Neat & Clean Rapid setting upLow vibration levelsLow operation height (2300) & confined space Minimal site disturbance, Maximum cleanlinessSuperbly economical & productive to bored micropile
New Lift shaftMachine plinthUnderpinning Old Shophouse conservationMezzannine floor additionA&A, Reconstruction, Erection projects
123456
API sch. 40 or equivalent Description Units PDM 200 PDM 250 PDM 300 Outside dia mm 114.3 141.3 168.3Thickness 6.02 6.55 7.11 Max WL (incl -ve SF) *geotech WL to confirm* kN 200 250 300
Infill to pile void Pile joints Pile Length mm Capping plate & rebar (2000mmL)
150x150x121H25
Headroom (min) mm Width access (min) mm Equipment wt. ton Hammer wt. ton
2500 - 5000
Concrete infill (non-structural)Internal sleeve spot weld + all round butt weld externally
<1000 - 3000200x200x15
1H25
1500 - 25005 - 20
1.1 - 2.8 (3.3 PDA only)
12345
Mild steel capping plate
.
Underside of pilecap
1H25 rebar 2000mm length 1000mm to protrude 400mm welded both 3000mm sides to capping plate length Concrete infill (non-structural)
Spot welded internally sleeve Welded all round externally
1000 mm to 3000 mm length
* Joint Detail *
Internal sleeve Spot welded
to pile
Internal
Mild steel sleeve. Butt weld pile shoe all round
* NOT TO SCALE *
Neat & TidySilent & vibration-free operation Every pile is static load-tested Continuous monitoring of jack force
Vibration / Noise sensitive area Vicinity of MRT tunnels/ viaducts Factory mezzannine floor addition A&A, Reconstruction, Erection projects
1234
1234
Description units JP160 JP280 JP450 JP680 JP800 JP130SMP Pile size (max) mm 175 200 250 300 300 300 Pile material H-pile Pile length (max) mm 12,000 Max WL (incl -ve SF) - 280 400 450 450 350 *To confirm geotech WL* 160 - 500 680 750 400
9,000
Operation weight ton 40 86 120 140 180 120 Side mast position Front a - * 1500 1,600 1,600 1,600 1,200
<400KN Side b - * 2000 2,800 2,800 3,000 2,800 Centre mast position Front A * 1400 - 2,800 2,800 2,800 2,500
>400KN Side B * 1800 - 2,800 2,800 3,000 2,800
Reinforced Concrete / H-pile / steel pipe
mm
6,000Side
kNCentre
Site width (min.) mm 6,000 10,000*Intermediate terrace < 6,000 not advised*
mm
Rear neighbour
Recommend min. width of site
LHS
nei
ghbo
ur SIDE
installation Position <400KN
No pile zone !
b
N
o pi
le
zone
!
No
pile
zon
e !
Bou
ndar
y Li
ne
b
a
No pile zone !
ba
CENTRE installation
Position >400KN
No pile zone !
No pile zone !
B
No
pile
zon
e ! N
o pi
le z
one
!
B
A
A RH
S n
eigh
bour
Bou
ndar
y Li
ne
A
Recommend min. width of site
Rear neighbour
B
Description Pile size (max) Depth m < 6 - 40 < 6 - 18
E q u i p m e n tunits Bored Micropile Mini-bored pile
mm dia 200, 250, 300, 350 400, 500, 600
Description Rebar size & (Link) Max WL *geotech WL to confirm*
Grout strength Pile joints Pile size (max) Rod length (max) Operation ht. (min) Equipment width (min) Equipment wt.
Units BM250.1 BM250.3 BM300.3 BM350.2 BM350.3mm dia
kNkN
mm 250 250 300 350 350mm 1,000 3,000 3,000 2,000 3,000mm 3000 6700 6700/8000 3700 10700mm 1800 2200 2600 1800 2500ton 6.0 7.0 7.0/13.0 7.0 14.0
H20, H25, H32, H40 & (R6, R8)200 - 1000G35 - G40
Thread & Coupling
Vibration / Noise sensitive area Vicinity of MRT tunnels/ viaducts Factory mezzannine floor addition A&A, Reconstruction, Erection projects