NOTICE August 6, 2020 Dear Village/City Resident: All concrete work on the south side of 13 Mile Road has been completed and the contractor will begin paving the south side of 13 Mile Rd. on Thursday, August 6 th . After the paving is complete, the south side of the road will be restored with topsoil and hydroseed and the contractor will move operations to Phase 2. The current plan is to make the Phase switch on August 15 th . This Phase switch should have minimal impact on traffic and only during the physical moving of the signs and barrels. Phase 2 includes reconstructing the north half of 13 Mile Road from Evergreen Rd. to Southfield Rd. The traffic control plan for Phase 2 will involve moving westbound traffic from the north side of 13 Mile Road to the south side of 13 Mile Road so that the contractor may work on the north side of the road. All closures and access points will remain the same as in Phase 1. The limits of construction and traffic control plan can be found on the reverse side of this flyer. Eastbound 13 Mile Road Traffic between Evergreen Rd. and Southfield Rd. will remain closed during construction and only one (1) lane of Westbound Traffic will be maintained. Please adjust your travel accordingly and follow posted detours. Thank you for your patience during the 13 Mile Road and Southfield Rd intersection paving, we know it was not convenient but tried to minimize the duration of impact as best we could. The project is tracking ahead of schedule so we hope to beat our anticipated completion date. The Village and City are planning on providing e-mail updates to notify residents about the status and progress of the project, these updates will be posted to the Village of Beverly Hills website www.villagebeverlyhills.com throughout construction. If you wish to receive e-mail updates, please go to the “Quick Links” tab and the “13 Mile Road Reconstruction” project page and sign up. The project is currently ahead of schedule and has been pleasantly uneventful to this point. Thank you for your patience during this short-term inconvenience. This project will result in long-term improvements for the area. Construction crews will be on-site providing layout stakes for the contractor, marking utilities, mobilizing traffic control signage, and installing soil erosion control measures. Please do not remove the stakes as they are needed to properly align construction of the underground utilities and roadway. Construction is anticipated to be complete by the end of October, with restoration to follow closely thereafter. Every effort will be made to minimize the inconvenience to area residents. Should you have any questions, please notify the Consulting Engineers. Thank you. Consulting Engineers Hubbell, Roth & Clark, Inc. 555 Hulet Drive Bloomfield Hills, MI 48303 Project Manager Brad Shepler (248) 535-3337 [email protected] Field Representative Marty Garrison (248) 535-3463 Village of Beverly Hills 18500 W. 13 Mile Road Beverly Hills, MI 48025 Tom Meszler (248) 646-6404 City of Southfield 26000 Evergreen Rd. Southfield, MI 48076 Leigh Schultz (248) 796-4810 Contractor Ajax Paving Josh Matuzak (248) 388-5634 Project Manager [email protected]

Upload: others

Post on 17-Feb-2022

2 views

Category:

Documents


0 download

TRANSCRIPT

NOTICE August 6, 2020 Dear Village/City Resident: All concrete work on the south side of 13 Mile Road has been completed and the contractor will begin paving the south side of 13 Mile Rd. on Thursday, August 6th. After the paving is complete, the south side of the road will be restored with topsoil and hydroseed and the contractor will move operations to Phase 2. The current plan is to make the Phase switch on August 15th. This Phase switch should have minimal impact on traffic and only during the physical moving of the signs and barrels. Phase 2 includes reconstructing the north half of 13 Mile Road from Evergreen Rd. to Southfield Rd. The traffic control plan for Phase 2 will involve moving westbound traffic from the north side of 13 Mile Road to the south side of 13 Mile Road so that the contractor may work on the north side of the road. All closures and access points will remain the same as in Phase 1. The limits of construction and traffic control plan can be found on the reverse side of this flyer. Eastbound 13 Mile Road Traffic between Evergreen Rd. and Southfield Rd. will remain closed during construction and only one (1) lane of Westbound Traffic will be maintained. Please adjust your travel accordingly and follow posted detours. Thank you for your patience during the 13 Mile Road and Southfield Rd intersection paving, we know it was not convenient but tried to minimize the duration of impact as best we could. The project is tracking ahead of schedule so we hope to beat our anticipated completion date. The Village and City are planning on providing e-mail updates to notify residents about the status and progress of the project, these updates will be posted to the Village of Beverly Hills website www.villagebeverlyhills.com throughout construction. If you wish to receive e-mail updates, please go to the “Quick Links” tab and the “13 Mile Road Reconstruction” project page and sign up. The project is currently ahead of schedule and has been pleasantly uneventful to this point. Thank you for your patience during this short-term inconvenience. This project will result in long-term improvements for the area. Construction crews will be on-site providing layout stakes for the contractor, marking utilities, mobilizing traffic control signage, and installing soil erosion control measures. Please do not remove the stakes as they are needed to properly align construction of the underground utilities and roadway. Construction is anticipated to be complete by the end of October, with restoration to follow closely thereafter. Every effort will be made to minimize the inconvenience to area residents. Should you have any questions, please notify the Consulting Engineers. Thank you.

