nsls – ii efac review
DESCRIPTION
NSLS – II EFAC Review. Conventional Facilities Briefing Marty Fallier Director for Conventional Facilities National Synchrotron Light Source – II Project October 19, 2006. Outline. Conventional Facilities Scope Facility OverviewFacility Program Experimental Floor - PowerPoint PPT PresentationTRANSCRIPT
1 BROOKHAVEN SCIENCE ASSOCIATES
NSLS – II EFAC Review
Conventional Facilities Briefing
Marty FallierDirector for Conventional Facilities
National Synchrotron Light Source – II ProjectOctober 19, 2006
2 BROOKHAVEN SCIENCE ASSOCIATES
Outline
• Conventional Facilities Scope•Facility Overview Facility Program
• Experimental Floor• Central Lab Office Building• Lab Office Building(s)• Differential Settlement• Vibration Mitigation• Utility Services• Temperature Stability• Schedule
3 BROOKHAVEN SCIENCE ASSOCIATES
NSLS II Facility Overview
4 BROOKHAVEN SCIENCE ASSOCIATES
Site Plan
NSLS
LOB Typ 4
RF-LINAC AREA
Service Bldg Typ 4
CFNCLOB
Ring Bldg
Future JPsi
Future Guest House
Conf. Center
Underpass
Loading
5 BROOKHAVEN SCIENCE ASSOCIATES
Building Program
Building/Function
Full Buildout
NASF
Full Buildout
GSFBase
Scope GSF% OfTotal
Ring Building 225,268 242,284 242,284 63.9%Lab Office Buildings 30,480 44,000 11,000 8.6%Central Lab Office Building 38,820 55,128 55,128 11.0%Auditoruim/Vendor Space 13,440 15,000 0 3.8%Service Buildings 28,696 32,000 32,000 8.1%Linac/RF Building 15,862 21,000 21,000 4.5%
Total Square Feet 352,566 409,411 361,411 100%
Spaces
6 BROOKHAVEN SCIENCE ASSOCIATES
Experimental Floor Concept
• Divided into 5 clusters
• Service Bldg supports all services within the cluster
• Six sectors/Cluster
• CLOB & Service Bldgs contain all Accelerator systems
• Ring, CLOB, LOB 1 & service bldgs are base scope
• LOB’s 2,3,4 can be added as needed w/o interruption
7 BROOKHAVEN SCIENCE ASSOCIATES
Experimental Floor Arrangement
8 BROOKHAVEN SCIENCE ASSOCIATES
Experimental Floor - Ring Building Section
9 BROOKHAVEN SCIENCE ASSOCIATES
CLOB Features
• Space for 190 Offices, 8 labs• Nominally 30 User Offices, 5 User labs from the total• Possible 400 seat Conference Center addition w/ vendor area and
three breakout rooms• Lobby and User Reception area• 2nd floor viewing gallery overlooking experimental floor• Bridge to electrical mezzanine and control room & RF/LINAC
areas• Close Proximity to future:
• JPSI Building• Guest house
10 BROOKHAVEN SCIENCE ASSOCIATES
Floor Plan – CLOB 1st
11 BROOKHAVEN SCIENCE ASSOCIATES
Floor Plan - CLOB 2nd
12 BROOKHAVEN SCIENCE ASSOCIATES
Floor Plan – CLOB 3rd
13 BROOKHAVEN SCIENCE ASSOCIATES
LOB Features
• Modular design – can be added when needed without interrupting operation• 11,000 SF each – Serves six sectors• 30 offices w/ conference space, interaction areas, lavs, showers• 5 labs intended for shared use• Shipping/Receiving/Storage area & chemical storage area• Potential for expansion for more offices if needed
• Egress provided for personnel and large items at each LOB• Loading area with exterior roll-up door• Roll-up door from each lab onto the experimental floor
• Designed to minimize impacts to future long beamlines
14 BROOKHAVEN SCIENCE ASSOCIATES
Lab – Office Building
15 BROOKHAVEN SCIENCE ASSOCIATES
Differential Settlement
• Measures to reduce potential for differential settlement include:• Thorough geotechnical analysis of site to identify problem areas• Minimize footprint over disturbed areas• Set finished floor elevation for maximum cut and minimum fill• Early site preparation contract for maximum time to cut, fill,
compact and observe settlement prior to building contract.• Monolithic slab design for tunnel and experimental floor• High slab stiffness, Tunnel 36”; Experimental Floor 18”• Building loads isolated from tunnel and experimental floor slab• Access corridor isolated from experimental floor slab
16 BROOKHAVEN SCIENCE ASSOCIATES
Vibration Mitigation
• Measures to be implemented in conventional design include:• “Monolithic” slab for accelerator and experimental floor• Slab thickness and section changes will be based on vibration modeling
results• Possible use of polymer admixtures for enhanced damping
characteristics – likely use for access corridor• Isolation of bldg structure from tunnel and slab• Inertial bases and isolation of machinery• Low flow velocity design for ducts and piping
• Limited use of duct and piping isolation to avoid conversion & transmission of low frequency vibration
• Commissioning of equipment and systems to include alignment, balancing & vibration measurement
17 BROOKHAVEN SCIENCE ASSOCIATES
Utility Support
• Utilities run underground in center of ring and distributed to five service bldgs (one in CLOB RF/LINAC area)• Minimizes pipe runs and pipe size in bldg proper• Only needed service piping will be run in experimental area• Minimizes potential noise and vibration impacts
• Services provided at each BL include:• Electric Power Panel at Ratchet Wall, 75-95kW/Cell, 120/208V• Cooling Water, HVAC Supply Air, Exhaust• Compressed Air, LN2, GN2
• DI Water (Copper and Aluminum) by Accelerator Group
18 BROOKHAVEN SCIENCE ASSOCIATES
Utility Support
19 BROOKHAVEN SCIENCE ASSOCIATES
Temperature Stability
• Key temperature stability requirement is tunnel air @ +/- 0.1C at a given location with respect to time.• Requires high resolution industrial grade instruments and
controls with excellent repeatability.• Space temp setpoint of 85 F is nominally equivalent to process
cooling water supply setpoint to minimize temperature gradients• Should be readily achievable provided loads to accelerator
components are relatively steady-state
• Experimental Floor Temperature • Cooling: 75 F +/- 1 F, 50% RH +/- 10% RH• Heating: 75 F +/- 1F, 30% RH +/- 10% RH
20 BROOKHAVEN SCIENCE ASSOCIATES
Experimental Floor Air Distribution
21 BROOKHAVEN SCIENCE ASSOCIATES
Schedule
• Construction sequencing will enable • Availability of Ring Bldg for LINAC, booster and storage ring
installation to begin as early as March 2010• Beneficial Occupancy of Ring Building & LOB - June 2011• Control/Computer room availability & CLOB BO - August 2011• Conventional Construction complete - October 2011