nsn training on flexi edge bts installation

Upload: nnaji-maurice

Post on 22-Feb-2018

220 views

Category:

Documents


0 download

TRANSCRIPT

  • 7/24/2019 NSN Training on Flexi EDGE BTS Installation

    1/3

    NOKIA SEIMENS TRAINING ON BTS

    INSTALLATION, COMMISSIONING AND

    INTEGRATION.

    HELD AT F13, WOKE STREET, OFF SANNI ABACHA ROAD,

    GRA, PORTHACOURT

    DATE: 20TH 22ND JANUARY, 2011

    INSTRUCTOR: MICHEAL MAHER

    A SEMINAR REPORT

    Submitted by:

    OTENAIKE ADEGBOYEGA B.

    LCSNG!"

    Li#$%&'t C&mmu#i()ti Sy%tem%,

    O#it%*) C+u%te,

    A#)mb) St)te, Ni-ei).

    CORE OBECTI/ES

  • 7/24/2019 NSN Training on Flexi EDGE BTS Installation

    2/3

    Introduction to the Nokia-Siemens BTS Units

    Planning, Installation, Commissioning and Integration of BTS

    INTRODUCTION

    The training is as important to BSS Engineers as a manual of any product is to a

    lay person The only difference is that !efore e"erything discussed #ill make

    "alua!le meaning, it re$uires familiarity #ith telecommunication kno#-ho#

    The training #as focused on %le&i E'(E BTS, its units, installation and

    commissioning

    The instructor !y the name ofMichael Maherdeli"ered the message #ell and

    clearly )e is a trained Nokia-Siemens instructor from NSN *cademy

    I participated in almost + of the training and e"erything done #as of great

    !enefit

    CONTENT

    The topics discussed in the training are as listed !elo#.

    %le&i E'(E BTS Introduction and Units

    %le&i E'(E BTS Installation Planning %le&i E'(E BTS /odule Installation and Ca!ling

    %le&i E'(E BTS Configurations

    %le&i E'(E BTS Commissioning and Integration

    %le&i E'(E BTS 0icensed %eatures and Soft#are Compati!ility

    Note: The course materials that explain these topics explicitly are given in softcopy.

    DISCUSSION

    Please refer to the course materials that are attached with this report

    CONCLUSION

    1peration and maintenance of net#ork element 2especially Nokia BTS #hich

    #e handle3 is made easier if and only if #e kno# ho# the e$uipment #orks

    *lthough the focus of the training #as not on maintenance per se, thekno#ledge gained on ho# each unit #orks and ho# a site is planned 4

  • 7/24/2019 NSN Training on Flexi EDGE BTS Installation

    3/3

    integrated is a solid !ase for maintenance as #ell as upgrading the site #hen

    needed

    Please refer to the course#are for more information on the content

    RECOMMENDATION

    Base on the e&perience I gained through this training, I recommend the

    follo#ing.

    5 That the course#are6training materials !e distri!uted to all BSS

    Engineers in the "arious clusters to study and hone their skills

    7 Periodical training for the field operati"es should !e encouraged on 2and

    not limited to3 the follo#ing. Transmission, Po#er, Team-!uild and

    /anagement

    GRATITUDE

    I sincerely appreciate the effort of the management to in"est on the skills of her

    staff so as to ensure e&cellent outputs from them

    I am pri"ilege to !e selected to attend this training out of many BSS Engineers

    in the system8 I #ill like to thank my direct !osses for this rare pri"ilege. Mr.

    Prashant Singhs and Mr. Jude Aamadu

    Thanks and (od !less