northwest wood design symposium microsoft sammamish village · 2019. 6. 18. · 19. th. june 2019...

30
19 th June 2019 Tim J. Whitcombe, RIBA Senior Associate, NBBJ Northwest Wood Design Symposium Microsoft Sammamish Village O U O U N R G D T H E E L E R I N N C L P

Upload: others

Post on 05-Feb-2021

0 views

Category:

Documents


0 download

TRANSCRIPT

  • 19th June 2019

    Tim J. Whitcombe, RIBA Senior Associate, NBBJ

    Northwest Wood Design SymposiumMicrosoft Sammamish Village

    O

    UOU

    NRG

    DTH

    EEL

    ERI

    N

    NC

    LP

    801 SECOND AVENUE, SUITE 900

    (206) 343-0460

    SEATTLE, WA 98104

    www.cplinc.com

    NOT FOR CONSTRUCTION

    Sheet Title/Number

    Status

    Senior Project Manager

    Development Manager

    Project Manager

    Quality Control Reviewer

    Quality Control FF&E

    No. Date

    Revisions

    Description

    M.S. Project No.

    ARCH. Project No.

    Microsoft Mechanical Engineer

    Microsoft Cable Engineer

    Microsoft Electrical Engineer

    Engineering Manager

    Security Manager

    Project Planner

    Project Manager

    FF&E

    CUSTOMER

    PROJECT MANAGEMENT

    Approvals

    OPERATIONS

    Checked

    Design

    Drawn

    Design Team

    Registration

    Date

    Date

    Issuance

    6/4/

    2019

    5:4

    6:01

    PM

    C:\R

    evit

    Loca

    l\201

    9\G

    7001

    2-34

    _S-S

    TRU

    _mat

    tm@

    cplin

    c.co

    m.rv

    t

    WOOD DETAILS

    S-F602

    CAMPUS MODERNIZATIONSAMMAMISH VILLAGE

    1 MICROSOFT WAY,REDMOND, WA 98052

    Designer

    MRM

    Checker

    S180025-02

    05/31/2019 70% DD

    BUILDING 215

    215

    1 2 3 4 5 6

    7 8 9 10 11 12

    13 14 15 16 17 18

    19 20 21 22 23 24

    25 26 27 28 29 30

    COLUMN BEYOND

    LEDGER Ù

    CONCRETE EDGE BEAMPER PLAN

    MASS TIMBER PANEL &CONCRETE TOPPINGPER PLAN

    STEEL EMBED @ 6'-0"oc

    COLUMNBEYOND

    TAPERED WT9 @5'-0"oc

    GUARDRAIL

    TIMBERDECKING

    24

    3030 3600

    31,32,33,34

    24 3601

    31,32,33,34

    12" column widthtbd

    Most

    likely

    will c

    hang

    e

    with o

    utloo

    k red

    esign

    12" column widthtbd

    POST/CONN.

    POST PER PLAN

    SLAB & REINF. PER PLAN

    KERF Ð" W/ (4)Ô"øBOLTS - ORIENT BOLTS INNORTH/SOUTH DIRECTION(COUNTERSINK BOLTS PER14/S601)

    STANDOFF 1" TOMATCH POST POSTDIMENSIONS

    EMBED Ð"x18"x1'-6"W/ (4)Ô"ø x 6" STUDS@ 12"oc EA. WAY

    Ì

    Ì

    (5)#5 x 4'-0" BOT. EA.WAY CTRD. ON POST EAST/WEST

    4"2" 2"

    2"4"

    4"

    4242 6801

    Î" MAX GAP.

    4"4"2"

    4"4"

    4"4"

    2"

    4"

    2" 4" 5" 2"4"

    4"

    2"

    11

    2

    2

    3

    BEAM PER PLAN

    INSTALL VERTICALLYORIENTED SHORT SLOTHOLES IN TOP ROW OF

    KERF Ð" W/ (8)Ô"øBOLTS (COUNTERSINK

    DAP BEAM FOR Ì

    BRG. Ô" x (BEAMWIDTH - 2") x (POST

    INSTALL VERT ORIENTEDSHORT SLOTTED HOLESIN TOP ROW

    KERF Ð" W/ (4)Ô"øBOLTS (COUNTERSINK

    KERF Ð" W/ (2)Ô"øBOLTS (COUNTERSINK

    POST

    BOLTS PER 14/S601)

    CONDITIONBEAMS ARE SAME DEPTH

    CONDITION AT BEAM ENDSSEE CONDITION FOR CALLOUTS IN COMMON

    BEARING Ô" x

    BEAM PER PLAN

    POST

    CONDITION TWO DIFFERENT BEAM DEPTHSSEE CONDITION FOR CALLOUTS IN COMMON

    (BEAM WIDTH - 3")

    'S & BOLTING PER14/S601 (CONDITION A)

    BOLTS PER 14/S601)KERF Ð" W/ (4)Ô"øBOLTS (COUNTERSINKBOLTS PER 14/S601)

    TOP 1" x (INCOMINGBEAM WIDTH - 3") (DAPBEAM FOR )

    POST

    WIDTH)

    POST PER PLANÌ

    cjp

    STOP TOP OF UPTURNEDBEAM PORTION PER19/S601 OR 20/S602 ATPOST FACE WHEREOCCURS

    BOLTS PER 14/S601)

    4"4"

    2"

    2" 4" 5"

    2" 2"

    35 6805

    35

    ls

    CONCRETE TOPPING& REINF. PER PLAN

    ACOUSTIC MAT PERARCH'L (WHERE OCCURS)

    DLT DECKING PERPLAN

    REDUCE DLT DEPTHFOR CHASE WHEREOCCURS PER MECH'L- 10" WIDE x 3" MAX.SIZE (SCREW REINF.PER DLT MFR. ASREQD.)

    Ð"x6" PLYWOOD SPLINEW/ 10d @ 8"oc EA. SIDEOF JOINT

    GAP PER DLT MFR.FOR WOODEXPANSION (Ô" MAX.)

    EXTEND REINF. PER42/S301

    CONSTRUCTION JOINTLOCATIONS TO BEDETERMINED BY CONTR.SUBMIT PROPOSED LOC.TO ENGINEER ANDARCHITECT FOR REVIEW &APPROVAL PRIOR TOPOURING SLAB

    TYPICAL DLT DECKING SPLINE 77 6800

    FOR CALL-OUTSIN COMMON SEEDETAIL

    1"

    BEAM PER PLAN

    (2) ROWS OF Î"ø x5Ð" SWG ASSY VGSCREWS @ 12"oc

    21/S601

    DLT DECKING SPLINE OVER BEAMDLT DECKING CONT. OVER BEAM

    BEAM BEAM

    1818 5808

    3" MIN.

    1"

    3/8"ø x 12Ò" SWGASSY 3.0 SCREWS @12"oc - EA. SIDE OFPANEL JOINT

    BEAM PER PLAN

    Ð" MAX. GAP

    DLT DECKING SPLINE OVER BEAMDLT DECKING CONT. OVER BEAM

    DLT DECKING &TOPPING PER PLAN(ORIENTATIONVARIES)

    PLYWOOD SPLINEPER 7/S601

    BEAM BEAM

    3/8"ø x 12Ò" SWGASSY 3.0 SCREWS @12"oc

    (2) ROWS OF Ì"ø x 5"SDS SCREWS @ 18"oc- STAGGER EA. SIDEOF JOINT

    Ì"ø x 5" SDS SCREWS@ 18"oc

    2121 6803

    8"

    EQ.

    EQ.

    5"

    EQ. 5" EQ.

    PLAN

    PLAN

    Ö"ø x 1'-0" THREADEDROD IN ×"ø HOLE

    Ð"x8"x0'-8" W/

    Ð" MIN., Ô" MAX. GROUT3"ø GROUTED HOLES

    SLAB PER PLAN

    (2)Ò"ø x 8" D2L'SÌ

    COLUMN PER PLAN (COUNTERSINK)

    COLUMN

    22No beam for thisproject

    wood block fastenedto ledger angle. steelcould be exposed ifpainted for a 1-hr firerating

    Sample Wood Details6.11.19

  • Project Overview

  • Weave Geode Living Room Civic PortalMasterplan Whatcom Washington Sammamish Chelan

    Sammamish Village

  • TOTAL 782,000 SF

    TOTAL 842,000 SF

    WASHINGTON

    SAMMAMISH

    Campus-wide diagram illustrating proposed villages.

    156t

    h Av

    e

    157t

    h Pl

    Bel-Re

    d Rd

    SR-5

    20

    31st St

    36th St

    157t

    h Av

    e

    159t

    h Av

    e

    163r

    d Av

    e

    37

    G37

    36Q

    TOTAL 264,000 SFCHELAN

    R

    A

    N

    B

    C

    D

    EF

    H

    G

    I

    J

    K

    L

    PO

    TOTAL 153,000 SFJEWEL BOX

    TOTAL 940,180 SFWHATCOM

    * Microsoft reserves the right to change village boundaries in the future.

    0 100 200 500N

    Microsoft Campus Refresh Master Plan Guidelines | 2018 April 23 | 23

    TOTAL 782,000 SF

    TOTAL 842,000 SF

    WASHINGTON

    SAMMAMISH

    Campus-wide diagram illustrating proposed villages.

    156t

    h Av

    e

    157t

    h Pl

    Bel-Re

    d Rd

    SR-5

    20

    31st St

    36th St

    157t

    h Av

    e

    159t

    h Av

    e

    163r

    d Av

    e

    37

    G37

    36Q

    TOTAL 264,000 SFCHELAN

    R

    A

    N

    B

    C

    D

    EF

    H

    G

    I

    J

    K

    L

    PO

    TOTAL 153,000 SFJEWEL BOX

    TOTAL 940,180 SFWHATCOM

    * Microsoft reserves the right to change village boundaries in the future.

    0 100 200 500N

    Microsoft Campus Refresh Master Plan Guidelines | 2018 April 23 | 23

    TOTAL 782,000 SF

    TOTAL 842,000 SF

    WASHINGTON

    SAMMAMISH

    Campus-wide diagram illustrating proposed villages.

    156t

    h Av

    e

    157t

    h Pl

    Bel-Re

    d Rd

    SR-5

    20

    31st St

    36th St

    157t

    h Av

    e

    159t

    h Av

    e

    163r

    d Av

    e

    37

    G37

    36Q

    TOTAL 264,000 SFCHELAN

    R

    A

    N

    B

    C

    D

    EF

    H

    G

    I

    J

    K

    L

    PO

    TOTAL 153,000 SFJEWEL BOX

    TOTAL 940,180 SFWHATCOM

    * Microsoft reserves the right to change village boundaries in the future.

    0 100 200 500N

    Microsoft Campus Refresh Master Plan Guidelines | 2018 April 23 | 23

    TOTAL 782,000 SF

    TOTAL 842,000 SF

    WASHINGTON

    SAMMAMISH

    Campus-wide diagram illustrating proposed villages.