Consulting Engineers Hubbell, Roth & Clark, Inc. 555 Hulet Drive Bloomfield Hills, MI 48303 Project Manager Brad Shepler (248) 535-3337 [email protected] Field Representative Marty Garrison (248) 535-3463

Village of Beverly Hills 18500 W. 13 Mile Road Beverly Hills, MI 48025 Tom Meszler (248) 646-6404 City of Southfield 26000 Evergreen Rd. Southfield, MI 48076 Leigh Schultz (248) 796-4810

Contractor Ajax Paving Josh Matuzak (248) 388-5634 Project Manager [email protected]

12 Mile

13 Mile

Everg

reen

South

field

Pierce

Rock

Cree

k

Guy

WebsterWestb

rook

Edwards

Pleasant

Marim

oor

Berm

uda

Lathr

up

Ramb

ling

Stell

amar

South

Fall River

Spring Hill

Sprin

g Rive

r Violet

Northgate

Nadora

Roseland

Alhambra

Evans

Hickory Leaf

Leem

oor

Long

crest

Wildhern

Butternut

Kesh

Stua

rt

Revere

Ventu

ra

Eldridge

Autumn

Coryell

Willowick

Sharon

Park

Cherry Hill

Chelmsford

Madison

North

Windflower

Some

rset

Northome

Red L

eaf

Southome

Bainbridge

Glas

gow

Greenway

Crescent

Southgate

Shor

eham

Embassy

Framingham

Beechaven

Northbrook

Forestwood

Candlewood

Woodgate

Old Stream

Red M

aple

Herit

age

Bedford

Spark

leberr

y

Morri

son

Wood

stock

Ranc

hwoo

d

San Rosa

Winterset

Prestwick

Casc

ade

Wink

Meadowlane

Green Spruce

Silve

r Spri

ng

Chelt

on

Elwood

Spring Leaf

Hyac

inth

McDo

nnell

Plantation

Kens

ington

Ashle

y

Wood

crest

Chur

chill

Roseland

12 Mile

Wink

Pierce

Webster

Leemoor

13 Mile Pierce

Willowick

13 Mile South

field

Chelt

on

Stell

amar

Emba

ssy

Walmer

Coryell

Leem

oor

Marim

oor

Pierce

Pickw

ick

Waltham

Churchill

Rutla

nd

Elwood

Cline

Everg

reen

Madoline

ElizabethDownin

g

Suns

etPlantation

Kenn

oway

Marguerite

Huntl

ey

Heath

BelmontButt

onwood

13 Mile13 Mile

Copyright nearmap 2015

µ

Project Location

Eastbound 13 Mile Rd. Detour Route

Westbound 13 Mile Rd.Road Closed

Westbound 13 Mile Rd.Traffic will be maintainedthroughout construction.

Eastbound 13 Mile Rd. Trafficmust turn at Evergreen

Greentrees North and CranbrookVillage Subdivisions will not have