northwest wood design symposium microsoft sammamish village · 2019. 6. 18. · 19. th. june 2019...
TRANSCRIPT
-
19th June 2019
Tim J. Whitcombe, RIBA Senior Associate, NBBJ
Northwest Wood Design SymposiumMicrosoft Sammamish Village
O
UOU
NRG
DTH
EEL
ERI
N
NC
LP
801 SECOND AVENUE, SUITE 900
(206) 343-0460
SEATTLE, WA 98104
www.cplinc.com
NOT FOR CONSTRUCTION
Sheet Title/Number
Status
Senior Project Manager
Development Manager
Project Manager
Quality Control Reviewer
Quality Control FF&E
No. Date
Revisions
Description
M.S. Project No.
ARCH. Project No.
Microsoft Mechanical Engineer
Microsoft Cable Engineer
Microsoft Electrical Engineer
Engineering Manager
Security Manager
Project Planner
Project Manager
FF&E
CUSTOMER
PROJECT MANAGEMENT
Approvals
OPERATIONS
Checked
Design
Drawn
Design Team
Registration
Date
Date
Issuance
6/4/
2019
5:4
6:01
PM
C:\R
evit
Loca
l\201
9\G
7001
2-34
_S-S
TRU
_mat
tm@
cplin
c.co
m.rv
t
WOOD DETAILS
S-F602
CAMPUS MODERNIZATIONSAMMAMISH VILLAGE
1 MICROSOFT WAY,REDMOND, WA 98052
Designer
MRM
Checker
S180025-02
05/31/2019 70% DD
BUILDING 215
215
1 2 3 4 5 6
7 8 9 10 11 12
13 14 15 16 17 18
19 20 21 22 23 24
25 26 27 28 29 30
COLUMN BEYOND
LEDGER Ù
CONCRETE EDGE BEAMPER PLAN
MASS TIMBER PANEL &CONCRETE TOPPINGPER PLAN
STEEL EMBED @ 6'-0"oc
COLUMNBEYOND
TAPERED WT9 @5'-0"oc
GUARDRAIL
TIMBERDECKING
24
3030 3600
31,32,33,34
24 3601
31,32,33,34
12" column widthtbd
Most
likely
will c
hang
e
with o
utloo
k red
esign
12" column widthtbd
POST/CONN.
POST PER PLAN
SLAB & REINF. PER PLAN
KERF Ð" W/ (4)Ô"øBOLTS - ORIENT BOLTS INNORTH/SOUTH DIRECTION(COUNTERSINK BOLTS PER14/S601)
STANDOFF 1" TOMATCH POST POSTDIMENSIONS
EMBED Ð"x18"x1'-6"W/ (4)Ô"ø x 6" STUDS@ 12"oc EA. WAY
Ì
Ì
(5)#5 x 4'-0" BOT. EA.WAY CTRD. ON POST EAST/WEST
4"2" 2"
2"4"
4"
4242 6801
Î" MAX GAP.
4"4"2"
4"4"
4"4"
2"
4"
2" 4" 5" 2"4"
4"
2"
11
2
2
3
BEAM PER PLAN
INSTALL VERTICALLYORIENTED SHORT SLOTHOLES IN TOP ROW OF
KERF Ð" W/ (8)Ô"øBOLTS (COUNTERSINK
DAP BEAM FOR Ì
BRG. Ô" x (BEAMWIDTH - 2") x (POST
INSTALL VERT ORIENTEDSHORT SLOTTED HOLESIN TOP ROW
KERF Ð" W/ (4)Ô"øBOLTS (COUNTERSINK
KERF Ð" W/ (2)Ô"øBOLTS (COUNTERSINK
POST
BOLTS PER 14/S601)
CONDITIONBEAMS ARE SAME DEPTH
CONDITION AT BEAM ENDSSEE CONDITION FOR CALLOUTS IN COMMON
BEARING Ô" x
BEAM PER PLAN
POST
CONDITION TWO DIFFERENT BEAM DEPTHSSEE CONDITION FOR CALLOUTS IN COMMON
(BEAM WIDTH - 3")
'S & BOLTING PER14/S601 (CONDITION A)
BOLTS PER 14/S601)KERF Ð" W/ (4)Ô"øBOLTS (COUNTERSINKBOLTS PER 14/S601)
TOP 1" x (INCOMINGBEAM WIDTH - 3") (DAPBEAM FOR )
POST
WIDTH)
POST PER PLANÌ
cjp
STOP TOP OF UPTURNEDBEAM PORTION PER19/S601 OR 20/S602 ATPOST FACE WHEREOCCURS
BOLTS PER 14/S601)
4"4"
2"
2" 4" 5"
2" 2"
35 6805
35
ls
CONCRETE TOPPING& REINF. PER PLAN
ACOUSTIC MAT PERARCH'L (WHERE OCCURS)
DLT DECKING PERPLAN
REDUCE DLT DEPTHFOR CHASE WHEREOCCURS PER MECH'L- 10" WIDE x 3" MAX.SIZE (SCREW REINF.PER DLT MFR. ASREQD.)
Ð"x6" PLYWOOD SPLINEW/ 10d @ 8"oc EA. SIDEOF JOINT
GAP PER DLT MFR.FOR WOODEXPANSION (Ô" MAX.)
EXTEND REINF. PER42/S301
CONSTRUCTION JOINTLOCATIONS TO BEDETERMINED BY CONTR.SUBMIT PROPOSED LOC.TO ENGINEER ANDARCHITECT FOR REVIEW &APPROVAL PRIOR TOPOURING SLAB
TYPICAL DLT DECKING SPLINE 77 6800
FOR CALL-OUTSIN COMMON SEEDETAIL
1"
BEAM PER PLAN
(2) ROWS OF Î"ø x5Ð" SWG ASSY VGSCREWS @ 12"oc
21/S601
DLT DECKING SPLINE OVER BEAMDLT DECKING CONT. OVER BEAM
BEAM BEAM
1818 5808
3" MIN.
1"
3/8"ø x 12Ò" SWGASSY 3.0 SCREWS @12"oc - EA. SIDE OFPANEL JOINT
BEAM PER PLAN
Ð" MAX. GAP
DLT DECKING SPLINE OVER BEAMDLT DECKING CONT. OVER BEAM
DLT DECKING &TOPPING PER PLAN(ORIENTATIONVARIES)
PLYWOOD SPLINEPER 7/S601
BEAM BEAM
3/8"ø x 12Ò" SWGASSY 3.0 SCREWS @12"oc
(2) ROWS OF Ì"ø x 5"SDS SCREWS @ 18"oc- STAGGER EA. SIDEOF JOINT
Ì"ø x 5" SDS SCREWS@ 18"oc
2121 6803
8"
EQ.
EQ.
5"
EQ. 5" EQ.
PLAN
PLAN
Ö"ø x 1'-0" THREADEDROD IN ×"ø HOLE
Ð"x8"x0'-8" W/
Ð" MIN., Ô" MAX. GROUT3"ø GROUTED HOLES
SLAB PER PLAN
(2)Ò"ø x 8" D2L'SÌ
COLUMN PER PLAN (COUNTERSINK)
COLUMN
22No beam for thisproject
wood block fastenedto ledger angle. steelcould be exposed ifpainted for a 1-hr firerating
Sample Wood Details6.11.19
-
Project Overview
-
Weave Geode Living Room Civic PortalMasterplan Whatcom Washington Sammamish Chelan
Sammamish Village
-
TOTAL 782,000 SF
TOTAL 842,000 SF
WASHINGTON
SAMMAMISH
Campus-wide diagram illustrating proposed villages.
156t
h Av
e
157t
h Pl
Bel-Re
d Rd
SR-5
20
31st St
36th St
157t
h Av
e
159t
h Av
e
163r
d Av
e
37
G37
36Q
TOTAL 264,000 SFCHELAN
R
A
N
B
C
D
EF
H
G
I
J
K
L
PO
TOTAL 153,000 SFJEWEL BOX
TOTAL 940,180 SFWHATCOM
* Microsoft reserves the right to change village boundaries in the future.
0 100 200 500N
Microsoft Campus Refresh Master Plan Guidelines | 2018 April 23 | 23
TOTAL 782,000 SF
TOTAL 842,000 SF
WASHINGTON
SAMMAMISH
Campus-wide diagram illustrating proposed villages.
156t
h Av
e
157t
h Pl
Bel-Re
d Rd
SR-5
20
31st St
36th St
157t
h Av
e
159t
h Av
e
163r
d Av
e
37
G37
36Q
TOTAL 264,000 SFCHELAN
R
A
N
B
C
D
EF
H
G
I
J
K
L
PO
TOTAL 153,000 SFJEWEL BOX
TOTAL 940,180 SFWHATCOM
* Microsoft reserves the right to change village boundaries in the future.
0 100 200 500N
Microsoft Campus Refresh Master Plan Guidelines | 2018 April 23 | 23
TOTAL 782,000 SF
TOTAL 842,000 SF
WASHINGTON
SAMMAMISH
Campus-wide diagram illustrating proposed villages.
156t
h Av
e
157t
h Pl
Bel-Re
d Rd
SR-5
20
31st St
36th St
157t
h Av
e
159t
h Av
e
163r
d Av
e
37
G37
36Q
TOTAL 264,000 SFCHELAN
R
A
N
B
C
D
EF
H
G
I
J
K
L
PO
TOTAL 153,000 SFJEWEL BOX
TOTAL 940,180 SFWHATCOM
* Microsoft reserves the right to change village boundaries in the future.
0 100 200 500N
Microsoft Campus Refresh Master Plan Guidelines | 2018 April 23 | 23
TOTAL 782,000 SF
TOTAL 842,000 SF
WASHINGTON
SAMMAMISH
Campus-wide diagram illustrating proposed villages.
156t
h Av
e
157t
h Pl
Bel-Re
d Rd
SR-5
20
31st St
36th St
157t
h Av
e
159t
h Av
e
163r
d Av
e
37
G37
36Q
TOTAL 264,000 SFCHELAN
R
A
N
B
C
D
EF
H
G
I
J
K
L
PO
TOTAL 153,000 SFJEWEL BOX
TOTAL 940,180 SFWHATCOM
* Microsoft reserves the right to change village boundaries in the future.
