Who is Roxtec?• World’s leading manufacturer of
modular sealing systems.
• Founded in 1990-Sweden
• The only modular sealing system in the U.S with direct local support.
• Coast to Coast distributors and sales professionals in the U.S.
![Page 3: Nuclear presentation 2014 d nasr](https://reader033.vdocuments.us/reader033/viewer/2022052311/55646970d8b42ae57c8b4995/html5/thumbnails/3.jpg)
![Page 4: Nuclear presentation 2014 d nasr](https://reader033.vdocuments.us/reader033/viewer/2022052311/55646970d8b42ae57c8b4995/html5/thumbnails/4.jpg)
Scope of what we do:
• Sealing demands covered: Roxtec seals against Fire, Gas, Vapor, Water, Dust, Air, and rodents. Also includes hazardous locations.
• Applications: Seal cables on walls and floors, all types of cabinets, underground, and pipes with one product.
![Page 5: Nuclear presentation 2014 d nasr](https://reader033.vdocuments.us/reader033/viewer/2022052311/55646970d8b42ae57c8b4995/html5/thumbnails/5.jpg)
Roxtec 2003-5-1
U.S. Nuclear Projects using Roxtec
![Page 6: Nuclear presentation 2014 d nasr](https://reader033.vdocuments.us/reader033/viewer/2022052311/55646970d8b42ae57c8b4995/html5/thumbnails/6.jpg)
2011
Multidiameter™
Only 6 basic size modules enable: • adapt to cable / pipe diameters
from 0.118” to 3.98• Easy Planning• Smaller Stock• Fast and Reliable Installations• Future Included• Lower cost of ownership
The ability to peel away interior module layers to fit around cables and pipes of varying diameters
![Page 7: Nuclear presentation 2014 d nasr](https://reader033.vdocuments.us/reader033/viewer/2022052311/55646970d8b42ae57c8b4995/html5/thumbnails/7.jpg)
• All Roxtec modules are made with Roxylon™• Halogen-Free EPDM-Based Rubber• Excellent smoke and fire resistance (elastomeric)• High level of insulation and vibration damping • Excellent resistance against UV, radiation and
chemicals. • Long lasting material
Why EPDM rubber blocks?
![Page 8: Nuclear presentation 2014 d nasr](https://reader033.vdocuments.us/reader033/viewer/2022052311/55646970d8b42ae57c8b4995/html5/thumbnails/8.jpg)
![Page 9: Nuclear presentation 2014 d nasr](https://reader033.vdocuments.us/reader033/viewer/2022052311/55646970d8b42ae57c8b4995/html5/thumbnails/9.jpg)
Field/contractor based decisions (the bad stuff)
![Page 10: Nuclear presentation 2014 d nasr](https://reader033.vdocuments.us/reader033/viewer/2022052311/55646970d8b42ae57c8b4995/html5/thumbnails/10.jpg)
2011
Field/contractor based decisions (the sloppy mess)
![Page 12: Nuclear presentation 2014 d nasr](https://reader033.vdocuments.us/reader033/viewer/2022052311/55646970d8b42ae57c8b4995/html5/thumbnails/12.jpg)
2009
![Page 13: Nuclear presentation 2014 d nasr](https://reader033.vdocuments.us/reader033/viewer/2022052311/55646970d8b42ae57c8b4995/html5/thumbnails/13.jpg)
Four Typical ApplicationsWalls And Floors
Pipe Penetrations
Vaults/Undergroundund
Cabinets
![Page 14: Nuclear presentation 2014 d nasr](https://reader033.vdocuments.us/reader033/viewer/2022052311/55646970d8b42ae57c8b4995/html5/thumbnails/14.jpg)
Application examples - Nuclear power
Connection boxes
Terminal boxes
Wall transits
Cable tunnels/culverts
Power infrastructureI/C cabinets Substation
![Page 15: Nuclear presentation 2014 d nasr](https://reader033.vdocuments.us/reader033/viewer/2022052311/55646970d8b42ae57c8b4995/html5/thumbnails/15.jpg)
2011
Rectangular solutions:Walls and floors with larger amounts of cables/pipes (cable tray, switch gear)
•UL1479 – Up to 4 Hours•Water Tight 58 PSI•Gas Tight•For new and retrofit applications•Virtually unlimited configurations• Future capacity for expansion included
![Page 16: Nuclear presentation 2014 d nasr](https://reader033.vdocuments.us/reader033/viewer/2022052311/55646970d8b42ae57c8b4995/html5/thumbnails/16.jpg)
2011
R Seal: For round penetrations with multiple penetrants.
