ADDENDUM NO.: 02 PROJECT NAME: Property Management Services at the Richard J. Daley Center CONTRACT NO.: PS2099 DATE OF ISSUE: July 10, 2018 NOTICE OF CHANGES, MODIFICATIONS, OR CLARIFICATIONS TO CONTRACT DOCUMENTS The following changes, modifications, or clarifications are hereby incorporated and made an integral part of the Contract Documents. Unless clearly expressed otherwise by this Addendum, all terms and conditions defined in the original Contract Documents shall continue in full force and effect and shall have the same meaning in this Addendum. Issued Addenda represent responses/clarifications to various inquiries. Respondents shall be responsible for including all associated costs in their bid. ITEM NO. 1: CHANGE TO KEY DATES Change 1. Bid Due/Time: a. The Due Date and Time for Submissions has been RESCHEDULED to Monday, July 16, 2018 at 4:00 p.m. ITEM NO. 2: REQUESTS FOR INFORMATION RFI-1. Question: Can you please provide the manufacturer, age and capacity for all elevators at the site? Response: There are 43 Westinghouse Elevators. The elevators are from the mid-1960s. Lift motors are original Westinghouse Units. 36 of the 43 elevators are passenger elevators with 3,500lb- 4,000lb capacity. 3 of the elevators are Freight Elevators; and 4 of the 43 elevators are Private, used by the building and Judges. In 2012, 43 of the elevators were refurbished with new controls, drives, and electrical feeder distribution. Please also see attached Exhibit D, Elevator Information Sheet. RFI-2. Question: Can PBC please provide the manufacturer of each of the elevators listed in Exhibit 2? Response: Please refer to Question 1 and attached Exhibit D, Elevator Information Sheet. RFI-3. Question: Can the PBC provide the age of the building's chillers – and if they are currently under warranty, and when the warranty runs out? Response: The Chiller shells are original from mid 1960s. All four chillers were re-tubed in mid 1990s when converted to 134A refrigerant. In 2011 all new drive lines were installed including the VFD starters. They are NOT under warranty. RFI-4. Question: Can you please provide an inventory of existing surplus light bulbs and electrical supplies? Are these supplies the property of the incumbent or of the PBC? Response: All materials and spare parts are the property of the owner. Please also see attached Exhibit C, Bulb and Lamp List. RFI-5. Question: Is the current CMMS the property of the incumbent Manager or of the PBC? Does the PBC have a preference for a CMMS system and, if so, which one? Response: The current CMMS is an internet based system with a monthly user fee. Addendum No. 2, Property Managment Services at the Richard J. Daley Center Page 1 of 26

Upload: others

Post on 10-Mar-2021

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: NOTICE OF CHANGES, MODIFICATIONS, OR …...Jul 10, 2018  · RFI-6. Question: Can the PBC provide the equipment counts for the following areas of building support; • HVAC – Chillers,

ADDENDUM NO.: 02 PROJECT NAME: Property Management Services at the Richard J. Daley Center CONTRACT NO.: PS2099 DATE OF ISSUE: July 10, 2018

NOTICE OF CHANGES, MODIFICATIONS, OR CLARIFICATIONS TO CONTRACT DOCUMENTS

The following changes, modifications, or clarifications are hereby incorporated and made an integral part of the Contract Documents. Unless clearly expressed otherwise by this Addendum, all terms and conditions defined in the original Contract Documents shall continue in full force and effect and shall have the same meaning in this Addendum. Issued Addenda represent responses/clarifications to various inquiries. Respondents shall be responsible for including all associated costs in their bid. ITEM NO. 1: CHANGE TO KEY DATES

Change 1. Bid Due/Time: a. The Due Date and Time for Submissions has been RESCHEDULED to

Monday, July 16, 2018 at 4:00 p.m. ITEM NO. 2: REQUESTS FOR INFORMATION

RFI-1. Question: Can you please provide the manufacturer, age and capacity for all elevators at the site? Response: There are 43 Westinghouse Elevators. The elevators are from the mid-1960s. Lift motors are

original Westinghouse Units. 36 of the 43 elevators are passenger elevators with 3,500lb-4,000lb capacity. 3 of the elevators are Freight Elevators; and 4 of the 43 elevators are Private, used by the building and Judges. In 2012, 43 of the elevators were refurbished with new controls, drives, and electrical feeder distribution. Please also see attached Exhibit D, Elevator Information Sheet.

RFI-2. Question: Can PBC please provide the manufacturer of each of the elevators listed in Exhibit 2? Response: Please refer to Question 1 and attached Exhibit D, Elevator Information Sheet. RFI-3. Question: Can the PBC provide the age of the building's chillers – and if they are currently under warranty,

and when the warranty runs out? Response: The Chiller shells are original from mid 1960s. All four chillers were re-tubed in mid 1990s when

converted to 134A refrigerant. In 2011 all new drive lines were installed including the VFD starters. They are NOT under warranty.

RFI-4. Question: Can you please provide an inventory of existing surplus light bulbs and electrical supplies? Are

these supplies the property of the incumbent or of the PBC? Response: All materials and spare parts are the property of the owner. Please also see attached Exhibit C,

Bulb and Lamp List. RFI-5. Question: Is the current CMMS the property of the incumbent Manager or of the PBC? Does the PBC have

a preference for a CMMS system and, if so, which one? Response: The current CMMS is an internet based system with a monthly user fee.

Addendum No. 2, Property Managment Services at the Richard J. Daley Center Page 1 of 26

Page 2: NOTICE OF CHANGES, MODIFICATIONS, OR …...Jul 10, 2018  · RFI-6. Question: Can the PBC provide the equipment counts for the following areas of building support; • HVAC – Chillers,

RFI-6. Question: Can the PBC provide the equipment counts for the following areas of building support;

• HVAC – Chillers, boilers, building automation systems (# of points), air compressors, AHUs, Fan Coil Units, Pumps, Cooling Towers, VAVs, VFDs, heat exchangers, etc.

• Fire/Life Safety – horns, strobes, remote panels, manual pull stations, fire extinguishers, fire/smoke dampers, annunciator panels, etc.

• Electrical – Switchgears, Transformers, panelboards, UPS, Generators, Parallel Switchgear, automatic transfer switches, switchboards, Motor control centers, disconnects, transfer switches, etc.

• Plumbing – Sump pumps, grease traps, storage tanks, fuel tanks, etc. • Elevators/Escalators – number, size, capacity and type of elevators, number of escalators?

Response: • HVAC

o Please see attached Exhibit A, Mechanical Equipment List. • Fire/Life Safety

o (1) main panel o (1) remote panel o Approx. (350) Smoke and (900) voice evacuation devices. No pull stations. (300) fire

extinguishers. • Electrical

o (260)Breaker Panels o (10) Motor Control Centers, Switch Board Centers are located on LL,CL,9, and 31st

Floors as are Com Ed transformer vaults o (18) Transfer Switches o (48) 208V Switchgear o (57) 480V Switchgear o (4) 4160V Switchgear

• Plumbing o Please see attached Exhibit B, Plumbing Fixture List.

• Elevators/Escalators o For Elevator information, refer to Question 1. o There are (8) escalators. The (4) Lobby units were complete replaced in the mid 2000’s.

The (4) units located on 6-7-8 were completely refurbished in place during the same time period

RFI-7. Question: Can PBC provide an estimated number of annual move ins and move outs? Is an allowance

provided for this service or is the Manager expected to provide these services with regular staff?

Response: There have been less than 5 moves on the Lower Level. The 27th Floor is currently being remodeled. The majority of moves are Judges who rotate.

RFI-8. Question: Can PBC provide an estimated number of special events held in Daley Plaza? Is an allowance

provided for this service or is the Manager expected to provide these services with regular staff?

Response: The Plaza hosts approximately 80-100 events, per year. There is no allowance as the Property Manager is expected to provide these services. Please refer to RFP Pages 28 and 181.

RFI-9. Question: Are the existing trades and maintenance equipment and machines the property of the

incumbent or the PBC? Response: The existing trades and maintenance equipment and machines are the property of the PBC.

Addendum No. 2, Property Managment Services at the Richard J. Daley Center Page 2 of 26

Page 3: NOTICE OF CHANGES, MODIFICATIONS, OR …...Jul 10, 2018  · RFI-6. Question: Can the PBC provide the equipment counts for the following areas of building support; • HVAC – Chillers,

RFI-10. Question: Is the existing computerized guard touring system the property of the incumbent or the PBC? Response: The existing computerized guard touring system is the property of the PBC. RFI-11. Question: Does the PBC provide office furniture and computers for the Office of the Building? Response: Please refer to the RFP Page 214. RFI-12. Question: Are any of the building’s HVAC components (chillers, blowers, condensers, etc.) under

warranty? If so, when do those warranties end? Response: HVAC components are NOT under warranty. Please refer to Question 3. RFI-13. Question: Are any of the building’s elevators under warranty? If so, when do those warranties end? Response: No elevators are under warranty. Please refer to Question 1. RFI-14. Question: How many engineers are at the property? Response: Please refer to RFP Page 181 and Page 209. RFI-15. Question: How many management staff are currently at the property? Response: Please refer to RFP Page 181. RFI-16. Question: Who was consultant on LEED Certification? Response: The initial LEED consultant was ESD. RFI-17. Question: When was the last Property Condition Assessment completed? Response: The last Property Condition Assessment was reported approximately 2-3 years ago. RFI-18. Question: What is current MBE/WBE spend? Response: The PBC reported $4,095,525.33 was paid to Minority Business Enterprise (“MBE”) firms and

$901,781.48 was paid to Women Business Enterprise (“WBE”) Firms. These numbers reflect approximately 45% MBE and 10% WBE out of $8,184,960.65 paid in 2017.

RFI-19. Question: Is the contract expected to be a Principle of Agency Contract? Response: A sample Contract is included in the RFP as Attachment F, Page 83.

This Addendum includes the following attached Documents: 1. Exhibit A – Mechanical Equipment List 2. Exhibit B – Plumbing Fixture List 3. Exhibit C – Bulb and Lamp List 4. Exhibit D – Elevator Information List

END OF ADDENDUM NO. 02

Addendum No. 2, Property Managment Services at the Richard J. Daley Center Page 3 of 26

Page 4: NOTICE OF CHANGES, MODIFICATIONS, OR …...Jul 10, 2018  · RFI-6. Question: Can the PBC provide the equipment counts for the following areas of building support; • HVAC – Chillers,