0 100 200 500N
Microsoft Campus Refresh Master Plan Guidelines | 2018 April 23 | 23
TOTAL 782,000 SF
TOTAL 842,000 SF
WASHINGTON
SAMMAMISH
Campus-wide diagram illustrating proposed villages.
156t
h Av
e
157t
h Pl
Bel-Re
d Rd
SR-5
20
31st St
36th St
157t
h Av
e
159t
h Av
e
163r
d Av
e
37
G37
36Q
TOTAL 264,000 SFCHELAN
R
A
N
B
C
D
EF
H
G
I
J
K
L
PO
TOTAL 153,000 SFJEWEL BOX
TOTAL 940,180 SFWHATCOM
* Microsoft reserves the right to change village boundaries in the future.
0 100 200 500N
Microsoft Campus Refresh Master Plan Guidelines | 2018 April 23 | 23
TOTAL 782,000 SF
TOTAL 842,000 SF
WASHINGTON
SAMMAMISH
Campus-wide diagram illustrating proposed villages.
156t
h Av
e
157t
h Pl
Bel-Re
d Rd
SR-5
20
31st St
36th St
157t
h Av
e
159t
h Av
e
163r
d Av
e
37
G37
36Q
TOTAL 264,000 SFCHELAN
R
A
N
B
C
D
EF
H
G
I
J
K
L
PO
TOTAL 153,000 SFJEWEL BOX
TOTAL 940,180 SFWHATCOM
* Microsoft reserves the right to change village boundaries in the future.
0 100 200 500N
Microsoft Campus Refresh Master Plan Guidelines | 2018 April 23 | 23
NE 31ST ST
156TH AVE N
E
Sammamish Village
Current Masterplan
BUILDING R
WASHINGTON
SAMMAMISH
WHATCOM CHELAN
-
Sammamish Village
Village Overview
NE 31ST ST
156TH AVE N
E
TOTAL 782,000 SF
TOTAL 842,000 SF
WASHINGTON
SAMMAMISH
Campus-wide diagram illustrating proposed villages.
156t
h Av
e
157t
h Pl
Bel-Re
d Rd
SR-5
20
31st St
36th St
157t
h Av
e
159t
h Av
e
163r
d Av
e
37
G37
36Q
TOTAL 264,000 SFCHELAN
R
A
N
B
C
D
EF
H
G
I
J
K
L
PO
TOTAL 153,000 SFJEWEL BOX
TOTAL 940,180 SFWHATCOM
* Microsoft reserves the right to change village boundaries in the future.
0 100 200 500N
Microsoft Campus Refresh Master Plan Guidelines | 2018 April 23 | 23
0 50 100 200
-
Sammamish Village
Building ElementsNE 31ST ST
156TH AVE NE
-
Office Buildings
Sammamish Village
Building ElementsNE 31ST ST
156TH AVE NE
-
Sammamish Village
Building Elements
Living Rooms
Dens
NE 31ST ST
156TH AVE NE
-
Sammamish Village
Building Elements
Village Amenities
NE 31ST ST
156TH AVE NE
-
Concept
-
Concept Diagram: Inverse Density cut by Calm Horizontal
Concept Image: Nisqually River cuts through the dense forest, revealing Mt. Rainier
Sammamish Village
Inverse Density
Developing on the theme of Sammamish as the Forest Village, with Buildings 212, 213, 214 & 215 nestled between the forest and the Campus Edge, the Inverse Density diagram is reminiscent of the natural landscape of the Pacific Northwest.
Using the Inverse Density diagram to represent the forest on the Office Heads, the Office Link takes on the Calm Horizontal of the river, cutting through the forest and revealing the Building Entries and Living Rooms.
Setting the Living Rooms and Dens within the clearings provides access to light, views, and the outdoors, as well as providing a distinct differentiation in articulation across the building, breaking down the building massing.
-
NE 31ST ST
-
Living Rooms
NE 31ST ST
Dens
-
Timber Considerations • Structural Comparison • Concrete • Steel • Timber • Hybrid • Use Type and Occupancy • Fire Proofing • CLT or DLT
-
STRUCTURAL SYSTEM OPTIONS
SYSTEMDESCRIPTION
LATERAL SYSTEM OPTIONS
/ +/-30’ x +/-30’ column grid/ 5 1/2” thick concrete-filled metal deck / 16” to 21” deep wide flange beams/ Wide flange columns/ Fireproofed structure, if lightweight concrete fill no spray on soffit
/ Perimeter steel braced frames (conventional or BRBF)/ Moment frames/ Steel plate shear walls/ Concrete shear walls/ Dual systems
/ +/-25’ x +/-40’ column grid/ 2 1/4” - 3 1/2” concrete topping over 7 ply CLT panels or 2x10 DLT panels (total slab depth = 11 1/2”-13 1/2”)/ 18” to 24” deep wide flange beams/ Wide flange columns/ Varying amount of fireproofing con-crete fill no spray on soffit
/ Perimeter steel braced frames (conventional or BRBF)/ Interior shear wall cores/ Dual systems
/ +/-20’ x +/- 28’ column grid/ 2 1/4”-3 1/2”: concrete topping over 7 ply CLT panels or 2x10 DLT panels (total slab depth = 11 1/2”-13 1/2”)/ 30”-36” deep glulam beams/ Timber columns
/ Perimeter steel braced frames (conventional or BRBF)
/ +/-30’ x +/-30’ column grid/ 9” thick PT concrete slabs/ Concrete columns
/ Interior shear wall cores/ Dual systems
Carbon leadership *(story potential)
Efficient use of materials (quantity) Structural eight impacts on lateral system & foundation costs
Energy performance impact
Embodied carbon
OPERATIONAL AND
EMbODIED CARbON
HEALTHY wORkPLACE Serviceability acoustics
Serviceability vibration
Serviceability floor flatness
Red list / ingredient impacts
Experiences: Biophilic connection with nature
Space planning impact Flexibility bay sizes
Systems: Comfort improvement
Systems: Daylighting impact
Health/social impactSourcing practices
CLT/DLT PANELS & TOPPING W/
STEEL WF BEAMS& GIRDERS
CONCRETE ON METALDECK W/ STEEL WF BEAMS &
INTERMEDIATE SPAN GIRDERS
CONCRETE PT SLAB
CLT/DLT PANELS & TOPPING W/
GLULAM BEAMS
PRIOTIzE THE EMPLOYEE
bRIDgE THE buILT & NATuRAL
ENvIRONMENT
DESIgN fOR LONgEvITY
ExEMPLIfY OPERATIONAL ExCELLENCE
bE MEMORAbLE
TREAD LIgHTLY
wALk (AND bIkE) THE TALk
SHOwCASE MICROSOfT
TECHNOLOgY
ExCELLENT
vERY gOOD
gOOD
fAIR
POOR
STRUCTURAL SYSTEM OPTIONS
SYSTEMDESCRIPTION
LATERAL SYSTEM OPTIONS
/ +/-30’ x +/-30’ column grid/ 5 1/2” thick concrete-filled metal deck / 16” to 21” deep wide flange beams/ Wide flange columns/ Fireproofed structure, if lightweight concrete fill no spray on soffit
/ Perimeter steel braced frames (conventional or BRBF)/ Moment frames/ Steel plate shear walls/ Concrete shear walls/ Dual systems
/ +/-25’ x +/-40’ column grid/ 2 1/4” - 3 1/2” concrete topping over 7 ply CLT panels or 2x10 DLT panels (total slab depth = 11 1/2”-13 1/2”)/ 18” to 24” deep wide flange beams/ Wide flange columns/ Varying amount of fireproofing con-crete fill no spray on soffit
/ Perimeter steel braced frames (conventional or BRBF)/ Interior shear wall cores/ Dual systems
/ +/-20’ x +/- 28’ column grid/ 2 1/4”-3 1/2”: concrete topping over 7 ply CLT panels or 2x10 DLT panels (total slab depth = 11 1/2”-13 1/2”)/ 30”-36” deep glulam beams/ Timber columns
/ Perimeter steel braced frames (conventional or BRBF)
/ +/-30’ x +/-30’ column grid/ 9” thick PT concrete slabs/ Concrete columns
/ Interior shear wall cores/ Dual systems
Carbon leadership *(story potential)
Efficient use of materials (quantity) Structural eight impacts on lateral system & foundation costs
Energy performance impact
Embodied carbon
OPERATIONAL AND
EMbODIED CARbON
HEALTHY wORkPLACE Serviceability acoustics
Serviceability vibration
Serviceability floor flatness
Red list / ingredient impacts
Experiences: Biophilic connection with nature
Space planning impact Flexibility bay sizes
Systems: Comfort improvement
Systems: Daylighting impact
Health/social impactSourcing practices
CLT/DLT PANELS & TOPPING W/
STEEL WF BEAMS& GIRDERS
CONCRETE ON METALDECK W/ STEEL WF BEAMS &
INTERMEDIATE SPAN GIRDERS
CONCRETE PT SLAB
CLT/DLT PANELS & TOPPING W/
GLULAM BEAMS
PRIOTIzE THE EMPLOYEE
bRIDgE THE buILT & NATuRAL
ENvIRONMENT
DESIgN fOR LONgEvITY
ExEMPLIfY OPERATIONAL ExCELLENCE
bE MEMORAbLE
TREAD LIgHTLY
wALk (AND bIkE) THE TALk
SHOwCASE MICROSOfT
TECHNOLOgY
ExCELLENT
vERY gOOD
gOOD
fAIR
