroek, CDM Smith . Project Purpose •Address capacity issues in original sewer system: –Oakwood District](https://reader033.vdocuments.us/reader033/viewer/2022052012/6027c7dcbe371935887f177c/html5/thumbnails/27.jpg)
Ground Level CSO Basin
• Most DWSD CSO basins are gravity flow through style
• Hydraulics in the Oakwood District required pumping
• Decided to construct basin partially above ground:
– Reduced excavation costs
– Fewer dewatering issues
– Allows mostly gravity dewatering
![Page 28: Oakwood CSO Control Facility and Pump Station (PC-755)€¦ · Mark TenBroek, CDM Smith . Project Purpose •Address capacity issues in original sewer system: –Oakwood District](https://reader033.vdocuments.us/reader033/viewer/2022052012/6027c7dcbe371935887f177c/html5/thumbnails/28.jpg)
Basin Pile Foundation Construction
![Page 29: Oakwood CSO Control Facility and Pump Station (PC-755)€¦ · Mark TenBroek, CDM Smith . Project Purpose •Address capacity issues in original sewer system: –Oakwood District](https://reader033.vdocuments.us/reader033/viewer/2022052012/6027c7dcbe371935887f177c/html5/thumbnails/29.jpg)
CSO Screening and Basin Area
![Page 30: Oakwood CSO Control Facility and Pump Station (PC-755)€¦ · Mark TenBroek, CDM Smith . Project Purpose •Address capacity issues in original sewer system: –Oakwood District](https://reader033.vdocuments.us/reader033/viewer/2022052012/6027c7dcbe371935887f177c/html5/thumbnails/30.jpg)
CSO Basin Effluent Weirs
![Page 31: Oakwood CSO Control Facility and Pump Station (PC-755)€¦ · Mark TenBroek, CDM Smith . Project Purpose •Address capacity issues in original sewer system: –Oakwood District](https://reader033.vdocuments.us/reader033/viewer/2022052012/6027c7dcbe371935887f177c/html5/thumbnails/31.jpg)
Basin Flushing Lanes
![Page 32: Oakwood CSO Control Facility and Pump Station (PC-755)€¦ · Mark TenBroek, CDM Smith . Project Purpose •Address capacity issues in original sewer system: –Oakwood District](https://reader033.vdocuments.us/reader033/viewer/2022052012/6027c7dcbe371935887f177c/html5/thumbnails/32.jpg)
Influent Screening using Perforated Plate Screens
• Provides removal of small material
• Includes bypass channels should screens become blinded with
excessive material
• Screen discharge includes screening washer and discharge to a
dumpster
![Page 33: Oakwood CSO Control Facility and Pump Station (PC-755)€¦ · Mark TenBroek, CDM Smith . Project Purpose •Address capacity issues in original sewer system: –Oakwood District](https://reader033.vdocuments.us/reader033/viewer/2022052012/6027c7dcbe371935887f177c/html5/thumbnails/33.jpg)
Perforated Plate Screen Installation
![Page 34: Oakwood CSO Control Facility and Pump Station (PC-755)€¦ · Mark TenBroek, CDM Smith . Project Purpose •Address capacity issues in original sewer system: –Oakwood District](https://reader033.vdocuments.us/reader033/viewer/2022052012/6027c7dcbe371935887f177c/html5/thumbnails/34.jpg)
Project Summary
• Slurry wall construction installed quickly
• Pumping systems have worked well, in spite of small wet well
• Chemical application has worked effectively
• Flushing system has removed solids with single flush
• No problems have been encountered with screen blinding
• Project PPC 1-year sampling period has been completed
• Final PPC report to be submitted this fall
![Page 35: Oakwood CSO Control Facility and Pump Station (PC-755)€¦ · Mark TenBroek, CDM Smith . Project Purpose •Address capacity issues in original sewer system: –Oakwood District](https://reader033.vdocuments.us/reader033/viewer/2022052012/6027c7dcbe371935887f177c/html5/thumbnails/35.jpg)
Completed Facility
![Page 36: Oakwood CSO Control Facility and Pump Station (PC-755)€¦ · Mark TenBroek, CDM Smith . Project Purpose •Address capacity issues in original sewer system: –Oakwood District](https://reader033.vdocuments.us/reader033/viewer/2022052012/6027c7dcbe371935887f177c/html5/thumbnails/36.jpg)
Acknowledgements
Detroit Water & Sewerage Department (DWSD)
• Sue McCormick DWSD Director
• Mirza Rabbaig CSO Program Manager
CDM Michigan Inc. (CDM Smith) Engineering Partners
Applied Science, Inc. Hamilton Anderson Associates
JE Associates PMA Consultants, LLC
SOMAT Inc. Spalding DeDecker Associates
Sigma Associates Superior Engineering, Inc.
Tucker Young Jackson Tull, Inc.
L D’Agostini & Sons (LDS) Construction Contractor
• Gino L. D’Agostini, Jr. Project Manager