ITEM DESCRIPTION LOCATION SERVICE TONS H.P. MFG. DATE

AC - 1 CHILLER LL MECHANICAL BUILDING COOLING 1750 1750 YORK 2010

AC - 2 CHILLER LL MECHANICAL BUILDING COOLING 1750 1750 YORK 2010

AC - 3 CHILLER LL MECHANICAL BUILDING COOLING 1750 1750 YORK 2010

AC - 4 CHILLER LL MECHANICAL BUILDING COOLING 1750 1750 YORK 2010

ITEM DESCRIPTION LOCATION SERVICE TONS H.P. MFG. DATE

AC - PH - 01 PACKAGE UNIT M3 MECHANICAL RADIO ROOM 15 5 CARRIER 2003

AC - M3 - 01 PACKAGE UNIT M3 MECHANICAL RADIO ROOM 2 3/4 CARRIER 2003

AC - M3 - 02 PACKAGE UNIT M3 MECHANICAL RADIO ROOM 2 3/4 CARRIER 2003

AC - M2 - 01 PACKAGE UNIT M2 MECHANICAL ELEV. MACH. RM 15 5 CARRIER 2002

AC - M2 - 02 PACKAGE UNIT M2 MECHANICAL ELEV. MACH. RM 15 5 CARRIER 2002

AC - M1 - 01 PACKAGE UNIT M1 MECHANICAL ELEV. MACH. RM 7.5 1.5 CARRIER 2002

AC - M1 - 02 PACKAGE UNIT M1 MECHANICAL ELEV. MACH. RM 10 2 CARRIER 2002

AC - M1 - 03 PACKAGE UNIT M1 MECHANICAL ELEV. MACH. RM 10 2 CARRIER 2002

AC - M1 - 04 PACKAGE UNIT M1 MECHANICAL ELEV. MACH. RM 5 1 CARRIER 2002

AC - 26 - 01 PACKAGE UNIT 26 th FLOOR ELEV. MACHINE ROOM 7.5 1.5 CARRIER 2002

AC - 26 - 02 PACKAGE UNIT 26 th FLOOR ELEV. MACHINE ROOM 7.5 1.5 CARRIER 2002

AC - 26 - 03 PACKAGE UNIT 26 th FLOOR ELEV. MACHINE ROOM 7.5 1.5 CARRIER 2002

AC - 26 - 04 PACKAGE UNIT 26 th FLOOR ELEV. MACHINE ROOM 7.5 1.5 CARRIER 2002

AC - 25 - 01 PACKAGE UNIT 25 th FLOOR ELEV. MACHINE ROOM 15 5 CARRIER 2002

AC - 19 - 01 PACKAGE UNIT 19 th FLOOR ELEV. MACHINE ROOM 7.5 1.5 CARRIER 2002

AC - 19 - 02 PACKAGE UNIT 19 th FLOOR ELEV. MACHINE ROOM 7.5 1.5 CARRIER 2002

AC - 19 - 03 PACKAGE UNIT 19 th FLOOR ELEV. MACHINE ROOM 7.5 1.5 CARRIER 2002

AC - 13 - 01 PACKAGE UNIT 13 th FLOOR ELEV. MACHINE ROOM 15 5 CARRIER 2002

AC - 13 - 02 PACKAGE UNIT 13 th FLOOR ELEV. MACHINE ROOM 10 2 CARRIER 2002

AC - 09 - 01 PACKAGE UNIT 9 th FL. MECH. ELEV. MACHINE ROOM 10 2 CARRIER 2002

AC - 09 - 02 PACKAGE UNIT 9 th FL. MECH. ELEV. MACHINE ROOM 10 2 CARRIER 2002

AC - 07 - 01 PACKAGE UNIT 7 th FLOOR ELEV. MACHINE ROOM 15 5 CARRIER 2002

AC - 07 - 02 PACKAGE UNIT 7 th FLOOR ELEV. MACHINE ROOM 7.5 1.5 CARRIER 2000

AC - 03 - 01 PACKAGE UNIT 3 rd FLOOR COPY ROOM 3 3/4 LIEBERT 1990

AC - CL - 01 PACKAGE UNIT CONCOURSE CL - 27 20 7.5 CARRIER 2003

AC - CL - 02 PACKAGE UNIT CONCOURSE CL - 27 20 7.5 CARRIER 2003

AC - CL - 03 PACKAGE UNIT CONCOURSE CL - 127 10 2 LIEBERT 1990

AC - CL - 04 PACKAGE UNIT CONCOURSE CL - 27 5 1 TRANE 1980

AC - CL - 05 PACKAGE UNIT CONCOURSE CL - 27 5 1 TRANE 1980

AC - LL - 01 PACKAGE UNIT LOWER LEVEL LL - 00 5 1 CARRIER 2000

AC - LL - 02 PACKAGE UNIT LOWER LEVEL LL - 12 - BIS 3 3/4 LIEBERT 2000

AC - LL - 02 PACKAGE UNIT LOWER LEVEL LL - 12 - BIS 3 3/4 LIEBERT 2000

ITEM DESCRIPTION LOCATION SERVICE P.P.H. H.P. MFG. DATE

B - 1 BOILER LOWER LEVEL BUILDING HEATING 50000 1450 SPRINGFIELD 1985

B - 2 BOILER LOWER LEVEL BUILDING HEATING 50000 1450 SPRINGFIELD 1986

B - 3 BOILER LOWER LEVEL BUILDING HEATING 50000 1450 SPRINGFIELD 1987

B - 4 BOILER LOWER LEVEL BUILDING HEATING 70000 2030 ERIE CITY 1988

B - 5 BOILER LOWER LEVEL FUEL OIL HEATER 1655 48 COATES 1970

MECHANICAL EQUIPMENT LIST

Addendum No. 2, Property Managment Services at the Richard J. Daley Center Page 4 of 26

Page 5: NOTICE OF CHANGES, MODIFICATIONS, OR …...Jul 10, 2018  · RFI-6. Question: Can the PBC provide the equipment counts for the following areas of building support; • HVAC – Chillers,

ITEM DESCRIPTION LOCATION SERVICE C.F.M. H.P. MFG. DATE

CA - 1 AIR COMPRESSOR CL MECHANICAL PNEUMATIC CONTROLS 240 50 KAESOR 1994

CA - 2 AIR COMPRESSOR CL MECHANICAL PNEUMATIC CONTROLS 92 20 KAESOR 1990

CA - 3 AIR COMPRESSOR 9 th FL. MECH. PNEUMATIC CONTROLS 92 20 KAESOR 1990

CA - 4 AIR COMPRESSOR 31st FL. MECH. PNEUMATIC CONTROLS 92 20 KAESOR 1990

CA - 5 AIR COMPRESSOR LL MECHANICAL SEWAGE EJECTOR 204 40 KAESOR 2003

CA - 6 AIR COMPRESSOR LL MECHANICAL SEWAGE EJECTOR 204 40 KAESOR 2003

ITEM DESCRIPTION LOCATION SERVICE G.P.M. H.P. MFG. DATE

CP - 1 COND. RET. PUMP 9 th FL. MECH. S - 17, 3, 7 45 2 x 2 ITT DOMESTIC 2001

CP - 2 COND. RET. PUMP 9 th FL. MECH. S - 16, 13, 1A 45 2 x 2 ITT DOMESTIC 2001

CP - 3 COND. RET. PUMP 9 th FL. MECH. S - 14, 5 , 15 45 2 x 2 ITT DOMESTIC 2001

CP - 4 COND. RET. PUMP 9 th FL. MECH. S - 4, 1B, 8 45 2 x 2 ITT DOMESTIC 2001

CP - 5 COND. RET. PUMP 31st FL. MECH. S - 6 45 2 x 2 ITT DOMESTIC 2002

CP - 6 COND. RET. PUMP 31st FL. MECH. S - 9 45 2 x 2 ITT DOMESTIC 2002

CP - 7 COND. RET. PUMP 31st FL. MECH. S - 11, 2 130 x 2 7.5 x 2 GRUNDFOS 2002

CP - 8 COND. RET. PUMP 31st FL. MECH. S - 10, 12, CV - 8, 9, 10 130 x 2 7.5 x 2 GRUNDFOS 2002

CP - 9 COND. RET. PUMP BOILER ROOM LL - CL MECHANICAL 180 7.5 GRUNDFOS 1998

CP - 10 COND. RET. PUMP BOILER ROOM LL - CL MECHANICAL 180 7.5 GRUNDFOS 1998

CP - 11 COND. RET. PUMP BOILER ROOM LL - CL MECHANICAL 180 7.5 GRUNDFOS 1998

CP - 12 COND. RET. PUMP BOILER ROOM LL - CL MECHANICAL 180 7.5 GRUNDFOS 1998

CP - 13 COND. RET. PUMP CITY REC. RM. CITY-COUNTY 112 3 x 2 ITT DOMESTIC 1997

CP - 14 COND. RET. PUMP CITY REC. RM. CITY-COUNTY 8 1/3 ITT DOMESTIC 2003

ITEM DESCRIPTION LOCATION SERVICE TONS H.P. MFG. DATE

CT - 1 CLG TOWER 31 - M2 AC - 1, 2, 3, 4 725 60 MARLEY 1990

CT - 2 CLG TOWER 31 - M2 AC - 1, 2, 3, 4 725 60 MARLEY 1990

CT - 3 CLG TOWER 31 - M2 AC - 1, 2, 3, 4 725 60 MARLEY 1990

CT - 4 CLG TOWER 31 - M2 AC - 1, 2, 3, 4 725 60 MARLEY 1990

CT - 5 CLG TOWER 31 - M2 AC - 1, 2, 3, 4 725 60 MARLEY 1990

CT - 6 CLG TOWER 31 - M2 AC - 1, 2, 3, 4 725 60 MARLEY 1990

CT - 7 CLG TOWER 31 - M2 AC - 1, 2, 3, 4 725 60 MARLEY 1990

CT - 8 CLG TOWER 31 - M2 AC - 1, 2, 3, 4 725 60 MARLEY 1990

CT - 9 CLG TOWER 31 - M2 AC - 1, 2, 3, 4 725 60 MARLEY 1990

CT - 10 CLG TOWER 31 - M2 AC - 1, 2, 3, 4 725 60 MARLEY 1990

CT - 11 CLG TOWER 31 - M2 AC - 1, 2, 3, 4 725 60 MARLEY 1990

CT - 12 CLG TOWER 31 - M2 PACKAGE UNITS 3 - PH 650 50 B.A.C 2002

ITEM DESCRIPTION LOCATION SERVICE G.P.M. B.T.U. MFG. DATE

CV - 1 IND. SYS. CONVERTER CL MECHANICAL COOLING 2 - 18 NORTH 1315 2.5 M WATUBO 1966

CV - 2 A&B IND. SYS. CONVERTER CL MECHANICAL COOLING 2 - 18 SOUTH 2630 7.6 M WATUBO 1966

CV - 3 A&B IND. SYS. CONVERTER CL MECHANICAL COOLING 2 - 18 E & W 2790 4.6 M WATUBO 1966

CV - 4 IND. SYS. CONVERTER CL MECHANICAL HEATING 2 - 18 NORTH 1315 6.57 M WATUBO 1966

CV - 5 IND. SYS. CONVERTER CL MECHANICAL HEATING 2 - 18 SOUTH 2630 13.15 M WATUBO 1966

CV - 6 IND. SYS. CONVERTER CL MECHANICAL HEATING 2 - 18 E & W 2790 13.95 M WATUBO 1966

CV - 7 IND. SYS. CONVERTER 31 - M2 HEATING 19 - 30 NORTH 985 4.92 M WATUBO 1966

CV - 8 IND. SYS. CONVERTER 31 - M2 HEATING 19 - 30 SOUTH 1970 9.95 M WATUBO 1966

CV - 9 IND. SYS. CONVERTER 31 - M2 HEATING 19 - 30 E & W 2790 10.45 M WATUBO 1966

Addendum No. 2, Property Managment Services at the Richard J. Daley Center Page 5 of 26

Page 6: NOTICE OF CHANGES, MODIFICATIONS, OR …...Jul 10, 2018  · RFI-6. Question: Can the PBC provide the equipment counts for the following areas of building support; • HVAC – Chillers,