POOR
STRUCTURAL SYSTEM OPTIONS
SYSTEMDESCRIPTION
LATERAL SYSTEM OPTIONS
/ +/-30’ x +/-30’ column grid/ 5 1/2” thick concrete-filled metal deck / 16” to 21” deep wide flange beams/ Wide flange columns/ Fireproofed structure, if lightweight concrete fill no spray on soffit
/ Perimeter steel braced frames (conventional or BRBF)/ Moment frames/ Steel plate shear walls/ Concrete shear walls/ Dual systems
/ +/-25’ x +/-40’ column grid/ 2 1/4” - 3 1/2” concrete topping over 7 ply CLT panels or 2x10 DLT panels (total slab depth = 11 1/2”-13 1/2”)/ 18” to 24” deep wide flange beams/ Wide flange columns/ Varying amount of fireproofing con-crete fill no spray on soffit
/ Perimeter steel braced frames (conventional or BRBF)/ Interior shear wall cores/ Dual systems
/ +/-20’ x +/- 28’ column grid/ 2 1/4”-3 1/2”: concrete topping over 7 ply CLT panels or 2x10 DLT panels (total slab depth = 11 1/2”-13 1/2”)/ 30”-36” deep glulam beams/ Timber columns
/ Perimeter steel braced frames (conventional or BRBF)
/ +/-30’ x +/-30’ column grid/ 9” thick PT concrete slabs/ Concrete columns
/ Interior shear wall cores/ Dual systems
Carbon leadership *(story potential)
Efficient use of materials (quantity) Structural eight impacts on lateral system & foundation costs
Energy performance impact
Embodied carbon
OPERATIONAL AND
EMbODIED CARbON
HEALTHY wORkPLACE Serviceability acoustics
Serviceability vibration
Serviceability floor flatness
Red list / ingredient impacts
Experiences: Biophilic connection with nature
Space planning impact Flexibility bay sizes
Systems: Comfort improvement
Systems: Daylighting impact
Health/social impactSourcing practices
CLT/DLT PANELS & TOPPING W/
STEEL WF BEAMS& GIRDERS
CONCRETE ON METALDECK W/ STEEL WF BEAMS &
INTERMEDIATE SPAN GIRDERS
CONCRETE PT SLAB
CLT/DLT PANELS & TOPPING W/
GLULAM BEAMS
PRIOTIzE THE EMPLOYEE
bRIDgE THE buILT & NATuRAL
ENvIRONMENT
DESIgN fOR LONgEvITY
ExEMPLIfY OPERATIONAL ExCELLENCE
bE MEMORAbLE
TREAD LIgHTLY
wALk (AND bIkE) THE TALk
SHOwCASE MICROSOfT
TECHNOLOgY
ExCELLENT
vERY gOOD
gOOD
fAIR
POOR
STRUCTURAL SYSTEM OPTIONS
SYSTEMDESCRIPTION
LATERAL SYSTEM OPTIONS
/ +/-30’ x +/-30’ column grid/ 5 1/2” thick concrete-filled metal deck / 16” to 21” deep wide flange beams/ Wide flange columns/ Fireproofed structure, if lightweight concrete fill no spray on soffit
/ Perimeter steel braced frames (conventional or BRBF)/ Moment frames/ Steel plate shear walls/ Concrete shear walls/ Dual systems
/ +/-25’ x +/-40’ column grid/ 2 1/4” - 3 1/2” concrete topping over 7 ply CLT panels or 2x10 DLT panels (total slab depth = 11 1/2”-13 1/2”)/ 18” to 24” deep wide flange beams/ Wide flange columns/ Varying amount of fireproofing con-crete fill no spray on soffit
/ Perimeter steel braced frames (conventional or BRBF)/ Interior shear wall cores/ Dual systems
/ +/-20’ x +/- 28’ column grid/ 2 1/4”-3 1/2”: concrete topping over 7 ply CLT panels or 2x10 DLT panels (total slab depth = 11 1/2”-13 1/2”)/ 30”-36” deep glulam beams/ Timber columns
/ Perimeter steel braced frames (conventional or BRBF)
/ +/-30’ x +/-30’ column grid/ 9” thick PT concrete slabs/ Concrete columns
/ Interior shear wall cores/ Dual systems
Carbon leadership *(story potential)
Efficient use of materials (quantity) Structural eight impacts on lateral system & foundation costs
Energy performance impact
Embodied carbon
OPERATIONAL AND
EMbODIED CARbON
HEALTHY wORkPLACE Serviceability acoustics
Serviceability vibration
Serviceability floor flatness
Red list / ingredient impacts
Experiences: Biophilic connection with nature
Space planning impact Flexibility bay sizes
Systems: Comfort improvement
Systems: Daylighting impact
Health/social impactSourcing practices
CLT/DLT PANELS & TOPPING W/
STEEL WF BEAMS& GIRDERS
CONCRETE ON METALDECK W/ STEEL WF BEAMS &
INTERMEDIATE SPAN GIRDERS
CONCRETE PT SLAB
CLT/DLT PANELS & TOPPING W/
GLULAM BEAMS
PRIOTIzE THE EMPLOYEE
bRIDgE THE buILT & NATuRAL
ENvIRONMENT
DESIgN fOR LONgEvITY
ExEMPLIfY OPERATIONAL ExCELLENCE
bE MEMORAbLE
TREAD LIgHTLY
wALk (AND bIkE) THE TALk
SHOwCASE MICROSOfT
TECHNOLOgY
ExCELLENT
vERY gOOD
gOOD
fAIR
POOR
Sammamish Village
Considerations - Structural Comparison
-
28.50 16.75 28.5037.75
28.50 16.75 28.5037.75
28.50 16.75 28.5037.75
10.3
8
16.75
13.5
0
11.2
912
.75
9.38
13.5
0
37.75
13.5
0
0.75
28.50
13.5
0
28.50
Concrete PT Slab
CLT/DLT Panels, Glulam Beams
CLT/DLT Panels, Steel Beams
Concrete on Metal Deck, Steel Beams
L
PHONE
focus
focus
PHONE
CO
PY
M
Kitchen
S
S
WCs
PHONE
PHONE
PHONE
PHONE
SM
Proj Team
Proj Team
Proj Team
Proj Team
S
Wellness
Proj Team
Proj Team
CO
PY
360.00
18.75 13.0021.00 18.25 30.00
30.00 15.25 21.00 15.25 30.00
105.00
30.00
45.00
150.00
15.00
19.00
30.00
255.00
30.00
Test-fit Plan : Concrete
Test-fit Section : Concrete
28.50 16.75 28.5037.75
28.50 16.75 28.5037.75
28.50 16.75 28.5037.75
10.3
8
16.75
13.5
0
11.2
912
.75
9.38
13.5
0
37.75
13.5
0
0.75
28.50
13.5
0
28.50
Concrete PT Slab
CLT/DLT Panels, Glulam Beams
CLT/DLT Panels, Steel Beams
Concrete on Metal Deck, Steel Beams
L
PHONE
focus
focus
PHONE
CO
PY
M
Kitchen
S
S
WCs
PHONE
PHONE
PHONE
PHONE
SM
Proj Team
Proj Team
Proj Team
Proj Team
S
Wellness
Proj Team
Proj Team
CO
PY
Test-fit Plan : CLT / DLT & Glulam Beams
Test-fit Section : CLT / DLT & Glulam Beams
28.50 16.75 28.5037.75
28.50 16.75 28.5037.75
28.50 16.75 28.5037.75
10.3
8
16.75
13.5
0
11.2
912
.75
9.38
13.5
0
37.75
13.5
0
0.75
28.50
13.5
0
28.50
Concrete PT Slab
CLT/DLT Panels, Glulam Beams
CLT/DLT Panels, Steel Beams
Concrete on Metal Deck, Steel Beams
Proj Team
Proj Team
Proj Team
S
Wellness
Proj Team
Proj Team
CO
PY
L
PHONE
focus
focus
PHONE
CO
PY
M
Kitchen
S
S
WCs
PHONE
PHONE
PHONE
PHONE
SM
Proj Team
36.25
30.0015.00
150.00
45.00
30.00
105.00
360.00
255.00
30.0015.2530.00
30.0018.2519.0021.00 13.0018.7530.00
Test-fit Plan : Steel
Test-fit Section : Steel
28.50 16.75 28.5037.75
28.50 16.75 28.5037.75
28.50 16.75 28.5037.75
10.3
8
16.75
13.5
0
11.2
912
.75
9.38
13.5
0
37.75
13.5
0
0.75
28.50
13.5
0
28.50
Concrete PT Slab
CLT/DLT Panels, Glulam Beams
CLT/DLT Panels, Steel Beams
Concrete on Metal Deck, Steel Beams
L
PHONE
focus
focus
PHONE
CO
PY
M
Kitchen
S
S
WCs
PHONE
PHONE
PHONE
PHONE
SM
Proj Team
Proj Team
Proj Team
Proj Team
S
Wellness
Proj Team
Proj Team
CO
PY
Test-fit Plan : CLT / DLT & Steel Beams
Test-fit Section : CLT / DLT & Steel Beams
Sammamish Village
Considerations - Structural Comparison
-
Sammamish Village
Considerations - Use Type & Occupancy
"A" Occupancy
Less than or Equal to 4 floors
L1
L2
L3
L4
"B" Occupancy
Less than or Equal to 6 floors
L1
L2
L3
L4
Sammamish:
• Principally "B" Occupancy • Less than or Equal to 5 floors• Gathering spaces are below 750sf AND / OR• Gathering spaces are below 10% floor area
L1
L2
L3
L4
L5
L6
L5
-
Sammamish Village
Considerations - Fire Proofing
Photo credit: Arup / thinkwood.com
-
Sammamish Village
CLT or DLT?
• DLT is a one-way span system, resulting in a greater span, with less depth, giving a taller floor to ceiling.
• Electrical can be routed through the DLT Panel.
• DLT Boards run perpendicular to the Glulam Beams, creating visual interest from below.
• Design Team's aesthetic preferences.