    156t

    h Av

    e

    157t

    h Pl

    Bel-Re

    d Rd

    SR-5

    20

    31st St

    36th St

    157t

    h Av

    e

    159t

    h Av

    e

    163r

    d Av

    e

    37

    G37

    36Q

    TOTAL 264,000 SFCHELAN

    R

    A

    N

    B

    C

    D

    EF

    H

    G

    I

    J

    K

    L

    PO

    TOTAL 153,000 SFJEWEL BOX

    TOTAL 940,180 SFWHATCOM

    * Microsoft reserves the right to change village boundaries in the future.

    0 100 200 500N

    Microsoft Campus Refresh Master Plan Guidelines | 2018 April 23 | 23

    TOTAL 782,000 SF

    TOTAL 842,000 SF

    WASHINGTON

    SAMMAMISH

    Campus-wide diagram illustrating proposed villages.

    156t

    h Av

    e

    157t

    h Pl

    Bel-Re

    d Rd

    SR-5

    20

    31st St

    36th St

    157t

    h Av

    e

    159t

    h Av

    e

    163r

    d Av

    e

    37

    G37

    36Q

    TOTAL 264,000 SFCHELAN

    R

    A

    N

    B

    C

    D

    EF

    H

    G

    I

    J

    K

    L

    PO

    TOTAL 153,000 SFJEWEL BOX

    TOTAL 940,180 SFWHATCOM

    * Microsoft reserves the right to change village boundaries in the future.

    0 100 200 500N

    Microsoft Campus Refresh Master Plan Guidelines | 2018 April 23 | 23

    TOTAL 782,000 SF

    TOTAL 842,000 SF

    WASHINGTON

    SAMMAMISH

    Campus-wide diagram illustrating proposed villages.

    156t

    h Av

    e

    157t

    h Pl

    Bel-Re

    d Rd

    SR-5

    20

    31st St

    36th St

    157t

    h Av

    e

    159t

    h Av

    e

    163r

    d Av

    e

    37

    G37

    36Q

    TOTAL 264,000 SFCHELAN

    R

    A

    N

    B

    C

    D

    EF

    H

    G

    I

    J

    K

    L

    PO

    TOTAL 153,000 SFJEWEL BOX

    TOTAL 940,180 SFWHATCOM

    * Microsoft reserves the right to change village boundaries in the future.

    0 100 200 500N

    Microsoft Campus Refresh Master Plan Guidelines | 2018 April 23 | 23

    NE 31ST ST

    156TH AVE N

    E

    Sammamish Village

    Current Masterplan

    BUILDING R

    WASHINGTON

    SAMMAMISH

    WHATCOM CHELAN

  • Sammamish Village

    Village Overview

    NE 31ST ST

    156TH AVE N

    E

    TOTAL 782,000 SF

    TOTAL 842,000 SF

    WASHINGTON

    SAMMAMISH

    Campus-wide diagram illustrating proposed villages.

    156t

    h Av

    e

    157t

    h Pl

    Bel-Re

    d Rd

    SR-5

    20

    31st St

    36th St

    157t

    h Av

    e

    159t

    h Av

    e

    163r

    d Av

    e

    37

    G37

    36Q

    TOTAL 264,000 SFCHELAN

    R

    A

    N

    B

    C

    D

    EF

    H

    G

    I

    J

    K

    L

    PO

    TOTAL 153,000 SFJEWEL BOX

    TOTAL 940,180 SFWHATCOM

    * Microsoft reserves the right to change village boundaries in the future.

    0 100 200 500N

    Microsoft Campus Refresh Master Plan Guidelines | 2018 April 23 | 23

    0 50 100 200

  • Sammamish Village

    Building ElementsNE 31ST ST

    156TH AVE NE

  • Office Buildings

    Sammamish Village

    Building ElementsNE 31ST ST

    156TH AVE NE

  • Sammamish Village

    Building Elements

    Living Rooms

    Dens

    NE 31ST ST

    156TH AVE NE

  • Sammamish Village

    Building Elements

    Village Amenities

    NE 31ST ST

    156TH AVE NE

  • Concept

  • Concept Diagram: Inverse Density cut by Calm Horizontal

    Concept Image: Nisqually River cuts through the dense forest, revealing Mt. Rainier

    Sammamish Village

    Inverse Density

    Developing on the theme of Sammamish as the Forest Village, with Buildings 212, 213, 214 & 215 nestled between the forest and the Campus Edge, the Inverse Density diagram is reminiscent of the natural landscape of the Pacific Northwest.

    Using the Inverse Density diagram to represent the forest on the Office Heads, the Office Link takes on the Calm Horizontal of the river, cutting through the forest and revealing the Building Entries and Living Rooms.

    Setting the Living Rooms and Dens within the clearings provides access to light, views, and the outdoors, as well as providing a distinct differentiation in articulation across the building, breaking down the building massing.

  • NE 31ST ST

  • Living Rooms

    NE 31ST ST

    Dens

  • Timber Considerations • Structural Comparison • Concrete • Steel • Timber • Hybrid • Use Type and Occupancy • Fire Proofing • CLT or DLT

  • STRUCTURAL SYSTEM OPTIONS

    SYSTEMDESCRIPTION

    LATERAL SYSTEM OPTIONS

    / +/-30’ x +/-30’ column grid/ 5 1/2” thick concrete-filled metal deck / 16” to 21” deep wide flange beams/ Wide flange columns/ Fireproofed structure, if lightweight concrete fill no spray on soffit

    / Perimeter steel braced frames (conventional or BRBF)/ Moment frames/ Steel plate shear walls/ Concrete shear walls/ Dual systems

    / +/-25’ x +/-40’ column grid/ 2 1/4” - 3 1/2” concrete topping over 7 ply CLT panels or 2x10 DLT panels (total slab depth = 11 1/2”-13 1/2”)/ 18” to 24” deep wide flange beams/ Wide flange columns/ Varying amount of fireproofing con-crete fill no spray on soffit

    / Perimeter steel braced frames (conventional or BRBF)/ Interior shear wall cores/ Dual systems

    / +/-20’ x +/- 28’ column grid/ 2 1/4”-3 1/2”: concrete topping over 7 ply CLT panels or 2x10 DLT panels (total slab depth = 11 1/2”-13 1/2”)/ 30”-36” deep glulam beams/ Timber columns

    / Perimeter steel braced frames (conventional or BRBF)

    / +/-30’ x +/-30’ column grid/ 9” thick PT concrete slabs/ Concrete columns

    / Interior shear wall cores/ Dual systems

    Carbon leadership *(story potential)

    Efficient use of materials (quantity) Structural eight impacts on lateral system & foundation costs

    Energy performance impact

    Embodied carbon

    OPERATIONAL AND

    EMbODIED CARbON

    HEALTHY wORkPLACE Serviceability acoustics

    Serviceability vibration

    Serviceability floor flatness

    Red list / ingredient impacts

    Experiences: Biophilic connection with nature

    Space planning impact Flexibility bay sizes

    Systems: Comfort improvement

    Systems: Daylighting impact

    Health/social impactSourcing practices

    CLT/DLT PANELS & TOPPING W/

    STEEL WF BEAMS& GIRDERS

    CONCRETE ON METALDECK W/ STEEL WF BEAMS &

    INTERMEDIATE SPAN GIRDERS

    CONCRETE PT SLAB

    CLT/DLT PANELS & TOPPING W/

    GLULAM BEAMS

    PRIOTIzE THE EMPLOYEE

    bRIDgE THE buILT & NATuRAL

    ENvIRONMENT

    DESIgN fOR LONgEvITY

    ExEMPLIfY OPERATIONAL ExCELLENCE

    bE MEMORAbLE

    TREAD LIgHTLY

    wALk (AND bIkE) THE TALk

    SHOwCASE MICROSOfT

    TECHNOLOgY

    ExCELLENT

    vERY gOOD

    gOOD

    fAIR

    POOR

    STRUCTURAL SYSTEM OPTIONS

    SYSTEMDESCRIPTION

    LATERAL SYSTEM OPTIONS

    / +/-30’ x +/-30’ column grid/ 5 1/2” thick concrete-filled metal deck / 16” to 21” deep wide flange beams/ Wide flange columns/ Fireproofed structure, if lightweight concrete fill no spray on soffit

    / Perimeter steel braced frames (conventional or BRBF)/ Moment frames/ Steel plate shear walls/ Concrete shear walls/ Dual systems

    / +/-25’ x +/-40’ column grid/ 2 1/4” - 3 1/2” concrete topping over 7 ply CLT panels or 2x10 DLT panels (total slab depth = 11 1/2”-13 1/2”)/ 18” to 24” deep wide flange beams/ Wide flange columns/ Varying amount of fireproofing con-crete fill no spray on soffit

    / Perimeter steel braced frames (conventional or BRBF)/ Interior shear wall cores/ Dual systems

    / +/-20’ x +/- 28’ column grid/ 2 1/4”-3 1/2”: concrete topping over 7 ply CLT panels or 2x10 DLT panels (total slab depth = 11 1/2”-13 1/2”)/ 30”-36” deep glulam beams/ Timber columns

    / Perimeter steel braced frames (conventional or BRBF)

    / +/-30’ x +/-30’ column grid/ 9” thick PT concrete slabs/ Concrete columns

    / Interior shear wall cores/ Dual systems

    Carbon leadership *(story potential)

    Efficient use of materials (quantity) Structural eight impacts on lateral system & foundation costs

    Energy performance impact

    Embodied carbon

    OPERATIONAL AND

    EMbODIED CARbON

    HEALTHY wORkPLACE Serviceability acoustics

    Serviceability vibration

    Serviceability floor flatness

    Red list / ingredient impacts

    Experiences: Biophilic connection with nature

    Space planning impact Flexibility bay sizes

    Systems: Comfort improvement

    Systems: Daylighting impact

    Health/social impactSourcing practices

    CLT/DLT PANELS & TOPPING W/

    STEEL WF BEAMS& GIRDERS

    CONCRETE ON METALDECK W/ STEEL WF BEAMS &

    INTERMEDIATE SPAN GIRDERS

    CONCRETE PT SLAB

    CLT/DLT PANELS & TOPPING W/

    GLULAM BEAMS

    PRIOTIzE THE EMPLOYEE

    bRIDgE THE buILT & NATuRAL

    ENvIRONMENT

    DESIgN fOR LONgEvITY

    ExEMPLIfY OPERATIONAL ExCELLENCE

    bE MEMORAbLE

    TREAD LIgHTLY

    wALk (AND bIkE) THE TALk

    SHOwCASE MICROSOfT

    TECHNOLOgY

    ExCELLENT

    vERY gOOD

    gOOD

    fAIR

    POOR

    STRUCTURAL SYSTEM OPTIONS

    SYSTEMDESCRIPTION

    LATERAL SYSTEM OPTIONS

    / +/-30’ x +/-30’ column grid/ 5 1/2” thick concrete-filled metal deck / 16” to 21” deep wide flange beams/ Wide flange columns/ Fireproofed structure, if lightweight concrete fill no spray on soffit