•Fire Stop•UL1479 – Up to 4 Hours
•Water Tight up to 58 PSI•Gas/air Tight•For new or retrofit applications•UV Resistant•Standard stainless 316 fittings
![Page 17: Nuclear presentation 2014 d nasr](https://reader033.vdocuments.us/reader033/viewer/2022052311/55646970d8b42ae57c8b4995/html5/thumbnails/17.jpg)
2011
RS Seal: Conduit, pipes, underground, cored holes, conduit/hole plug
•Fire Stop•UL1479 – Up to 4 Hours
•Water Tight up to 58 PSI•Gas/air Tight•For new or retrofit applications•UV Resistant•Standard stainless 316 fittings
![Page 18: Nuclear presentation 2014 d nasr](https://reader033.vdocuments.us/reader033/viewer/2022052311/55646970d8b42ae57c8b4995/html5/thumbnails/18.jpg)
2011
Wall & Floor ApplicationsHABOG interim storage facility, The Netherlands
![Page 19: Nuclear presentation 2014 d nasr](https://reader033.vdocuments.us/reader033/viewer/2022052311/55646970d8b42ae57c8b4995/html5/thumbnails/19.jpg)
2011
Cables or pipes, multiple types.TVO, OL 1 and 2, Finland
![Page 20: Nuclear presentation 2014 d nasr](https://reader033.vdocuments.us/reader033/viewer/2022052311/55646970d8b42ae57c8b4995/html5/thumbnails/20.jpg)
Cable Tunnels / Culverts Applications
![Page 21: Nuclear presentation 2014 d nasr](https://reader033.vdocuments.us/reader033/viewer/2022052311/55646970d8b42ae57c8b4995/html5/thumbnails/21.jpg)
Retrofit applications
![Page 22: Nuclear presentation 2014 d nasr](https://reader033.vdocuments.us/reader033/viewer/2022052311/55646970d8b42ae57c8b4995/html5/thumbnails/22.jpg)
2011
Retrofit applications/capacity expansion
![Page 23: Nuclear presentation 2014 d nasr](https://reader033.vdocuments.us/reader033/viewer/2022052311/55646970d8b42ae57c8b4995/html5/thumbnails/23.jpg)
Oconee Nuclear Station, Seneca, SCUnderground Applications
![Page 24: Nuclear presentation 2014 d nasr](https://reader033.vdocuments.us/reader033/viewer/2022052311/55646970d8b42ae57c8b4995/html5/thumbnails/24.jpg)
2011
Wall & Floor ApplicationsCables & Pipes – Round solutions
![Page 25: Nuclear presentation 2014 d nasr](https://reader033.vdocuments.us/reader033/viewer/2022052311/55646970d8b42ae57c8b4995/html5/thumbnails/25.jpg)
2011
Seal pipes individually. New or retrofitNuclear facility in US (undisclosed)
![Page 26: Nuclear presentation 2014 d nasr](https://reader033.vdocuments.us/reader033/viewer/2022052311/55646970d8b42ae57c8b4995/html5/thumbnails/26.jpg)
2011
Manholes and vaults-Water seal
![Page 27: Nuclear presentation 2014 d nasr](https://reader033.vdocuments.us/reader033/viewer/2022052311/55646970d8b42ae57c8b4995/html5/thumbnails/27.jpg)
2011
Underground: TVA-Sequoyah
![Page 28: Nuclear presentation 2014 d nasr](https://reader033.vdocuments.us/reader033/viewer/2022052311/55646970d8b42ae57c8b4995/html5/thumbnails/28.jpg)
2011
Underground: TVA-Sequoyah
![Page 29: Nuclear presentation 2014 d nasr](https://reader033.vdocuments.us/reader033/viewer/2022052311/55646970d8b42ae57c8b4995/html5/thumbnails/29.jpg)
2011
TVA, Plant Sequoyah