-
Proposed System
-
28.50 16.75 28.5037.75
28.50 16.75 28.5037.75
28.50 16.75 28.5037.75
10.3
8
16.75
13.5
0
11.2
912
.75
9.38
13.5
0
37.75
13.5
0
0.75
28.50
13.5
0
28.50
Concrete PT Slab
CLT/DLT Panels, Glulam Beams
CLT/DLT Panels, Steel Beams
Concrete on Metal Deck, Steel Beams
CLT / DLT & Steel Beams
28.50 16.75 28.5037.75
28.50 16.75 28.5037.75
28.50 16.75 28.5037.75
10.3
8
16.75
13.5
0
11.2
912
.75
9.38
13.5
0
37.75
13.5
0
0.75
28.50
13.5
0
28.50
Concrete PT Slab
CLT/DLT Panels, Glulam Beams
CLT/DLT Panels, Steel Beams
Concrete on Metal Deck, Steel Beams
CLT / DLT & Glulam Beams
Amenity "pop outs"
"Living Rooms"
Sammamish Village
Proposed System
-
Mass Timber Deck with Concrete topping slab to create diaphragm / vibration control,Glulam Beams & Glulam Columns
Post-tension flat Concrete Slab,Concrete Columns
Sammamish Village
Proposed System
-
LEVEL 1
LEVEL 2
LEVEL 3
LEVEL 4
LEVEL 5
ROOF
110'
35'35'Sammamish Village
Proposed System
-
O
UOU
NRG
DTH
EEL
ERI
N
NC
LP
801 SECOND AVENUE, SUITE 900
(206) 343-0460
SEATTLE, WA 98104
www.cplinc.com
NOT FOR CONSTRUCTION
Sheet Title/Number
Status
Senior Project Manager
Development Manager
Project Manager
Quality Control Reviewer
Quality Control FF&E
No. Date
Revisions
Description
M.S. Project No.
ARCH. Project No.
Microsoft Mechanical Engineer
Microsoft Cable Engineer
Microsoft Electrical Engineer
Engineering Manager
Security Manager
Project Planner
Project Manager
FF&E
CUSTOMER
PROJECT MANAGEMENT
Approvals
OPERATIONS
Checked
Design
Drawn
Design Team
Registration
Date
Date
Issuance
6/4/
2019
5:4
6:01
PM
C:\R
evit
Loca
l\201
9\G
7001
2-34
_S-S
TRU
_mat
tm@
cplin
c.co
m.rv
t
WOOD DETAILS
S-F602
CAMPUS MODERNIZATIONSAMMAMISH VILLAGE
1 MICROSOFT WAY,REDMOND, WA 98052
Designer
MRM
Checker
S180025-02
05/31/2019 70% DD
BUILDING 215
215
1 2 3 4 5 6
7 8 9 10 11 12
13 14 15 16 17 18
19 20 21 22 23 24
25 26 27 28 29 30
COLUMN BEYOND
LEDGER Ù
CONCRETE EDGE BEAMPER PLAN
MASS TIMBER PANEL &CONCRETE TOPPINGPER PLAN
STEEL EMBED @ 6'-0"oc
COLUMNBEYOND
TAPERED WT9 @5'-0"oc
GUARDRAIL
TIMBERDECKING
24
3030 3600
31,32,33,34
24 3601
31,32,33,34
12" column widthtbd
Most
likely
will c
hang
e
with o
utloo
k red
esign
12" column widthtbd
POST/CONN.
POST PER PLAN
SLAB & REINF. PER PLAN
KERF Ð" W/ (4)Ô"øBOLTS - ORIENT BOLTS INNORTH/SOUTH DIRECTION(COUNTERSINK BOLTS PER14/S601)
STANDOFF 1" TOMATCH POST POSTDIMENSIONS
EMBED Ð"x18"x1'-6"W/ (4)Ô"ø x 6" STUDS@ 12"oc EA. WAY
Ì
Ì
(5)#5 x 4'-0" BOT. EA.WAY CTRD. ON POST EAST/WEST
4"2" 2"
2"4"
4"
4242 6801
Î" MAX GAP.
4"4"2"
4"4"
4"4"
2"
4"
2" 4" 5" 2"4"
4"
2"
11
2
2
3
BEAM PER PLAN
INSTALL VERTICALLYORIENTED SHORT SLOTHOLES IN TOP ROW OF
KERF Ð" W/ (8)Ô"øBOLTS (COUNTERSINK
DAP BEAM FOR Ì
BRG. Ô" x (BEAMWIDTH - 2") x (POST
INSTALL VERT ORIENTEDSHORT SLOTTED HOLESIN TOP ROW
KERF Ð" W/ (4)Ô"øBOLTS (COUNTERSINK
KERF Ð" W/ (2)Ô"øBOLTS (COUNTERSINK
POST
BOLTS PER 14/S601)
CONDITIONBEAMS ARE SAME DEPTH
CONDITION AT BEAM ENDSSEE CONDITION FOR CALLOUTS IN COMMON
BEARING Ô" x
BEAM PER PLAN
POST
CONDITION TWO DIFFERENT BEAM DEPTHSSEE CONDITION FOR CALLOUTS IN COMMON
(BEAM WIDTH - 3")
'S & BOLTING PER14/S601 (CONDITION A)
BOLTS PER 14/S601)KERF Ð" W/ (4)Ô"øBOLTS (COUNTERSINKBOLTS PER 14/S601)
TOP 1" x (INCOMINGBEAM WIDTH - 3") (DAPBEAM FOR )
POST
WIDTH)
POST PER PLANÌ
cjp
STOP TOP OF UPTURNEDBEAM PORTION PER19/S601 OR 20/S602 ATPOST FACE WHEREOCCURS
BOLTS PER 14/S601)
4"4"
2"
2" 4" 5"
2" 2"
35 6805
35
ls
CONCRETE TOPPING& REINF. PER PLAN
ACOUSTIC MAT PERARCH'L (WHERE OCCURS)
DLT DECKING PERPLAN
REDUCE DLT DEPTHFOR CHASE WHEREOCCURS PER MECH'L- 10" WIDE x 3" MAX.SIZE (SCREW REINF.PER DLT MFR. ASREQD.)
Ð"x6" PLYWOOD SPLINEW/ 10d @ 8"oc EA. SIDEOF JOINT
GAP PER DLT MFR.FOR WOODEXPANSION (Ô" MAX.)
EXTEND REINF. PER42/S301
CONSTRUCTION JOINTLOCATIONS TO BEDETERMINED BY CONTR.SUBMIT PROPOSED LOC.TO ENGINEER ANDARCHITECT FOR REVIEW &APPROVAL PRIOR TOPOURING SLAB
TYPICAL DLT DECKING SPLINE 77 6800
FOR CALL-OUTSIN COMMON SEEDETAIL
1"
BEAM PER PLAN
(2) ROWS OF Î"ø x5Ð" SWG ASSY VGSCREWS @ 12"oc
21/S601
DLT DECKING SPLINE OVER BEAMDLT DECKING CONT. OVER BEAM
BEAM BEAM
1818 5808
3" MIN.
1"
3/8"ø x 12Ò" SWGASSY 3.0 SCREWS @12"oc - EA. SIDE OFPANEL JOINT
BEAM PER PLAN
Ð" MAX. GAP
DLT DECKING SPLINE OVER BEAMDLT DECKING CONT. OVER BEAM
DLT DECKING &TOPPING PER PLAN(ORIENTATIONVARIES)
PLYWOOD SPLINEPER 7/S601
BEAM BEAM
3/8"ø x 12Ò" SWGASSY 3.0 SCREWS @12"oc
(2) ROWS OF Ì"ø x 5"SDS SCREWS @ 18"oc- STAGGER EA. SIDEOF JOINT
Ì"ø x 5" SDS SCREWS@ 18"oc
2121 6803
8"
EQ.
EQ.
5"
EQ. 5" EQ.
PLAN
PLAN
Ö"ø x 1'-0" THREADEDROD IN ×"ø HOLE
Ð"x8"x0'-8" W/
Ð" MIN., Ô" MAX. GROUT3"ø GROUTED HOLES
SLAB PER PLAN
(2)Ò"ø x 8" D2L'SÌ
COLUMN PER PLAN (COUNTERSINK)
COLUMN
22No beam for thisproject
wood block fastenedto ledger angle. steelcould be exposed ifpainted for a 1-hr firerating
Sample Wood Details6.11.19
O
UOU
NRG
DTH
EEL
ERI
N
NC
LP
801 SECOND AVENUE, SUITE 900
(206) 343-0460
SEATTLE, WA 98104
www.cplinc.com
NOT FOR CONSTRUCTION
Sheet Title/Number
Status
Senior Project Manager
Development Manager
Project Manager
Quality Control Reviewer
Quality Control FF&E
No. Date
Revisions
Description
M.S. Project No.
ARCH. Project No.
Microsoft Mechanical Engineer
Microsoft Cable Engineer
Microsoft Electrical Engineer
Engineering Manager
Security Manager
Project Planner
Project Manager
FF&E
CUSTOMER
PROJECT MANAGEMENT
Approvals
OPERATIONS
Checked
Design
Drawn
Design Team
Registration
Date
Date
Issuance
6/4/
2019
5:4
6:01
PM
C:\R
evit
Loca
l\201
9\G
7001
2-34
_S-S
TRU
_mat
tm@
cplin
c.co
m.rv
t
WOOD DETAILS
S-F602
CAMPUS MODERNIZATIONSAMMAMISH VILLAGE
1 MICROSOFT WAY,REDMOND, WA 98052
Designer
MRM
Checker
S180025-02
05/31/2019 70% DD
BUILDING 215
215
1 2 3 4 5 6
7 8 9 10 11 12
13 14 15 16 17 18
19 20 21 22 23 24
25 26 27 28 29 30
COLUMN BEYOND
LEDGER Ù
CONCRETE EDGE BEAMPER PLAN
MASS TIMBER PANEL &CONCRETE TOPPINGPER PLAN
STEEL EMBED @ 6'-0"oc
COLUMNBEYOND
TAPERED WT9 @5'-0"oc
GUARDRAIL
TIMBERDECKING
24
3030 3600
31,32,33,34
24 3601
31,32,33,34
12" column widthtbd
Most
likely
will c
hang
e
with o
utloo
k red
esign
12" column widthtbd
POST/CONN.
POST PER PLAN
SLAB & REINF. PER PLAN
KERF Ð" W/ (4)Ô"øBOLTS - ORIENT BOLTS INNORTH/SOUTH DIRECTION(COUNTERSINK BOLTS PER14/S601)
STANDOFF 1" TOMATCH POST POSTDIMENSIONS
EMBED Ð"x18"x1'-6"W/ (4)Ô"ø x 6" STUDS@ 12"oc EA. WAY
Ì
Ì
(5)#5 x 4'-0" BOT. EA.WAY CTRD. ON POST EAST/WEST
4"2" 2"
2"4"
4"
4242 6801
Î" MAX GAP.
