norway euref london national report · rrent epoch to euref89(etrf89). so far sufficient data are...

13
National report from Norway National report from Norway by Torbjørn Nørbech and Olav Vestøl

Upload: others

Post on 07-Jul-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Norway euref london national report · rrent epoch to EUREF89(ETRF89). So far sufficient data are not available to make such a transformation with geodetic accurac y (better then

National report from NorwayNational report from Norway

by

Torbjørn Nørbech and Olav Vestøl

Page 2: Norway euref london national report · rrent epoch to EUREF89(ETRF89). So far sufficient data are not available to make such a transformation with geodetic accurac y (better then

OutlineOutline

Reference networksDensification of the EUREF89 (ETRF89) network.

General plan for leveling and calculation of a new height system

Permanent stations and RTK-services

Transformations from ITRF current epoch to ETRF89

Page 3: Norway euref london national report · rrent epoch to EUREF89(ETRF89). So far sufficient data are not available to make such a transformation with geodetic accurac y (better then

Hierarchy of the EUREF89 Hierarchy of the EUREF89 networknetwork

3D-stations130 stations. The first realization of ETRS89 in Norway

1994-1995

Processed by use of Gipsy

Stamnett (1st order network)770 points calculated in 1996

Adjustment of vectors of length ca 20 km

Landsnett (2nd order network)A densification of Stamnett

10657 points so far…

Completed in 2007

Old triangle networkAll points recalculated. Completed in 2007

More than 50 000 points

Page 4: Norway euref london national report · rrent epoch to EUREF89(ETRF89). So far sufficient data are not available to make such a transformation with geodetic accurac y (better then

LandsnettLandsnett (2(2ndnd order network)order network)

Established in 406 of 431 municipalities

The municipalities, the road authorities and other official and private organizations supports financially

LandsnettetStatus pr. 01.01.2007

Under planlegging (6)Under arbeid (19)Ferdig (406)

Page 5: Norway euref london national report · rrent epoch to EUREF89(ETRF89). So far sufficient data are not available to make such a transformation with geodetic accurac y (better then

EUREF89 in the municipalitiesEUREF89 in the municipalities

STATUS MAP

Project completed(177)

Project running (170)

Project start before 2009 (84)

Overgang EUREF89 - antall komuner

0

20

40

60

80

100

120

140

160

180

200

jan.02

apr.02

jul.02

okt.02

jan.03

apr.03

jul.03

okt.03

jan.04

apr.04

jul.04

okt.04

jan.05

apr.05

jul.05

okt.05

jan.06

apr.06

jul.06

okt.06

jan.07

apr.07

Page 6: Norway euref london national report · rrent epoch to EUREF89(ETRF89). So far sufficient data are not available to make such a transformation with geodetic accurac y (better then

General plan for levelingGeneral plan for leveling

The project started in 1980 as a cooperation with Sweden, Finland and Denmark within NKG

The plan has been revised many times

10 000 km has been leveled (360 km/yr)

The whole network consist of are 20 000 1st

order bench marks (many of the old ones are destroyed.)

1980 -2007

Swedish or Finnish lines

Page 7: Norway euref london national report · rrent epoch to EUREF89(ETRF89). So far sufficient data are not available to make such a transformation with geodetic accurac y (better then

New height systemNew height system

An extension of the new height systems in Sweden and Finland

Fundamental point is ‘New Amsterdam Peil’

Normal heights

Epoch 2000

Zero tidal system

A slightly different land uplift model may be used

Name: NN2000

Final adjustment of the 1st order leveling network in December this year.

Page 8: Norway euref london national report · rrent epoch to EUREF89(ETRF89). So far sufficient data are not available to make such a transformation with geodetic accurac y (better then

NN2000NN2000--heights in heights in LandsnettLandsnett (2(2ndnd

order network) order network)

Some Landsnett-points are leveled, but most of them are GPS-measured and have ellipsoidal height only.

However, a geoid model fitted to 2 100 gps/leveling points (height reference model) gives NN2000 heights better than 3 cm in non-leveled Landsnett-points.

If the distance to the nearest gps/leveling point is more than 10-15 km the accuracy is poorer

More than 2000 km more leveling is necessary to obtain reliable NN2000 heights in the Landsnett countrywide

Page 9: Norway euref london national report · rrent epoch to EUREF89(ETRF89). So far sufficient data are not available to make such a transformation with geodetic accurac y (better then

EUREF station

Page 10: Norway euref london national report · rrent epoch to EUREF89(ETRF89). So far sufficient data are not available to make such a transformation with geodetic accurac y (better then

RTCRTC--servicesservices

•210 customers

•The net of stations is extended based on localdemand.

•Establisment and operation is paid by thecustomers.Need 4 users in two years pr station. (NOK 25 000 pr user pr year)

•Cpos consists of 47 permanent stations

Page 11: Norway euref london national report · rrent epoch to EUREF89(ETRF89). So far sufficient data are not available to make such a transformation with geodetic accurac y (better then

RTCRTC--servicesservices ((extentionextention))

Ca dekningsområde

Page 12: Norway euref london national report · rrent epoch to EUREF89(ETRF89). So far sufficient data are not available to make such a transformation with geodetic accurac y (better then

From ITRF to ETRF89 From ITRF to ETRF89 PublicationPublication II

Transformation from a Common Nordic Reference Frame to ETRS89in Denmark, Finland, Norway, and Sweden – status report

Torbjørn Nørbech1, Karsten Engsager2, 3, Lotti Jivall4, Per Knudsen2, Hannu Koivula5,Martin Lidberg4, 6, Bo Madsen2, Matti Ollikainen5, Mette Weber3

(1) Norwegian Mapping Authority, Kartverksveien 21, N-3511 Hønefoss, Norway,phone: +47-32118100, fax: +47-32118101, Email: [email protected]

(2) Danish National Space Centre(3) Kort og Matrikelstyrelsen (National Survey and Cadastre, Denmark)

(4) Lantmäteriet (National Land Survey of Sweden)(5) Finnish Geodetic Institute

(6) Department of radio and Space Science, Chalmers University of Technology. Onsala Space Observatory.

AbstractThe Nordic countries have implemented national realizations of ETRS89. Depending on when the realizations were made and

on which ITRF the realizations are based, there are differences between the realizations up to a few cm. The national realizations have already been introduced to the users and will not be replaced. In this paper we present the transformations from

the new developed common Nordic reference frame, NKG_RF03, to the official national ETRS89 realizations. The transformation is performed in two steps. First step is to correct for intraplate deformations using a new developed three

dimensional velocity model, NKG_RF03vel. Second step is to perform a seven parameter transformation for each nation.

Page 13: Norway euref london national report · rrent epoch to EUREF89(ETRF89). So far sufficient data are not available to make such a transformation with geodetic accurac y (better then

From ITRF to ETRF89 From ITRF to ETRF89 PublicationPublication IIII

An Approximate Transformation from ITRF2005 Current Epochto EUREF89(ETRF89) in Norway for Offshore use.

Torbjørn Nørbech, Halfdan P. Kierulf

Norwegian Mapping Authority, N-3507 Hønefoss, Norway,phone: +47-32118100, fax: +47-32118101, Email: [email protected]

AbstractThe Offshore sector has requested a transformation from ITRF2005 current epoch to EUREF89(ETRF89). So far sufficient data are not available to make such a transformation with geodetic accuracy (better then 1 cm). An approximate transformation is therefore

released. The transformation gives EUREF89 coordinates within -3 cm to +3 cm in north and east components, and within -6cm to +6 cm for the vertical component at epoch 2007.0