CV - 10 FHW CONVERTER CL MECH RM HEATING CL & LOBBY 2000 20.00 M WATUBO 1966

CV - 11 FHW CONVERTER CL MECH RM HEATING CL & LOBBY 2000 20.00 M WATUBO 1966

CV - 17 CONVERTER BOILER ROOM FUEL OIL HEATER 75 750,000 WATUBO 1966

CV - 18 CONVERTER BOILER ROOM FUEL OIL HEATER 75 750,000 WATUBO 1966

CV - 12 DOMESTIC WTR. HTR. CL MECHANICAL 21 - PENTHOUSE 29 40 - 130*F RECO USA 2001

CV - 13 DOMESTIC WTR. HTR. CL MECHANICAL 21 - PENTHOUSE 29 40 - 130*F RECO USA 2001

CV - 14 DOMESTIC WTR. HTR. CL MECHANICAL 10 - 20 th FLOOR 29 40 - 125*F RECO USA 2001

CV - 15 DOMESTIC WTR. HTR. CL MECHANICAL 10 - 20 th FLOOR 29 40 - 125*F RECO USA 2001

CV - 16 DOMESTIC WTR. HTR. CL MECHANICAL LL - 9 th FLOOR 25 40 - 120*F RECO USA 2001

CV - 17 DOMESTIC WTR. HTR. CL MECHANICAL LL - 9 th FLOOR 25 40 - 120*F RECO USA 2001

CV - 18 DOMESTIC WTR. HTR. CL MECHANICAL RESTAURANT 56 40 - 155*F RECO USA 2001

ITEM DESCRIPTION LOCATION SERVICE C.F.M. H.P. MFG. DATE

DHR - 1 DOOR HEATER # 1 CL NORTH - EAST NORTH - EAST ENTRANCE 3000 3/4 DAYTON 2004

DHR - 2 DOOR HEATER # 2 CL SOUTH - EAST SOUTH - EAST ENTRANCE 3000 3/4 DAYTON 2004

DHR - 3 DOOR HEATER # 3 CL SOUTH - WEST SOUTH - WEST ENTRANCE 3000 3/4 DAYTON 2004

DHR - 4 DOOR HEATER # 4 CL NORTH - WEST NORTH - WEST ENTRANCE 3000 3/4 DAYTON 2004

ITEM DESCRIPTION LOCATION SERVICE C.F.M. H.P. MFG. DATE

DKR - 1 DOCK HEATER # 1 LOADING DOCK LOADING DOCK 5000 1/2 MODINE 1992

DKR - 2 DOCK HEATER # 2 LOADING DOCK LOADING DOCK 5000 1/2 MODINE 1992

DKR - 3 DOCK HEATER # 3 LOADING DOCK LOADING DOCK 5000 1/2 MODINE 1992

DKR - 4 DOCK HEATER # 4 LOADING DOCK LOADING DOCK 5000 1/2 MODINE 1992

ITEM DESCRIPTION LOCATION SERVICE MFG. DATE

DR - 1 DRY RISER LOWER LEVEL GARAGE & LOADING DOCK 2006

ITEM DESCRIPTION LOCATION SERVICE C.F.M. H.P. MFG. DATE

ER-1A EXH. - RET. FAN 9 th FL. MECH. PERIMETER 2 - 18 81000 150 CHICAGO BLOWER 1966

ER-1B EXH. - RET. FAN 9 th FL. MECH. PERIMETER 2 - 18 81000 150 CHICAGO BLOWER 1966

ER-2 EXH. - RET. FAN 31st FL. MECH. PERIMETER 19 - 30 121000 200 CHICAGO BLOWER 1966

ER-3 EXH. - RET. FAN 9 th FL. MECH. INTERIOR LL - 8 130000 200 CHICAGO BLOWER 1966

ER-4 EXH. - RET. FAN 9 th FL. MECH. INTERIOR LL - 8 130000 200 CHICAGO BLOWER 1966

ER-5 EXH. - RET. FAN 9 th FL. MECH. INT.COURT & JURY 10 - 18 130000 200 CHICAGO BLOWER 1966

ER-6 EXH. - RET. FAN 31st FL. MECH. INT. COURT & JURY 19 - 30 130000 200 CHICAGO BLOWER 1966

ER-7 EXH. - RET. FAN 9 th FL. MECH. COURT & JURY 13 - 16 E. 93000 150 CHICAGO BLOWER 1966

ER-8 EXH. - RET. FAN 9 th FL. MECH. COURT & JURY 13 - 18 W. 108000 200 CHICAGO BLOWER 1966

ER-9 EXH. - RET. FAN 31st FL. MECH. COURT & JURY 17 - 30 E. 130000 200 CHICAGO BLOWER 1966

ER-10 EXH. - RET. FAN 31st FL. MECH. 27th & 29th FLOORS 98000 150 CHICAGO BLOWER 1966

ER-11 EXH. - RET. FAN 31st FL. MECH. COURT & JURY 19 - 24 E. 130000 200 CHICAGO BLOWER 1966

ER-12 EXH. - RET. FAN 31st FL. MECH. COURT & JURY 19 - 26 W. 121000 200 CHICAGO BLOWER 1966

ER-13 EXH. - RET. FAN 9 th FL. MECH. WEST CONCOURSE 35000 60 CHICAGO BLOWER 1966

ER-14 EXH. - RET. FAN 9 th FL. MECH. LOWER LEVEL 40000 100 FLAKT 1966

ER-17 EXH. - RET. FAN 9 th FL. MECH. RESTAURANT CL 35000 40 CHICAGO BLOWER 1966

E - 1 EXHAUST FAN 31st FL. MECH. KITCHEN 25000 50 CHICAGO BLOWER 1966

E - 2B EXHAUST FAN 31st FL. MECH. LOWER LEVEL 30000 75 CHICAGO BLOWER 1966

E - 3 EXHAUST FAN GARAGE GARAGE EAST 2007

E - 4 EXHAUST FAN GARAGE GARAGE WEST 34450 30 CHICAGO BLOWER 1966

Addendum No. 2, Property Managment Services at the Richard J. Daley Center Page 6 of 26

Page 7: NOTICE OF CHANGES, MODIFICATIONS, OR …...Jul 10, 2018  · RFI-6. Question: Can the PBC provide the equipment counts for the following areas of building support; • HVAC – Chillers,

ITEM DESCRIPTION LOCATION SERVICE K.W.H. H.P. MFG. DATE

G-1 GENERATOR LL GARAGE FIRE PUMPS & EJECTORS 1500 NA DETROIT DIESEL 2008

G-2 GENERATOR 9 th FL. MECH. LIGHTING 375 NA CATERPILLAR 1968

G-3 GENERATOR 31st FL. MECH. LIGHTING & ELEV. # 29 400 NA DETROIT DIESEL 2000

G-4 GENERATOR 31st FL. MECH. 27 TH FLOOR 750 NA DETROIT DIESEL 1999

ITEM DESCRIPTION LOCATION SERVICE C.F.M. H.P. MFG. DATE

GB - 1 GAS BOOSTER BOILER ROOM BOILERS 1300 40 SPENCER 1966

GB - 2 GAS BOOSTER BOILER ROOM BOILERS 1300 40 SPENCER 1966

GB - 3 GAS BOOSTER BOILER ROOM BOILERS 1300 40 SPENCER 1966

ITEM DESCRIPTION LOCATION SERVICE G.P.M. H.P. MFG. DATE

P - 1 COND. WATER PUMP LL MECHANICAL AC - 1, 2, 3, 4 6000 200 AURORA 2003

P - 2 COND. WATER PUMP LL MECHANICAL AC - 1, 2, 3, 4 6000 200 AURORA 2003

P - 3 COND. WATER PUMP LL MECHANICAL AC - 1, 2, 3, 4 6000 200 AURORA 2003

P - 4 COND. WATER PUMP LL MECHANICAL AC - 1, 2, 3, 4 6000 200 AURORA 2003

P - 5 CHILL WTR PUMP LL MECHANICAL AC - 1, 2, 3, 4 4000 125 BELL & GOSSIT 2002

P - 6 CHILL WTR PUMP LL MECHANICAL AC - 1, 2, 3, 4 4000 125 BELL & GOSSIT 2002

P - 7 CHILL WTR PUMP LL MECHANICAL AC - 1, 2, 3, 4 4000 125 BELL & GOSSIT 2002

P - 8 CHILL WTR PUMP LL MECHANICAL AC - 1, 2, 3, 4 4000 125 BELL & GOSSIT 2002

P - 9 INDUCTION PUMP LL MECHANICAL 2 - 18 th FLOOR NORTH 1316 40 BELL & GOSSIT 2002

P - 10 INDUCTION PUMP LL MECHANICAL 2 - 18 th FLOOR SOUTH 2600 75 BELL & GOSSIT 2002

P - 11 INDUCTION PUMP LL MECHANICAL 2 - 18 th FLOOR E & W 2600 75 BELL & GOSSIT 2002

P - 12 INDUCTION PUMP M2 MECHANICAL 19 - 30 th FLOOR NORTH 985 25 BELL & GOSSIT 2003

P - 13 INDUCTION PUMP M2 MECHANICAL 19 - 30 th FLOOR SOUTH 1970 40 BELL & GOSSIT 2003

P - 14 INDUCTION PUMP M2 MECHANICAL 19 - 30 th FLOOR E & W 2090 150 BELL & GOSSIT 2003

P - 15 FORCED HW LL MECH RM CL & LOBBY HEATING 900 30 TACO 1995

P - 16 FORCED HW LL MECH RM CL & LOBBY HEATING 900 30 TACO 1995

P - 17 COND. WATER PUMP 31 - M2 MECH. PACKAGE UNITS 3 - PH 1950 75 BELL & GOSSIT 2002

P - 18 COND. WATER PUMP 31 - M2 MECH. PACKAGE UNITS 3 - PH 1950 75 BELL & GOSSIT 2002

P - 26 FUEL OIL BOILER ROOM BOILERS 30 10 I W O 1966

P - 27 FUEL OIL BOILER ROOM BOILERS 30 10 I W O 1966

P - 28 TRANSFER BOILER ROOM BOILERS 350 15 ALLIS-CHALMERS 1966

P - 29 TRANSFER BOILER ROOM BOILERS 350 15 ALLIS-CHALMERS 1966

P - 30 FEED WATER BOILER ROOM BOILERS 150 40 ALLIS-CHALMERS 1966

P - 31 FEED WATER BOILER ROOM BOILERS 150 40 ALLIS-CHALMERS 1966

P - 32 FEED WATER BOILER ROOM BOILERS 150 40 ALLIS-CHALMERS 1966

P - 41 FOUNTAIN PUMP CL MECHANICAL FOUNTAIN 950 40 MARLOW 2002

P - 42 FOUNTAIN PUMP CL MECHANICAL FOUNTAIN 950 40 MARLOW 2002

P - 43 FOUNTAIN PUMP CL MECHANICAL FOUNTAIN 950 40 MARLOW 2002

P - 100 FIRE PUMP LL MECHANICAL HIGH LEVEL 16 - PH 1500 200 PEERLESS 1966

P - 101 JOCKEY PUMP LL MECHANICAL HIGH LEVEL 16 - PH 20 30 PEERLESS 1966

P - 102 FIRE PUMP LL MECHANICAL LOW LEVEL LL - 15 1500 250 PEERLESS 1966

P - 103 JOCKEY PUMP LL MECHANICAL LOW LEVEL LL - 15 20 20 PEERLESS 1966

P - 105 MAKE-UP PUMP LL MECHANICAL MAKE-UP WATER 500 125 PEERLESS 1966

P - 105 A MAKE-UP PUMP LL MECHANICAL MAKE-UP WATER 650 125 PEERLESS 1966

P - 106 DOM. WTR. PUMP LL MECHANICAL LL - 9 th FLOOR 250 25 PEERLESS 1966

P - 107 DOM. WTR. PUMP LL MECHANICAL LL - 9 th FLOOR 250 25 PEERLESS 1966

Addendum No. 2, Property Managment Services at the Richard J. Daley Center Page 7 of 26

Page 8: NOTICE OF CHANGES, MODIFICATIONS, OR …...Jul 10, 2018  · RFI-6. Question: Can the PBC provide the equipment counts for the following areas of building support; • HVAC – Chillers,

P - 108 DOM. WTR. PUMP LL MECHANICAL 10 - 20 th FLOOR 600 100 PEERLESS 1966

P - 109 DOM. WTR. PUMP LL MECHANICAL 10 - 20 th FLOOR 600 100 PEERLESS 1966

P - 110 DOM. WTR. PUMP LL MECHANICAL 21 - PENTHOUSE 400 40 PEERLESS 1966

P - 111 DOM. WTR. PUMP LL MECHANICAL 21 - PENTHOUSE 400 40 PEERLESS 1966

P - 112 DOMESTIC HW CIRC. CL MECHANICAL RESTAURANT 8 1/4 GRUNDFOS 2006

P - 113 DOMESTIC HW CIRC. CL MECHANICAL LL - 9 th FLOOR 25 3/4 GRUNDFOS 2006

P - 114 DOMESTIC HW CIRC. CL MECHANICAL 10 - 20 th FLOOR 25 3/4 GRUNDFOS 2006

P - 115 DOMESTIC HW CIRC. CL MECHANICAL 21 - PENTHOUSE 29 1 1/2 GRUNDFOS 2006

ITEM DESCRIPTION LOCATION SERVICE P.P.H. P.S.I. MFG. DATE

PRV-1 PRES. REDUCER # 1 31st FL. MECH. 31 ST FLOOR FANS & IND. 25000 20 LESLIE 1966

PRV-2 PRES. REDUCER # 1 31st FL. MECH. 31 ST FLOOR FANS & IND. 50000 20 LESLIE 1966

PRV-3 PRES. REDUCER # 2 9 th FL. MECH. 9 TH FLOOR FANS 15000 20 LESLIE 1966

PRV-4 PRES. REDUCER # 2 9 th FL. MECH. 9 TH FLOOR FANS 30000 20 LESLIE 1966

PRV-5 PRES. REDUCER # 3 BOILER ROOM FORCED HOT WATER 24000 20 LESLIE 1966

PRV-6 PRES. REDUCER # 3 BOILER ROOM FORCED HOT WATER 60000 20 LESLIE 1966

PRV-7 PRES. REDUCER # 4 BOILER ROOM DOMESTIC WATER HEATER 8000 60 LESLIE 1966

PRV-8 PRES. REDUCER # 4 BOILER ROOM DOMESTIC WATER HEATER 18000 60 LESLIE 1966

PRV-9 PRES. REDUCER # 5 BOILER ROOM DEAREATOR 20000 20 LESLIE 1966

PRV-10 PRES. REDUCER # 6 BOILER ROOM BOILER OIL HEATER 2000 20 LESLIE 1966

PRV-11 PRES. REDUCER # 7 BOILER ROOM BOILER OIL HEATER 2000 20 LESLIE 1966

ITEM DESCRIPTION LOCATION SERVICE C.F.M. H.P. MFG. DATE

S-1A SUPPLY FAN 9 th FL. MECH. PERIMETER 2 - 18 90000 250 CHICAGO BLOWER 1966

S-1B SUPPLY FAN 9 th FL. MECH. PERIMETER 2 - 18 90000 250 CHICAGO BLOWER 1966

S-2 SUPPLY FAN 31st FL. MECH. PERIMETER 19 - 30 136000 300 CHICAGO BLOWER 1966

S-3 SUPPLY FAN 9 th FL. MECH. INTERIOR LL - 8 142000 300 CHICAGO BLOWER 1966

S-4 SUPPLY FAN 9 th FL. MECH. INTERIOR LL - 8 145000 300 CHICAGO BLOWER 1966

S-5 SUPPLY FAN 9 th FL. MECH. INT.COURT & JURY 10 - 18 145000 300 CHICAGO BLOWER 1966

S-6 SUPPLY FAN 31st FL. MECH. INT. COURT & JURY 19 - 30 145000 300 CHICAGO BLOWER 1966

S-7 SUPPLY FAN 9 th FL. MECH. COURT & JURY 13 - 16 E. 102000 250 CHICAGO BLOWER 1966

S-8 SUPPLY FAN 9 th FL. MECH. COURT & JURY 13 - 18 W. 110000 250 CHICAGO BLOWER 1966

S-9 SUPPLY FAN 31st FL. MECH. COURT & JURY 17 - 30 E. 145000 300 CHICAGO BLOWER 1966

S-10 SUPPLY FAN 31st FL. MECH. 27th & 29th FLOORS 108000 250 CHICAGO BLOWER 1966

S-11 SUPPLY FAN 31st FL. MECH. COURT & JURY 19 - 24 E. 145000 300 CHICAGO BLOWER 1966

S-12 SUPPLY FAN 31st FL. MECH. COURT & JURY 19 - 26 W. 132000 300 CHICAGO BLOWER 1966

S-13 SUPPLY FAN 9 th FL. MECH. WEST CONCOURSE 41000 150 CHICAGO BLOWER 1966

S-14 SUPPLY FAN 9 th FL. MECH. LOWER LEVEL 61500 150 CHICAGO BLOWER 1966

S-15 SUPPLY FAN 9 th FL. MECH. LL - CL MECH. / GAR. 145000 300 CHICAGO BLOWER 1966

S-16 SUPPLY FAN 9 th FL. MECH. NO SERVICE 25000 75 CHICAGO BLOWER 1966

S-17 SUPPLY FAN 9 th FL. MECH. CL-16 25000 75 CHICAGO BLOWER 1966

S-18 SUPPLY FAN CL CEILING LOBBY NORTH - WEST 6140 7.5 CARRIER 1995

S-19 SUPPLY FAN CL CEILING LOBBY WEST - NORTH 5940 7.5 CARRIER 1995

S-20 SUPPLY FAN CL CEILING LOBBY WEST - SOUTH 4380 5 CARRIER 1995

S-21 SUPPLY FAN CL CEILING LOBBY SOUTH - WEST 9600 10 CARRIER 1995

S-22 SUPPLY FAN CL CEILING LOBBY SOUTH - EAST 7200 7.5 CARRIER 1995

S-23 SUPPLY FAN CL CEILING LOBBY EAST - SOUTH 7480 7.5 CARRIER 1995

S-24 SUPPLY FAN CL CEILING LOBBY EAST - NORTH 11380 15 CARRIER 1995

S-25 SUPPLY FAN CL CEILING LOBBY NORTH - EAST 9600 10 CARRIER 1995

Addendum No. 2, Property Managment Services at the Richard J. Daley Center Page 8 of 26