4"4"2"
4"4"
4"4"
2"
4"
2" 4" 5" 2"4"
4"
2"
11
2
2
3
BEAM PER PLAN
INSTALL VERTICALLYORIENTED SHORT SLOTHOLES IN TOP ROW OF
KERF Ð" W/ (8)Ô"øBOLTS (COUNTERSINK
DAP BEAM FOR Ì
BRG. Ô" x (BEAMWIDTH - 2") x (POST
INSTALL VERT ORIENTEDSHORT SLOTTED HOLESIN TOP ROW
KERF Ð" W/ (4)Ô"øBOLTS (COUNTERSINK
KERF Ð" W/ (2)Ô"øBOLTS (COUNTERSINK
POST
BOLTS PER 14/S601)
CONDITIONBEAMS ARE SAME DEPTH
CONDITION AT BEAM ENDSSEE CONDITION FOR CALLOUTS IN COMMON
BEARING Ô" x
BEAM PER PLAN
POST
CONDITION TWO DIFFERENT BEAM DEPTHSSEE CONDITION FOR CALLOUTS IN COMMON
(BEAM WIDTH - 3")
'S & BOLTING PER14/S601 (CONDITION A)
BOLTS PER 14/S601)KERF Ð" W/ (4)Ô"øBOLTS (COUNTERSINKBOLTS PER 14/S601)
TOP 1" x (INCOMINGBEAM WIDTH - 3") (DAPBEAM FOR )
POST
WIDTH)
POST PER PLANÌ
cjp
STOP TOP OF UPTURNEDBEAM PORTION PER19/S601 OR 20/S602 ATPOST FACE WHEREOCCURS
BOLTS PER 14/S601)
4"4"
2"
2" 4" 5"
2" 2"
35 6805
35
ls
CONCRETE TOPPING& REINF. PER PLAN
ACOUSTIC MAT PERARCH'L (WHERE OCCURS)
DLT DECKING PERPLAN
REDUCE DLT DEPTHFOR CHASE WHEREOCCURS PER MECH'L- 10" WIDE x 3" MAX.SIZE (SCREW REINF.PER DLT MFR. ASREQD.)
Ð"x6" PLYWOOD SPLINEW/ 10d @ 8"oc EA. SIDEOF JOINT
GAP PER DLT MFR.FOR WOODEXPANSION (Ô" MAX.)
EXTEND REINF. PER42/S301
CONSTRUCTION JOINTLOCATIONS TO BEDETERMINED BY CONTR.SUBMIT PROPOSED LOC.TO ENGINEER ANDARCHITECT FOR REVIEW &APPROVAL PRIOR TOPOURING SLAB
TYPICAL DLT DECKING SPLINE 77 6800
FOR CALL-OUTSIN COMMON SEEDETAIL
1"
BEAM PER PLAN
(2) ROWS OF Î"ø x5Ð" SWG ASSY VGSCREWS @ 12"oc
21/S601
DLT DECKING SPLINE OVER BEAMDLT DECKING CONT. OVER BEAM
BEAM BEAM
1818 5808
3" MIN.
1"
3/8"ø x 12Ò" SWGASSY 3.0 SCREWS @12"oc - EA. SIDE OFPANEL JOINT
BEAM PER PLAN
Ð" MAX. GAP
DLT DECKING SPLINE OVER BEAMDLT DECKING CONT. OVER BEAM
DLT DECKING &TOPPING PER PLAN(ORIENTATIONVARIES)
PLYWOOD SPLINEPER 7/S601
BEAM BEAM
3/8"ø x 12Ò" SWGASSY 3.0 SCREWS @12"oc
(2) ROWS OF Ì"ø x 5"SDS SCREWS @ 18"oc- STAGGER EA. SIDEOF JOINT
Ì"ø x 5" SDS SCREWS@ 18"oc
2121 6803
8"
EQ.
EQ.
5"
EQ. 5" EQ.
PLAN
PLAN
Ö"ø x 1'-0" THREADEDROD IN ×"ø HOLE
Ð"x8"x0'-8" W/
Ð" MIN., Ô" MAX. GROUT3"ø GROUTED HOLES
SLAB PER PLAN
(2)Ò"ø x 8" D2L'SÌ
COLUMN PER PLAN (COUNTERSINK)
COLUMN
22No beam for thisproject
wood block fastenedto ledger angle. steelcould be exposed ifpainted for a 1-hr firerating
Sample Wood Details6.11.19
O
UOU
NRG
DTH
EEL
ERI
N
NC
LP
801 SECOND AVENUE, SUITE 900
(206) 343-0460
SEATTLE, WA 98104
www.cplinc.com
NOT FOR CONSTRUCTION
Sheet Title/Number
Status
Senior Project Manager
Development Manager
Project Manager
Quality Control Reviewer
Quality Control FF&E
No. Date
Revisions
Description
M.S. Project No.
ARCH. Project No.
Microsoft Mechanical Engineer
Microsoft Cable Engineer
Microsoft Electrical Engineer
Engineering Manager
Security Manager
Project Planner
Project Manager
FF&E
CUSTOMER
PROJECT MANAGEMENT
Approvals
OPERATIONS
Checked
Design
Drawn
Design Team
Registration
Date
Date
Issuance
6/4/
2019
5:4
6:01
PM
C:\R
evit
Loca
l\201
9\G
7001
2-34
_S-S
TRU
_mat
tm@
cplin
c.co
m.rv
t
WOOD DETAILS
S-F602
CAMPUS MODERNIZATIONSAMMAMISH VILLAGE
1 MICROSOFT WAY,REDMOND, WA 98052
Designer
MRM
Checker
S180025-02
05/31/2019 70% DD
BUILDING 215
215
1 2 3 4 5 6
7 8 9 10 11 12
13 14 15 16 17 18
19 20 21 22 23 24
25 26 27 28 29 30
COLUMN BEYOND
LEDGER Ù
CONCRETE EDGE BEAMPER PLAN
MASS TIMBER PANEL &CONCRETE TOPPINGPER PLAN
STEEL EMBED @ 6'-0"oc
COLUMNBEYOND
TAPERED WT9 @5'-0"oc
GUARDRAIL
TIMBERDECKING
24
3030 3600
31,32,33,34
24 3601
31,32,33,34
12" column widthtbd
Most
likely
will c
hang
e
with o
utloo
k red
esign
12" column widthtbd
POST/CONN.
POST PER PLAN
SLAB & REINF. PER PLAN
KERF Ð" W/ (4)Ô"øBOLTS - ORIENT BOLTS INNORTH/SOUTH DIRECTION(COUNTERSINK BOLTS PER14/S601)
STANDOFF 1" TOMATCH POST POSTDIMENSIONS
EMBED Ð"x18"x1'-6"W/ (4)Ô"ø x 6" STUDS@ 12"oc EA. WAY
Ì
Ì
(5)#5 x 4'-0" BOT. EA.WAY CTRD. ON POST EAST/WEST
4"2" 2"
2"4"
4"
4242 6801
Î" MAX GAP.
4"4"2"
4"4"
4"4"
2"
4"
2" 4" 5" 2"4"
4"
2"
11
2
2
3
BEAM PER PLAN
INSTALL VERTICALLYORIENTED SHORT SLOTHOLES IN TOP ROW OF
KERF Ð" W/ (8)Ô"øBOLTS (COUNTERSINK
DAP BEAM FOR Ì
BRG. Ô" x (BEAMWIDTH - 2") x (POST
INSTALL VERT ORIENTEDSHORT SLOTTED HOLESIN TOP ROW
KERF Ð" W/ (4)Ô"øBOLTS (COUNTERSINK
KERF Ð" W/ (2)Ô"øBOLTS (COUNTERSINK
POST
BOLTS PER 14/S601)
CONDITIONBEAMS ARE SAME DEPTH
CONDITION AT BEAM ENDSSEE CONDITION FOR CALLOUTS IN COMMON
BEARING Ô" x
BEAM PER PLAN
POST
CONDITION TWO DIFFERENT BEAM DEPTHSSEE CONDITION FOR CALLOUTS IN COMMON
(BEAM WIDTH - 3")
'S & BOLTING PER14/S601 (CONDITION A)
BOLTS PER 14/S601)KERF Ð" W/ (4)Ô"øBOLTS (COUNTERSINKBOLTS PER 14/S601)
TOP 1" x (INCOMINGBEAM WIDTH - 3") (DAPBEAM FOR )
POST
WIDTH)
POST PER PLANÌ
cjp
STOP TOP OF UPTURNEDBEAM PORTION PER19/S601 OR 20/S602 ATPOST FACE WHEREOCCURS
BOLTS PER 14/S601)
4"4"
2"
2" 4" 5"
2" 2"
35 6805
35
ls
CONCRETE TOPPING& REINF. PER PLAN
ACOUSTIC MAT PERARCH'L (WHERE OCCURS)
DLT DECKING PERPLAN
REDUCE DLT DEPTHFOR CHASE WHEREOCCURS PER MECH'L- 10" WIDE x 3" MAX.SIZE (SCREW REINF.PER DLT MFR. ASREQD.)
Ð"x6" PLYWOOD SPLINEW/ 10d @ 8"oc EA. SIDEOF JOINT
GAP PER DLT MFR.FOR WOODEXPANSION (Ô" MAX.)
EXTEND REINF. PER42/S301
CONSTRUCTION JOINTLOCATIONS TO BEDETERMINED BY CONTR.SUBMIT PROPOSED LOC.TO ENGINEER ANDARCHITECT FOR REVIEW &APPROVAL PRIOR TOPOURING SLAB
TYPICAL DLT DECKING SPLINE 77 6800
FOR CALL-OUTSIN COMMON SEEDETAIL
1"
BEAM PER PLAN
(2) ROWS OF Î"ø x5Ð" SWG ASSY VGSCREWS @ 12"oc
21/S601
DLT DECKING SPLINE OVER BEAMDLT DECKING CONT. OVER BEAM
BEAM BEAM
1818 5808
3" MIN.