    / Perimeter steel braced frames (conventional or BRBF)/ Moment frames/ Steel plate shear walls/ Concrete shear walls/ Dual systems

    / +/-25’ x +/-40’ column grid/ 2 1/4” - 3 1/2” concrete topping over 7 ply CLT panels or 2x10 DLT panels (total slab depth = 11 1/2”-13 1/2”)/ 18” to 24” deep wide flange beams/ Wide flange columns/ Varying amount of fireproofing con-crete fill no spray on soffit

    / Perimeter steel braced frames (conventional or BRBF)/ Interior shear wall cores/ Dual systems

    / +/-20’ x +/- 28’ column grid/ 2 1/4”-3 1/2”: concrete topping over 7 ply CLT panels or 2x10 DLT panels (total slab depth = 11 1/2”-13 1/2”)/ 30”-36” deep glulam beams/ Timber columns

    / Perimeter steel braced frames (conventional or BRBF)

    / +/-30’ x +/-30’ column grid/ 9” thick PT concrete slabs/ Concrete columns

    / Interior shear wall cores/ Dual systems

    Carbon leadership *(story potential)

    Efficient use of materials (quantity) Structural eight impacts on lateral system & foundation costs

    Energy performance impact

    Embodied carbon

    OPERATIONAL AND

    EMbODIED CARbON

    HEALTHY wORkPLACE Serviceability acoustics

    Serviceability vibration

    Serviceability floor flatness

    Red list / ingredient impacts

    Experiences: Biophilic connection with nature

    Space planning impact Flexibility bay sizes

    Systems: Comfort improvement

    Systems: Daylighting impact

    Health/social impactSourcing practices

    CLT/DLT PANELS & TOPPING W/

    STEEL WF BEAMS& GIRDERS

    CONCRETE ON METALDECK W/ STEEL WF BEAMS &

    INTERMEDIATE SPAN GIRDERS

    CONCRETE PT SLAB

    CLT/DLT PANELS & TOPPING W/

    GLULAM BEAMS

    PRIOTIzE THE EMPLOYEE

    bRIDgE THE buILT & NATuRAL

    ENvIRONMENT

    DESIgN fOR LONgEvITY

    ExEMPLIfY OPERATIONAL ExCELLENCE

    bE MEMORAbLE

    TREAD LIgHTLY

    wALk (AND bIkE) THE TALk

    SHOwCASE MICROSOfT

    TECHNOLOgY

    ExCELLENT

    vERY gOOD

    gOOD

    fAIR

    POOR

    STRUCTURAL SYSTEM OPTIONS

    SYSTEMDESCRIPTION

    LATERAL SYSTEM OPTIONS

    / +/-30’ x +/-30’ column grid/ 5 1/2” thick concrete-filled metal deck / 16” to 21” deep wide flange beams/ Wide flange columns/ Fireproofed structure, if lightweight concrete fill no spray on soffit

    / Perimeter steel braced frames (conventional or BRBF)/ Moment frames/ Steel plate shear walls/ Concrete shear walls/ Dual systems

    / +/-25’ x +/-40’ column grid/ 2 1/4” - 3 1/2” concrete topping over 7 ply CLT panels or 2x10 DLT panels (total slab depth = 11 1/2”-13 1/2”)/ 18” to 24” deep wide flange beams/ Wide flange columns/ Varying amount of fireproofing con-crete fill no spray on soffit

    / Perimeter steel braced frames (conventional or BRBF)/ Interior shear wall cores/ Dual systems

    / +/-20’ x +/- 28’ column grid/ 2 1/4”-3 1/2”: concrete topping over 7 ply CLT panels or 2x10 DLT panels (total slab depth = 11 1/2”-13 1/2”)/ 30”-36” deep glulam beams/ Timber columns

    / Perimeter steel braced frames (conventional or BRBF)

    / +/-30’ x +/-30’ column grid/ 9” thick PT concrete slabs/ Concrete columns

    / Interior shear wall cores/ Dual systems

    Carbon leadership *(story potential)

    Efficient use of materials (quantity) Structural eight impacts on lateral system & foundation costs

    Energy performance impact

    Embodied carbon

    OPERATIONAL AND

    EMbODIED CARbON

    HEALTHY wORkPLACE Serviceability acoustics

    Serviceability vibration

    Serviceability floor flatness

    Red list / ingredient impacts

    Experiences: Biophilic connection with nature

    Space planning impact Flexibility bay sizes

    Systems: Comfort improvement

    Systems: Daylighting impact

    Health/social impactSourcing practices

    CLT/DLT PANELS & TOPPING W/

    STEEL WF BEAMS& GIRDERS

    CONCRETE ON METALDECK W/ STEEL WF BEAMS &

    INTERMEDIATE SPAN GIRDERS

    CONCRETE PT SLAB

    CLT/DLT PANELS & TOPPING W/

    GLULAM BEAMS

    PRIOTIzE THE EMPLOYEE

    bRIDgE THE buILT & NATuRAL

    ENvIRONMENT

    DESIgN fOR LONgEvITY

    ExEMPLIfY OPERATIONAL ExCELLENCE

    bE MEMORAbLE

    TREAD LIgHTLY

    wALk (AND bIkE) THE TALk

    SHOwCASE MICROSOfT

    TECHNOLOgY

    ExCELLENT

    vERY gOOD

    gOOD

    fAIR

    POOR

    Sammamish Village

    Considerations - Structural Comparison

  • 28.50 16.75 28.5037.75

    28.50 16.75 28.5037.75

    28.50 16.75 28.5037.75

    10.3

    8

    16.75

    13.5

    0

    11.2

    912

    .75

    9.38

    13.5

    0

    37.75

    13.5

    0

    0.75

    28.50

    13.5

    0

    28.50

    Concrete PT Slab

    CLT/DLT Panels, Glulam Beams

    CLT/DLT Panels, Steel Beams

    Concrete on Metal Deck, Steel Beams

    L

    PHONE

    focus

    focus

    PHONE

    CO

    PY

    M

    Kitchen

    S

    S

    WCs

    PHONE

    PHONE

    PHONE

    PHONE

    SM

    Proj Team

    Proj Team

    Proj Team

    Proj Team

    S

    Wellness

    Proj Team

    Proj Team

    CO

    PY

    360.00

    18.75 13.0021.00 18.25 30.00

    30.00 15.25 21.00 15.25 30.00

    105.00

    30.00

    45.00

    150.00

    15.00

    19.00

    30.00

    255.00

    30.00

    Test-fit Plan : Concrete

    Test-fit Section : Concrete

    28.50 16.75 28.5037.75

    28.50 16.75 28.5037.75

    28.50 16.75 28.5037.75

    10.3

    8

    16.75

    13.5

    0

    11.2

    912

    .75

    9.38

    13.5

    0

    37.75

    13.5

    0

    0.75

    28.50

    13.5

    0

    28.50

    Concrete PT Slab

    CLT/DLT Panels, Glulam Beams

    CLT/DLT Panels, Steel Beams

    Concrete on Metal Deck, Steel Beams

    L

    PHONE

    focus

    focus

    PHONE

    CO

    PY

    M

    Kitchen

    S

    S

    WCs

    PHONE

    PHONE

    PHONE

    PHONE

    SM

    Proj Team

    Proj Team

    Proj Team

    Proj Team

    S

    Wellness

    Proj Team

    Proj Team

    CO

    PY

    Test-fit Plan : CLT / DLT & Glulam Beams

    Test-fit Section : CLT / DLT & Glulam Beams

    28.50 16.75 28.5037.75

    28.50 16.75 28.5037.75

    28.50 16.75 28.5037.75

    10.3

    8

    16.75

    13.5

    0

    11.2

    912

    .75

    9.38

    13.5

    0

    37.75

    13.5

    0

    0.75

    28.50

    13.5

    0

    28.50

    Concrete PT Slab

    CLT/DLT Panels, Glulam Beams

    CLT/DLT Panels, Steel Beams

    Concrete on Metal Deck, Steel Beams

    Proj Team

    Proj Team

    Proj Team

    S

    Wellness

    Proj Team

    Proj Team

    CO

    PY

    L

    PHONE

    focus

    focus

    PHONE

    CO

    PY

    M

    Kitchen

    S

    S

    WCs

    PHONE

    PHONE

    PHONE

    PHONE

    SM

    Proj Team

    36.25

    30.0015.00

    150.00

    45.00

    30.00

    105.00

    360.00

    255.00

    30.0015.2530.00

    30.0018.2519.0021.00 13.0018.7530.00

    Test-fit Plan : Steel

    Test-fit Section : Steel

    28.50 16.75 28.5037.75

    28.50 16.75 28.5037.75

    28.50 16.75 28.5037.75

    10.3

    8

    16.75

    13.5

    0

    11.2

    912

    .75

    9.38

    13.5

    0

    37.75

    13.5

    0

    0.75

    28.50

    13.5

    0

    28.50

    Concrete PT Slab

    CLT/DLT Panels, Glulam Beams

    CLT/DLT Panels, Steel Beams

    Concrete on Metal Deck, Steel Beams

    L

    PHONE

    focus

    focus

    PHONE

    CO

    PY

    M

    Kitchen

    S

    S

    WCs

    PHONE

    PHONE

    PHONE

    PHONE

    SM

    Proj Team

    Proj Team

    Proj Team

    Proj Team

    S

    Wellness

    Proj Team

    Proj Team

    CO

    PY

    Test-fit Plan : CLT / DLT & Steel Beams

    Test-fit Section : CLT / DLT & Steel Beams

    Sammamish Village

    Considerations - Structural Comparison

  • Sammamish Village

    Considerations - Use Type & Occupancy

    "A" Occupancy

    Less than or Equal to 4 floors

    L1

    L2

    L3

    L4

    "B" Occupancy

    Less than or Equal to 6 floors

    L1

    L2

    L3

    L4

    Sammamish:

    • Principally "B" Occupancy • Less than or Equal to 5 floors• Gathering spaces are below 750sf AND / OR• Gathering spaces are below 10% floor area

    L1

    L2

    L3

    L4

    L5

    L6

    L5

  • Sammamish Village

    Considerations - Fire Proofing

    Photo credit: Arup / thinkwood.com

  • Sammamish Village

    CLT or DLT?

    • DLT is a one-way span system, resulting in a greater span, with less depth, giving a taller floor to ceiling.

    • Electrical can be routed through the DLT Panel.

    • DLT Boards run perpendicular to the Glulam Beams, creating visual interest from below.

    • Design Team's aesthetic preferences.

