  • Review ofPower System OperationSeptember 2010 Monthly Meeting October 04, 2010National Transmission & Despatch Company Ltd.

    NPCC

  • System Summary

    NPCC

    Sheet1

    Sep-09Sep-10Difference%age

    Installed Capacity (MW)18,22819,7651,5378.43

    Maximum Recorded Demand (MW)14,30913,916(393)(2.75)

    1-Sep-092-Sep-10

    Maximum Computed Demand (MW)17,70518,5218164.61

    18-Sep-097-Sep-10

    Energy Generation (MkWh)8,8568,198(658)(7.43)

    Export to KESC (MkWh)450434(16)(3.56)

    T&T Losses (%)6.52(6.52)0.0

    (Based on Units Sent-out on 11 kV)0.000.0

  • Hydrology

    NPCC

    Sheet1

    September-09September-10

    TarbelaManglaCombinedTarbelaManglaCombined

    Average Inflows (CFS)80,86321,074101,937125,00027,526152,526

    Average Outflows (CFS)121,97039,676161,646125,32729,729155,056

    Average Outflows Through Turbine (CFS)113,89038,006151,8969,55529,50739,062

    Reservoir Level (FT.)1,5021,1810.01,5501,2040.0

    (30-September)

    Energy Generated (MkWh)2,4357063,1412,1605612,721

    Water Utilization (CFS/MW)34.1940.0634.9740.21

  • Energy Generation

    NPCC

    Sheet1

    (Values in MkWh)

    Sep-09Sep-10Increase / (Decrease)

    Hydel4,1683,719(449)

    ThermalGENCOs1,6191,151(468)20434304193

    IPPs2,8153,09227715536925957

    Rental4235(7)25556731173

    Total4,4764,278(198)598241120

    Nuclear211199(12)61527961323

    Import0.01162126202443

    Total System8,8568,198(658)

  • Hydel Energy Generation

    NPCC

    Sheet1

    (Values in MkWh)

    StationSep-09Sep-10Increase / (Decrease)

    Tarbela2,4352,160(275)

    Mangla706561(145)

    Ghazi Barotha729714(15)

    Warsak10412824

    Chashma-Hydel1051094

    Small-Hydel3534(1)

    Malakand III3513(22)

    Jagran180.0(18)

    Total Hydel4,1683,719(449)

  • GENCOs Energy Generation

    NPCC

    Sheet1

    (Values in MkWh)

    StationSep-09Sep-10Increase / (Decrease)

    Lakhra90.0(9)

    TPS Jamshoro372236-37%(137)

    GTPS Kotri6443(21)

    GENCO-I436279-36%(158)

    TPS Guddu563403-28%(160)

    TPS Quetta16160.0

    GENCO-II579419-28%(160)(27.63)

    Muzaffargarh517387-25%(130)(0.05)

    NGPS Multan95-49%(4)(5.43)

    SPS Faisalabad4538-16%(7)(0.35)

    GTPS Faisalabad23230.00.0

    Shahdara0.00.00.00.0

    GENCO-III594453-24%(142)(23.86)

    Total GENCOs1,6191,151-29%(467)

  • IPPs Energy Generation

    NPCC

    Sheet1

    (Values in MkWh)

    StationSep-09Sep-10Increase / (Decrease)

    KAPCO570470(100)

    HUBCO745677(68)

    KEL73752

    AES Lalpir1650.0(165)

    AES Pakgen1210.0(121)

    SEPCOL265529

    HCPC82864

    FKPCL9790(7)

    Rousch277264(13)

    Saba Power6626(40)

    Japan Power0.03737

    UCH368361(7)

    Liberty Power8710013

    AEL112110

    Attok Generation108101(7)

    Atlas Power19134115

    Engro0.09595

    Saif Power0.0127127

    Orient0.0113113

    Nishat Power0.0128128

    Nishat Chunian0.0123123

    Saphire0.099

    Total IPPs2,8153,092277

  • Load Demand Curve07-09-2010 (Maximum Day)

    NPCC

  • Daily Report September 30

    NPCC

    Sheet1

    StationPeak Sharing (MW)Energy (MkWh)

    Sep-09Sep-10Increase / (Decrease)Sep-09Sep-10Increase / (Decrease)

    Tarbela3,3342,184(1,150)6740(27)

    Mangla1,075920(155)2616(10)

    Total Hydel6,3024,687(1,615)12588(37)

    GENCO - III843562(281)1914(5)

    Total Gencos1,7181,744264039(1)

    KAPCO1,033606(427)2313(10)

    AES Pakgen3410.0(341)70.0(7)

    Total IPPs4,6034,7471441081124

    Total Rental0.062620.011

    Total Thermal6,3216,5532321471535

    Total System12,62311,240(1,383)272241(32)

    System Demand15,70616,7261,020372347(26)

    Shortfall3,0835,4862,4031001066

  • Estimated Power Position(October 01 10)Estimated Power Position is Based on;Export to KESC 400 MW Tarbela & Mangla Indents 45,000 & 35,000 CFSRestricted Gas Quotas for Guddu, Faisalabad & KotriAES & 2 units of KAPCO on forced outage

    NPCC

    Sheet1

    Values in MW

    HoursNet CapabilityDemandSurplus / (Shortfall)

    00:01 ~ 06:009,57814,478(4,900)

    06:01 ~ 18:0010,26815,168(4,900)

    18:01 ~ 24:0011,00016,500(5,500)

  • Estimated Power Position(2010-11)Estimated Power Position is Based on;Export to KESC 600 MW Indents & Reservoir Levels as 5 Years averageFull Fuel Oil supplies for all IPPs & GENCO PlantsIncoming IPPs & Rentals incorporated as per Schedule

    NPCC

    Sheet1

    Values in MW

    MonthPeriodCapabilityDemandSurplus / (Shortfall)

    OctoberI11,26216,500(5,238)

    II12,97215,835(2,863)

    III12,74114,941(2,200)

    NovemberI13,88414,532(648)

    II14,12813,801327

    III12,43013,488(1,058)

    DecemberI13,36012,647713

    II14,32814,30721

    III12,21614,681(2,465)

  • THANK YOU

    NPCC

    This year less water was released during December from Tarbela. 18000 cusecs was released less which is equivalent to 29000 cusecs at Mangla. From Mangla only 7600 cusecs.