1"
3/8"ø x 12Ò" SWGASSY 3.0 SCREWS @12"oc - EA. SIDE OFPANEL JOINT
BEAM PER PLAN
Ð" MAX. GAP
DLT DECKING SPLINE OVER BEAMDLT DECKING CONT. OVER BEAM
DLT DECKING &TOPPING PER PLAN(ORIENTATIONVARIES)
PLYWOOD SPLINEPER 7/S601
BEAM BEAM
3/8"ø x 12Ò" SWGASSY 3.0 SCREWS @12"oc
(2) ROWS OF Ì"ø x 5"SDS SCREWS @ 18"oc- STAGGER EA. SIDEOF JOINT
Ì"ø x 5" SDS SCREWS@ 18"oc
2121 6803
8"
EQ.
EQ.
5"
EQ. 5" EQ.
PLAN
PLAN
Ö"ø x 1'-0" THREADEDROD IN ×"ø HOLE
Ð"x8"x0'-8" W/
Ð" MIN., Ô" MAX. GROUT3"ø GROUTED HOLES
SLAB PER PLAN
(2)Ò"ø x 8" D2L'SÌ
COLUMN PER PLAN (COUNTERSINK)
COLUMN
22No beam for thisproject
wood block fastenedto ledger angle. steelcould be exposed ifpainted for a 1-hr firerating
Sample Wood Details6.11.19
28.50 16.75 28.5037.75
28.50 16.75 28.5037.75
28.50 16.75 28.5037.75
10.3
8
16.75
13.5
0
11.2
912
.75
9.38
13.5
0
37.75
13.5
0
0.75
28.50
13.5
0
28.50
Concrete PT Slab
CLT/DLT Panels, Glulam Beams
CLT/DLT Panels, Steel Beams
Concrete on Metal Deck, Steel Beams
DLT Deck with Concrete topping & Glulam Beams
O
UOU
NRG
DTH
EEL
ERI
N
NC
LP
801 SECOND AVENUE, SUITE 900
(206) 343-0460
SEATTLE, WA 98104
www.cplinc.com
NOT FOR CONSTRUCTION
Sheet Title/Number
Status
Senior Project Manager
Development Manager
Project Manager
Quality Control Reviewer
Quality Control FF&E
No. Date
Revisions
Description
M.S. Project No.
ARCH. Project No.
Microsoft Mechanical Engineer
Microsoft Cable Engineer
Microsoft Electrical Engineer
Engineering Manager
Security Manager
Project Planner
Project Manager
FF&E
CUSTOMER
PROJECT MANAGEMENT
Approvals
OPERATIONS
Checked
Design
Drawn
Design Team
Registration
Date
Date
Issuance
6/4/
2019
5:4
6:01
PM
C:\R
evit
Loca
l\201
9\G
7001
2-34
_S-S
TRU
_mat
tm@
cplin
c.co
m.rv
t
WOOD DETAILS
S-F602
CAMPUS MODERNIZATIONSAMMAMISH VILLAGE
1 MICROSOFT WAY,REDMOND, WA 98052
Designer
MRM
Checker
S180025-02
05/31/2019 70% DD
BUILDING 215
215
1 2 3 4 5 6
7 8 9 10 11 12
13 14 15 16 17 18
19 20 21 22 23 24
25 26 27 28 29 30
COLUMN BEYOND
LEDGER Ù
CONCRETE EDGE BEAMPER PLAN
MASS TIMBER PANEL &CONCRETE TOPPINGPER PLAN
STEEL EMBED @ 6'-0"oc
COLUMNBEYOND
TAPERED WT9 @5'-0"oc
GUARDRAIL
TIMBERDECKING
24
3030 3600
31,32,33,34
24 3601
31,32,33,34
12" column widthtbd
Most
likely
will c
hang
e
with o
utloo
k red
esign
12" column widthtbd
POST/CONN.
POST PER PLAN
SLAB & REINF. PER PLAN
KERF Ð" W/ (4)Ô"øBOLTS - ORIENT BOLTS INNORTH/SOUTH DIRECTION(COUNTERSINK BOLTS PER14/S601)
STANDOFF 1" TOMATCH POST POSTDIMENSIONS
EMBED Ð"x18"x1'-6"W/ (4)Ô"ø x 6" STUDS@ 12"oc EA. WAY
Ì
Ì
(5)#5 x 4'-0" BOT. EA.WAY CTRD. ON POST EAST/WEST
4"2" 2"
2"4"
4"
4242 6801
Î" MAX GAP.
4"4"2"4"
4"
4"4"
2"
4"
2" 4" 5" 2"4"
4"
2"
11
2
2
3
BEAM PER PLAN
INSTALL VERTICALLYORIENTED SHORT SLOTHOLES IN TOP ROW OF
KERF Ð" W/ (8)Ô"øBOLTS (COUNTERSINK
DAP BEAM FOR Ì
BRG. Ô" x (BEAMWIDTH - 2") x (POST
INSTALL VERT ORIENTEDSHORT SLOTTED HOLESIN TOP ROW
KERF Ð" W/ (4)Ô"øBOLTS (COUNTERSINK
KERF Ð" W/ (2)Ô"øBOLTS (COUNTERSINK
POST
BOLTS PER 14/S601)
CONDITIONBEAMS ARE SAME DEPTH
CONDITION AT BEAM ENDSSEE CONDITION FOR CALLOUTS IN COMMON
BEARING Ô" x
BEAM PER PLAN
POST
CONDITION TWO DIFFERENT BEAM DEPTHSSEE CONDITION FOR CALLOUTS IN COMMON
(BEAM WIDTH - 3")
'S & BOLTING PER14/S601 (CONDITION A)
BOLTS PER 14/S601)KERF Ð" W/ (4)Ô"øBOLTS (COUNTERSINKBOLTS PER 14/S601)
TOP 1" x (INCOMINGBEAM WIDTH - 3") (DAPBEAM FOR )
POST
WIDTH)
POST PER PLANÌ
cjp
STOP TOP OF UPTURNEDBEAM PORTION PER19/S601 OR 20/S602 ATPOST FACE WHEREOCCURS
BOLTS PER 14/S601)
4"4"
2"
2" 4" 5"
2" 2"
35 6805
35
ls
CONCRETE TOPPING& REINF. PER PLAN
ACOUSTIC MAT PERARCH'L (WHERE OCCURS)
DLT DECKING PERPLAN
REDUCE DLT DEPTHFOR CHASE WHEREOCCURS PER MECH'L- 10" WIDE x 3" MAX.SIZE (SCREW REINF.PER DLT MFR. ASREQD.)
Ð"x6" PLYWOOD SPLINEW/ 10d @ 8"oc EA. SIDEOF JOINT
GAP PER DLT MFR.FOR WOODEXPANSION (Ô" MAX.)
EXTEND REINF. PER42/S301
CONSTRUCTION JOINTLOCATIONS TO BEDETERMINED BY CONTR.SUBMIT PROPOSED LOC.TO ENGINEER ANDARCHITECT FOR REVIEW &APPROVAL PRIOR TOPOURING SLAB
TYPICAL DLT DECKING SPLINE 77 6800
FOR CALL-OUTSIN COMMON SEEDETAIL
1"
BEAM PER PLAN
(2) ROWS OF Î"ø x5Ð" SWG ASSY VGSCREWS @ 12"oc
21/S601
DLT DECKING SPLINE OVER BEAMDLT DECKING CONT. OVER BEAM
BEAM BEAM
1818 5808
3" MIN.
1"
3/8"ø x 12Ò" SWGASSY 3.0 SCREWS @12"oc - EA. SIDE OFPANEL JOINT
BEAM PER PLAN
Ð" MAX. GAP
DLT DECKING SPLINE OVER BEAMDLT DECKING CONT. OVER BEAM
DLT DECKING &TOPPING PER PLAN(ORIENTATIONVARIES)
PLYWOOD SPLINEPER 7/S601
BEAM BEAM
3/8"ø x 12Ò" SWGASSY 3.0 SCREWS @12"oc
(2) ROWS OF Ì"ø x 5"SDS SCREWS @ 18"oc- STAGGER EA. SIDEOF JOINT
Ì"ø x 5" SDS SCREWS@ 18"oc
2121 6803
8"
EQ.
EQ.
5"
EQ. 5" EQ.
PLAN
PLAN
Ö"ø x 1'-0" THREADEDROD IN ×"ø HOLE
Ð"x8"x0'-8" W/
Ð" MIN., Ô" MAX. GROUT3"ø GROUTED HOLES
SLAB PER PLAN
(2)Ò"ø x 8" D2L'SÌ
COLUMN PER PLAN (COUNTERSINK)
COLUMN
22No beam for thisproject
wood block fastenedto ledger angle. steelcould be exposed ifpainted for a 1-hr firerating
Sample Wood Details6.11.19
"Living Rooms"DLT & Glulam Beams Typical Details
DLT to Concrete Connection Detail Sketch Glulam to Concrete Detail Sketch
Sammamish Village
Proposed System
-
O
UOU
NRG
DTH
EEL
ERI
N
NC
LP
801 SECOND AVENUE, SUITE 900
(206) 343-0460
SEATTLE, WA 98104
www.cplinc.com
NOT FOR CONSTRUCTION
Sheet Title/Number
Status
Senior Project Manager
Development Manager
Project Manager
Quality Control Reviewer
Quality Control FF&E
No. Date
Revisions
Description
M.S. Project No.
ARCH. Project No.
Microsoft Mechanical Engineer
Microsoft Cable Engineer
Microsoft Electrical Engineer
Engineering Manager
Security Manager
Project Planner
Project Manager
FF&E
CUSTOMER
PROJECT MANAGEMENT
Approvals
OPERATIONS
Checked
Design
Drawn
Design Team
Registration
Date
Date
Issuance
6/4/
2019
5:4
6:01
PM
C:\R
evit
Loca
l\201
9\G
7001
2-34
_S-S
TRU
_mat
tm@
cplin
c.co
m.rv
t
WOOD DETAILS
S-F602
CAMPUS MODERNIZATIONSAMMAMISH VILLAGE
1 MICROSOFT WAY,REDMOND, WA 98052
Designer
MRM
Checker
S180025-02
05/31/2019 70% DD
BUILDING 215
215
1 2 3 4 5 6
7 8 9 10 11 12
13 14 15 16 17 18
19 20 21 22 23 24
25 26 27 28 29 30
COLUMN BEYOND
LEDGER Ù
CONCRETE EDGE BEAMPER PLAN
MASS TIMBER PANEL &CONCRETE TOPPINGPER PLAN
STEEL EMBED @ 6'-0"oc
COLUMNBEYOND
TAPERED WT9 @5'-0"oc
GUARDRAIL
TIMBERDECKING
24
3030 3600
31,32,33,34
24 3601
31,32,33,34
12" column widthtbd
Most
likely
will c
hang
e
with o
utloo
k red
esign
12" column widthtbd
POST/CONN.