  • Proposed System

  • 28.50 16.75 28.5037.75

    28.50 16.75 28.5037.75

    28.50 16.75 28.5037.75

    10.3

    8

    16.75

    13.5

    0

    11.2

    912

    .75

    9.38

    13.5

    0

    37.75

    13.5

    0

    0.75

    28.50

    13.5

    0

    28.50

    Concrete PT Slab

    CLT/DLT Panels, Glulam Beams

    CLT/DLT Panels, Steel Beams

    Concrete on Metal Deck, Steel Beams

    CLT / DLT & Steel Beams

    28.50 16.75 28.5037.75

    28.50 16.75 28.5037.75

    28.50 16.75 28.5037.75

    10.3

    8

    16.75

    13.5

    0

    11.2

    912

    .75

    9.38

    13.5

    0

    37.75

    13.5

    0

    0.75

    28.50

    13.5

    0

    28.50

    Concrete PT Slab

    CLT/DLT Panels, Glulam Beams

    CLT/DLT Panels, Steel Beams

    Concrete on Metal Deck, Steel Beams

    CLT / DLT & Glulam Beams

    Amenity "pop outs"

    "Living Rooms"

    Sammamish Village

    Proposed System

  • Mass Timber Deck with Concrete topping slab to create diaphragm / vibration control,Glulam Beams & Glulam Columns

    Post-tension flat Concrete Slab,Concrete Columns

    Sammamish Village

    Proposed System

  • LEVEL 1

    LEVEL 2

    LEVEL 3

    LEVEL 4

    LEVEL 5

    ROOF

    110'

    35'35'Sammamish Village

    Proposed System

  • O

    UOU

    NRG

    DTH

    EEL

    ERI

    N

    NC

    LP

    801 SECOND AVENUE, SUITE 900

    (206) 343-0460

    SEATTLE, WA 98104

    www.cplinc.com

    NOT FOR CONSTRUCTION

    Sheet Title/Number

    Status

    Senior Project Manager

    Development Manager

    Project Manager

    Quality Control Reviewer

    Quality Control FF&E

    No. Date

    Revisions

    Description

    M.S. Project No.

    ARCH. Project No.

    Microsoft Mechanical Engineer

    Microsoft Cable Engineer

    Microsoft Electrical Engineer

    Engineering Manager

    Security Manager

    Project Planner

    Project Manager

    FF&E

    CUSTOMER

    PROJECT MANAGEMENT

    Approvals

    OPERATIONS

    Checked

    Design

    Drawn

    Design Team

    Registration

    Date

    Date

    Issuance

    6/4/

    2019

    5:4

    6:01

    PM

    C:\R

    evit

    Loca

    l\201

    9\G

    7001

    2-34

    _S-S

    TRU

    _mat

    tm@

    cplin

    c.co

    m.rv

    t

    WOOD DETAILS

    S-F602

    CAMPUS MODERNIZATIONSAMMAMISH VILLAGE

    1 MICROSOFT WAY,REDMOND, WA 98052

    Designer

    MRM

    Checker

    S180025-02

    05/31/2019 70% DD

    BUILDING 215

    215

    1 2 3 4 5 6

    7 8 9 10 11 12

    13 14 15 16 17 18

    19 20 21 22 23 24

    25 26 27 28 29 30

    COLUMN BEYOND

    LEDGER Ù

    CONCRETE EDGE BEAMPER PLAN

    MASS TIMBER PANEL &CONCRETE TOPPINGPER PLAN

    STEEL EMBED @ 6'-0"oc

    COLUMNBEYOND

    TAPERED WT9 @5'-0"oc

    GUARDRAIL

    TIMBERDECKING

    24

    3030 3600

    31,32,33,34

    24 3601

    31,32,33,34

    12" column widthtbd

    Most

    likely

    will c

    hang

    e

    with o

    utloo

    k red

    esign

    12" column widthtbd

    POST/CONN.

    POST PER PLAN

    SLAB & REINF. PER PLAN

    KERF Ð" W/ (4)Ô"øBOLTS - ORIENT BOLTS INNORTH/SOUTH DIRECTION(COUNTERSINK BOLTS PER14/S601)

    STANDOFF 1" TOMATCH POST POSTDIMENSIONS

    EMBED Ð"x18"x1'-6"W/ (4)Ô"ø x 6" STUDS@ 12"oc EA. WAY

    Ì

    Ì

    (5)#5 x 4'-0" BOT. EA.WAY CTRD. ON POST EAST/WEST

    4"2" 2"

    2"4"

    4"

    4242 6801

    Î" MAX GAP.

    4"4"2"

    4"4"

    4"4"

    2"

    4"

    2" 4" 5" 2"4"

    4"

    2"

    11

    2

    2

    3

    BEAM PER PLAN

    INSTALL VERTICALLYORIENTED SHORT SLOTHOLES IN TOP ROW OF

    KERF Ð" W/ (8)Ô"øBOLTS (COUNTERSINK

    DAP BEAM FOR Ì

    BRG. Ô" x (BEAMWIDTH - 2") x (POST

    INSTALL VERT ORIENTEDSHORT SLOTTED HOLESIN TOP ROW

    KERF Ð" W/ (4)Ô"øBOLTS (COUNTERSINK

    KERF Ð" W/ (2)Ô"øBOLTS (COUNTERSINK

    POST

    BOLTS PER 14/S601)

    CONDITIONBEAMS ARE SAME DEPTH

    CONDITION AT BEAM ENDSSEE CONDITION FOR CALLOUTS IN COMMON

    BEARING Ô" x

    BEAM PER PLAN

    POST

    CONDITION TWO DIFFERENT BEAM DEPTHSSEE CONDITION FOR CALLOUTS IN COMMON

    (BEAM WIDTH - 3")

    'S & BOLTING PER14/S601 (CONDITION A)

    BOLTS PER 14/S601)KERF Ð" W/ (4)Ô"øBOLTS (COUNTERSINKBOLTS PER 14/S601)

    TOP 1" x (INCOMINGBEAM WIDTH - 3") (DAPBEAM FOR )

    POST

    WIDTH)

    POST PER PLANÌ

    cjp

    STOP TOP OF UPTURNEDBEAM PORTION PER19/S601 OR 20/S602 ATPOST FACE WHEREOCCURS

    BOLTS PER 14/S601)

    4"4"

    2"

    2" 4" 5"

    2" 2"

    35 6805

    35

    ls

    CONCRETE TOPPING& REINF. PER PLAN

    ACOUSTIC MAT PERARCH'L (WHERE OCCURS)

    DLT DECKING PERPLAN

    REDUCE DLT DEPTHFOR CHASE WHEREOCCURS PER MECH'L- 10" WIDE x 3" MAX.SIZE (SCREW REINF.PER DLT MFR. ASREQD.)

    Ð"x6" PLYWOOD SPLINEW/ 10d @ 8"oc EA. SIDEOF JOINT

    GAP PER DLT MFR.FOR WOODEXPANSION (Ô" MAX.)

    EXTEND REINF. PER42/S301

    CONSTRUCTION JOINTLOCATIONS TO BEDETERMINED BY CONTR.SUBMIT PROPOSED LOC.TO ENGINEER ANDARCHITECT FOR REVIEW &APPROVAL PRIOR TOPOURING SLAB

    TYPICAL DLT DECKING SPLINE 77 6800

    FOR CALL-OUTSIN COMMON SEEDETAIL

    1"

    BEAM PER PLAN

    (2) ROWS OF Î"ø x5Ð" SWG ASSY VGSCREWS @ 12"oc

    21/S601

    DLT DECKING SPLINE OVER BEAMDLT DECKING CONT. OVER BEAM

    BEAM BEAM

    1818 5808

    3" MIN.

    1"

    3/8"ø x 12Ò" SWGASSY 3.0 SCREWS @12"oc - EA. SIDE OFPANEL JOINT

    BEAM PER PLAN

    Ð" MAX. GAP

    DLT DECKING SPLINE OVER BEAMDLT DECKING CONT. OVER BEAM

    DLT DECKING &TOPPING PER PLAN(ORIENTATIONVARIES)

    PLYWOOD SPLINEPER 7/S601

    BEAM BEAM

    3/8"ø x 12Ò" SWGASSY 3.0 SCREWS @12"oc

    (2) ROWS OF Ì"ø x 5"SDS SCREWS @ 18"oc- STAGGER EA. SIDEOF JOINT

    Ì"ø x 5" SDS SCREWS@ 18"oc

    2121 6803

    8"

    EQ.

    EQ.

    5"

    EQ. 5" EQ.

    PLAN

    PLAN

    Ö"ø x 1'-0" THREADEDROD IN ×"ø HOLE

    Ð"x8"x0'-8" W/

    Ð" MIN., Ô" MAX. GROUT3"ø GROUTED HOLES

    SLAB PER PLAN

    (2)Ò"ø x 8" D2L'SÌ

    COLUMN PER PLAN (COUNTERSINK)

    COLUMN

    22No beam for thisproject

    wood block fastenedto ledger angle. steelcould be exposed ifpainted for a 1-hr firerating

    Sample Wood Details6.11.19

    O

    UOU

    NRG

    DTH

    EEL

    ERI

    N

    NC

    LP

    801 SECOND AVENUE, SUITE 900

    (206) 343-0460

    SEATTLE, WA 98104

    www.cplinc.com

    NOT FOR CONSTRUCTION

    Sheet Title/Number

    Status

    Senior Project Manager

    Development Manager

    Project Manager

    Quality Control Reviewer

    Quality Control FF&E

    No. Date

    Revisions

    Description

    M.S. Project No.

    ARCH. Project No.

    Microsoft Mechanical Engineer

    Microsoft Cable Engineer

    Microsoft Electrical Engineer

    Engineering Manager

    Security Manager

    Project Planner

    Project Manager

    FF&E

    CUSTOMER

    PROJECT MANAGEMENT

    Approvals

    OPERATIONS

    Checked

    Design

    Drawn

    Design Team

    Registration

    Date

    Date

    Issuance

    6/4/

    2019

    5:4

    6:01

    PM

    C:\R

    evit

    Loca

    l\201

    9\G

    7001

    2-34

    _S-S

    TRU

    _mat

    tm@

    cplin

    c.co

    m.rv

    t

    WOOD DETAILS

    S-F602

    CAMPUS MODERNIZATIONSAMMAMISH VILLAGE

    1 MICROSOFT WAY,REDMOND, WA 98052

    Designer

    MRM

    Checker

    S180025-02

    05/31/2019 70% DD

    BUILDING 215

    215

    1 2 3 4 5 6

    7 8 9 10 11 12

    13 14 15 16 17 18

    19 20 21 22 23 24

    25 26 27 28 29 30

    COLUMN BEYOND

    LEDGER Ù

    CONCRETE EDGE BEAMPER PLAN

    MASS TIMBER PANEL &CONCRETE TOPPINGPER PLAN

    STEEL EMBED @ 6'-0"oc

    COLUMNBEYOND

    TAPERED WT9 @5'-0"oc

    GUARDRAIL

    TIMBERDECKING

    24

    3030 3600

    31,32,33,34

    24 3601

    31,32,33,34

    12" column widthtbd

    Most

    likely

    will c

    hang

    e

    with o

    utloo

    k red

    esign

    12" column widthtbd

    POST/CONN.