Page 9: NOTICE OF CHANGES, MODIFICATIONS, OR …...Jul 10, 2018  · RFI-6. Question: Can the PBC provide the equipment counts for the following areas of building support; • HVAC – Chillers,

ITEM DESCRIPTION LOCATION SERVICE G.P.M. H.P. MFG. DATE

SE - 1 SEWAGE EJECTOR LL MECHANICAL LL & CL NORTH 300 NA SHONE 1966

SE - 2 SEWAGE EJECTOR LL MECHANICAL LL & CL NORTH 300 NA SHONE 1966

SE - 3 SEWAGE EJECTOR BOILER ROOM LL & CL SOUTH 300 NA SHONE 1966

SE - 4 SEWAGE EJECTOR BOILER ROOM LL & CL SOUTH 300 NA SHONE 1966

ITEM DESCRIPTION LOCATION SERVICE C.F.M. H.P. MFG. DATE

TE - 1 TOILET EXHAUST 9 th FL. MECH. LL - 18th FLOOR 22000 15 CHICAGO BLOWER 1966

TE - 2 TOILET EXHAUST 9 th FL. MECH. LL - 18th FLOOR 22000 15 CHICAGO BLOWER 1966

TE - 3 TOILET EXHAUST 31st FL. MECH. 19 - 30th FLOOR 22000 15 CHICAGO BLOWER 1966

TE - 4 TOILET EXHAUST 31st FL. MECH. 19 - 30th FLOOR 22000 15 CHICAGO BLOWER 1966

TE - 5 TOILET EXHAUST PENTHOUSE 31st FLOOR LOCKER RM. 400 1/6 GENERIC 1966

ITEM DESCRIPTION LOCATION SERVICE C.F.M. H.P. MFG. DATE

V - 1 EXHAUST FAN 31 - M2 MECH. TRANSFORMER 31 15700 7.5 CHICAGO BLOWER 1966

V - 2 EXHAUST FAN 31 - M2 MECH. TRANSFORMER 31 15700 7.5 CHICAGO BLOWER 1966

V - 3 EXHAUST FAN 9 th FL. MECH. TRANSFORMER 9 10300 5 CHICAGO BLOWER 1966

V - 4 EXHAUST FAN 9 th FL. MECH. TRANSFORMER 9 12600 5 CHICAGO BLOWER 1966

V - 5 EXHAUST FAN CL MECHANICAL TRANSFORMER CL 8000 7.5 CHICAGO BLOWER 1966

V - 6 EXHAUST FAN LL MECHANICAL STACK COOLING 18700 20 CHICAGO BLOWER 1966

V - 7 EXHAUST FAN 31st FL. MECH. PAINT SHOP 10800 7.5 CHICAGO BLOWER 1966

V - 8 EXHAUST FAN 31st FL. MECH. PAINT SHOP 10300 7.5 CHICAGO BLOWER 1966

V - 9 EXHAUST FAN 31st FL. MECH. TRANSFORMER 2500 2 CHICAGO BLOWER 1966

V - 10 EXHAUST FAN 9 th FL. MECH. ELEC. SHOP 2500 2 CHICAGO BLOWER 1966

V - 11 EXHAUST FAN 31 - M2 MECH. TRANSFORMER 31 30000 20 PORTER 1966

V - 12 EXHAUST FAN 31 - M2 MECH. BATTERY ROOM 400 1/6 GENERIC 1966

ITEM DESCRIPTION LOCATION SERVICE C.F.M. B.T.U. MFG. DATE

CC-1A CLG COIL ASSY 9 th FL. MECH. S-1A FAN 90000 4.05 M HEATCRAFT 1993

CC-1B CLG COIL ASSY 9 th FL. MECH. S-1B FAN 90000 4.05 M HEATCRAFT 1993

CC-2 CLG COIL ASSY 31st FL. MECH. S-2 FAN 136000 6.12 M HEATCRAFT 1993

CC-3 CLG COIL ASSY 9 th FL. MECH. S-3 FAN 142000 6.15 M HEATCRAFT 1993

CC-4 CLG COIL ASSY 9 th FL. MECH. S-4 FAN 145000 6.27 M HEATCRAFT 1993

CC-5 CLG COIL ASSY 9 th FL. MECH. S-5 FAN 145000 6.27 M HEATCRAFT 1993

CC-6 CLG COIL ASSY 31st FL. MECH. S-6 FAN 145000 7.80 M HEATCRAFT 1993

CC-7 CLG COIL ASSY 9 th FL. MECH. S-7 FAN 102000 4.41 M HEATCRAFT 1993

CC-8 CLG COIL ASSY 9 th FL. MECH. S-8 FAN 110000 4.74 M HEATCRAFT 1993

CC-9 CLG COIL ASSY 31st FL. MECH. S-9 FAN 145000 6.27 M HEATCRAFT 1993

CC-10 CLG COIL ASSY 31st FL. MECH. S-10 FAN 108000 4.67 M HEATCRAFT 1993

CC-11 CLG COIL ASSY 31st FL. MECH. S-11 FAN 145000 6.27 M HEATCRAFT 1993

CC-12 CLG COIL ASSY 31st FL. MECH. S-12 FAN 132000 5.71 M HEATCRAFT 1993

CC-13 CLG COIL ASSY 9 th FL. MECH. S-13 FAN 41000 1.78 M HEATCRAFT 1993

CC-14 CLG COIL ASSY 9 th FL. MECH. S-14 FAN 61500 4.98 M HEATCRAFT 1993

CC-15 CLG COIL ASSY 9 th FL. MECH. S-15 FAN 145000 4.98 M HEATCRAFT 1993

CC-16 CLG COIL ASSY 9 th FL. MECH. S-16 FAN 25000 1.08 M HEATCRAFT 1993

CC-17 CLG COIL ASSY 9 th FL. MECH. S-17 FAN 25000 1.08 M HEATCRAFT 1993

Addendum No. 2, Property Managment Services at the Richard J. Daley Center Page 9 of 26

Page 10: NOTICE OF CHANGES, MODIFICATIONS, OR …...Jul 10, 2018  · RFI-6. Question: Can the PBC provide the equipment counts for the following areas of building support; • HVAC – Chillers,

ITEM DESCRIPTION LOCATION SERVICE C.F.M. B.T.U. MFG. DATE

HC-1A HTG COIL ASSY 9 th FL. MECH. S-1A FAN 90000 2.43 M HEATCRAFT 1993

HC-1B HTG COIL ASSY 9 th FL. MECH. S-1B FAN 90000 2.43 M HEATCRAFT 1993

HC-2 HTG COIL ASSY 31st FL. MECH. S-2 FAN 136000 3.67 M HEATCRAFT 1993

HC-3 HTG COIL ASSY 9 th FL. MECH. S-3 FAN 142000 4.03 M HEATCRAFT 1993

HC-4 HTG COIL ASSY 9 th FL. MECH. S-4 FAN 145000 4.11 M HEATCRAFT 1993

HC-5 HTG COIL ASSY 9 th FL. MECH. S-5 FAN 145000 4.11 M HEATCRAFT 1993

HC-6 HTG COIL ASSY 31st FL. MECH. S-6 FAN 145000 4.11 M HEATCRAFT 1993

HC-7 HTG COIL ASSY 9 th FL. MECH. S-7 FAN 102000 3.15 M HEATCRAFT 1993

HC-8 HTG COIL ASSY 9 th FL. MECH. S-8 FAN 110000 3.4 M HEATCRAFT 1993

HC-9 HTG COIL ASSY 31st FL. MECH. S-9 FAN 145000 4.48 M HEATCRAFT 1993

HC-10 HTG COIL ASSY 31st FL. MECH. S-10 FAN 108000 3.33 M HEATCRAFT 1993

HC-11 HTG COIL ASSY 31st FL. MECH. S-11 FAN 145000 4.48 M HEATCRAFT 1993

HC-12 HTG COIL ASSY 31st FL. MECH. S-12 FAN 132000 4.07 M HEATCRAFT 1993

HC-13 HTG COIL ASSY 9 th FL. MECH. S-13 FAN 41000 2.95 M HEATCRAFT 1993

HC-14 HTG COIL ASSY 9 th FL. MECH. S-14 FAN 61500 6 M HEATCRAFT 1993

HC-15 HTG COIL ASSY 9 th FL. MECH. S-15 FAN 145000 14.25 M HEATCRAFT 1993

HC-16 HTG COIL ASSY 9 th FL. MECH. S-16 FAN 25000 2.46 M HEATCRAFT 1993

HC-17 HTG COIL ASSY 9 th FL. MECH. S-17 FAN 25000 704,000 HEATCRAFT 1993

HC-18 HEATING COIL CL CEILING S-18 FAN 6140 265,200 CARRIER 1995

HC-19 HEATING COIL CL CEILING S-19 FAN 5940 256,600 CARRIER 1995

HC-20 HEATING COIL CL CEILING S-20 FAN 4380 189,200 CARRIER 1995

HC-21 HEATING COIL CL CEILING S-21 FAN 9600 414,700 CARRIER 1995

HC-22 HEATING COIL CL CEILING S-22 FAN 7200 311,000 CARRIER 1995

HC-23 HEATING COIL CL CEILING S-23 FAN 7480 323,100 CARRIER 1995

HC-24 HEATING COIL CL CEILING S-24 FAN 11380 491,600 CARRIER 1995

HC-25 HEATING COIL CL CEILING S-25 FAN 9600 414,700 CARRIER 1995

ITEM DESCRIPTION LOCATION SERVICE C.F.M. DATE

FB-1A FILTER BANK 9 th FL. MECH. S-1A FAN 90000 STERN 1993

FB-1B FILTER BANK 9 th FL. MECH. S-1B FAN 90000 STERN 1993

FB-2 FILTER BANK 31st FL. MECH. S-2 FAN 136000 STERN 1993

FB-3 FILTER BANK 9 th FL. MECH. S-3 FAN 142000 STERN 1993

FB-4 FILTER BANK 9 th FL. MECH. S-4 FAN 145000 STERN 1993

FB-5 FILTER BANK 9 th FL. MECH. S-5 FAN 145000 STERN 1993

FB-6 FILTER BANK 31st FL. MECH. S-6 FAN 145000 STERN 1993

FB-7 FILTER BANK 9 th FL. MECH. S-7 FAN 102000 STERN 1993

FB-8 FILTER BANK 9 th FL. MECH. S-8 FAN 110000 STERN 1993

FB-9 FILTER BANK 31st FL. MECH. S-9 FAN 145000 STERN 1993

FB-10 FILTER BANK 31st FL. MECH. S-10 FAN 108000 STERN 1993

FB-11 FILTER BANK 31st FL. MECH. S-11 FAN 145000 STERN 1993

FB-12 FILTER BANK 31st FL. MECH. S-12 FAN 132000 STERN 1993

FB-13 FILTER BANK 9 th FL. MECH. S-13 FAN 41000 STERN 1993

FB-14 FILTER BANK 9 th FL. MECH. S-14 FAN 61500 STERN 1993

FB-15 FILTER BANK 9 th FL. MECH. S-15 FAN 145000 STERN 1993

FB-16 FILTER BANK 9 th FL. MECH. S-16 FAN 25000 STERN 1993

FB-17 FILTER BANK 9 th FL. MECH. S-17 FAN 25000 STERN 1993

FB-18 FILTER BANK CL CEILING S-18 FAN 6140 STERN 1993

Addendum No. 2, Property Managment Services at the Richard J. Daley Center Page 10 of 26