POST PER PLAN
SLAB & REINF. PER PLAN
KERF Ð" W/ (4)Ô"øBOLTS - ORIENT BOLTS INNORTH/SOUTH DIRECTION(COUNTERSINK BOLTS PER14/S601)
STANDOFF 1" TOMATCH POST POSTDIMENSIONS
EMBED Ð"x18"x1'-6"W/ (4)Ô"ø x 6" STUDS@ 12"oc EA. WAY
Ì
Ì
(5)#5 x 4'-0" BOT. EA.WAY CTRD. ON POST EAST/WEST
4"2" 2"
2"4"
4"
4242 6801
Î" MAX GAP.
4"4"2"
4"4"
4"4"
2"
4"
2" 4" 5" 2"4"
4"
2"
11
2
2
3
BEAM PER PLAN
INSTALL VERTICALLYORIENTED SHORT SLOTHOLES IN TOP ROW OF
KERF Ð" W/ (8)Ô"øBOLTS (COUNTERSINK
DAP BEAM FOR Ì
BRG. Ô" x (BEAMWIDTH - 2") x (POST
INSTALL VERT ORIENTEDSHORT SLOTTED HOLESIN TOP ROW
KERF Ð" W/ (4)Ô"øBOLTS (COUNTERSINK
KERF Ð" W/ (2)Ô"øBOLTS (COUNTERSINK
POST
BOLTS PER 14/S601)
CONDITIONBEAMS ARE SAME DEPTH
CONDITION AT BEAM ENDSSEE CONDITION FOR CALLOUTS IN COMMON
BEARING Ô" x
BEAM PER PLAN
POST
CONDITION TWO DIFFERENT BEAM DEPTHSSEE CONDITION FOR CALLOUTS IN COMMON
(BEAM WIDTH - 3")
'S & BOLTING PER14/S601 (CONDITION A)
BOLTS PER 14/S601)KERF Ð" W/ (4)Ô"øBOLTS (COUNTERSINKBOLTS PER 14/S601)
TOP 1" x (INCOMINGBEAM WIDTH - 3") (DAPBEAM FOR )
POST
WIDTH)
POST PER PLANÌ
cjp
STOP TOP OF UPTURNEDBEAM PORTION PER19/S601 OR 20/S602 ATPOST FACE WHEREOCCURS
BOLTS PER 14/S601)
4"4"
2"
2" 4" 5"
2" 2"
35 6805
35
ls
CONCRETE TOPPING& REINF. PER PLAN
ACOUSTIC MAT PERARCH'L (WHERE OCCURS)
DLT DECKING PERPLAN
REDUCE DLT DEPTHFOR CHASE WHEREOCCURS PER MECH'L- 10" WIDE x 3" MAX.SIZE (SCREW REINF.PER DLT MFR. ASREQD.)
Ð"x6" PLYWOOD SPLINEW/ 10d @ 8"oc EA. SIDEOF JOINT
GAP PER DLT MFR.FOR WOODEXPANSION (Ô" MAX.)
EXTEND REINF. PER42/S301
CONSTRUCTION JOINTLOCATIONS TO BEDETERMINED BY CONTR.SUBMIT PROPOSED LOC.TO ENGINEER ANDARCHITECT FOR REVIEW &APPROVAL PRIOR TOPOURING SLAB
TYPICAL DLT DECKING SPLINE 77 6800
FOR CALL-OUTSIN COMMON SEEDETAIL
1"
BEAM PER PLAN
(2) ROWS OF Î"ø x5Ð" SWG ASSY VGSCREWS @ 12"oc
21/S601
DLT DECKING SPLINE OVER BEAMDLT DECKING CONT. OVER BEAM
BEAM BEAM
1818 5808
3" MIN.
1"
3/8"ø x 12Ò" SWGASSY 3.0 SCREWS @12"oc - EA. SIDE OFPANEL JOINT
BEAM PER PLAN
Ð" MAX. GAP
DLT DECKING SPLINE OVER BEAMDLT DECKING CONT. OVER BEAM
DLT DECKING &TOPPING PER PLAN(ORIENTATIONVARIES)
PLYWOOD SPLINEPER 7/S601
BEAM BEAM
3/8"ø x 12Ò" SWGASSY 3.0 SCREWS @12"oc
(2) ROWS OF Ì"ø x 5"SDS SCREWS @ 18"oc- STAGGER EA. SIDEOF JOINT
Ì"ø x 5" SDS SCREWS@ 18"oc
2121 6803
8"
EQ.
EQ.
5"
EQ. 5" EQ.
PLAN
PLAN
Ö"ø x 1'-0" THREADEDROD IN ×"ø HOLE
Ð"x8"x0'-8" W/
Ð" MIN., Ô" MAX. GROUT3"ø GROUTED HOLES
SLAB PER PLAN
(2)Ò"ø x 8" D2L'SÌ
COLUMN PER PLAN (COUNTERSINK)
COLUMN
22No beam for thisproject
wood block fastenedto ledger angle. steelcould be exposed ifpainted for a 1-hr firerating
Sample Wood Details6.11.19
O
UOU
NRG
DTH
EEL
ERI
N
NC
LP
801 SECOND AVENUE, SUITE 900
(206) 343-0460
SEATTLE, WA 98104
www.cplinc.com
NOT FOR CONSTRUCTION
Sheet Title/Number
Status
Senior Project Manager
Development Manager
Project Manager
Quality Control Reviewer
Quality Control FF&E
No. Date
Revisions
Description
M.S. Project No.
ARCH. Project No.
Microsoft Mechanical Engineer
Microsoft Cable Engineer
Microsoft Electrical Engineer
Engineering Manager
Security Manager
Project Planner
Project Manager
FF&E
CUSTOMER
PROJECT MANAGEMENT
Approvals
OPERATIONS
Checked
Design
Drawn
Design Team
Registration
Date
Date
Issuance
6/4/
2019
5:4
6:01
PM
C:\R
evit
Loca
l\201
9\G
7001
2-34
_S-S
TRU
_mat
tm@
cplin
c.co
m.rv
t
WOOD DETAILS
S-F602
CAMPUS MODERNIZATIONSAMMAMISH VILLAGE
1 MICROSOFT WAY,REDMOND, WA 98052
Designer
MRM
Checker
S180025-02
05/31/2019 70% DD
BUILDING 215
215
1 2 3 4 5 6
7 8 9 10 11 12
13 14 15 16 17 18
19 20 21 22 23 24
25 26 27 28 29 30
COLUMN BEYOND
LEDGER Ù
CONCRETE EDGE BEAMPER PLAN
MASS TIMBER PANEL &CONCRETE TOPPINGPER PLAN
STEEL EMBED @ 6'-0"oc
COLUMNBEYOND
TAPERED WT9 @5'-0"oc
GUARDRAIL
TIMBERDECKING
24
3030 3600
31,32,33,34
24 3601
31,32,33,34
12" column widthtbd
Most
likely
will c
hang
e
with o
utloo
k red
esign
12" column widthtbd
POST/CONN.
POST PER PLAN
SLAB & REINF. PER PLAN
KERF Ð" W/ (4)Ô"øBOLTS - ORIENT BOLTS INNORTH/SOUTH DIRECTION(COUNTERSINK BOLTS PER14/S601)
STANDOFF 1" TOMATCH POST POSTDIMENSIONS
EMBED Ð"x18"x1'-6"W/ (4)Ô"ø x 6" STUDS@ 12"oc EA. WAY
Ì
Ì
(5)#5 x 4'-0" BOT. EA.WAY CTRD. ON POST EAST/WEST
4"2" 2"
2"4"
4"
4242 6801
Î" MAX GAP.
4"4"2"
4"4"
4"4"
2"
4"
2" 4" 5" 2"4"
4"
2"
11
2
2
3
BEAM PER PLAN
INSTALL VERTICALLYORIENTED SHORT SLOTHOLES IN TOP ROW OF
KERF Ð" W/ (8)Ô"øBOLTS (COUNTERSINK
DAP BEAM FOR Ì
BRG. Ô" x (BEAMWIDTH - 2") x (POST
INSTALL VERT ORIENTEDSHORT SLOTTED HOLESIN TOP ROW
KERF Ð" W/ (4)Ô"øBOLTS (COUNTERSINK
KERF Ð" W/ (2)Ô"øBOLTS (COUNTERSINK
POST
BOLTS PER 14/S601)
CONDITIONBEAMS ARE SAME DEPTH
CONDITION AT BEAM ENDSSEE CONDITION FOR CALLOUTS IN COMMON
BEARING Ô" x
BEAM PER PLAN
POST
CONDITION TWO DIFFERENT BEAM DEPTHSSEE CONDITION FOR CALLOUTS IN COMMON
(BEAM WIDTH - 3")
'S & BOLTING PER14/S601 (CONDITION A)
BOLTS PER 14/S601)KERF Ð" W/ (4)Ô"øBOLTS (COUNTERSINKBOLTS PER 14/S601)
TOP 1" x (INCOMINGBEAM WIDTH - 3") (DAPBEAM FOR )
POST
WIDTH)
POST PER PLANÌ
cjp
STOP TOP OF UPTURNEDBEAM PORTION PER19/S601 OR 20/S602 ATPOST FACE WHEREOCCURS
BOLTS PER 14/S601)
4"4"
2"
2" 4" 5"
2" 2"
35 6805
35
ls
CONCRETE TOPPING& REINF. PER PLAN
ACOUSTIC MAT PERARCH'L (WHERE OCCURS)
DLT DECKING PERPLAN
REDUCE DLT DEPTHFOR CHASE WHEREOCCURS PER MECH'L- 10" WIDE x 3" MAX.SIZE (SCREW REINF.PER DLT MFR. ASREQD.)