    POST PER PLAN

    SLAB & REINF. PER PLAN

    KERF Ð" W/ (4)Ô"øBOLTS - ORIENT BOLTS INNORTH/SOUTH DIRECTION(COUNTERSINK BOLTS PER14/S601)

    STANDOFF 1" TOMATCH POST POSTDIMENSIONS

    EMBED Ð"x18"x1'-6"W/ (4)Ô"ø x 6" STUDS@ 12"oc EA. WAY

    Ì

    Ì

    (5)#5 x 4'-0" BOT. EA.WAY CTRD. ON POST EAST/WEST

    4"2" 2"

    2"4"

    4"

    4242 6801

    Î" MAX GAP.

    4"4"2"

    4"4"

    4"4"

    2"

    4"

    2" 4" 5" 2"4"

    4"

    2"

    11

    2

    2

    3

    BEAM PER PLAN

    INSTALL VERTICALLYORIENTED SHORT SLOTHOLES IN TOP ROW OF

    KERF Ð" W/ (8)Ô"øBOLTS (COUNTERSINK

    DAP BEAM FOR Ì

    BRG. Ô" x (BEAMWIDTH - 2") x (POST

    INSTALL VERT ORIENTEDSHORT SLOTTED HOLESIN TOP ROW

    KERF Ð" W/ (4)Ô"øBOLTS (COUNTERSINK

    KERF Ð" W/ (2)Ô"øBOLTS (COUNTERSINK

    POST

    BOLTS PER 14/S601)

    CONDITIONBEAMS ARE SAME DEPTH

    CONDITION AT BEAM ENDSSEE CONDITION FOR CALLOUTS IN COMMON

    BEARING Ô" x

    BEAM PER PLAN

    POST

    CONDITION TWO DIFFERENT BEAM DEPTHSSEE CONDITION FOR CALLOUTS IN COMMON

    (BEAM WIDTH - 3")

    'S & BOLTING PER14/S601 (CONDITION A)

    BOLTS PER 14/S601)KERF Ð" W/ (4)Ô"øBOLTS (COUNTERSINKBOLTS PER 14/S601)

    TOP 1" x (INCOMINGBEAM WIDTH - 3") (DAPBEAM FOR )

    POST

    WIDTH)

    POST PER PLANÌ

    cjp

    STOP TOP OF UPTURNEDBEAM PORTION PER19/S601 OR 20/S602 ATPOST FACE WHEREOCCURS

    BOLTS PER 14/S601)

    4"4"

    2"

    2" 4" 5"

    2" 2"

    35 6805

    35

    ls

    CONCRETE TOPPING& REINF. PER PLAN

    ACOUSTIC MAT PERARCH'L (WHERE OCCURS)

    DLT DECKING PERPLAN

    REDUCE DLT DEPTHFOR CHASE WHEREOCCURS PER MECH'L- 10" WIDE x 3" MAX.SIZE (SCREW REINF.PER DLT MFR. ASREQD.)

    Ð"x6" PLYWOOD SPLINEW/ 10d @ 8"oc EA. SIDEOF JOINT

    GAP PER DLT MFR.FOR WOODEXPANSION (Ô" MAX.)

    EXTEND REINF. PER42/S301

    CONSTRUCTION JOINTLOCATIONS TO BEDETERMINED BY CONTR.SUBMIT PROPOSED LOC.TO ENGINEER ANDARCHITECT FOR REVIEW &APPROVAL PRIOR TOPOURING SLAB

    TYPICAL DLT DECKING SPLINE 77 6800

    FOR CALL-OUTSIN COMMON SEEDETAIL

    1"

    BEAM PER PLAN

    (2) ROWS OF Î"ø x5Ð" SWG ASSY VGSCREWS @ 12"oc

    21/S601

    DLT DECKING SPLINE OVER BEAMDLT DECKING CONT. OVER BEAM

    BEAM BEAM

    1818 5808

    3" MIN.

    1"

    3/8"ø x 12Ò" SWGASSY 3.0 SCREWS @12"oc - EA. SIDE OFPANEL JOINT

    BEAM PER PLAN

    Ð" MAX. GAP

    DLT DECKING SPLINE OVER BEAMDLT DECKING CONT. OVER BEAM

    DLT DECKING &TOPPING PER PLAN(ORIENTATIONVARIES)

    PLYWOOD SPLINEPER 7/S601

    BEAM BEAM

    3/8"ø x 12Ò" SWGASSY 3.0 SCREWS @12"oc

    (2) ROWS OF Ì"ø x 5"SDS SCREWS @ 18"oc- STAGGER EA. SIDEOF JOINT

    Ì"ø x 5" SDS SCREWS@ 18"oc

    2121 6803

    8"

    EQ.

    EQ.

    5"

    EQ. 5" EQ.

    PLAN

    PLAN

    Ö"ø x 1'-0" THREADEDROD IN ×"ø HOLE

    Ð"x8"x0'-8" W/

    Ð" MIN., Ô" MAX. GROUT3"ø GROUTED HOLES

    SLAB PER PLAN

    (2)Ò"ø x 8" D2L'SÌ

    COLUMN PER PLAN (COUNTERSINK)

    COLUMN

    22No beam for thisproject

    wood block fastenedto ledger angle. steelcould be exposed ifpainted for a 1-hr firerating

    Sample Wood Details6.11.19

    O

    UOU

    NRG

    DTH

    EEL

    ERI

    N

    NC

    LP

    801 SECOND AVENUE, SUITE 900

    (206) 343-0460

    SEATTLE, WA 98104

    www.cplinc.com

    NOT FOR CONSTRUCTION

    Sheet Title/Number

    Status

    Senior Project Manager

    Development Manager

    Project Manager

    Quality Control Reviewer

    Quality Control FF&E

    No. Date

    Revisions

    Description

    M.S. Project No.

    ARCH. Project No.

    Microsoft Mechanical Engineer

    Microsoft Cable Engineer

    Microsoft Electrical Engineer

    Engineering Manager

    Security Manager

    Project Planner

    Project Manager

    FF&E

    CUSTOMER

    PROJECT MANAGEMENT

    Approvals

    OPERATIONS

    Checked

    Design

    Drawn

    Design Team

    Registration

    Date

    Date

    Issuance

    6/4/

    2019

    5:4

    6:01

    PM

    C:\R

    evit

    Loca

    l\201

    9\G

    7001

    2-34

    _S-S

    TRU

    _mat

    tm@

    cplin

    c.co

    m.rv

    t

    WOOD DETAILS

    S-F602

    CAMPUS MODERNIZATIONSAMMAMISH VILLAGE

    1 MICROSOFT WAY,REDMOND, WA 98052

    Designer

    MRM

    Checker

    S180025-02

    05/31/2019 70% DD

    BUILDING 215

    215

    1 2 3 4 5 6

    7 8 9 10 11 12

    13 14 15 16 17 18

    19 20 21 22 23 24

    25 26 27 28 29 30

    COLUMN BEYOND

    LEDGER Ù

    CONCRETE EDGE BEAMPER PLAN

    MASS TIMBER PANEL &CONCRETE TOPPINGPER PLAN

    STEEL EMBED @ 6'-0"oc

    COLUMNBEYOND

    TAPERED WT9 @5'-0"oc

    GUARDRAIL

    TIMBERDECKING

    24

    3030 3600

    31,32,33,34

    24 3601

    31,32,33,34

    12" column widthtbd

    Most

    likely

    will c

    hang

    e

    with o

    utloo

    k red

    esign

    12" column widthtbd

    POST/CONN.

    POST PER PLAN

    SLAB & REINF. PER PLAN

    KERF Ð" W/ (4)Ô"øBOLTS - ORIENT BOLTS INNORTH/SOUTH DIRECTION(COUNTERSINK BOLTS PER14/S601)

    STANDOFF 1" TOMATCH POST POSTDIMENSIONS

    EMBED Ð"x18"x1'-6"W/ (4)Ô"ø x 6" STUDS@ 12"oc EA. WAY

    Ì

    Ì

    (5)#5 x 4'-0" BOT. EA.WAY CTRD. ON POST EAST/WEST

    4"2" 2"

    2"4"

    4"

    4242 6801

    Î" MAX GAP.

    4"4"2"

    4"4"

    4"4"

    2"

    4"

    2" 4" 5" 2"4"

    4"

    2"

    11

    2

    2

    3

    BEAM PER PLAN

    INSTALL VERTICALLYORIENTED SHORT SLOTHOLES IN TOP ROW OF

    KERF Ð" W/ (8)Ô"øBOLTS (COUNTERSINK

    DAP BEAM FOR Ì

    BRG. Ô" x (BEAMWIDTH - 2") x (POST

    INSTALL VERT ORIENTEDSHORT SLOTTED HOLESIN TOP ROW

    KERF Ð" W/ (4)Ô"øBOLTS (COUNTERSINK

    KERF Ð" W/ (2)Ô"øBOLTS (COUNTERSINK

    POST

    BOLTS PER 14/S601)

    CONDITIONBEAMS ARE SAME DEPTH

    CONDITION AT BEAM ENDSSEE CONDITION FOR CALLOUTS IN COMMON

    BEARING Ô" x

    BEAM PER PLAN

    POST

    CONDITION TWO DIFFERENT BEAM DEPTHSSEE CONDITION FOR CALLOUTS IN COMMON

    (BEAM WIDTH - 3")

    'S & BOLTING PER14/S601 (CONDITION A)

    BOLTS PER 14/S601)KERF Ð" W/ (4)Ô"øBOLTS (COUNTERSINKBOLTS PER 14/S601)

    TOP 1" x (INCOMINGBEAM WIDTH - 3") (DAPBEAM FOR )

    POST

    WIDTH)

    POST PER PLANÌ

    cjp

    STOP TOP OF UPTURNEDBEAM PORTION PER19/S601 OR 20/S602 ATPOST FACE WHEREOCCURS

    BOLTS PER 14/S601)

    4"4"

    2"

    2" 4" 5"

    2" 2"

    35 6805

    35

    ls

    CONCRETE TOPPING& REINF. PER PLAN

    ACOUSTIC MAT PERARCH'L (WHERE OCCURS)

    DLT DECKING PERPLAN

    REDUCE DLT DEPTHFOR CHASE WHEREOCCURS PER MECH'L- 10" WIDE x 3" MAX.SIZE (SCREW REINF.PER DLT MFR. ASREQD.)

    Ð"x6" PLYWOOD SPLINEW/ 10d @ 8"oc EA. SIDEOF JOINT

    GAP PER DLT MFR.FOR WOODEXPANSION (Ô" MAX.)

    EXTEND REINF. PER42/S301

    CONSTRUCTION JOINTLOCATIONS TO BEDETERMINED BY CONTR.SUBMIT PROPOSED LOC.TO ENGINEER ANDARCHITECT FOR REVIEW &APPROVAL PRIOR TOPOURING SLAB

    TYPICAL DLT DECKING SPLINE 77 6800

    FOR CALL-OUTSIN COMMON SEEDETAIL

    1"

    BEAM PER PLAN

    (2) ROWS OF Î"ø x5Ð" SWG ASSY VGSCREWS @ 12"oc

    21/S601

    DLT DECKING SPLINE OVER BEAMDLT DECKING CONT. OVER BEAM

    BEAM BEAM

    1818 5808

    3" MIN.