Page 11: NOTICE OF CHANGES, MODIFICATIONS, OR …...Jul 10, 2018  · RFI-6. Question: Can the PBC provide the equipment counts for the following areas of building support; • HVAC – Chillers,

FB-19 FILTER BANK CL CEILING S-19 FAN 5940 STERN 1993

FB-20 FILTER BANK CL CEILING S-20 FAN 4380 STERN 1993

FB-21 FILTER BANK CL CEILING S-21 FAN 9600 STERN 1993

FB-22 FILTER BANK CL CEILING S-22 FAN 7200 STERN 1993

FB-23 FILTER BANK CL CEILING S-23 FAN 7480 STERN 1993

FB-24 FILTER BANK CL CEILING S-24 FAN 11380 STERN 1993

FB-25 FILTER BANK CL CEILING S-25 FAN 9600 STERN 1993

FB-V-1 FILTER BANK 31 - M2 MECH. V - 1 15700 STERN 1993

FB-V-2 FILTER BANK 31 - M2 MECH. V - 2 15700 STERN 1993

FB-V-3 FILTER BANK 9 th FL. MECH. V - 3 10300 STERN 1993

FB-V-4 FILTER BANK 9 th FL. MECH. V - 4 12600 STERN 1993

ITEM DESCRIPTION LOCATION SERVICE MFG. DATE

MBC-7 MOD. BLDG. CONTROL 9 th FL. MECH. SIEMENS 2003

MBC-8 MOD. BLDG. CONTROL 9 th FL. MECH. SIEMENS 2003

MBC-9 MOD. BLDG. CONTROL 9 th FL. MECH. SIEMENS 2003

MBC-10 MOD. BLDG. CONTROL 9 th FL. MECH. SIEMENS 2003

MBC-11 MOD. BLDG. CONTROL 9 th FL. MECH. SIEMENS 2003

MBC-12 MOD. BLDG. CONTROL 31st FL. MECH. SIEMENS 2003

MBC-13 MOD. BLDG. CONTROL 31st FL. MECH. SIEMENS 2003

MBC-14 MOD. BLDG. CONTROL 31st FL. MECH. SIEMENS 2003

MBC-15 MOD. BLDG. CONTROL 31st FL. MECH. SIEMENS 2003

MBC-16 MOD. BLDG. CONTROL 31st FL. MECH. SIEMENS 2003

MBC-17 MOD. BLDG. CONTROL 31st FL. MECH. SIEMENS 2003

MBC-18 MOD. BLDG. CONTROL LL MECHANICAL SIEMENS 2003

MBC-19 MOD. BLDG. CONTROL CONTROL ROOM SIEMENS 2003

MBC-20 MOD. BLDG. CONTROL 31st FL. MECH. SIEMENS 2003

MBC-21 MOD. BLDG. CONTROL 31st FL. MECH. SIEMENS 2003

MBC-22 MOD. BLDG. CONTROL 9 th FL. MECH. SIEMENS 2003

MBC-23 MOD. BLDG. CONTROL BOILER ROOM SIEMENS 2003

MBC-24 MOD. BLDG. CONTROL 9 th FL. MECH. SIEMENS 2003

MBC-25 MOD. BLDG. CONTROL 9 th FL. MECH. SIEMENS 2003

MBC-26 MOD. BLDG. CONTROL BOILER ROOM SIEMENS 2003

MBC-27 MOD. BLDG. CONTROL LL MECHANICAL SIEMENS 2003

MBC-28 MOD. BLDG. CONTROL CL MECHANICAL SIEMENS 2003

MBC-29 MOD. BLDG. CONTROL CL WEST VAULT SIEMENS 2003

MBC-30 MOD. BLDG. CONTROL CL EAST VAULT SIEMENS 2003

MBC-31 MOD. BLDG. CONTROL 31st FL. MECH. SIEMENS 2003

MBC-33 MOD. BLDG. CONTROL CONTROL ROOM SIEMENS 2003

MBC-34 MOD. BLDG. CONTROL CONTROL ROOM SIEMENS 2003

MBC-36 MOD. BLDG. CONTROL 4th FLOOR SIEMENS 2003

MBC-37 MOD. BLDG. CONTROL 31 - M2 MECH. SIEMENS 2003

MBC-38 MOD. BLDG. CONTROL CL MECHANICAL SIEMENS 2003

ITEM DESCRIPTION LOCATION SERVICE MFG. DATE

O.A -1A FRESH AIR DAMPER 9 th FL. MECH. S-1A FAN TAMCO 2003

O.A -1B FRESH AIR DAMPER 9 th FL. MECH. S-1B FAN TAMCO 2003

O.A.- S-2 FRESH AIR DAMPER 31st FL. MECH. S-2 FAN TAMCO 2001

O.A.- S-3 FRESH AIR DAMPER 9 th FL. MECH. S-3 FAN TAMCO 2005

FOUNTAIN

E-5, VAULT TEMP.

V-1, 2, 11, VAULT TEMP.

UPPER INDUCTION PUMPS AND TEMP. CONTROL

BOILERS 1, 2, 3, 4

HOUSE, MAKE-UP, CHWR, CWR PUMPS

LOWER INDUCTION PUMPS AND TEMP. CONTROL

E-4, VAULT TEMP., CP-13 ALARM

FIRE ALARM INTERFACE - INACTIVE

LOBBY HEATING VALVES

LIGHTING GATEWAY

LIGHTING GATEWAY

SECURITY INTERFACE - INACTIVE

4th FLOOR VAV TEC's

S-17

S-15 COOLING

S-14

V-3, V-4

S-6, TEC'S 18-19-20-21

S-9, TEC'S 22-23

S-10

S-11, TEC'S 24-25-26

S-12, TEC'S 28, P-12, P-13, P-14

CHILLERS, P-9, P-10, P-11, S-18, 19, 20, 21, 22, 23, 24, 25

S-1A, S-13, S-16, TEC'S 13-14-15

S-3, S-7, TEC'S 15

S-4, S-1B

S-8, TEC'S 15-16-17-18

S-5, S-15, TEC'S 10

S-2, TEC'S 30

Addendum No. 2, Property Managment Services at the Richard J. Daley Center Page 11 of 26

Page 12: NOTICE OF CHANGES, MODIFICATIONS, OR …...Jul 10, 2018  · RFI-6. Question: Can the PBC provide the equipment counts for the following areas of building support; • HVAC – Chillers,

O.A.- S-4 FRESH AIR DAMPER 9 th FL. MECH. S-4 FAN TAMCO 2005

O.A.- S-5 FRESH AIR DAMPER 9 th FL. MECH. S-5 FAN TAMCO 2007

O.A.- S-6 FRESH AIR DAMPER 31st FL. MECH. S-6 FAN TAMCO 1999

O.A.- S-7 FRESH AIR DAMPER 9 th FL. MECH. S-7 FAN TAMCO 2007

O.A.- S-8 FRESH AIR DAMPER 9 th FL. MECH. S-8 FAN TAMCO 2007

O.A.- S-9 FRESH AIR DAMPER 31st FL. MECH. S-9 FAN TAMCO 1999

O.A.- S-10 FRESH AIR DAMPER 31st FL. MECH. S-10 FAN TAMCO 1999

O.A.- S-11 FRESH AIR DAMPER 31st FL. MECH. S-11 FAN TAMCO 1999

O.A.- S-12 FRESH AIR DAMPER 31st FL. MECH. S-12 FAN TAMCO 1999

O.A.- S-13 FRESH AIR DAMPER 9 th FL. MECH. S-13 FAN TAMCO 2007

O.A.- S-14 FRESH AIR DAMPER 9 th FL. MECH. S-14 FAN TAMCO 2007

O.A.- S-15 FRESH AIR DAMPER 9 th FL. MECH. S-15 FAN TAMCO 2007

O.A.- S-16 FRESH AIR DAMPER 9 th FL. MECH. S-16 FAN TAMCO 2003

O.A.- S-17 FRESH AIR DAMPER 9 th FL. MECH. S-17 FAN TAMCO 2003

ITEM DESCRIPTION LOCATION SERVICE MFG. DATE

E.A -1A EXHAUST AIR DAMPER 9 th FL. MECH. ER-1A FAN TAMCO 2002

E.A -1B EXHAUST AIR DAMPER 9 th FL. MECH. ER-1B FAN TAMCO 2002

E.A.- S-2 EXHAUST AIR DAMPER 31st FL. MECH. ER-2 FAN TAMCO 2002

E.A.- S-3 EXHAUST AIR DAMPER 9 th FL. MECH. ER-3 FAN TAMCO 2002

E.A.- S-4 EXHAUST AIR DAMPER 9 th FL. MECH. ER-4 FAN TAMCO 2002

E.A.- S-5 EXHAUST AIR DAMPER 9 th FL. MECH. ER-5 FAN TAMCO 2002

E.A.- S-6 EXHAUST AIR DAMPER 31st FL. MECH. ER-6 FAN TAMCO 2002

E.A.- S-7 EXHAUST AIR DAMPER 9 th FL. MECH. ER-7 FAN TAMCO 2002

E.A.- S-8 EXHAUST AIR DAMPER 9 th FL. MECH. ER-8 FAN TAMCO 2002

E.A.- S-9 EXHAUST AIR DAMPER 31st FL. MECH. ER-9 FAN TAMCO 2002

E.A.- S-10 EXHAUST AIR DAMPER 31st FL. MECH. ER-10 FAN TAMCO 2002

E.A.- S-11 EXHAUST AIR DAMPER 31st FL. MECH. ER-11 FAN TAMCO 2002

E.A.- S-12 EXHAUST AIR DAMPER 31st FL. MECH. ER-12 FAN TAMCO 2002

E.A.- S-13 EXHAUST AIR DAMPER 9 th FL. MECH. ER-13 FAN TAMCO 2002

E.A.- S-14 EXHAUST AIR DAMPER 9 th FL. MECH. ER-14 FAN TAMCO 2002

E.A.- S-15 EXHAUST AIR DAMPER 9 th FL. MECH. ER-15 FAN TAMCO 2002

E.A.- S-17 EXHAUST AIR DAMPER 9 th FL. MECH. ER-17 FAN TAMCO 2002

EA -V - 1 EXHAUST AIR DAMPER 31 - M2 MECH. TRANSFORMER ROOM 31 TAMCO 2002

EA -V - 2 EXHAUST AIR DAMPER 31 - M2 MECH. TRANSFORMER ROOM 31 TAMCO 2002

EA -V - 3 EXHAUST AIR DAMPER 9 th FL. MECH. TRANSFORMER ROOM 9 TAMCO 2002

EA -V - 4 EXHAUST AIR DAMPER 9 th FL. MECH. TRANSFORMER ROOM 9 TAMCO 2002

ITEM DESCRIPTION LOCATION SERVICE MFG. DATE

R.A -1A RETURN AIR DAMPER 9 th FL. MECH. ER-1A FAN TAMCO 2003

R.A -1B RETURN AIR DAMPER 9 th FL. MECH. ER-1B FAN TAMCO 2003

R.A.- S-2 RETURN AIR DAMPER 31st FL. MECH. ER-2 FAN TAMCO 2001

R.A.- S-3 RETURN AIR DAMPER 9 th FL. MECH. ER-3 FAN TAMCO 2005

R.A.- S-4 RETURN AIR DAMPER 9 th FL. MECH. ER-4 FAN TAMCO 2005

R.A.- S-5 RETURN AIR DAMPER 9 th FL. MECH. ER-5 FAN TAMCO 2007

R.A.- S-6 RETURN AIR DAMPER 31st FL. MECH. ER-6 FAN TAMCO 1999

R.A.- S-7 RETURN AIR DAMPER 9 th FL. MECH. ER-7 FAN TAMCO 2007

R.A.- S-8 RETURN AIR DAMPER 9 th FL. MECH. ER-8 FAN TAMCO 2007

R.A.- S-9 RETURN AIR DAMPER 31st FL. MECH. ER-9 FAN TAMCO 1999

Addendum No. 2, Property Managment Services at the Richard J. Daley Center Page 12 of 26

Page 13: NOTICE OF CHANGES, MODIFICATIONS, OR …...Jul 10, 2018  · RFI-6. Question: Can the PBC provide the equipment counts for the following areas of building support; • HVAC – Chillers,