Ð"x6" PLYWOOD SPLINEW/ 10d @ 8"oc EA. SIDEOF JOINT
GAP PER DLT MFR.FOR WOODEXPANSION (Ô" MAX.)
EXTEND REINF. PER42/S301
CONSTRUCTION JOINTLOCATIONS TO BEDETERMINED BY CONTR.SUBMIT PROPOSED LOC.TO ENGINEER ANDARCHITECT FOR REVIEW &APPROVAL PRIOR TOPOURING SLAB
TYPICAL DLT DECKING SPLINE 77 6800
FOR CALL-OUTSIN COMMON SEEDETAIL
1"
BEAM PER PLAN
(2) ROWS OF Î"ø x5Ð" SWG ASSY VGSCREWS @ 12"oc
21/S601
DLT DECKING SPLINE OVER BEAMDLT DECKING CONT. OVER BEAM
BEAM BEAM
1818 5808
3" MIN.
1"
3/8"ø x 12Ò" SWGASSY 3.0 SCREWS @12"oc - EA. SIDE OFPANEL JOINT
BEAM PER PLAN
Ð" MAX. GAP
DLT DECKING SPLINE OVER BEAMDLT DECKING CONT. OVER BEAM
DLT DECKING &TOPPING PER PLAN(ORIENTATIONVARIES)
PLYWOOD SPLINEPER 7/S601
BEAM BEAM
3/8"ø x 12Ò" SWGASSY 3.0 SCREWS @12"oc
(2) ROWS OF Ì"ø x 5"SDS SCREWS @ 18"oc- STAGGER EA. SIDEOF JOINT
Ì"ø x 5" SDS SCREWS@ 18"oc
2121 6803
8"
EQ.
EQ.
5"
EQ. 5" EQ.
PLAN
PLAN
Ö"ø x 1'-0" THREADEDROD IN ×"ø HOLE
Ð"x8"x0'-8" W/
Ð" MIN., Ô" MAX. GROUT3"ø GROUTED HOLES
SLAB PER PLAN
(2)Ò"ø x 8" D2L'SÌ
COLUMN PER PLAN (COUNTERSINK)
COLUMN
22No beam for thisproject
wood block fastenedto ledger angle. steelcould be exposed ifpainted for a 1-hr firerating
Sample Wood Details6.11.19
28.50 16.75 28.5037.75
28.50 16.75 28.5037.75
28.50 16.75 28.5037.75
10.3
8
16.75
13.5
0
11.2
912
.75
9.38
13.5
0
37.75
13.5
0
0.75
28.50
13.5
0
28.50
Concrete PT Slab
CLT/DLT Panels, Glulam Beams
CLT/DLT Panels, Steel Beams
Concrete on Metal Deck, Steel Beams
Amenity "pop outs"
DLT Deck with Concrete topping & Steel Beams
DLT & Steel Beam Typical Details
Sammamish Village
Proposed System
-
Questions?
Tim J. Whitcombe, RIBA, LEED® Green Assoc. NBBJ Senior Associate / Architect
[email protected]+1. 206.223.5220www.nbbj.com@nbbjdesign
O
UOU
NRG
DTH
EEL
ERI
N
NC
LP
801 SECOND AVENUE, SUITE 900
(206) 343-0460
SEATTLE, WA 98104
www.cplinc.com
NOT FOR CONSTRUCTION
Sheet Title/Number
Status
Senior Project Manager
Development Manager
Project Manager
Quality Control Reviewer
Quality Control FF&E
No. Date
Revisions
Description
M.S. Project No.
ARCH. Project No.
Microsoft Mechanical Engineer
Microsoft Cable Engineer
Microsoft Electrical Engineer
Engineering Manager
Security Manager
Project Planner
Project Manager
FF&E
CUSTOMER
PROJECT MANAGEMENT
Approvals
OPERATIONS
Checked
Design
Drawn
Design Team
Registration
Date
Date
Issuance
6/4/
2019
5:4
6:01
PM
C:\R
evit
Loca
l\201
9\G
7001
2-34
_S-S
TRU
_mat
tm@
cplin
c.co
m.rv
t
WOOD DETAILS
S-F602
CAMPUS MODERNIZATIONSAMMAMISH VILLAGE
1 MICROSOFT WAY,REDMOND, WA 98052
Designer
MRM
Checker
S180025-02
05/31/2019 70% DD
BUILDING 215
215
1 2 3 4 5 6
7 8 9 10 11 12
13 14 15 16 17 18
19 20 21 22 23 24
25 26 27 28 29 30
COLUMN BEYOND
LEDGER Ù
CONCRETE EDGE BEAMPER PLAN
MASS TIMBER PANEL &CONCRETE TOPPINGPER PLAN
STEEL EMBED @ 6'-0"oc
COLUMNBEYOND
TAPERED WT9 @5'-0"oc
GUARDRAIL
TIMBERDECKING
24
3030 3600
31,32,33,34
24 3601
31,32,33,34
12" column widthtbd
Most
likely
will c
hang
e
with o
utloo
k red
esign
12" column widthtbd
POST/CONN.
POST PER PLAN
SLAB & REINF. PER PLAN
KERF Ð" W/ (4)Ô"øBOLTS - ORIENT BOLTS INNORTH/SOUTH DIRECTION(COUNTERSINK BOLTS PER14/S601)
STANDOFF 1" TOMATCH POST POSTDIMENSIONS
EMBED Ð"x18"x1'-6"W/ (4)Ô"ø x 6" STUDS@ 12"oc EA. WAY
Ì
Ì
(5)#5 x 4'-0" BOT. EA.WAY CTRD. ON POST EAST/WEST
4"2" 2"
2"4"
4"
4242 6801
Î" MAX GAP.
4"4"2"
4"4"
4"4"
2"
4"
2" 4" 5" 2"4"
4"
2"
11
2
2
3
BEAM PER PLAN
INSTALL VERTICALLYORIENTED SHORT SLOTHOLES IN TOP ROW OF
KERF Ð" W/ (8)Ô"øBOLTS (COUNTERSINK
DAP BEAM FOR Ì
BRG. Ô" x (BEAMWIDTH - 2") x (POST
INSTALL VERT ORIENTEDSHORT SLOTTED HOLESIN TOP ROW
KERF Ð" W/ (4)Ô"øBOLTS (COUNTERSINK
KERF Ð" W/ (2)Ô"øBOLTS (COUNTERSINK
POST
BOLTS PER 14/S601)
CONDITIONBEAMS ARE SAME DEPTH
CONDITION AT BEAM ENDSSEE CONDITION FOR CALLOUTS IN COMMON
BEARING Ô" x
BEAM PER PLAN
POST
CONDITION TWO DIFFERENT BEAM DEPTHSSEE CONDITION FOR CALLOUTS IN COMMON
(BEAM WIDTH - 3")
'S & BOLTING PER14/S601 (CONDITION A)
BOLTS PER 14/S601)KERF Ð" W/ (4)Ô"øBOLTS (COUNTERSINKBOLTS PER 14/S601)
TOP 1" x (INCOMINGBEAM WIDTH - 3") (DAPBEAM FOR )
POST
WIDTH)
POST PER PLANÌ
cjp
STOP TOP OF UPTURNEDBEAM PORTION PER19/S601 OR 20/S602 ATPOST FACE WHEREOCCURS
BOLTS PER 14/S601)
4"4"
2"
2" 4" 5"
2" 2"
35 6805
35
ls
CONCRETE TOPPING& REINF. PER PLAN
ACOUSTIC MAT PERARCH'L (WHERE OCCURS)
DLT DECKING PERPLAN
REDUCE DLT DEPTHFOR CHASE WHEREOCCURS PER MECH'L- 10" WIDE x 3" MAX.SIZE (SCREW REINF.PER DLT MFR. ASREQD.)
Ð"x6" PLYWOOD SPLINEW/ 10d @ 8"oc EA. SIDEOF JOINT
GAP PER DLT MFR.FOR WOODEXPANSION (Ô" MAX.)
EXTEND REINF. PER42/S301
CONSTRUCTION JOINTLOCATIONS TO BEDETERMINED BY CONTR.SUBMIT PROPOSED LOC.TO ENGINEER ANDARCHITECT FOR REVIEW &APPROVAL PRIOR TOPOURING SLAB
TYPICAL DLT DECKING SPLINE 77 6800
FOR CALL-OUTSIN COMMON SEEDETAIL
1"
BEAM PER PLAN
(2) ROWS OF Î"ø x5Ð" SWG ASSY VGSCREWS @ 12"oc
21/S601
DLT DECKING SPLINE OVER BEAMDLT DECKING CONT. OVER BEAM
BEAM BEAM
1818 5808
3" MIN.
1"
3/8"ø x 12Ò" SWGASSY 3.0 SCREWS @12"oc - EA. SIDE OFPANEL JOINT
BEAM PER PLAN
Ð" MAX. GAP
DLT DECKING SPLINE OVER BEAMDLT DECKING CONT. OVER BEAM
DLT DECKING &TOPPING PER PLAN(ORIENTATIONVARIES)
PLYWOOD SPLINEPER 7/S601
BEAM BEAM
3/8"ø x 12Ò" SWGASSY 3.0 SCREWS @12"oc
(2) ROWS OF Ì"ø x 5"SDS SCREWS @ 18"oc- STAGGER EA. SIDEOF JOINT
Ì"ø x 5" SDS SCREWS@ 18"oc
2121 6803
8"
EQ.
EQ.
5"
EQ. 5" EQ.
PLAN
PLAN
Ö"ø x 1'-0" THREADEDROD IN ×"ø HOLE
Ð"x8"x0'-8" W/
Ð" MIN., Ô" MAX. GROUT3"ø GROUTED HOLES
SLAB PER PLAN
(2)Ò"ø x 8" D2L'SÌ
COLUMN PER PLAN (COUNTERSINK)
COLUMN
22No beam for thisproject
wood block fastenedto ledger angle. steelcould be exposed ifpainted for a 1-hr firerating
Sample Wood Details6.11.19