    1"

    3/8"ø x 12Ò" SWGASSY 3.0 SCREWS @12"oc - EA. SIDE OFPANEL JOINT

    BEAM PER PLAN

    Ð" MAX. GAP

    DLT DECKING SPLINE OVER BEAMDLT DECKING CONT. OVER BEAM

    DLT DECKING &TOPPING PER PLAN(ORIENTATIONVARIES)

    PLYWOOD SPLINEPER 7/S601

    BEAM BEAM

    3/8"ø x 12Ò" SWGASSY 3.0 SCREWS @12"oc

    (2) ROWS OF Ì"ø x 5"SDS SCREWS @ 18"oc- STAGGER EA. SIDEOF JOINT

    Ì"ø x 5" SDS SCREWS@ 18"oc

    2121 6803

    8"

    EQ.

    EQ.

    5"

    EQ. 5" EQ.

    PLAN

    PLAN

    Ö"ø x 1'-0" THREADEDROD IN ×"ø HOLE

    Ð"x8"x0'-8" W/

    Ð" MIN., Ô" MAX. GROUT3"ø GROUTED HOLES

    SLAB PER PLAN

    (2)Ò"ø x 8" D2L'SÌ

    COLUMN PER PLAN (COUNTERSINK)

    COLUMN

    22No beam for thisproject

    wood block fastenedto ledger angle. steelcould be exposed ifpainted for a 1-hr firerating

    Sample Wood Details6.11.19

    28.50 16.75 28.5037.75

    28.50 16.75 28.5037.75

    28.50 16.75 28.5037.75

    10.3

    8

    16.75

    13.5

    0

    11.2

    912

    .75

    9.38

    13.5

    0

    37.75

    13.5

    0

    0.75

    28.50

    13.5

    0

    28.50

    Concrete PT Slab

    CLT/DLT Panels, Glulam Beams

    CLT/DLT Panels, Steel Beams

    Concrete on Metal Deck, Steel Beams

    DLT Deck with Concrete topping & Glulam Beams

    O

    UOU

    NRG

    DTH

    EEL

    ERI

    N

    NC

    LP

    801 SECOND AVENUE, SUITE 900

    (206) 343-0460

    SEATTLE, WA 98104

    www.cplinc.com

    NOT FOR CONSTRUCTION

    Sheet Title/Number

    Status

    Senior Project Manager

    Development Manager

    Project Manager

    Quality Control Reviewer

    Quality Control FF&E

    No. Date

    Revisions

    Description

    M.S. Project No.

    ARCH. Project No.

    Microsoft Mechanical Engineer

    Microsoft Cable Engineer

    Microsoft Electrical Engineer

    Engineering Manager

    Security Manager

    Project Planner

    Project Manager

    FF&E

    CUSTOMER

    PROJECT MANAGEMENT

    Approvals

    OPERATIONS

    Checked

    Design

    Drawn

    Design Team

    Registration

    Date

    Date

    Issuance

    6/4/

    2019

    5:4

    6:01

    PM

    C:\R

    evit

    Loca

    l\201

    9\G

    7001

    2-34

    _S-S

    TRU

    _mat

    tm@

    cplin

    c.co

    m.rv

    t

    WOOD DETAILS

    S-F602

    CAMPUS MODERNIZATIONSAMMAMISH VILLAGE

    1 MICROSOFT WAY,REDMOND, WA 98052

    Designer

    MRM

    Checker

    S180025-02

    05/31/2019 70% DD

    BUILDING 215

    215

    1 2 3 4 5 6

    7 8 9 10 11 12

    13 14 15 16 17 18

    19 20 21 22 23 24

    25 26 27 28 29 30

    COLUMN BEYOND

    LEDGER Ù

    CONCRETE EDGE BEAMPER PLAN

    MASS TIMBER PANEL &CONCRETE TOPPINGPER PLAN

    STEEL EMBED @ 6'-0"oc

    COLUMNBEYOND

    TAPERED WT9 @5'-0"oc

    GUARDRAIL

    TIMBERDECKING

    24

    3030 3600

    31,32,33,34

    24 3601

    31,32,33,34

    12" column widthtbd

    Most

    likely

    will c

    hang

    e

    with o

    utloo

    k red

    esign

    12" column widthtbd

    POST/CONN.

    POST PER PLAN

    SLAB & REINF. PER PLAN

    KERF Ð" W/ (4)Ô"øBOLTS - ORIENT BOLTS INNORTH/SOUTH DIRECTION(COUNTERSINK BOLTS PER14/S601)

    STANDOFF 1" TOMATCH POST POSTDIMENSIONS

    EMBED Ð"x18"x1'-6"W/ (4)Ô"ø x 6" STUDS@ 12"oc EA. WAY

    Ì

    Ì

    (5)#5 x 4'-0" BOT. EA.WAY CTRD. ON POST EAST/WEST

    4"2" 2"

    2"4"

    4"

    4242 6801

    Î" MAX GAP.

    4"4"2"4"

    4"

    4"4"

    2"

    4"

    2" 4" 5" 2"4"

    4"

    2"

    11

    2

    2

    3

    BEAM PER PLAN

    INSTALL VERTICALLYORIENTED SHORT SLOTHOLES IN TOP ROW OF

    KERF Ð" W/ (8)Ô"øBOLTS (COUNTERSINK

    DAP BEAM FOR Ì

    BRG. Ô" x (BEAMWIDTH - 2") x (POST

    INSTALL VERT ORIENTEDSHORT SLOTTED HOLESIN TOP ROW

    KERF Ð" W/ (4)Ô"øBOLTS (COUNTERSINK

    KERF Ð" W/ (2)Ô"øBOLTS (COUNTERSINK

    POST

    BOLTS PER 14/S601)

    CONDITIONBEAMS ARE SAME DEPTH

    CONDITION AT BEAM ENDSSEE CONDITION FOR CALLOUTS IN COMMON

    BEARING Ô" x

    BEAM PER PLAN

    POST

    CONDITION TWO DIFFERENT BEAM DEPTHSSEE CONDITION FOR CALLOUTS IN COMMON

    (BEAM WIDTH - 3")

    'S & BOLTING PER14/S601 (CONDITION A)

    BOLTS PER 14/S601)KERF Ð" W/ (4)Ô"øBOLTS (COUNTERSINKBOLTS PER 14/S601)

    TOP 1" x (INCOMINGBEAM WIDTH - 3") (DAPBEAM FOR )

    POST

    WIDTH)

    POST PER PLANÌ

    cjp

    STOP TOP OF UPTURNEDBEAM PORTION PER19/S601 OR 20/S602 ATPOST FACE WHEREOCCURS

    BOLTS PER 14/S601)

    4"4"

    2"

    2" 4" 5"

    2" 2"

    35 6805

    35

    ls

    CONCRETE TOPPING& REINF. PER PLAN

    ACOUSTIC MAT PERARCH'L (WHERE OCCURS)

    DLT DECKING PERPLAN

    REDUCE DLT DEPTHFOR CHASE WHEREOCCURS PER MECH'L- 10" WIDE x 3" MAX.SIZE (SCREW REINF.PER DLT MFR. ASREQD.)

    Ð"x6" PLYWOOD SPLINEW/ 10d @ 8"oc EA. SIDEOF JOINT

    GAP PER DLT MFR.FOR WOODEXPANSION (Ô" MAX.)

    EXTEND REINF. PER42/S301

    CONSTRUCTION JOINTLOCATIONS TO BEDETERMINED BY CONTR.SUBMIT PROPOSED LOC.TO ENGINEER ANDARCHITECT FOR REVIEW &APPROVAL PRIOR TOPOURING SLAB

    TYPICAL DLT DECKING SPLINE 77 6800

    FOR CALL-OUTSIN COMMON SEEDETAIL

    1"

    BEAM PER PLAN

    (2) ROWS OF Î"ø x5Ð" SWG ASSY VGSCREWS @ 12"oc

    21/S601

    DLT DECKING SPLINE OVER BEAMDLT DECKING CONT. OVER BEAM

    BEAM BEAM

    1818 5808

    3" MIN.

    1"

    3/8"ø x 12Ò" SWGASSY 3.0 SCREWS @12"oc - EA. SIDE OFPANEL JOINT

    BEAM PER PLAN

    Ð" MAX. GAP

    DLT DECKING SPLINE OVER BEAMDLT DECKING CONT. OVER BEAM

    DLT DECKING &TOPPING PER PLAN(ORIENTATIONVARIES)

    PLYWOOD SPLINEPER 7/S601

    BEAM BEAM

    3/8"ø x 12Ò" SWGASSY 3.0 SCREWS @12"oc

    (2) ROWS OF Ì"ø x 5"SDS SCREWS @ 18"oc- STAGGER EA. SIDEOF JOINT

    Ì"ø x 5" SDS SCREWS@ 18"oc

    2121 6803

    8"

    EQ.

    EQ.

    5"

    EQ. 5" EQ.

    PLAN

    PLAN

    Ö"ø x 1'-0" THREADEDROD IN ×"ø HOLE

    Ð"x8"x0'-8" W/

    Ð" MIN., Ô" MAX. GROUT3"ø GROUTED HOLES

    SLAB PER PLAN

    (2)Ò"ø x 8" D2L'SÌ

    COLUMN PER PLAN (COUNTERSINK)

    COLUMN

    22No beam for thisproject

    wood block fastenedto ledger angle. steelcould be exposed ifpainted for a 1-hr firerating

    Sample Wood Details6.11.19

    "Living Rooms"DLT & Glulam Beams Typical Details

    DLT to Concrete Connection Detail Sketch Glulam to Concrete Detail Sketch

    Sammamish Village

    Proposed System

  • O

    UOU

    NRG

    DTH

    EEL

    ERI

    N

    NC

    LP

    801 SECOND AVENUE, SUITE 900

    (206) 343-0460

    SEATTLE, WA 98104

    www.cplinc.com

    NOT FOR CONSTRUCTION

    Sheet Title/Number

    Status

    Senior Project Manager

    Development Manager

    Project Manager

    Quality Control Reviewer

    Quality Control FF&E

    No. Date

    Revisions

    Description

    M.S. Project No.

    ARCH. Project No.

