nuol campus intranets (team 5) e-mail: [email protected]@csd.ssvl.kth.se...

23
NUOL Campus Intranets (Team 5) E-mail: [email protected] http:// csd.ssvl.kth.se /~csd2004-team5

Upload: rolf-hodge

Post on 19-Jan-2016

216 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: NUOL Campus Intranets (Team 5) E-mail: csd2004-team5@csd.ssvl.kth.secsd2004-team5@csd.ssvl.kth.se csd2004-team5

NUOL Campus Intranets (Team 5)

E-mail: [email protected]://csd.ssvl.kth.se/~csd2004-team5

Page 2: NUOL Campus Intranets (Team 5) E-mail: csd2004-team5@csd.ssvl.kth.secsd2004-team5@csd.ssvl.kth.se csd2004-team5

Agenda

• Background

• Main goals

• Work done

• Work left

• Problems

• Summary

• Questions

Page 3: NUOL Campus Intranets (Team 5) E-mail: csd2004-team5@csd.ssvl.kth.secsd2004-team5@csd.ssvl.kth.se csd2004-team5

Background

• This is the second year that KTH is helping National University of Laos (NUOL) with their network implementation and configuration.

• The project will be implemented during a two-year period

• This year three teams will work with this project

Page 4: NUOL Campus Intranets (Team 5) E-mail: csd2004-team5@csd.ssvl.kth.secsd2004-team5@csd.ssvl.kth.se csd2004-team5

Overview of NUOL

Page 5: NUOL Campus Intranets (Team 5) E-mail: csd2004-team5@csd.ssvl.kth.secsd2004-team5@csd.ssvl.kth.se csd2004-team5

Overview of NUOL

Page 6: NUOL Campus Intranets (Team 5) E-mail: csd2004-team5@csd.ssvl.kth.secsd2004-team5@csd.ssvl.kth.se csd2004-team5
Page 7: NUOL Campus Intranets (Team 5) E-mail: csd2004-team5@csd.ssvl.kth.secsd2004-team5@csd.ssvl.kth.se csd2004-team5
Page 8: NUOL Campus Intranets (Team 5) E-mail: csd2004-team5@csd.ssvl.kth.secsd2004-team5@csd.ssvl.kth.se csd2004-team5
Page 9: NUOL Campus Intranets (Team 5) E-mail: csd2004-team5@csd.ssvl.kth.secsd2004-team5@csd.ssvl.kth.se csd2004-team5

Current situation

• Few computers

• Few LANs

• Few computer rooms

• Lack of knowledge

Page 10: NUOL Campus Intranets (Team 5) E-mail: csd2004-team5@csd.ssvl.kth.secsd2004-team5@csd.ssvl.kth.se csd2004-team5

GOAL 1• Build LAN in five faculties

GOAL 2• Computer room in five faculties- 15-20 computers- 1 DHCP- 1 print server- 1 network printer

GOAL 3• Train local administrators- 2 administrators from each faculty

Main goals of the team

Page 11: NUOL Campus Intranets (Team 5) E-mail: csd2004-team5@csd.ssvl.kth.secsd2004-team5@csd.ssvl.kth.se csd2004-team5

Work done - Training

- Links and LANs- Routing- DNS - DHCP- Web & Mail server

Page 12: NUOL Campus Intranets (Team 5) E-mail: csd2004-team5@csd.ssvl.kth.secsd2004-team5@csd.ssvl.kth.se csd2004-team5

Work done – Team training

- Links and LANs- DHCP- Cable link - Print server- Ghost CD

Page 13: NUOL Campus Intranets (Team 5) E-mail: csd2004-team5@csd.ssvl.kth.secsd2004-team5@csd.ssvl.kth.se csd2004-team5

Work done – Links and LANs, DHCP

• Scenario

• IP-address

Page 14: NUOL Campus Intranets (Team 5) E-mail: csd2004-team5@csd.ssvl.kth.secsd2004-team5@csd.ssvl.kth.se csd2004-team5

Work done - LAN Standard

Page 15: NUOL Campus Intranets (Team 5) E-mail: csd2004-team5@csd.ssvl.kth.secsd2004-team5@csd.ssvl.kth.se csd2004-team5

Work done – Cable training and Print Server

Cable training

-Straight and Cross

Print server

• Samba

• LPRng

Page 16: NUOL Campus Intranets (Team 5) E-mail: csd2004-team5@csd.ssvl.kth.secsd2004-team5@csd.ssvl.kth.se csd2004-team5

Software

• Windows

• Linux 8

• Ghost CD

Documents

• Lao language

Work done - Software Installation and documents

Page 17: NUOL Campus Intranets (Team 5) E-mail: csd2004-team5@csd.ssvl.kth.secsd2004-team5@csd.ssvl.kth.se csd2004-team5

Week 1:

• Campus survey

• Prepare the computer room

• Set up print and DHCP server

Work left – 6 weeks in Vientiane

Page 18: NUOL Campus Intranets (Team 5) E-mail: csd2004-team5@csd.ssvl.kth.secsd2004-team5@csd.ssvl.kth.se csd2004-team5

Work left – 6 weeks in Vientiane

Week 2-5:

• Implementation in each faculty

- Dong Dok

- Done Nokhum

- Tathong

• Test

• Train staff

Page 19: NUOL Campus Intranets (Team 5) E-mail: csd2004-team5@csd.ssvl.kth.secsd2004-team5@csd.ssvl.kth.se csd2004-team5

Work left – 6 weeks in Vientiane

Week 6:

• Handover process

• Final report

• Video

Page 20: NUOL Campus Intranets (Team 5) E-mail: csd2004-team5@csd.ssvl.kth.secsd2004-team5@csd.ssvl.kth.se csd2004-team5

Work left – 3 weeks in Stockholm

Week 7-9:

• Documents

• Final presentation

Page 21: NUOL Campus Intranets (Team 5) E-mail: csd2004-team5@csd.ssvl.kth.secsd2004-team5@csd.ssvl.kth.se csd2004-team5

Problems

• Hardware risk

• Software risk

Page 22: NUOL Campus Intranets (Team 5) E-mail: csd2004-team5@csd.ssvl.kth.secsd2004-team5@csd.ssvl.kth.se csd2004-team5

Summary

Work that has been done:• Training • Hardware• Software • Documents• LAN standard

Work that is left:• 6 weeks in Vientiane

-Implementation and put in service • 3 weeks in Stockholm

-Documents and final presentation

Page 23: NUOL Campus Intranets (Team 5) E-mail: csd2004-team5@csd.ssvl.kth.secsd2004-team5@csd.ssvl.kth.se csd2004-team5

Questions?

[email protected]

http://csd.ssvl.kth.se/~csd2004-team5