![Page 30: Nuclear presentation 2014 d nasr](https://reader033.vdocuments.us/reader033/viewer/2022052311/55646970d8b42ae57c8b4995/html5/thumbnails/30.jpg)
2011
Conduit Seal Applications
![Page 31: Nuclear presentation 2014 d nasr](https://reader033.vdocuments.us/reader033/viewer/2022052311/55646970d8b42ae57c8b4995/html5/thumbnails/31.jpg)
Conduit Seal Applications (DCP1950)
![Page 32: Nuclear presentation 2014 d nasr](https://reader033.vdocuments.us/reader033/viewer/2022052311/55646970d8b42ae57c8b4995/html5/thumbnails/32.jpg)
![Page 33: Nuclear presentation 2014 d nasr](https://reader033.vdocuments.us/reader033/viewer/2022052311/55646970d8b42ae57c8b4995/html5/thumbnails/33.jpg)
2011
Cabinets & Enclosures
![Page 34: Nuclear presentation 2014 d nasr](https://reader033.vdocuments.us/reader033/viewer/2022052311/55646970d8b42ae57c8b4995/html5/thumbnails/34.jpg)
2011
•Meet UL/Nema 4, 4x,12,13•Prevention of Rodent Intrusion•Ability to Pull Pre-Terminated Cables Without Cutting and Reconnecting•Significant Space Savings on Equipment•Variety of Materials & Finishes Available
Cabinets & Enclosures
![Page 35: Nuclear presentation 2014 d nasr](https://reader033.vdocuments.us/reader033/viewer/2022052311/55646970d8b42ae57c8b4995/html5/thumbnails/35.jpg)
Roxtec 2003-5-1
![Page 36: Nuclear presentation 2014 d nasr](https://reader033.vdocuments.us/reader033/viewer/2022052311/55646970d8b42ae57c8b4995/html5/thumbnails/36.jpg)
2009
![Page 37: Nuclear presentation 2014 d nasr](https://reader033.vdocuments.us/reader033/viewer/2022052311/55646970d8b42ae57c8b4995/html5/thumbnails/37.jpg)
2009
Modular Building Applications
![Page 38: Nuclear presentation 2014 d nasr](https://reader033.vdocuments.us/reader033/viewer/2022052311/55646970d8b42ae57c8b4995/html5/thumbnails/38.jpg)
Wall entry (outside)
![Page 39: Nuclear presentation 2014 d nasr](https://reader033.vdocuments.us/reader033/viewer/2022052311/55646970d8b42ae57c8b4995/html5/thumbnails/39.jpg)
Wall entry (Inside)
![Page 40: Nuclear presentation 2014 d nasr](https://reader033.vdocuments.us/reader033/viewer/2022052311/55646970d8b42ae57c8b4995/html5/thumbnails/40.jpg)
2009
Modular Building Applications
![Page 41: Nuclear presentation 2014 d nasr](https://reader033.vdocuments.us/reader033/viewer/2022052311/55646970d8b42ae57c8b4995/html5/thumbnails/41.jpg)
2009
Modular Building Applications
![Page 42: Nuclear presentation 2014 d nasr](https://reader033.vdocuments.us/reader033/viewer/2022052311/55646970d8b42ae57c8b4995/html5/thumbnails/42.jpg)
![Page 43: Nuclear presentation 2014 d nasr](https://reader033.vdocuments.us/reader033/viewer/2022052311/55646970d8b42ae57c8b4995/html5/thumbnails/43.jpg)
2011
Modular Building Applications
![Page 44: Nuclear presentation 2014 d nasr](https://reader033.vdocuments.us/reader033/viewer/2022052311/55646970d8b42ae57c8b4995/html5/thumbnails/44.jpg)
2011
Modular Building Applications
![Page 45: Nuclear presentation 2014 d nasr](https://reader033.vdocuments.us/reader033/viewer/2022052311/55646970d8b42ae57c8b4995/html5/thumbnails/45.jpg)
2011
