north-south cycle superhighway (cs6) section 1 ... super… · north-south cycle superhighway...

9
C a l l u m G r a n t c a l l u m 8 3 @ g m a i l . c o m | 0 7 7 3 9 6 4 3 0 9 5 | 8 C a l d e r s t o n e s A v e n u e , A l l e r t o n , L i v e r p o o l , L 1 8 6 H X . D O B : 0 7 / 0 3 / 1 9 8 3 C a l l u m G r a n t c a l l u m 8 3 @ g m a i l . c o m | 0 7 7 3 9 6 4 3 0 9 5 | 8 C a l d e r s t o n e s A v e n u e , A l l e r t o n , L i v e r p o o l , L 1 8 6 H X . D O B : 0 7 / 0 3 / 1 9 8 3 C a l l u m G r a n t c a l l u m 8 3 @ g m a i l . c o m | 0 7 7 3 9 6 4 3 0 9 5 | 8 C a l d e r s t o n e s A v e n u e , A l l e r t o n , L i v e r p o o l , L 1 8 6 H X . D O B : 0 7 / 0 3 / 1 9 8 3 BUS STOP BUS STOP BUS STOP BUS STOP TAXI TAXIS TAXIS BUS STOP DISABLED CS6 SOLO MOTORCYCLES ONLY SOLO MOTORCYCLES ONLY SOLO MOTORCYCLES ONLY CS6 CS6 North-South Cycle Superhighway (CS6) Section 1 - Farringdon Street A P P Santander Cycle Hire docking station Signalised pedestrian or pedestrian/cycle crossing Contrasting coloured surface at informal crossing New footway or traffic island North-South Cycle Superhighway Existing footway or traffic island New road markings Trees Development not part of consultation Existing road markings Existing kerbline removed Key: Bus stop New cycle parking P A Section A-A ST. BRIDE STREET HARP ALLEY OLD FLEET LANE BEAR ALLEY FARRINGDON STREET FARRINGDON STREET NEWCASTLE CLOSE TURNAGAIN LANE STONECUTTER STREET Loading /disabled bay Stonecutter Street closed for traffic. Area impacted by another development - not part of this consultation Consulate parking bay Bus stop bypass for cyclists Existing loading / disabled bay Existing taxi parking bay Relocated motorcycle parking Relocated taxi parking bay Stepped cycle track Stepped cycle track Existing disabled bay Signalised cycle crossing Continued on Section 2 North - South Cycle Superhighway continues south to Elephant & Castle (in construction) CS6 CS6 CS6 Direction of Cycle Superhighway CS6

Upload: others

Post on 08-Aug-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: North-South Cycle Superhighway (CS6) Section 1 ... Super… · North-South Cycle Superhighway Existing footway or traffic island New road markings Trees Existing road markings Existing

C allum G rant c allum83@g mail.c om | 07739643095 | 8 C alders tones A v enue, A llerton, L iv erpool, L 18

6HX . D O B : 07/03/1983

C allum G rant c allum83@g mail.c om | 07739643095 | 8 C alders tones A v enue, A llerton, L iv erpool, L 18

6HX . D O B : 07/03/1983

C allum G rant c allum83@g mail.c om | 07739643095 | 8 C alders tones A v enue, A llerton, L iv erpool, L 18

6HX . D O B : 07/03/1983

BUS STOP

BUS STOPBUS STOP

BUS STOP

TAXI

TAXISTAXIS

BUS STOP

DISABLED

CS6

SOLO MOTORCYCLES ONLY

SOLO MOTORCYCLES ONLY

SOLO MOTORCYCLES ONLY

CS6

CS6

North-South Cycle Superhighway (CS6)Section 1 - Farringdon Street

A

PP

Santander Cycle Hire docking station

Signalised pedestrian or pedestrian/cycle crossing

Contrasting coloured surface at informal crossing

New footway or traffic island

North-South Cycle Superhighway

Existing footway or traffic island

New road markings

Trees

Development not part of consultation

Existing road markings

Existing kerbline removed

Key:

Bus stop

New cycle parkingP

A

Section A-A

ST. BRIDE STREET

HARP ALLEY

OLD FLEET LANE

BEAR ALLEY

FARRINGDON STREET

FARRINGDON STREET

NEWCASTLE CLOSE

TURNAGAIN LANE

STONECUTTER STREET

Loading /disabled bay

Stonecutter Street closed for traffic. Area impacted by another development - not part of this consultation

Consulate parking bay Bus stop bypass for cyclists

Existing loading /disabled bay

Existing taxi parking bay

Relocated motorcycle parking

Relocated taxi parking bay

Stepped cycle track

Stepped cycle track

Existing disabled bay Signalised cycle crossing

Continued on Section 2

Nor

th -

Sout

h C

ycle

Sup

erhi

ghw

ay c

ontin

ues

sout

h to

Ele

phan

t & C

astle

(in

cons

truc

tion)

CS6

CS6

CS6

Direction of Cycle SuperhighwayCS6

Page 2: North-South Cycle Superhighway (CS6) Section 1 ... Super… · North-South Cycle Superhighway Existing footway or traffic island New road markings Trees Existing road markings Existing

HOLB

ORN V

IADU

CT

LOAD

ING

ONLY

MM

KT1

BUS STOPBUS STOP

BUS STOPBUS STOP

BUS STOPBUS STOP

BUS STOPBUS STOP

CLEAR

KEEP

W

W

North-South Cycle Superhighway (CS6)Section 2 - Farringdon Street

Signalised pedestrian or pedestrian/cycle crossing

Area overrunable by traffic

New footway or traffic island

North-South Cycle Superhighway

Existing footway or traffic island

New road markings

Trees

Development not part of consultation

Existing road markings

Existing kerbline removed

Key:

Bus stop

New cycle parkingP

Contrasting coloured surface at informal crossing

P

Smithfield Market

PLUM

TREE

COUR

T

FARRINGDON STREET

SHOE LANE

FARRINGDON ROAD

CHARTERHOUSE STREET

CHARTERHOUSE STREET

WEST SMITHFIELD

SNOW HILL

HOLB

ORN VI

ADUCT

Relocated taxi bay New bus stop bypassfor cyclists

New bus stop bypassfor cyclists

Waiting areas for right turning cyclists

Early release signals for cyclists on all arms

Loading bay removed

Banned right turn into Charterhouse Street (West)

New signalised pedestrian crossingsacross all arms

Cyclists run with ahead traffic to maximise green time.Turning traffic held back

Loading / disabled bay Parking bay removed

Gaps in segregation to allow connection with Central London Grid, on West Smithfield

Stepped cycle tracksLoading / disabled bay

Continued on Section 3

Connection to proposed Central London Grid- not part of this consultation

Con

tinue

d on

Sec

tion

1

Direction of Cycle SuperhighwayCS6

CS6

CS6

Page 3: North-South Cycle Superhighway (CS6) Section 1 ... Super… · North-South Cycle Superhighway Existing footway or traffic island New road markings Trees Existing road markings Existing

BUS STOP

BUS STOP

BUS STOP

BUS STOP

BUS STOP

BUS STOP

CS6

CS6

BUSLANE

CS6

CS6

CS6

CAR

CLUB

ONL

Y

SOLO MOTORCYCLES ONLY

SOLO MOTORCYCLES ONLY

SOLO MOTORCYCLES ONLY

SOLO MOTORCYCLES ONLY

SOLO MOTORCYCLES ONLY

CAR

CLUB

ONL

Y

LOADING

ONLY

FARRINGDON ROAD

SAFFRON HILL

KIRBY STREET

FARRINGDON ROAD

COWCROSS STREET

GREVILLE STREET

LILY PLACE

ST CROSS STREET

GREVILLE STREET

GREVILLE STREET

North-South route continues northboundon Saffron Hill via Greville Street

Segregated cycle tracks

Area impacted by Farringdon Crossrail development - not part of this consultation