R.A.- S-10 RETURN AIR DAMPER 31st FL. MECH. ER-10 FAN TAMCO 1999

R.A.- S-11 RETURN AIR DAMPER 31st FL. MECH. ER-11 FAN TAMCO 1999

R.A.- S-12 RETURN AIR DAMPER 31st FL. MECH. ER-12 FAN TAMCO 1999

R.A.- S-13 RETURN AIR DAMPER 9 th FL. MECH. ER-13 FAN TAMCO 2007

R.A.- S-14 RETURN AIR DAMPER 9 th FL. MECH. ER-14 FAN TAMCO 2007

R.A.- S-17 RETURN AIR DAMPER 9 th FL. MECH. ER-17 FAN TAMCO 2003

ITEM DESCRIPTION LOCATION SERVICE C.F.M. H.P. MFG. DATE

S-1A-VFD SUPPLY FAN 9 th FL. MECH. PERIMETER 2 - 18 90000 250 ABB 2010

S-1B-VFD SUPPLY FAN 9 th FL. MECH. PERIMETER 2 - 18 90000 250 ABB 2010

S-2-VFD SUPPLY FAN 31st FL. MECH. PERIMETER 19 - 30 136000 300 ABB 2010

S-3-VFD SUPPLY FAN 9 th FL. MECH. INTERIOR LL - 8 142000 300 ABB 2010

S-4-VFD SUPPLY FAN 9 th FL. MECH. INTERIOR LL - 8 145000 300 ABB 2010

S-5-VFD SUPPLY FAN 9 th FL. MECH. INT.COURT & JURY 10 - 18 145000 300 ABB 1995

S-6-VFD SUPPLY FAN 31st FL. MECH. INT. COURT & JURY 19 - 30 145000 300 ABB 1995

S-7-VFD SUPPLY FAN 9 th FL. MECH. COURT & JURY 13 - 16 E. 102000 250 ABB 1995

S-8-VFD SUPPLY FAN 9 th FL. MECH. COURT & JURY 13 - 18 W. 110000 250 ABB 1995

S-9-VFD SUPPLY FAN 31st FL. MECH. COURT & JURY 17 - 30 E. 145000 300 ABB 1995

S-10-VFD SUPPLY FAN 31st FL. MECH. 27th & 29th FLOORS 108000 250 ABB 1995

S-11-VFD SUPPLY FAN 31st FL. MECH. COURT & JURY 19 - 24 E. 145000 300 ABB 1995

S-12-VFD SUPPLY FAN 31st FL. MECH. COURT & JURY 19 - 26 W. 132000 300 ABB 1995

S-13-VFD SUPPLY FAN 9 th FL. MECH. WEST CONCOURSE 41000 150 ABB 1995

S-14-VFD SUPPLY FAN 9 th FL. MECH. LOWER LEVEL 61500 150 ABB 1995

S-15-VFD SUPPLY FAN 9 th FL. MECH. LL - CL MECH. / GAR. 145000 300 ABB 1995

S-17-VFD SUPPLY FAN 9 th FL. MECH. CL-16 25000 75 ABB 1995

ITEM DESCRIPTION LOCATION SERVICE C.F.M. H.P. MFG. DATE

ER-1A-VFD EXH. - RET. FAN 9 th FL. MECH. PERIMETER 2 - 18 81000 150 ABB 2010

ER-1B-VFD EXH. - RET. FAN 9 th FL. MECH. PERIMETER 2 - 18 81000 150 ABB 2010

ER-2-VFD EXH. - RET. FAN 31st FL. MECH. PERIMETER 19 - 30 121000 200 ABB 2010

ER-3-VFD EXH. - RET. FAN 9 th FL. MECH. INTERIOR LL - 8 130000 200 ABB 2010

ER-4-VFD EXH. - RET. FAN 9 th FL. MECH. INTERIOR LL - 8 130000 200 ABB 2010

ER-5-VFD EXH. - RET. FAN 9 th FL. MECH. INT.COURT & JURY 10 - 18 130000 200 ABB 1995

ER-6-VFD EXH. - RET. FAN 31st FL. MECH. INT. COURT & JURY 19 - 30 130000 200 ABB 1995

ER-7-VFD EXH. - RET. FAN 9 th FL. MECH. COURT & JURY 13 - 16 E. 93000 150 ABB 1995

ER-8-VFD EXH. - RET. FAN 9 th FL. MECH. COURT & JURY 13 - 18 W. 108000 200 ABB 1995

ER-9-VFD EXH. - RET. FAN 31st FL. MECH. COURT & JURY 17 - 30 E. 130000 200 ABB 1995

ER-10-VFD EXH. - RET. FAN 31st FL. MECH. 27th & 29th FLOORS 98000 150 ABB 1995

ER-11-VFD EXH. - RET. FAN 31st FL. MECH. COURT & JURY 19 - 24 E. 130000 200 ABB 1995

ER-12-VFD EXH. - RET. FAN 31st FL. MECH. COURT & JURY 19 - 26 W. 121000 200 ABB 1995

ER-13-VFD EXH. - RET. FAN 9 th FL. MECH. WEST CONCOURSE 35000 60 ABB 1995

ER-14-VFD EXH. - RET. FAN 9 th FL. MECH. LOWER LEVEL 40000 100 ABB 1995

ER-17-VFD EXH. - RET. FAN 9 th FL. MECH. CL-116 35000 40 ABB 1995

E-1-VFD EXHAUST FAN 31st FL. MECH. KITCHEN 25000 50 ABB 1995

E-2B-VFD EXHAUST FAN 31st FL. MECH. LOWER LEVEL 30000 75 ABB 1995

E - 3-VFD EXHAUST FAN GARAGE GARAGE EAST 60000 60 ABB 2007

E - 4-VFD EXHAUST FAN GARAGE GARAGE WEST 34450 30 ABB

Addendum No. 2, Property Managment Services at the Richard J. Daley Center Page 13 of 26

Page 14: NOTICE OF CHANGES, MODIFICATIONS, OR …...Jul 10, 2018  · RFI-6. Question: Can the PBC provide the equipment counts for the following areas of building support; • HVAC – Chillers,

ITEM DESCRIPTION LOCATION SERVICE GPM H.P. MFG. DATE

P - 1-VFD COND. WATER PUMP LL MECHANICAL AC - 1, 2, 3, 4 6000 200 Danfoss 2003

P - 2-VFD COND. WATER PUMP LL MECHANICAL AC - 1, 2, 3, 4 6000 200 Danfoss 2003

P - 3-VFD COND. WATER PUMP LL MECHANICAL AC - 1, 2, 3, 4 6000 200 Danfoss 2003

P - 4-VFD COND. WATER PUMP LL MECHANICAL AC - 1, 2, 3, 4 6000 200 Danfoss 2003

P - 5-VFD CHILL WTR PUMP LL MECHANICAL AC - 1, 2, 3, 4 4000 125 Danfoss 2002

P - 6-VFD CHILL WTR PUMP LL MECHANICAL AC - 1, 2, 3, 4 4000 125 Danfoss 2002

P - 7-VFD CHILL WTR PUMP LL MECHANICAL AC - 1, 2, 3, 4 4000 125 Danfoss 2002

P - 8-VFD CHILL WTR PUMP LL MECHANICAL AC - 1, 2, 3, 4 4000 125 Danfoss 2002

P - 9-VFD INDUCTION PUMP LL MECHANICAL 2 - 18 th FLOOR NORTH 1316 40 Danfoss 2002

P - 10-VFD INDUCTION PUMP LL MECHANICAL 2 - 18 th FLOOR SOUTH 2600 75 Danfoss 2002

P - 11-VFD INDUCTION PUMP LL MECHANICAL 2 - 18 th FLOOR E & W 2600 75 Danfoss 2002

P - 12-VFD INDUCTION PUMP M2 MECHANICAL 19 - 30 th FLOOR NORTH 985 25 Danfoss 2003

P - 13-VFD INDUCTION PUMP M2 MECHANICAL 19 - 30 th FLOOR SOUTH 1970 40 Danfoss 2003

P - 14-VFD INDUCTION PUMP M2 MECHANICAL 19 - 30 th FLOOR E & W 2090 150 Danfoss 2003

P - 30-VFD FEED WATER BOILER ROOM BOILERS 150 40 Schnieder 2012

P - 31-VFD FEED WATER BOILER ROOM BOILERS 150 40 Schnieder 2012

P - 32-VFD FEED WATER BOILER ROOM BOILERS 150 40 Schnieder 2012

P - 105-VFD MAKE-UP PUMP LL MECHANICAL MAKE-UP WATER 500 125 ABB 2016

P - 105 A-VFD MAKE-UP PUMP LL MECHANICAL MAKE-UP WATER 500 125 ABB 2016

P - 105 A-VFD MAKE-UP PUMP LL MECHANICAL MAKE-UP WATER 100 2x5 Goulds 2016

P - 106-VFD DOM. WTR. PUMP LL MECHANICAL LL - 9 th FLOOR 250 25 LS 2016

P - 107-VFD DOM. WTR. PUMP LL MECHANICAL LL - 9 th FLOOR 250 25 LS 2016

P - 108-VFD DOM. WTR. PUMP LL MECHANICAL 10 - 20 th FLOOR 600 100 LS 2016

P - 109-VFD DOM. WTR. PUMP LL MECHANICAL 10 - 20 th FLOOR 600 100 LS 2016

P - 110-VFD DOM. WTR. PUMP LL MECHANICAL 21 - PENTHOUSE 400 40 LS 2016

P - 111-VFD DOM. WTR. PUMP LL MECHANICAL 21 - PENTHOUSE 400 40 LS 2016

Addendum No. 2, Property Managment Services at the Richard J. Daley Center Page 14 of 26

Page 15: NOTICE OF CHANGES, MODIFICATIONS, OR …...Jul 10, 2018  · RFI-6. Question: Can the PBC provide the equipment counts for the following areas of building support; • HVAC – Chillers,

LAVATORY TOILET URINAL MOP BASIN DR. FOUNTAIN SPECIAL

673 686 124 73 76 28

FLOOR FACILITY LAVATORY TOILET URINAL MOP BASIN FOUNTAIN SPECIAL

MENS PUBLIC 4 4 5

LL WOMENS PUBLIC 5 4

MEN SEMI PRIVATE 6 4 4

WOM. SEMI PRIVATE 6 6

JAN. MENS LOCKER 3 2 2 1 SHOWER

JAN. WOM. LOCKER 3 3 2 SHOWERS

ENG. LOCKER 3 2 2 2 SHOWERS

SHRF. MENS LOCKER 4 2 3 1 SHOWER

SHRF. WOM. LOCKER 3 3 2 SHOWERS

PRIVATE CORRIDOR 5

PRIVATE 1 1

JANITOR CL. 5

PUBLIC CORRIDOR 1

BREAK / COPY RMS. 4 SINKS

TOTAL 38 31 16 5 6 12

FLOOR FACILITY LAVATORY TOILET URINAL MOP BASIN FOUNTAIN SPECIAL

MENS PUBLIC 4 3 4

CL WOMENS PUBLIC 4 3

PEDWAY 2

CL-25 MEN SEMI PRIVATE 3 3 3

CL-25 WOM. SEMI PRIVATE 3 3

CL-54 SEMI PRIVATE 2 2

CL-88 SEMI PRIVATE 2 2 1 SINK

CL-95 MEN SEMI PRIVATE 2 2 2

CL-95 BREAK ROOM 1 SINK

CL-97 WOM. SEMI PRIVATE 2 2

CL-97 BREAK ROOM 1 SINK

CL-117 SEMI PRIVATE 2 2 1 SINK

CL-150 MENS LOCKUP 1 1

CL-150 WOM. LOCKUP 1 1

CL-150 LOCKUP 1 1

CL-16 MEN SEMI PRIVATE 2 2 1

CL-16 WOM. SEMI PRIVATE 2 3

CL-90 JANITOR CL. 1

TRAFFIC PRIVATE 1 1

TRAFFIC MEN SEMI PRIVATE 1 1 1

TRAFFIC WOM. SEMI PRIVATE 1 2

TRAFFIC MENS PUBLIC 2 2 1

TRAFFIC WOMENS PUBLIC 2 3

TRAFFIC HALLWAY 2

Total 38 39 12 1 4 4

PLUMBING FIXTURES

TOTAL BUILDING FIXTURESREVISED 1-1-2009

1660

Addendum No. 2, Property Managment Services at the Richard J. Daley Center Page 15 of 26

Page 16: NOTICE OF CHANGES, MODIFICATIONS, OR …...Jul 10, 2018  · RFI-6. Question: Can the PBC provide the equipment counts for the following areas of building support; • HVAC – Chillers,

FLOOR FACILITY LAVATORY TOILET URINAL MOP BASIN FOUNTAIN SPECIAL

JANITOR CL. 1

1

TOTAL 0 0 0 1 0 0

FLOOR FACILITY LAVATORY TOILET URINAL MOP BASIN FOUNTAIN SPECIAL

MENS PUBLIC 3 4 3

2 WOMENS PUBLIC 3 4

JANITOR CL. 1

200 MEN SEMI PRIVATE 2 1 2

200 WOM. SEMI PRIVATE 2 3

201 SEMI PRIVATE 1 1 1 SHOWER

203 MEN SEMI PRIVATE 2 1 1

203 WOM. SEMI PRIVATE 2 2

203 BREAK ROOM SNK - DISHW

PUBLIC CORRIDOR

TOTAL 15 16 6 1 0 3

FLOOR FACILITY LAVATORY TOILET URINAL MOP BASIN FOUNTAIN SPECIAL

MENS PUBLIC 2 4 3

3 WOMENS PUBLIC 3 4

MEN SEMI PRIVATE 1 1

WOM. SEMI PRIVATE 1 1

PRIVATE 9 9

JANITOR CL. 2

BREAK ROOM 1 SINK

PUBLIC CORRIDOR 1

TOTAL 16 19 3 2 1 1

FLOOR FACILITY LAVATORY TOILET URINAL MOP BASIN FOUNTAIN SPECIAL

MENS PUBLIC 3 2 2

4 WOMENS PUBLIC 3 4

MENS SEMI PRIVATE 2 2

WOM. SEMI PRIVATE 2 2

MENS JURY 2 2 1

WOM. JURY 2 2 1

PRIVATE 5 5

BREAK / COPY RMS. 2 SINKS

JANITOR CL. 1

PUBLIC CORRIDOR 3

TOTAL 19 19 2 1 5 2

Addendum No. 2, Property Managment Services at the Richard J. Daley Center Page 16 of 26

