notice to mariners - rak portsrakports.ae/wp-content/uploads/2019/12/ntm-no-3-of-2018... ·...

2
NOTICE TO MARINERS No. 3 23 rd January 2018 SUBJECT: Dredging works near RAK Maritime City approaches Ref: Chart 3174, 3404, Temporary Exclusion Zone Chartlet and NtM’s 5 of 2017 Mariners are advised that, Phase-II of dredging operations in connection with the Saqr Port berth extension project is scheduled to commence on 26 January near RAK Maritime City approaches for a duration of 02 weeks. Dredging operations are weather dependent and may be subject to delay. Dredging operations will be conducted by the vessel CSHD Athena and will operate up to approximately 750m radius towards the western side of Saqr Port breakwater. During this period, the existing project exclusion zone will be extended temporarily towards western side (drawing attached) and marker buoys will be re-positioned in below mentioned co-ordinates for ease of identification. Buoy Name Colour Light Latitude Longitude B#01 Yellow Flash Yellow 25°58.939'N 56°02.777'E B#02 Yellow Flash Yellow 25°58.961'N 56°02.691'E B#03 Yellow Flash Yellow 25°58.966'N 56°02.410'E B#04 Yellow Flash Yellow 25°58.788'N 56°02.361'E B#05 Yellow Flash Yellow 25°58.510'N 56°02.545'E B#06 Yellow Flash Yellow 25°58.405'N 56°02.640'E B#07 Yellow Flash Yellow 25°58.342'N 56°02.767'E A pipeline will extend from the existing breakwater and attach to the dredger. The dredger, pipe marker buoys and other marine units deployed shall be adequately lit during darkness. Marker buoys will be re-positioned to previous position (Project exclusion zone) on completion of dredging operation. All Mariners advised to be aware of above said temporary exclusion zone while entering and leaving RAK Maritime City / Stevin Rock Harbour and are requested to exercise extreme caution while transiting in the vicinity: 1. Keep well clear of above temporary exclusion zone. 2. All Vessels/Crafts proceed with minimum speed and navigate with caution. 3. Maintain constant listening watch on VHF Channel 16 / 14 / 69. 4. All movements should be co-ordinated with Mina Saqr / RAK Maritime City Port Control. Notice will be issued for further updates Capt. Michael Magee Harbour Master, RAK Ports Status of previously published notices: 2015: 1, 2016: 2 2017: 5, 10, 14, 15, 18, 19, 22, 23, 24 2018: 1, 2

Upload: others

Post on 03-Jun-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: NOTICE TO MARINERS - RAK Portsrakports.ae/wp-content/uploads/2019/12/ntm-no-3-of-2018... · 2019-12-26 · All Mariners advised to be aware of above said temporary exclusion zone

NOTICE TO MARINERS

No. 3 – 23rd January 2018

SUBJECT: Dredging works near RAK Maritime City approaches

Ref: Chart 3174, 3404, Temporary Exclusion Zone Chartlet and NtM’s 5 of 2017

Mariners are advised that, Phase-II of dredging operations in connection with the Saqr Port berth extension project is scheduled to commence on 26 January near RAK Maritime City approaches for a duration of 02 weeks. Dredging operations are weather dependent and may be subject to delay.

Dredging operations will be conducted by the vessel CSHD Athena and will operate up to approximately 750m radius towards the western side of Saqr Port breakwater. During this period, the existing project exclusion zone will be extended temporarily towards western side (drawing attached) and marker buoys will be re-positioned in below mentioned co-ordinates for ease of identification.

Buoy Name Colour Light Latitude Longitude

B#01 Yellow Flash Yellow 25°58.939'N 56°02.777'E

B#02 Yellow Flash Yellow 25°58.961'N 56°02.691'E

B#03 Yellow Flash Yellow 25°58.966'N 56°02.410'E

B#04 Yellow Flash Yellow 25°58.788'N 56°02.361'E

B#05 Yellow Flash Yellow 25°58.510'N 56°02.545'E

B#06 Yellow Flash Yellow 25°58.405'N 56°02.640'E

B#07 Yellow Flash Yellow 25°58.342'N 56°02.767'E

A pipeline will extend from the existing breakwater and attach to the dredger. The dredger, pipe marker buoys and other marine units deployed shall be adequately lit during darkness. Marker buoys will be re-positioned to previous position (Project exclusion zone) on completion of dredging operation.

All Mariners advised to be aware of above said temporary exclusion zone while entering and leaving RAK Maritime City / Stevin Rock Harbour and are requested to exercise extreme caution while transiting in the vicinity:

1. Keep well clear of above temporary exclusion zone. 2. All Vessels/Crafts proceed with minimum speed and navigate with caution. 3. Maintain constant listening watch on VHF Channel 16 / 14 / 69. 4. All movements should be co-ordinated with Mina Saqr / RAK Maritime City Port Control.

