1 of 16 OACA PERSPECTIVE ON GNSS IMPLEMENTATION © 2009 OACA - TUNISIA
OACA PERSPECTIVE ON OACA PERSPECTIVE ON GNSS GNSS IMPLEMENTATIONIMPLEMENTATION
© 2009 OACA - TUNISIA
REPUBLIC OF TUNISIA
MINISTRY OF TRANSPORT
CIVIL AVIATION AND AIRPORTS AUTHORITY
NIZAR ELMRABTIHEAD OF FANS SERVICE
OACA- TUNISIAN ANSP AND AIRPORTS MANAGER
E-mail : [email protected]
Web site : www.oaca.nat.tn
2 of 16 OACA PERSPECTIVE ON GNSS IMPLEMENTATION © 2009 OACA - TUNISIA
• TUNISIA ADHESION TO GNSS REGIONAL PLANS• INTERNATIONAL COOPERATION• WGS-84• GNSS BASED ON GPS• RNAV STATUS• GPS IN TMAs• EGNOS• CONCLUSION
PLAN
3 of 16 OACA PERSPECTIVE ON GNSS IMPLEMENTATION © 2009 OACA - TUNISIA
• As an interface country between ECAC and AFI Regions, TUNISIA isasked to follow the European Navigation Strategy and regional implementation plans (CNS/ATM and GNSS Implementation)
TUNISIA ADHESION TO GNSS REGIONAL PLANS : EUROPE
4 of 16 OACA PERSPECTIVE ON GNSS IMPLEMENTATION © 2009 OACA - TUNISIA
TUNISIA ADHESION TO GNSS REGIONAL PLANS : ICAO / AFI REGION
Draft GNSS Strategy 2008-2013 2013-2016
Airspace Navigation Specifications Navigation Specifications
where operationally required
Airspace Navigation Specifications
Navigation Specifications where
operationally required
Basic GNSS Basic GNSS • En-Route Oceanic • RNAV-10 • RNP-4 • En-Route Oceanic • RNAV-10, RNP-4 • En-Route • • En-Route
RNP-4 Remote Continental
• RNAV-10 • RNP-4 Remote Continental • RNAV-10,
• En-Route Continental • RNAV-5 • RNAV-1 • En-Route Continental • RNAV-2, RNAV-5
RNAV-1
• RNAV-1 in a •Expand RNAV-1, or RNP-1 application
surveillance
• TMA environment • TMA
Arrival/Depa • Basic RNP-1 Arrival/Depa • Mandate RNAV-1, or RNP-1 in high density TMAs
rture in non- rture
surveillance
environment
Basic GNSS ABAS or SBAS
• Approach
• RNP APCH with Baro-VNAV or RNP AR APCH if required
• Approach Expand RNP APCH with (Baro-VNAV) and APV (ABAS or SBAS) Expand RNP AR APCH where there are operational benefits
5 of 16 OACA PERSPECTIVE ON GNSS IMPLEMENTATION © 2009 OACA - TUNISIA
TUNISIA ADHESION TO GNSS REGIONAL PLANS : ICAO / AFI REGION
2017 – and beyond Airspace Navigation Specifications Navigation Specifications where
operationally requiredLong term GNSS
• En-Route Oceanic • RNAV-10 • RNP-4
• En-Route Remote Continental • RNAV-10 •
• RNP-4
• En-Route Continental • RNAV-5 • RNAV-1 • TMA Arrival/Departure RNAV-1 in a surveillance environment
Basic RNP-1 in non-surveillance environment SBAS, GBAS
• Approach RNP APCH with Baro-VNAV RNP AR APCH if required CAT I (SBAS) CAT I/II/II/ (GBAS) as required
6 of 16 OACA PERSPECTIVE ON GNSS IMPLEMENTATION © 2009 OACA - TUNISIA
INTERNATIONAL COOPERATION• Signed Agreements
• July 1997 : Tunisia – Italy• June 1998 : Tunisia – France• September 1998 : Tunisia – EUROCONTROL• April 2003 : Tunisia – ESA
• Ongoing projects • EUROMED : The EuroMed Transport Project aims to facilitate
cooperation between the 12 Mediterranean Partner Countries with the goal of supporting the development of the future Euro-Mediterranean Free Trade Area and promoting regional economic integration.
• BLUE MED : The BLUE MED project is pursuing the implementation of a Functional Airspace Block (FAB) in the South– East Mediterranean Area, in accordance with the requirements of the Single European Sky, to be put in operation within 2012 and with 2015 as target date for full FAB operations
7 of 16 OACA PERSPECTIVE ON GNSS IMPLEMENTATION © 2009 OACA - TUNISIA
• All the reporting points of the Tunisian airports have been surveyed in WGS-84 referential in accordance to the specifications of ICAO Doc 9674.