Modular Building Applications
![Page 46: Nuclear presentation 2014 d nasr](https://reader033.vdocuments.us/reader033/viewer/2022052311/55646970d8b42ae57c8b4995/html5/thumbnails/46.jpg)
Additional ProductsAvailable in Wall & Floor and Cabinet & Enclosure Product Lines
ATEX / EX
BG EMC
![Page 47: Nuclear presentation 2014 d nasr](https://reader033.vdocuments.us/reader033/viewer/2022052311/55646970d8b42ae57c8b4995/html5/thumbnails/47.jpg)
Roxtec 2003-5-1
Installation Training
![Page 48: Nuclear presentation 2014 d nasr](https://reader033.vdocuments.us/reader033/viewer/2022052311/55646970d8b42ae57c8b4995/html5/thumbnails/48.jpg)
2009
Thank You
![Page 49: Nuclear presentation 2014 d nasr](https://reader033.vdocuments.us/reader033/viewer/2022052311/55646970d8b42ae57c8b4995/html5/thumbnails/49.jpg)
Roxtec TCO Comparisons
![Page 50: Nuclear presentation 2014 d nasr](https://reader033.vdocuments.us/reader033/viewer/2022052311/55646970d8b42ae57c8b4995/html5/thumbnails/50.jpg)
Objective• Compare Roxtec against various
firestop methods and evaluate:– Material cost
– Installation cost
– Re-installation cost (cost to add cables in the future)
![Page 51: Nuclear presentation 2014 d nasr](https://reader033.vdocuments.us/reader033/viewer/2022052311/55646970d8b42ae57c8b4995/html5/thumbnails/51.jpg)
Roxtec vs others• Application1: New installation in 6 inch
existing concrete wall• (60) 1 inch
cables• 2 hr fire rating
• Product: Fire bricks, compound, pillows
• Objective: What is labor and material cost with these methods?
• Application2: need to add 10 more cables• Objective: What is Total Installed Cost
for this project after 2nd installation?
![Page 52: Nuclear presentation 2014 d nasr](https://reader033.vdocuments.us/reader033/viewer/2022052311/55646970d8b42ae57c8b4995/html5/thumbnails/52.jpg)
Bricks Pillows Compound RoxtecFirst Installation
Material $3,249.77 $1,647.25 $991.27 $1,405.72Labor $983.40 $919.60 $1,092.08 $288.75Total $4,233.17 $2,566.85 $2,083.35 $1,694.47
Second InstallationMaterial $49.46 $40.75 $626.19 $0.00
Labor $524.70 $435.88 $712.58 $52.80Total $574.16 $476.63 $1,338.77 $52.80
TOTAL PROJECT $4,807.33 $3,043.48 $3,422.12 $1,747.27SAVINGS 63.65% 42.59% 48.94%
Total Cost of Ownership
![Page 53: Nuclear presentation 2014 d nasr](https://reader033.vdocuments.us/reader033/viewer/2022052311/55646970d8b42ae57c8b4995/html5/thumbnails/53.jpg)
TCO after 4 installations
![Page 54: Nuclear presentation 2014 d nasr](https://reader033.vdocuments.us/reader033/viewer/2022052311/55646970d8b42ae57c8b4995/html5/thumbnails/54.jpg)
TCO Material vs Labor
![Page 55: Nuclear presentation 2014 d nasr](https://reader033.vdocuments.us/reader033/viewer/2022052311/55646970d8b42ae57c8b4995/html5/thumbnails/55.jpg)
Summary• Roxtec is the lowest TCO• Roxtec is the lowest maintenance cost• Over the life of the building, Roxtec is
the lowest labor AND material cost• Roxtec does not require a specialty
contractor to install which saves the owner even more
• Lowest MRO cost over life of building