    Microsoft Mechanical Engineer

    Microsoft Cable Engineer

    Microsoft Electrical Engineer

    Engineering Manager

    Security Manager

    Project Planner

    Project Manager

    FF&E

    CUSTOMER

    PROJECT MANAGEMENT

    Approvals

    OPERATIONS

    Checked

    Design

    Drawn

    Design Team

    Registration

    Date

    Date

    Issuance

    6/4/

    2019

    5:4

    6:01

    PM

    C:\R

    evit

    Loca

    l\201

    9\G

    7001

    2-34

    _S-S

    TRU

    _mat

    tm@

    cplin

    c.co

    m.rv

    t

    WOOD DETAILS

    S-F602

    CAMPUS MODERNIZATIONSAMMAMISH VILLAGE

    1 MICROSOFT WAY,REDMOND, WA 98052

    Designer

    MRM

    Checker

    S180025-02

    05/31/2019 70% DD

    BUILDING 215

    215

    1 2 3 4 5 6

    7 8 9 10 11 12

    13 14 15 16 17 18

    19 20 21 22 23 24

    25 26 27 28 29 30

    COLUMN BEYOND

    LEDGER Ù

    CONCRETE EDGE BEAMPER PLAN

    MASS TIMBER PANEL &CONCRETE TOPPINGPER PLAN

    STEEL EMBED @ 6'-0"oc

    COLUMNBEYOND

    TAPERED WT9 @5'-0"oc

    GUARDRAIL

    TIMBERDECKING

    24

    3030 3600

    31,32,33,34

    24 3601

    31,32,33,34

    12" column widthtbd

    Most

    likely

    will c

    hang

    e

    with o

    utloo

    k red

    esign

    12" column widthtbd

    POST/CONN.

    POST PER PLAN

    SLAB & REINF. PER PLAN

    KERF Ð" W/ (4)Ô"øBOLTS - ORIENT BOLTS INNORTH/SOUTH DIRECTION(COUNTERSINK BOLTS PER14/S601)

    STANDOFF 1" TOMATCH POST POSTDIMENSIONS

    EMBED Ð"x18"x1'-6"W/ (4)Ô"ø x 6" STUDS@ 12"oc EA. WAY

    Ì

    Ì

    (5)#5 x 4'-0" BOT. EA.WAY CTRD. ON POST EAST/WEST

    4"2" 2"

    2"4"

    4"

    4242 6801

    Î" MAX GAP.

    4"4"2"

    4"4"

    4"4"

    2"

    4"

    2" 4" 5" 2"4"

    4"

    2"

    11

    2

    2

    3

    BEAM PER PLAN

    INSTALL VERTICALLYORIENTED SHORT SLOTHOLES IN TOP ROW OF

    KERF Ð" W/ (8)Ô"øBOLTS (COUNTERSINK

    DAP BEAM FOR Ì

    BRG. Ô" x (BEAMWIDTH - 2") x (POST

    INSTALL VERT ORIENTEDSHORT SLOTTED HOLESIN TOP ROW

    KERF Ð" W/ (4)Ô"øBOLTS (COUNTERSINK

    KERF Ð" W/ (2)Ô"øBOLTS (COUNTERSINK

    POST

    BOLTS PER 14/S601)

    CONDITIONBEAMS ARE SAME DEPTH

    CONDITION AT BEAM ENDSSEE CONDITION FOR CALLOUTS IN COMMON

    BEARING Ô" x

    BEAM PER PLAN

    POST

    CONDITION TWO DIFFERENT BEAM DEPTHSSEE CONDITION FOR CALLOUTS IN COMMON

    (BEAM WIDTH - 3")

    'S & BOLTING PER14/S601 (CONDITION A)

    BOLTS PER 14/S601)KERF Ð" W/ (4)Ô"øBOLTS (COUNTERSINKBOLTS PER 14/S601)

    TOP 1" x (INCOMINGBEAM WIDTH - 3") (DAPBEAM FOR )

    POST

    WIDTH)

    POST PER PLANÌ

    cjp

    STOP TOP OF UPTURNEDBEAM PORTION PER19/S601 OR 20/S602 ATPOST FACE WHEREOCCURS

    BOLTS PER 14/S601)

    4"4"

    2"

    2" 4" 5"

    2" 2"

    35 6805

    35

    ls

    CONCRETE TOPPING& REINF. PER PLAN

    ACOUSTIC MAT PERARCH'L (WHERE OCCURS)

    DLT DECKING PERPLAN

    REDUCE DLT DEPTHFOR CHASE WHEREOCCURS PER MECH'L- 10" WIDE x 3" MAX.SIZE (SCREW REINF.PER DLT MFR. ASREQD.)

    Ð"x6" PLYWOOD SPLINEW/ 10d @ 8"oc EA. SIDEOF JOINT

    GAP PER DLT MFR.FOR WOODEXPANSION (Ô" MAX.)

    EXTEND REINF. PER42/S301

    CONSTRUCTION JOINTLOCATIONS TO BEDETERMINED BY CONTR.SUBMIT PROPOSED LOC.TO ENGINEER ANDARCHITECT FOR REVIEW &APPROVAL PRIOR TOPOURING SLAB

    TYPICAL DLT DECKING SPLINE 77 6800

    FOR CALL-OUTSIN COMMON SEEDETAIL

    1"

    BEAM PER PLAN

    (2) ROWS OF Î"ø x5Ð" SWG ASSY VGSCREWS @ 12"oc

    21/S601

    DLT DECKING SPLINE OVER BEAMDLT DECKING CONT. OVER BEAM

    BEAM BEAM

    1818 5808

    3" MIN.

    1"

    3/8"ø x 12Ò" SWGASSY 3.0 SCREWS @12"oc - EA. SIDE OFPANEL JOINT

    BEAM PER PLAN

    Ð" MAX. GAP

    DLT DECKING SPLINE OVER BEAMDLT DECKING CONT. OVER BEAM

    DLT DECKING &TOPPING PER PLAN(ORIENTATIONVARIES)

    PLYWOOD SPLINEPER 7/S601

    BEAM BEAM

    3/8"ø x 12Ò" SWGASSY 3.0 SCREWS @12"oc

    (2) ROWS OF Ì"ø x 5"SDS SCREWS @ 18"oc- STAGGER EA. SIDEOF JOINT

    Ì"ø x 5" SDS SCREWS@ 18"oc

    2121 6803

    8"

    EQ.

    EQ.

    5"

    EQ. 5" EQ.

    PLAN

    PLAN

    Ö"ø x 1'-0" THREADEDROD IN ×"ø HOLE

    Ð"x8"x0'-8" W/

    Ð" MIN., Ô" MAX. GROUT3"ø GROUTED HOLES

    SLAB PER PLAN

    (2)Ò"ø x 8" D2L'SÌ

    COLUMN PER PLAN (COUNTERSINK)

    COLUMN

    22No beam for thisproject

    wood block fastenedto ledger angle. steelcould be exposed ifpainted for a 1-hr firerating

    Sample Wood Details6.11.19

    O

    UOU

    NRG

    DTH

    EEL

    ERI

    N

    NC

    LP

    801 SECOND AVENUE, SUITE 900

    (206) 343-0460

    SEATTLE, WA 98104

    www.cplinc.com

    NOT FOR CONSTRUCTION

    Sheet Title/Number

    Status

    Senior Project Manager

    Development Manager

    Project Manager

    Quality Control Reviewer

    Quality Control FF&E

    No. Date

    Revisions

    Description

    M.S. Project No.

    ARCH. Project No.

    Microsoft Mechanical Engineer

    Microsoft Cable Engineer

    Microsoft Electrical Engineer

    Engineering Manager

    Security Manager

    Project Planner

    Project Manager

    FF&E

    CUSTOMER

    PROJECT MANAGEMENT

    Approvals

    OPERATIONS

    Checked

    Design

    Drawn

    Design Team

    Registration

    Date

    Date

    Issuance

    6/4/

    2019

    5:4

    6:01

    PM

    C:\R

    evit

    Loca

    l\201

    9\G

    7001

    2-34

    _S-S

    TRU

    _mat

    tm@

    cplin

    c.co

    m.rv

    t

    WOOD DETAILS

    S-F602

    CAMPUS MODERNIZATIONSAMMAMISH VILLAGE

    1 MICROSOFT WAY,REDMOND, WA 98052

    Designer

    MRM

    Checker

    S180025-02

    05/31/2019 70% DD

    BUILDING 215

    215

    1 2 3 4 5 6

    7 8 9 10 11 12

    13 14 15 16 17 18

    19 20 21 22 23 24

    25 26 27 28 29 30

    COLUMN BEYOND

    LEDGER Ù

    CONCRETE EDGE BEAMPER PLAN

    MASS TIMBER PANEL &CONCRETE TOPPINGPER PLAN

    STEEL EMBED @ 6'-0"oc

    COLUMNBEYOND

    TAPERED WT9 @5'-0"oc

    GUARDRAIL

    TIMBERDECKING

    24

    3030 3600

    31,32,33,34

    24 3601

    31,32,33,34

    12" column widthtbd

    Most

    likely

    will c

    hang

    e

    with o

    utloo

    k red

    esign

    12" column widthtbd

    POST/CONN.

    POST PER PLAN

    SLAB & REINF. PER PLAN

    KERF Ð" W/ (4)Ô"øBOLTS - ORIENT BOLTS INNORTH/SOUTH DIRECTION(COUNTERSINK BOLTS PER14/S601)

    STANDOFF 1" TOMATCH POST POSTDIMENSIONS

    EMBED Ð"x18"x1'-6"W/ (4)Ô"ø x 6" STUDS@ 12"oc EA. WAY

    Ì

    Ì

    (5)#5 x 4'-0" BOT. EA.WAY CTRD. ON POST EAST/WEST

    4"2" 2"

    2"4"

    4"

    4242 6801

    Î" MAX GAP.

    4"4"2"

    4"4"

    4"4"

    2"

    4"

    2" 4" 5" 2"4"

    4"

    2"

    11

    2

    2

    3

    BEAM PER PLAN

    INSTALL VERTICALLYORIENTED SHORT SLOTHOLES IN TOP ROW OF

    KERF Ð" W/ (8)Ô"øBOLTS (COUNTERSINK

    DAP BEAM FOR Ì

    BRG. Ô" x (BEAMWIDTH - 2") x (POST

    INSTALL VERT ORIENTEDSHORT SLOTTED HOLESIN TOP ROW

    KERF Ð" W/ (4)Ô"øBOLTS (COUNTERSINK

    KERF Ð" W/ (2)Ô"øBOLTS (COUNTERSINK

    POST

    BOLTS PER 14/S601)

    CONDITIONBEAMS ARE SAME DEPTH

    CONDITION AT BEAM ENDSSEE CONDITION FOR CALLOUTS IN COMMON

    BEARING Ô" x

    BEAM PER PLAN

    POST

    CONDITION TWO DIFFERENT BEAM DEPTHSSEE CONDITION FOR CALLOUTS IN COMMON

    (BEAM WIDTH - 3")

    'S & BOLTING PER14/S601 (CONDITION A)

    BOLTS PER 14/S601)KERF Ð" W/ (4)Ô"øBOLTS (COUNTERSINKBOLTS PER 14/S601)

    TOP 1" x (INCOMINGBEAM WIDTH - 3") (DAPBEAM FOR )

    POST

    WIDTH)

    POST PER PLANÌ

    cjp

    STOP TOP OF UPTURNEDBEAM PORTION PER19/S601 OR 20/S602 ATPOST FACE WHEREOCCURS

    BOLTS PER 14/S601)

    4"4"

    2"

    2" 4" 5"

    2" 2"

    35 6805

    35

    ls

    CONCRETE TOPPING& REINF. PER PLAN

    ACOUSTIC MAT PERARCH'L (WHERE OCCURS)

    DLT DECKING PERPLAN

    REDUCE DLT DEPTHFOR CHASE WHEREOCCURS PER MECH'L- 10" WIDE x 3" MAX.SIZE (SCREW REINF.PER DLT MFR. ASREQD.)