Notice will be issued for further updates

Capt. Michael Magee

Harbour Master, RAK Ports

Status of previously published notices:

2015: 1, 2016: 2 2017: 5, 10, 14, 15, 18, 19, 22, 23, 24 2018: 1, 2

Page 2: NOTICE TO MARINERS - RAK Portsrakports.ae/wp-content/uploads/2019/12/ntm-no-3-of-2018... · 2019-12-26 · All Mariners advised to be aware of above said temporary exclusion zone

BERTH 12BERTH 11

BERTH 10

BERTH 9

BERT

H 6

BERT

H 5

BERT

H 7

BERT

H 8

BERTH 4

BERTH 3

BERTH 2

BERTH 1

YARD 1

YARD 2

YARD 3

KGL Container Term

inal

(+)4.15 ACD

B

E

R

T

H

5

L.O.C

S

H

IN

Y

A

N

G

F

Z

C

B

E

R

T

H

4

B

E

R

T

H

3

B

E

R

T

H

6

&

7

D

D

D

D2

D1

Offices

Manhole

Security

Pond

Offices

R

o

a

d

R

o

a

d

S

P

A

L.O.

C

L.O.

C

L.O.

C

L.O.C

L.O.C

R

o

a

d

B

E

R

T

H

2

B

E

R

T

H

1

R

M

C

C

h

a

n

n

e

l

25°58.961'N

56°02.691'E

25°58.966'N

56°02.410'E

25°58.788'N

56°02.361'E

25°58.510'N

56°02.545'E

25°58.405'N

56°02.640'E

25°58.342'N

56°02.767'E

25°58.576'N

56°01.875'E

RV Position

4

6

1

.6

4

8

1

.