Greville Street closed for traffic between Saffron Hill and Farringdon Road

Stepped cycle track

Loading bay removed

New toucan crossing for pedestrians and cyclists

Motorcycle and parking bays relocated to west side

Short section of St Cross Street converted to one-way eastbound

Increased waiting and loading restrictions

Greville Street and Saffron Hill vehicle access only to reduce through traffic

Reverse one-way direction of Kirby Street to northbound

New loading bay

Con

tinue

d on

Sec

tion

2C

ontinued on Section 4C

ontinued on Section 4

Junction priorities changed

CS6

CS6

CS6

CS6

Direction of Cycle SuperhighwayCS6

CS6

CS6

Signalised pedestrian or pedestrian/cycle crossing

New footway or traffic island

North-South Cycle Superhighway

Existing footway or traffic island

New road markings

Trees

Existing road markings

Existing kerbline removed

Key:

Underground station

Bus stop

National Rail Station

New cycle parkingP

Development not part of consultation

North-South Cycle Superhighway (CS6)Section 3 - Farringdon Road and Saffron Hill

Farringdon Station

Pub

P

For detailed changes to parking, waiting and loading restrictions see accompanying text

Page 4: North-South Cycle Superhighway (CS6) Section 1 ... Super… · North-South Cycle Superhighway Existing footway or traffic island New road markings Trees Existing road markings Existing

CS6

BUSLANE

CS6

BUS

BUS STOP

BUS STOP

BUS STOP

BUSSTOP

STOP

SOLO MOTORCYCLES ONLYDISABLED

PERMIT HOLDER ONLY

CAR

CLUB

ONL

Y

CAR

CLUB

ONL

Y

B

B

CLEARKEEP

CLEARKEEP

FARRINGDON ROAD

ONSLOW STREET

SAFFRON HILL

FARRINGDON ROADFARRINGDON ROAD

HERBAL HILL

ST CROSS STREET

SAFFRON STREET

HATTON WALL

CLER

KENW

ELL R

OAD

CLER

KENW

ELL R

OAD

CLER

KENW

ELL R

OAD

SAFFRON STREET

Relocated bus stop

Footway narrowed

Stepped cycle track

Stepped cycle track

Stepped cycle track

Southbound bus lane removed

Waiting areas for turning cyclists

Early release signals for cyclists on all arms

Banned left turn into Clerkenwell Road (east) except cyclists

Banned left turn into Farringdon Road (north) except cyclists

Relocated bus stop

Relocated bus stop

Zebra crossing removed

Wider footway with cycle-only junction bypass

Loading/ disabled bayshortened by 16 metres

Cont

inue

d on

Sec

tion

3

Continued on Section 5

Continued on Section 5

Connection to proposed Central London Grid- not part of this consultation

Removed parkingCS6

CS6

CS6

CS6

Direction of Cycle SuperhighwayCS6

Signalised pedestrian or pedestrian/cycle crossing

New footway or traffic island

North-South Cycle Superhighway

Existing footway or traffic island

New road markings

Trees

Existing road markings

Existing kerbline removed

Key:

Bus stop

Bus stop removed or relocated

North-South Cycle Superhighway (CS6)Section 4 - Farringdon Road and Saffron Hill

New signalised junction with pedestrian crossing raised to footway level

Early release signals for cyclists

Section B-B

For detailed changes to parking, waiting and loading restrictions see accompanying text

Page 5: North-South Cycle Superhighway (CS6) Section 1 ... Super… · North-South Cycle Superhighway Existing footway or traffic island New road markings Trees Existing road markings Existing

CS6

CLEARKEEP

CS6

CS6

CS6

North-South Cycle Superhighway (CS6)Section 5 - Farringdon Road, Ray Street, Herbal Hill and Warner Street

RAY STREET BRIDGE

RAY STREET

WARNER STREETWARNER STREET

CRAWFORD PASSAGE

HERBAL HILL

FARRINGDON LANE

FARRINGDON LANE

FARRINGDON ROAD

FARRINGDON ROAD

FARRINGDON ROAD

PEAR

TREE

COUR

T

BOWL

ING G

REEN

LANE

BAKER’S ROW

EYE STREET HILL

BACK HILL

Footway widened

Trader parking bay relocated west

Removed parking bay

Herbal Hill raised to footway level

Footway widened

Parking bay lengthened

Parking shortened by 1 metre

Ray Street converted to one way westbound with cycle contraflow

Ray Street Bridge converted to one-way eastbound

Section of Farringdon Lane converted to one-way northbound

Pedestrian crossing relocated 32 metres south and incorporatedinto new signalised junction