Page 17: NOTICE OF CHANGES, MODIFICATIONS, OR …...Jul 10, 2018  · RFI-6. Question: Can the PBC provide the equipment counts for the following areas of building support; • HVAC – Chillers,

FLOOR FACILITY LAVATORY TOILET URINAL MOP BASIN FOUNTAIN SPECIAL

MENS PUBLIC 3 4 3

5 WOMENS PUBLIC 3 4

MEN SEMI PRIVATE 2 1 1

WOM. SEMI PRIVATE 2 2

PRIVATE 1 1

JANITOR CL. 3

BREAK ROOM 1 SINK

PUBLIC CORRIDOR 1

TOTAL 11 12 4 3 1 1

FLOOR FACILITY LAVATORY TOILET URINAL MOP BASIN FOUNTAIN SPECIAL

MENS PUBLIC 3 4 3

6 WOMENS PUBLIC 3 4

PRIVATE 1 1

JANITOR CL. 2

PUBLIC CORRIDOR 2

TOTAL 7 9 3 2 2 0

FLOOR FACILITY LAVATORY TOILET URINAL MOP BASIN FOUNTAIN SPECIAL

MENS PUBLIC 3 4 3

7 WOMENS PUBLIC 3 4 0

SEMI PRIVATE 1 1 1

SEMI PRIVATE 2 2 0

JANITOR CL. 1

PUBLIC CORRIDOR 2

TOTAL 9 11 4 1 2 0

FLOOR FACILITY LAVATORY TOILET URINAL MOP BASIN FOUNTAIN SPECIAL

MENS PUBLIC 3 4 3

8 WOMENS PUBLIC 3 4 0

SEMI PRIVATE 1 1

JANITOR CL. 2

PUBLIC CORRIDOR 2

TOTAL 7 9 3 2 2 0

FLOOR FACILITY LAVATORY TOILET URINAL MOP BASIN FOUNTAIN SPECIAL

LOCKER ROOM 1 2 1 1 SHOWER

9 JANITOR CL. 1

TOTAL 1 2 1 1 0 1

Addendum No. 2, Property Managment Services at the Richard J. Daley Center Page 17 of 26

Page 18: NOTICE OF CHANGES, MODIFICATIONS, OR …...Jul 10, 2018  · RFI-6. Question: Can the PBC provide the equipment counts for the following areas of building support; • HVAC – Chillers,

FLOOR FACILITY LAVATORY TOILET URINAL MOP BASIN FOUNTAIN SPECIAL

MENS PUBLIC 3 4 3

10 WOMENS PUBLIC 3 4

SEMI PRIVATE 1 1

JANITOR CL. 2

PUBLIC CORRIDOR 2

TOTAL 7 9 3 2 2 0

FLOOR FACILITY LAVATORY TOILET URINAL MOP BASIN FOUNTAIN SPECIAL

MENS PUBLIC 3 4 3

11 WOMENS PUBLIC 3 4 0

PRIVATE 12 12

JANITOR CL. 2

PUBLIC CORRIDOR 2

TOTAL 18 20 3 2 2 0

FLOOR FACILITY LAVATORY TOILET URINAL MOP BASIN FOUNTAIN SPECIAL

MENS PUBLIC 3 4 3

12 WOMENS PUBLIC 3 4 0

PRIVATE

JANITOR CL. 2

PUBLIC CORRIDOR 2

1203 OFFICE 1 SINK

TOTAL 6 8 3 2 2 1

FLOOR FACILITY LAVATORY TOILET URINAL MOP BASIN FOUNTAIN SPECIAL

MENS PUBLIC 3 3 3

13 WOMENS PUBLIC 3 3

MENS SEMI PRIVATE 2 2

WOM. SEMI PRIVATE 2 2

MENS JURY 3 3

WOM. JURY 3 3

PRIVATE 7 7

JANITOR CL. 3

PUBLIC CORRIDOR 2

1309 CHILDRENS ROOM 1 2

TOTAL 24 25 3 3 2 0

Addendum No. 2, Property Managment Services at the Richard J. Daley Center Page 18 of 26

Page 19: NOTICE OF CHANGES, MODIFICATIONS, OR …...Jul 10, 2018  · RFI-6. Question: Can the PBC provide the equipment counts for the following areas of building support; • HVAC – Chillers,

FLOOR FACILITY LAVATORY TOILET URINAL MOP BASIN FOUNTAIN SPECIAL

MENS PUBLIC 3 3 3

14 WOMENS PUBLIC 3 3

MENS SEMI PRIVATE 2 2

WOM. SEMI PRIVATE 2 2

MENS JURY 5 5

WOM. JURY 5 5

PRIVATE 10 10

JANITOR CL. 3

PUBLIC CORRIDOR 2

TOTAL 30 30 3 3 2 0

FLOOR FACILITY LAVATORY TOILET URINAL MOP BASIN FOUNTAIN SPECIAL

MENS PUBLIC 3 3 3

15 WOMENS PUBLIC 3 3

MENS SEMI PRIVATE 2 2

WOM. SEMI PRIVATE 2 2

MENS JURY 6 6

WOM. JURY 6 6

PRIVATE 10 10

JANITOR CL. 3

PUBLIC CORRIDOR 2

TOTAL 32 32 3 3 2 0

FLOOR FACILITY LAVATORY TOILET URINAL MOP BASIN FOUNTAIN SPECIAL

MENS PUBLIC 3 3 3

16 WOMENS PUBLIC 3 3

MENS SEMI PRIVATE 2 2

WOM. SEMI PRIVATE 2 2

MENS JURY 6 6

WOM. JURY 6 6

PRIVATE 10 10

JANITOR CL. 3

PUBLIC CORRIDOR 2

TOTAL 32 32 3 3 2 0

Addendum No. 2, Property Managment Services at the Richard J. Daley Center Page 19 of 26

Page 20: NOTICE OF CHANGES, MODIFICATIONS, OR …...Jul 10, 2018  · RFI-6. Question: Can the PBC provide the equipment counts for the following areas of building support; • HVAC – Chillers,

FLOOR FACILITY LAVATORY TOILET URINAL MOP BASIN FOUNTAIN SPECIAL

MENS PUBLIC 3 3 3

17 WOMENS PUBLIC 3 3

MENS SEMI PRIVATE 2 2

WOM. SEMI PRIVATE 3 3

1700 MENS PUBLIC 3 3 3

1700 WOMENS PUBLIC 3 3

MENS JURY 3 3

WOM. JURY 3 3

PRIVATE 10 10

JANITOR CL. 3

PUBLIC CORRIDOR 5

TOTAL 33 33 6 3 5 0

FLOOR FACILITY LAVATORY TOILET URINAL MOP BASIN FOUNTAIN SPECIAL

MENS PUBLIC 3 3 3

18 WOMENS PUBLIC 3 3

MENS SEMI PRIVATE 2 2

WOM. SEMI PRIVATE 2 2

MENS JURY 2 2

WOM. JURY 2 2

PRIVATE 3 3

JANITOR CL. 2

PUBLIC CORRIDOR 2

TOTAL 17 17 3 2 2 0

FLOOR FACILITY LAVATORY TOILET URINAL MOP BASIN FOUNTAIN SPECIAL

MENS PUBLIC 3 3 3

19 WOMENS PUBLIC 3 3

MENS SEMI PRIVATE 1 1

WOM. SEMI PRIVATE 2 2

MENS JURY 4 4

WOM. JURY 4 4

PRIVATE 8 8

JANITOR CL. 2

PUBLIC CORRIDOR 2

TOTAL 25 25 3 2 2 0

FLOOR FACILITY LAVATORY TOILET URINAL MOP BASIN FOUNTAIN SPECIAL

MENS PUBLIC 3 3 3

20 WOMENS PUBLIC 3 3

MENS SEMI PRIVATE 2 2

WOM. SEMI PRIVATE 2 2

MENS JURY 4 4

WOM. JURY 4 4

PRIVATE 9 9

JANITOR CL. 2

PUBLIC CORRIDOR 2

TOTAL 27 27 3 2 2 0

Addendum No. 2, Property Managment Services at the Richard J. Daley Center Page 20 of 26

Page 21: NOTICE OF CHANGES, MODIFICATIONS, OR …...Jul 10, 2018  · RFI-6. Question: Can the PBC provide the equipment counts for the following areas of building support; • HVAC – Chillers,

FLOOR FACILITY LAVATORY TOILET URINAL MOP BASIN FOUNTAIN SPECIAL

MENS PUBLIC 3 3 3

21 WOMENS PUBLIC 3 3

MENS SEMI PRIVATE 2 2

WOM. SEMI PRIVATE 2 2

MENS JURY 5 5

WOM. JURY 5 5

PRIVATE 10 10

JANITOR CL. 3

PUBLIC CORRIDOR 2

TOTAL 30 30 3 3 2 0

FLOOR FACILITY LAVATORY TOILET URINAL MOP BASIN FOUNTAIN SPECIAL

MENS PUBLIC 3 3 3

22 WOMENS PUBLIC 3 3

MENS SEMI PRIVATE 2 2

WOM. SEMI PRIVATE 2 2

MENS JURY 7 7

WOM. JURY 7 7

PRIVATE 10 10

JANITOR CL. 3

PUBLIC CORRIDOR 2

TOTAL 34 34 3 3 2 0

FLOOR FACILITY LAVATORY TOILET URINAL MOP BASIN FOUNTAIN SPECIAL

MENS PUBLIC 3 3 3

23 WOMENS PUBLIC 3 3

MENS SEMI PRIVATE 2 2

WOM. SEMI PRIVATE 2 2

MENS JURY 6 6

WOM. JURY 6 6

PRIVATE 10 10

JANITOR CL. 3

PUBLIC CORRIDOR 2

TOTAL 32 32 3 3 2 0

Addendum No. 2, Property Managment Services at the Richard J. Daley Center Page 21 of 26

Page 22: NOTICE OF CHANGES, MODIFICATIONS, OR …...Jul 10, 2018  · RFI-6. Question: Can the PBC provide the equipment counts for the following areas of building support; • HVAC – Chillers,

FLOOR FACILITY LAVATORY TOILET URINAL MOP BASIN FOUNTAIN SPECIAL

MENS PUBLIC 3 3 3

24 WOMENS PUBLIC 3 3

MENS SEMI PRIVATE 2 2

WOM. SEMI PRIVATE 2 2

MENS JURY 7 7

WOM. JURY 7 7

PRIVATE 10 10

JANITOR CL. 3

PUBLIC CORRIDOR 2

TOTAL 34 34 3 3 2 0

FLOOR FACILITY LAVATORY TOILET URINAL MOP BASIN FOUNTAIN SPECIAL

MENS PUBLIC 3 3 3

25 WOMENS PUBLIC 3 3

MENS SEMI PRIVATE 2 2

WOM. SEMI PRIVATE 2 2

MENS JURY 6 6

WOM. JURY 6 6

PRIVATE 10 10

JANITOR CL. 3

PUBLIC CORRIDOR 2

TOTAL 32 32 3 3 2 0

FLOOR FACILITY LAVATORY TOILET URINAL MOP BASIN FOUNTAIN SPECIAL

MENS PUBLIC 3 3 3

26 WOMENS PUBLIC 3 3

MENS SEMI PRIVATE 2 2 1

WOM. SEMI PRIVATE 3 3

MENS JURY 4 4

WOM. JURY 4 4

PRIVATE 6 6

2600 BREAK ROOM 1 SINK

JANITOR CL. 3

PUBLIC CORRIDOR 2

TOTAL 25 25 4 3 2 1

Addendum No. 2, Property Managment Services at the Richard J. Daley Center Page 22 of 26

Page 23: NOTICE OF CHANGES, MODIFICATIONS, OR …...Jul 10, 2018  · RFI-6. Question: Can the PBC provide the equipment counts for the following areas of building support; • HVAC – Chillers,