• The agreement on the Reporting Points located on the FIR limits has been coordinated with the edging FIRs.
IMPLEMENTATION OF THE WGS 84 REFERENTIAL
8 of 16 OACA PERSPECTIVE ON GNSS IMPLEMENTATION © 2009 OACA - TUNISIA
• The use of GNSS in Tunisian airspace is currently based on GPS only,
• The use of GPS is ruled by the decision of the minister of transport n° 574 dated on the 4th of November 2004,
TUNISIA TODAY :GNSS BASED ON GPS
9 of 16 OACA PERSPECTIVE ON GNSS IMPLEMENTATION © 2009 OACA - TUNISIA
• FIRST STAGE– JANUARY 2004 : (AIC NR 07/03) TUNISIAN
AIRSPACE IS B-RNAV (FL 245 AND ABOVE)• SECOND STAGE
– JANUARY 2006 : (AIC NR 12/05) TUNISIAN AIRSPACE IS B-RNAV (FL 155 AND ABOVE) ONLY IN AIRSPACES 2,3 AND 4
• THIRD STAGE– PLAN FOR THE INTRODUCTION OF PBN.
THE DRAFT NATIONAL PLAN IS ALREADY ESTABLISHED, THE FINAL DRAFT WILL BE ACHIEVED BY THE END OF 2009.
RNAV STATUS IN TUNISIA
• B-RNAV based on :• VOR/DME• DME/DME• GPS
10 of 16 OACA PERSPECTIVE ON GNSS IMPLEMENTATION © 2009 OACA - TUNISIA
GPS Procedures for Tunisian Airports designed in conformance with ICAO criteria (Doc 8186) and optimized after flight check have been published in AIRAC on December 2000.
GPS IN TMAs
11 of 16 OACA PERSPECTIVE ON GNSS IMPLEMENTATION © 2009 OACA - TUNISIA
RNAV PROCEDURES IMPLEMENTATION
Tunis Carthage 4 RNAV VOR/DME departure procedures3 RNAV VOR/DME approach procedures
15/12/200015/12/2000
Monastir Habib Bourguiba
2 RNAV VOR/DME approach procedures2 RNAV GPS approach procedures
02/11/200022/02/2001
Djerba Zarzis 2 RNAV VOR/DME departure procedures2 RNAV VOR/DME approach procedures2 RNAV GPS approach procedures
18/05/200015/12/200022/02/2001
Gabes Matmata 2 RNAV GPS approach procedures2 RNAV GPS departure procedures
01/07/200301/07/2003
Tozeur Nafta 2 RNAV VOR/DME approach procedures2 RNAV GPS approach procedures2 RNAV VOR/DME approach procedures
20/09/200120/09/200120/09/2001
Others Elaboration in progress Near Future
Airport Number and type of procedure Implementation date
12 of 16 OACA PERSPECTIVE ON GNSS IMPLEMENTATION © 2009 OACA - TUNISIA
Tunisia is a hosting entity of a RIMS station installed in Djerba airport since 2003.
Djerba RIMS is the first operational station out the European region.
OACA is providing facility and assuming local maintenance activities of Djerba RIMS.
TUNISIA EVOLVING IN EGNOS PROJECT
13 of 16 OACA PERSPECTIVE ON GNSS IMPLEMENTATION © 2009 OACA - TUNISIA
TUNISIA EVOLVING IN EGNOS PROJECT
TUNISIA has expressed its intention to :
• Verify the navigation performances over selected areas and airports in Tunisia,
• Evaluate critical issues (telecommunication network, expansion mode, airborne receivers performances,…)
• Validate the EGNOS simulation model outside Europe,• Evaluate APV1 procedure design, constraints and
operations• Sensitise potential services providers and users,
14 of 16 OACA PERSPECTIVE ON GNSS IMPLEMENTATION © 2009 OACA - TUNISIA
CONCLUSION
• As an interface country Tunisia is called to follow the technical enhancement in the field of the air navigation and the implementation of GNSS.
• Success conditions of GNSS implementation:very wide international and regional cooperation and the adhesion of all partners (countries, organisations, air space agencies, regional work groups…).
15 of 16 OACA PERSPECTIVE ON GNSS IMPLEMENTATION © 2009 OACA - TUNISIA
THANK YOUQUESTIONS?THANK YOUQUESTIONS?