    Ð"x6" PLYWOOD SPLINEW/ 10d @ 8"oc EA. SIDEOF JOINT

    GAP PER DLT MFR.FOR WOODEXPANSION (Ô" MAX.)

    EXTEND REINF. PER42/S301

    CONSTRUCTION JOINTLOCATIONS TO BEDETERMINED BY CONTR.SUBMIT PROPOSED LOC.TO ENGINEER ANDARCHITECT FOR REVIEW &APPROVAL PRIOR TOPOURING SLAB

    TYPICAL DLT DECKING SPLINE 77 6800

    FOR CALL-OUTSIN COMMON SEEDETAIL

    1"

    BEAM PER PLAN

    (2) ROWS OF Î"ø x5Ð" SWG ASSY VGSCREWS @ 12"oc

    21/S601

    DLT DECKING SPLINE OVER BEAMDLT DECKING CONT. OVER BEAM

    BEAM BEAM

    1818 5808

    3" MIN.

    1"

    3/8"ø x 12Ò" SWGASSY 3.0 SCREWS @12"oc - EA. SIDE OFPANEL JOINT

    BEAM PER PLAN

    Ð" MAX. GAP

    DLT DECKING SPLINE OVER BEAMDLT DECKING CONT. OVER BEAM

    DLT DECKING &TOPPING PER PLAN(ORIENTATIONVARIES)

    PLYWOOD SPLINEPER 7/S601

    BEAM BEAM

    3/8"ø x 12Ò" SWGASSY 3.0 SCREWS @12"oc

    (2) ROWS OF Ì"ø x 5"SDS SCREWS @ 18"oc- STAGGER EA. SIDEOF JOINT

    Ì"ø x 5" SDS SCREWS@ 18"oc

    2121 6803

    8"

    EQ.

    EQ.

    5"

    EQ. 5" EQ.

    PLAN

    PLAN

    Ö"ø x 1'-0" THREADEDROD IN ×"ø HOLE

    Ð"x8"x0'-8" W/

    Ð" MIN., Ô" MAX. GROUT3"ø GROUTED HOLES

    SLAB PER PLAN

    (2)Ò"ø x 8" D2L'SÌ

    COLUMN PER PLAN (COUNTERSINK)

    COLUMN

    22No beam for thisproject

    wood block fastenedto ledger angle. steelcould be exposed ifpainted for a 1-hr firerating

    Sample Wood Details6.11.19

    28.50 16.75 28.5037.75

    28.50 16.75 28.5037.75

    28.50 16.75 28.5037.75

    10.3

    8

    16.75

    13.5

    0

    11.2

    912

    .75

    9.38

    13.5

    0

    37.75

    13.5

    0

    0.75

    28.50

    13.5

    0

    28.50

    Concrete PT Slab

    CLT/DLT Panels, Glulam Beams

    CLT/DLT Panels, Steel Beams

    Concrete on Metal Deck, Steel Beams

    Amenity "pop outs"

    DLT Deck with Concrete topping & Steel Beams

    DLT & Steel Beam Typical Details

    Sammamish Village

    Proposed System

  • Questions?

    Tim J. Whitcombe, RIBA, LEED® Green Assoc. NBBJ Senior Associate / Architect

    [email protected]+1. 206.223.5220www.nbbj.com@nbbjdesign

    O

    UOU

    NRG

    DTH

    EEL

    ERI

    N

    NC

    LP

    801 SECOND AVENUE, SUITE 900

    (206) 343-0460

    SEATTLE, WA 98104

    www.cplinc.com

    NOT FOR CONSTRUCTION

    Sheet Title/Number

    Status

    Senior Project Manager

    Development Manager

    Project Manager

    Quality Control Reviewer

    Quality Control FF&E

    No. Date

    Revisions

    Description

    M.S. Project No.

    ARCH. Project No.

    Microsoft Mechanical Engineer

    Microsoft Cable Engineer

    Microsoft Electrical Engineer

    Engineering Manager

    Security Manager

    Project Planner

    Project Manager

    FF&E

    CUSTOMER

    PROJECT MANAGEMENT

    Approvals

    OPERATIONS

    Checked

    Design

    Drawn

    Design Team

    Registration

    Date

    Date

    Issuance

    6/4/

    2019

    5:4

    6:01

    PM

    C:\R

    evit

    Loca

    l\201

    9\G

    7001

    2-34

    _S-S

    TRU

    _mat

    tm@

    cplin

    c.co

    m.rv

    t

    WOOD DETAILS

    S-F602

    CAMPUS MODERNIZATIONSAMMAMISH VILLAGE

    1 MICROSOFT WAY,REDMOND, WA 98052

    Designer

    MRM

    Checker

    S180025-02

    05/31/2019 70% DD

    BUILDING 215

    215

    1 2 3 4 5 6

    7 8 9 10 11 12

    13 14 15 16 17 18

    19 20 21 22 23 24

    25 26 27 28 29 30

    COLUMN BEYOND

    LEDGER Ù

    CONCRETE EDGE BEAMPER PLAN

    MASS TIMBER PANEL &CONCRETE TOPPINGPER PLAN

    STEEL EMBED @ 6'-0"oc

    COLUMNBEYOND

    TAPERED WT9 @5'-0"oc

    GUARDRAIL

    TIMBERDECKING

    24

    3030 3600

    31,32,33,34

    24 3601

    31,32,33,34

    12" column widthtbd

    Most

    likely

    will c

    hang

    e

    with o

    utloo

    k red

    esign

    12" column widthtbd

    POST/CONN.

    POST PER PLAN

    SLAB & REINF. PER PLAN

    KERF Ð" W/ (4)Ô"øBOLTS - ORIENT BOLTS INNORTH/SOUTH DIRECTION(COUNTERSINK BOLTS PER14/S601)

    STANDOFF 1" TOMATCH POST POSTDIMENSIONS

    EMBED Ð"x18"x1'-6"W/ (4)Ô"ø x 6" STUDS@ 12"oc EA. WAY

    Ì

    Ì

    (5)#5 x 4'-0" BOT. EA.WAY CTRD. ON POST EAST/WEST

    4"2" 2"

    2"4"

    4"

    4242 6801

    Î" MAX GAP.

    4"4"2"

    4"4"

    4"4"

    2"

    4"

    2" 4" 5" 2"4"

    4"

    2"

    11

    2

    2

    3

    BEAM PER PLAN

    INSTALL VERTICALLYORIENTED SHORT SLOTHOLES IN TOP ROW OF

    KERF Ð" W/ (8)Ô"øBOLTS (COUNTERSINK

    DAP BEAM FOR Ì

    BRG. Ô" x (BEAMWIDTH - 2") x (POST

    INSTALL VERT ORIENTEDSHORT SLOTTED HOLESIN TOP ROW

    KERF Ð" W/ (4)Ô"øBOLTS (COUNTERSINK

    KERF Ð" W/ (2)Ô"øBOLTS (COUNTERSINK

    POST

    BOLTS PER 14/S601)

    CONDITIONBEAMS ARE SAME DEPTH

    CONDITION AT BEAM ENDSSEE CONDITION FOR CALLOUTS IN COMMON

    BEARING Ô" x

    BEAM PER PLAN

    POST

    CONDITION TWO DIFFERENT BEAM DEPTHSSEE CONDITION FOR CALLOUTS IN COMMON

    (BEAM WIDTH - 3")

    'S & BOLTING PER14/S601 (CONDITION A)

    BOLTS PER 14/S601)KERF Ð" W/ (4)Ô"øBOLTS (COUNTERSINKBOLTS PER 14/S601)

    TOP 1" x (INCOMINGBEAM WIDTH - 3") (DAPBEAM FOR )

    POST

    WIDTH)

    POST PER PLANÌ

    cjp

    STOP TOP OF UPTURNEDBEAM PORTION PER19/S601 OR 20/S602 ATPOST FACE WHEREOCCURS

    BOLTS PER 14/S601)

    4"4"

    2"

    2" 4" 5"

    2" 2"

    35 6805

    35

    ls

    CONCRETE TOPPING& REINF. PER PLAN

    ACOUSTIC MAT PERARCH'L (WHERE OCCURS)

    DLT DECKING PERPLAN

    REDUCE DLT DEPTHFOR CHASE WHEREOCCURS PER MECH'L- 10" WIDE x 3" MAX.SIZE (SCREW REINF.PER DLT MFR. ASREQD.)

    Ð"x6" PLYWOOD SPLINEW/ 10d @ 8"oc EA. SIDEOF JOINT

    GAP PER DLT MFR.FOR WOODEXPANSION (Ô" MAX.)

    EXTEND REINF. PER42/S301

    CONSTRUCTION JOINTLOCATIONS TO BEDETERMINED BY CONTR.SUBMIT PROPOSED LOC.TO ENGINEER ANDARCHITECT FOR REVIEW &APPROVAL PRIOR TOPOURING SLAB

    TYPICAL DLT DECKING SPLINE 77 6800

    FOR CALL-OUTSIN COMMON SEEDETAIL

    1"

    BEAM PER PLAN

    (2) ROWS OF Î"ø x5Ð" SWG ASSY VGSCREWS @ 12"oc

    21/S601

    DLT DECKING SPLINE OVER BEAMDLT DECKING CONT. OVER BEAM

    BEAM BEAM

    1818 5808

    3" MIN.

    1"

    3/8"ø x 12Ò" SWGASSY 3.0 SCREWS @12"oc - EA. SIDE OFPANEL JOINT

    BEAM PER PLAN

    Ð" MAX. GAP

    DLT DECKING SPLINE OVER BEAMDLT DECKING CONT. OVER BEAM

    DLT DECKING &TOPPING PER PLAN(ORIENTATIONVARIES)

    PLYWOOD SPLINEPER 7/S601

    BEAM BEAM

    3/8"ø x 12Ò" SWGASSY 3.0 SCREWS @12"oc

    (2) ROWS OF Ì"ø x 5"SDS SCREWS @ 18"oc- STAGGER EA. SIDEOF JOINT

    Ì"ø x 5" SDS SCREWS@ 18"oc

    2121 6803

    8"

    EQ.

    EQ.

    5"

    EQ. 5" EQ.

    PLAN

    PLAN

    Ö"ø x 1'-0" THREADEDROD IN ×"ø HOLE

    Ð"x8"x0'-8" W/

    Ð" MIN., Ô" MAX. GROUT3"ø GROUTED HOLES

    SLAB PER PLAN

    (2)Ò"ø x 8" D2L'SÌ

    COLUMN PER PLAN (COUNTERSINK)

    COLUMN

    22No beam for thisproject

    wood block fastenedto ledger angle. steelcould be exposed ifpainted for a 1-hr firerating

    Sample Wood Details6.11.19