FLOOR FACILITY LAVATORY TOILET URINAL MOP BASIN FOUNTAIN SPECIAL

MENS PUBLIC 3 3 3

27 WOMENS PUBLIC 3 3

PRIVATE 1 1

JANITOR CL. 1

TOTAL 7 7 3 1 0 0

FLOOR FACILITY LAVATORY TOILET URINAL MOP BASIN FOUNTAIN SPECIAL

MENS PUBLIC 3 3 3

28 WOMENS PUBLIC 3 3

MENS SEMI PRIVATE 2 2

WOM. SEMI PRIVATE 2 2

MENS JURY 2 2

WOM. JURY 2 2

PRIVATE 6 6

JANITOR CL. 2

PUBLIC CORRIDOR 2

TOTAL 20 20 3 2 2 0

FLOOR FACILITY LAVATORY TOILET URINAL MOP BASIN FOUNTAIN SPECIAL

MENS PUBLIC 3 3 3

29 WOMENS PUBLIC 3 3

SEMI PRIVATE 1

JANITOR CL. 2

PUBLIC CORRIDOR 3

TOTAL 7 6 3 2 3 0

FLOOR FACILITY LAVATORY TOILET URINAL MOP BASIN FOUNTAIN SPECIAL

MENS PUBLIC 3 3 3

30 WOMENS PUBLIC 3 3

MENS SEMI PRIVATE 2 2

WOM. SEMI PRIVATE 2 2 0

MENS JURY 8 8 8

WOM. JURY 8 8

PRIVATE 10 10

JANITOR CL. 2

PUBLIC CORRIDOR 2

TOTAL 36 36 3 2 10 0

Addendum No. 2, Property Managment Services at the Richard J. Daley Center Page 23 of 26

Page 24: NOTICE OF CHANGES, MODIFICATIONS, OR …...Jul 10, 2018  · RFI-6. Question: Can the PBC provide the equipment counts for the following areas of building support; • HVAC – Chillers,

FLOOR FACILITY LAVATORY TOILET URINAL MOP BASIN FOUNTAIN SPECIAL

MENS LOCKER 1 2 1 1 SHOWER

31

TOTAL 1 2 1 0 0 1

FLOOR FACILITY SINK WASHER DRYER FILTERS

LAUNDRY 1 2 2 2

M2TOTAL 1 2 2 0 0 1

FLOOR FACILITY LAVATORY TOILET URINAL MOP BASIN FOUNTAIN SPECIAL

WINDOW WASHER 1

PHTOTAL 0 0 0 1 0 1

BOILER ROOM 21 COLUMNS 12

LL MECH 27 9 MACHINE 57

LL PARKING 4 31 MACHINE 29

GARAGE 4 M-1 5

RAMP 14 M-2 9

CL MACHINE 9 M-2 ROOF 6

DOCK 3 M-3 1

PLAZA 17 PH 6

STAIRS 8 ROOF 19

TOTAL FLOOR DRAINS TOTAL 251

LOWER LEVEL TRIPPLE BASINS

Addendum No. 2, Property Managment Services at the Richard J. Daley Center Page 24 of 26

Page 25: NOTICE OF CHANGES, MODIFICATIONS, OR …...Jul 10, 2018  · RFI-6. Question: Can the PBC provide the equipment counts for the following areas of building support; • HVAC – Chillers,

40402 Total 8355 9048 9208 5756 58 344 154 253 618 5648 960 336 156 8 26 112 738

PHIL

IPS

--- F

40

T8 /

TL84

1 AL

TO

PHIL

IPS

--- F

32

T8 /

TL84

1 AL

TO

PHIL

IPS

--- F

25

T8 /

TL84

1 AL

TO

PHIL

IPS

--- F

17

T8 /

TL84

1 AL

TO

SYLV

ANIA

--- F

BO 3

1 / 8

41

PHIL

IPS

--- F

B 32

T8

/ TL

841

/ 6 A

LTO

PHIL

IPS

--- F

72

T12

/ CW

/ AL

TO

PHIL

IPS

--- F

36

T12

/ CW

SYLV

ANIA

A-1

9 8.

5 W

LED

GE

--- F

LE 1

5 / 2

/ G

25 X

L

PHIL

IPS

--- P

L T

32W

/ 41

/4P

ALTO

PHIL

IPS

--- C

DM

70

/ PAR

38

/ FL

/ 4K

PHIL

IPS

--- M

HC

100

/ U

/ M

P / 4

K AL

TO

PHIL

IPS

--- M

P 40

0 / B

U /

PS

VEN

TUR

E --

- MS

175W

/ BU

/ PS

/ 74

0

Nor

ibac

hi 0

84-B

-WW

-MT

3000

K

PHIL

IPS

--- F

8 T5

/ C

W

PH Total X X 4 F 32 T8 X X X X X X X X X X X X 18 LED X X X X X X X X X X X X X X 4 F8 T5

M3 Total 106 F 40 T8 X X X X X X X X X X X X X X 45 LED X X X X X X X X X X X X X X 4 F8 T5

M2 Total 126 F 40 T8 X X X X X X X X X X X X X X 14 LED X X X X X X X X X X X X X X 4 F8 T5

M1 Total 148 F 40 T8 X X X X X X X X X X X X X X 31 LED X X X X X X X X X X X X X X 4 F8 T5

31 Total 394 F 40 T8 X X X X X X X X X X X X X X 47 LED X X X X X X X X X X X X X X 10 F8 T5

30 Total 92 F 40 T8 545 F 32 T8 X X 90 F 17 T8 X X X X X X X X 6 LED X X 406 PLT 32 X X X X X X X X X X 22 F8 T5

29 Total 511 F 40 T8 8 F 32 T8 639 F 25 T8 48 F 17 T8 X X X X X X X X 13 LED X X X X X X X X X X X X X X 22 F8 T5

28 Total 67 F 40 T8 X X 448 F 25T8 4 F 17 T8 58 FBO 31T 8 X X X X X X 5 LED X X 330 PLT 32 X X X X X X X X X X 22 F8 T5

27 Total 532 F 40 T8 17 F 32T8 134 F 25T8 100 F 17T8 X X X X X X X X 9 LED X X X X X X X X X X X X X X 22 F8 T5

26 Total 78 F 40 T8 226 F 32T8 727 F 25T8 274 F 17T8 X X X X X X 4 F 36 T12 14 LED 380 FLE 15 X X X X X X X X X X X X 22 F8 T5

25 Total X X 314 F 32T8 618 F 25T8 323 F17T8 X X X X X X X X 10 LED 428 FLE 15 X X X X X X X X X X X X 22 F8 T5

24 Total X X 284 F 32T8 613 F 25T8 310 F 17T8 X X X X X X X X 22 LED 412 FLE 15 X X X X X X X X X X 16 LED 22 F8 T5

23 Total X X 346 F 32T8 645 F 25T8 310 F 17T8 X X X X X X 4 F 36 T12 20 LED 550 FLE 15 X X X X X X X X X X X X 22 F8 T5

22 Total 100 F 40 T8 348 F 32T8 231 F 25 T8 310 F 17T8 X X X X X X X X 21 LED 550 FLE 15 X X X X X X X X X X X X 22 F8 T5

21 Total 100 F 40 T8 288 F 32T8 231 F 25 T8 306 F 17T8 X X X X X X 4 F 36 T12 22 LED 454 FLE 15 X X X X X X X X X X X X 22 F8 T5

20 Total 115 F 40 T8 247 F 32T8 219 F 25 T8 310 F17T8 X X X X X X 4 F 36 T12 26 LED 380 FLE 15 X X X X X X X X X X 16 LED 22 F8 T5

19 Total 118 F 40 T8 283 F 32T8 223 F 25 T8 268 F17T8 X X X X X X 4 F 36 T12 12 LED 370 FLE 15 X X X X X X X X X X 16 LED 22 F8 T5

18 Total 84 F 40 T8 359 F 32T8 283 F 25T8 384 F 17T8 X X X X X X X X 21 LED 430 FLE 15 X X X X X X X X X X 16 LED 22 F8 T5

17 Total 16 F 40 T8 3 F 32T8 217 F 25T8 175 F 17T8 X X X X X X X X 8 LED 0 FLE 15 X X X X X X X X X X X X 22 F8 T5

16 Total X X 266 F 32 T8 505 F 25 T8 316 F 17 T8 X X X X X X 52 F 36 T12 22 LED 440 FLE 15 X X X X X X X X X X X X 22 F8 T5

15 Total X X 233 F 32 T8 499 F 25 T8 295 F 17 T8 X X X X X X 4 F 36 T12 24 LED 400 FLE 15 X X X X X X X X X X 16 LED 22 F8 T5

14 Total X X 261 F 32 T8 559 F 25T8 286 F 17T8 X X X X X X 4 F 36 T12 16 LED 400 FLE 15 X X X X X X X X X X 16 LED 22 F8 T5

13 Total X X 203 F 32 T8 841 F 25T8 330 F 17T8 X X X X X X X X 20 LED 298 FLC 15 X X X X X X X X X X 16 LED 22 F8 T5

12 Total 547 F 40 T8 X X 145 F 25T8 80 F 17 T8 X X X X X X X X 10 LED X X X X X X X X X X X X X X 22 F8 T5

11 Total 702 F 40 T8 396 F 32T8 393 F 25T8 64 F 17 T8 X X X X X X X X 9 LED 120 FLE 15 X X X X X X X X X X X X 22 F8 T5

10 Total 486 F 40 T8 5 F 32 T8 245 F 25T8 98 F 17 T8 X X X X X X X X 8 LED X X X X X X X X X X X X X X 22 F8 T5

9M Total 148 F 40 T8 X X X X X X X X X X X X X X 6 LED X X X X X X X X X X X X X X 10 F8 T5

9 Total 386 F 40 T8 X X X X X X X X X X X X X X 4 LED X X X X X X X X X X X X X X 4 F8 T5

8 Total 544 F 40 T8 X X 117 F 25T8 124 F 17 T8 X X X X X X X X 15 LED X X X X X X X X X X X X X X 22 F8 T5

7 Total 450 F 40 T8 18 F 32 T8 276 F 25T8 140 F 17 T8 X X X X X X X X 15 LED X X X X X X X X X X X X X X 22 F8 T5

6 Total 580 F 40 T8 X X 151 F 25T8 96 F 17 T8 X X X X X X X X 13 LED X X X X X X X X X X X X X X 22 F8 T5

5 Total 575 F 40 T8 X X X X 161 F 17 X X X X X X 16 F 36 T12 13 LED X X X X X X X X X X X X X X 22 F8 T5

4 Total 53 F40T8 322 F 32T8 11 F 25 T8 10 F17T8 X X 120 FB 32 T8 X X X X 12 LED X X 134 PLT 32 X X X X X X X X X X 22 F8 T5

3 Total 463 F 40 T8 X X 189 F 25 T8 184 F 17 T8 X X X X X X X X 11 LED X X X X X X X X X X X X X X 22 F8 T5

2 Total 493 F 40 T8 X X 21 F 25 T8 90 F 17 T8 X X X X 64 F 72 T12 135 F 36 T12 12 LED 36 FLE 15 X X X X X X X X X X X X 22 F8 T5

1 Total X X X X X X X X X X X X X X X X X X X X X X 336 CDM 70 156 MHC 100 X X X X X X 12 F8 T5

CL Total 16 F40T8 2093 F32T8 20 F25T8 111 F17T8 X X 86 FB32T8 90 F72T12 X X 29 LED X X 68 PLT 32 X X X X 8 MP 400 8 MS 175 W X X 30 F8 T5

LL Total 106 F 40 T8 1979 F 32 T8 8 F 25T8 159 F 17T8 X X 138 FB 32 T8 X X 22 F 36 T12 15 LED X X 22 PLT 32 X X X X X X 18 MS 175 W X X 30 F8 T5

BR Total 219 F 40 T8 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X 10 F8 T5

Richard J. Daley Center Lamp List

Addendum No. 2, Property Managment Services at the Richard J. Daley Center Page 25 of 26

Page 26: NOTICE OF CHANGES, MODIFICATIONS, OR …...Jul 10, 2018  · RFI-6. Question: Can the PBC provide the equipment counts for the following areas of building support; • HVAC – Chillers,

CARS SERVICE MACHINE ROOM MAX. LOAD / LBS. SPEED / FPM

1 - 2 - 3 - 4 LL to 5 7th FLOOR 3500 500

5 - 6 - 7 - 8 1, 7, 10, 11, 12 13th FLOOR 4000 700

9 - ( 10* ) - 11 - 12 ( LL* ) 1 through 30 31 - M1 3500 1200

13 - 14 - 15 - 16 1, 7, 23 through 30 31 - M1 4000 1200

17 - 18 - 19 - 20 1, 7, 23 through 30 31 - M1 4000 1200

21 - 22 - 23 - 24 1, 7, 12 through 17 18th FLOOR 4000 800

25 - 26 - 27 - 28 1, 7, 12 through 17 18th FLOOR 4000 800

29 ( Freight ) BR through 31-M2 PENTHOUSE 8000 500

30 ( Freight ) LL through 30 31 - M1 4000 500

31 - 32 - 33 - 34 G, 6, 7, 8 9th FLOOR 4000 700

35 - 36 - 37 - 38 1, 7, 17 through 23 25th FLOOR 4000 1000

39 - 40 - 41 - 42 1, 7, 17 through 23 25th FLOOR 4000 1000

43 ( Freight ) 31-M2, M3, PH PENTHOUSE 2000 100

ELEVATORS

Addendum No. 2, Property Managment Services at the Richard J. Daley Center Page 26 of 26