0

25°58.939'N

56°02.777'E

T

em

p. E

xclu

sion Z

on

e

AutoCAD SHX Text
DREDGE TO -12.20
AutoCAD SHX Text
EXISTING BREAKWATER
AutoCAD SHX Text
SAQR PORT
AutoCAD SHX Text
DREDGE TO -12.20
AutoCAD SHX Text
EXISTING BREAKWATER
AutoCAD SHX Text
SAQR PORT
AutoCAD SHX Text
Weighbridge Office
AutoCAD SHX Text
Weighbridge
AutoCAD SHX Text
Weighbridge
AutoCAD SHX Text
Weighbridge Office
AutoCAD SHX Text
0+080.50
AutoCAD SHX Text
10
AutoCAD SHX Text
Rak Lube
AutoCAD SHX Text
Flyover
AutoCAD SHX Text
Stevin Rock
AutoCAD SHX Text
Altek
AutoCAD SHX Text
EXISTING RAK GAS SITE
AutoCAD SHX Text
400mm%%C WATER LINE OLD LOCATION
AutoCAD SHX Text
4.0 x 4.0 M
AutoCAD SHX Text
SR OFFICE
AutoCAD SHX Text
3.5 x 4.0 M
AutoCAD SHX Text
CLIENT'S OFFICE
AutoCAD SHX Text
3.5 x 4.0 M
AutoCAD SHX Text
CLIENT'S OFFICE
AutoCAD SHX Text
5.0 x 4.0 M
AutoCAD SHX Text
STORE
AutoCAD SHX Text
AREA REDUCED BY 15 M2
AutoCAD SHX Text
1.5x1.5 M
AutoCAD SHX Text
Toilet
AutoCAD SHX Text
11 4.349m center
AutoCAD SHX Text
12 4.344m center
AutoCAD SHX Text
13 4.326m center
AutoCAD SHX Text
14 4.417m center
AutoCAD SHX Text
15 4.581m center
AutoCAD SHX Text
16 4.780m center
AutoCAD SHX Text
17 4.895m center
AutoCAD SHX Text
18 4.990m center
AutoCAD SHX Text
19 5.049m center
AutoCAD SHX Text
20 5.857m center
AutoCAD SHX Text
21 4.689m center
AutoCAD SHX Text
22 5.043m center
AutoCAD SHX Text
23 5.023m center
AutoCAD SHX Text
24 5.026m center
AutoCAD SHX Text
25 5.055m center
AutoCAD SHX Text
26 5.023m center
AutoCAD SHX Text
27 4.958m center
AutoCAD SHX Text
28 4.918m center
AutoCAD SHX Text
29 4.886m center
AutoCAD SHX Text
30 4.887m center
AutoCAD SHX Text
31 4.853m center
AutoCAD SHX Text
32 4.849m center
AutoCAD SHX Text
33 4.848m center
AutoCAD SHX Text
34 4.498m center
AutoCAD SHX Text
35 4.805m center
AutoCAD SHX Text
36 4.791m center
AutoCAD SHX Text
37 4.604m center
AutoCAD SHX Text
38 4.063m center
AutoCAD SHX Text
39 3.855m center
AutoCAD SHX Text
40 3.647m center
AutoCAD SHX Text
41 3.612m center
AutoCAD SHX Text
42 3.663m center
AutoCAD SHX Text
43 3.488m road
AutoCAD SHX Text
44 3.595m road
AutoCAD SHX Text
45 3.666m road
AutoCAD SHX Text
46 3.807m road
AutoCAD SHX Text
47 4.278m road
AutoCAD SHX Text
48 4.572m road
AutoCAD SHX Text
49 4.708m road
AutoCAD SHX Text
50 4.802m road
AutoCAD SHX Text
51 4.871m road
AutoCAD SHX Text
52 4.892m road
AutoCAD SHX Text
53 4.928m road
AutoCAD SHX Text
54 4.884m road
AutoCAD SHX Text
55 3.668m road
AutoCAD SHX Text
56 4.918m road
AutoCAD SHX Text
57 5.094m road
AutoCAD SHX Text
58 4.900m line
AutoCAD SHX Text
59 5.060m road
AutoCAD SHX Text
60 5.016m road
AutoCAD SHX Text
61 5.007m road
AutoCAD SHX Text
62 5.049m road
AutoCAD SHX Text
63 5.002m road
AutoCAD SHX Text
64 4.789m road
AutoCAD SHX Text
65 4.522m road
AutoCAD SHX Text
66 4.372m road
AutoCAD SHX Text
67 4.260m road
AutoCAD SHX Text
Raymond Jetty-2
AutoCAD SHX Text
780.72m
AutoCAD SHX Text
193.43m
AutoCAD SHX Text
L.O.W
AutoCAD SHX Text
ROAD-2
AutoCAD SHX Text
ROAD-6
AutoCAD SHX Text
400mm%%C WATER LINE OLD LOCATION
AutoCAD SHX Text
600mm%%C WATER DUCT
AutoCAD SHX Text
4WAY 100mm%%C TELEPHONE DUCT
AutoCAD SHX Text
ROAD-3
AutoCAD SHX Text
ROAD-5
AutoCAD SHX Text
ROAD-3
AutoCAD SHX Text
7.072
AutoCAD SHX Text
3.957
AutoCAD SHX Text
3.887
AutoCAD SHX Text
3.842
AutoCAD SHX Text
ROAD-7A
AutoCAD SHX Text
L.O.W
AutoCAD SHX Text
A
AutoCAD SHX Text
A
AutoCAD SHX Text
C
AutoCAD SHX Text
C
AutoCAD SHX Text
E
AutoCAD SHX Text
E
AutoCAD SHX Text
F
AutoCAD SHX Text
F
AutoCAD SHX Text
3.991
AutoCAD SHX Text
1WAY 150mm FOC FUTURE DUCT
AutoCAD SHX Text
11
AutoCAD SHX Text
Shore Line
AutoCAD SHX Text
Boundary Wall
AutoCAD SHX Text
SR Berth 6
AutoCAD SHX Text
Boundary Wall
AutoCAD SHX Text
SR Berth 6
AutoCAD SHX Text
Raymond Jetty-1
AutoCAD SHX Text
Raymond Jetty-3
AutoCAD SHX Text
TOWER1-B2
AutoCAD SHX Text
R6
AutoCAD SHX Text
SB3
AutoCAD SHX Text
ROAD-A
AutoCAD SHX Text
R6
AutoCAD SHX Text
SB3
AutoCAD SHX Text
TOWER1-B2
AutoCAD SHX Text
R6
AutoCAD SHX Text
SB3
AutoCAD SHX Text
TOWER1-B2
AutoCAD SHX Text
R6
AutoCAD SHX Text
SB3
AutoCAD SHX Text
TOWER
AutoCAD SHX Text
KITCHEN
AutoCAD SHX Text
STORE
AutoCAD SHX Text
TOILET
AutoCAD SHX Text
TOILET
AutoCAD SHX Text
DINING HALL
AutoCAD SHX Text
COOLER + WINDING MEACHINE
AutoCAD SHX Text
KITCHEN COUNTER
AutoCAD SHX Text
DISH WASHER
AutoCAD SHX Text
FRIDGE
AutoCAD SHX Text
GARBAGE
AutoCAD SHX Text
NEW ROAD
AutoCAD SHX Text
VEHICLE ACCESS
AutoCAD SHX Text
VEHICLE ACCESS