Northbound and southbound cyclists join at this point to continue north

Mandatory cycle lanes

Motorcycle parkingSignalised pedestrian or pedestrian/cycle crossing

New footway or traffic island

North-South Cycle Superhighway

Existing footway or traffic island

New road markings

Trees

Existing road markings

Existing kerbline or speed hump removed

Key:

Santander Cycle Hire docking station

Pub

Continued on Section 6

For detailed changes to parking, waiting and loading restrictions see accompanying text

Increased waiting and loading restrictions

Cont

inue

d on

Sect

ion

4

Cont

inue

d on

Sect

ion

4

CS6

CS6

CS6

Direction of Cycle SuperhighwayCS6

CS6

New signalised junction with controlled pedestrian crossings

Stepped cycle track

Page 6: North-South Cycle Superhighway (CS6) Section 1 ... Super… · North-South Cycle Superhighway Existing footway or traffic island New road markings Trees Existing road markings Existing

PERMIT HOLDERS ONLY

CS6CS6

CS6 CS6

Raised tables replace speed cushions

Parking relocated to allow placement of new raised table

Round top road humps replaced with raised table

Junction priorities changed

Round top road humps replaced with raised table

British Postal Museum and ArchiveCo

ntin

ued

on S

ectio

n 5

Con

tinue

d on

Sec

tion

7

Con

tinue

d on

Sec

tion

6b b

elow

Con

tinue

d on

Sec

tion

6a a

bove

North-South Cycle Superhighway ExtensionSection 6a - Warner Street

Section 6b - Phoenix Place

PHOENIX PLACE

WARNER STREET

MOUN

T PLE

ASAN

T

ROSEBERRY AVENUE

MOUN

T PLE

ASAN

T

PHOENIX PLACE

New footway or traffic island

North-South Cycle Superhighway

Existing footway or traffic island

New road markings

Existing tree

Existing road markings

Existing kerbline or speed hump removed

Key:

Direction of Cycle SuperhighwayCS6

CS6

CS6

Page 7: North-South Cycle Superhighway (CS6) Section 1 ... Super… · North-South Cycle Superhighway Existing footway or traffic island New road markings Trees Existing road markings Existing

ACCESSKEEP CLEAR

CS6

CS6

CS6

CS6

CS6

CS6

ONLY

COACHES

Width restriction reconstructed

Section of Pakenham Street closed for traffic to facilitate new two way cycle track

Coach bay raised to footway level

Junction priorities changed

Footway widened

Junction raised to footway level

Footway widened and junction raised to footway level

Footway widened and existing informal crossing replaced with new zebra crossing

Existing round top road humps removed

Existing road humps removedExisting road humps removed

Continued on Inset A

Continued on Section 7b belowC

ontin

ued

on S

ectio

n 6

Continued on Section 8

Continued on Section 7a above

For detailed changes to parking, waiting and loading restrictions see accompanying text

CUBITT STREET

CUBITT STREET

PAKENHAM STREET

PHOENIX PLACE

CUBITT STREET

FLEE

T SQU

ARE

SEDD

ON ST

REET

CALTHORPE STREET

CALTHORPE STREET

CUBITT STREET

WREN STREET

Section 7b - Pakenham Street and Cubitt Street

North-South Cycle Superhighway (CS6)Section 7a - Pakenham Street and Calthorpe Street

Inset A

New footway or traffic island

North-South Cycle Superhighway

Existing footway or traffic island New road markings

Trees

Existing road markings

Existing kerbline or speed hump removed

Key:

New cycle parkingP

Direction of Cycle SuperhighwayCS6

P

CS6

CS6

CS6

CS6

Page 8: North-South Cycle Superhighway (CS6) Section 1 ... Super… · North-South Cycle Superhighway Existing footway or traffic island New road markings Trees Existing road markings Existing

SOLO MOTORCYCLES ONLYSOLO MC/S ONLY

LOOK BOTH WAYS

LOOK

BOTH

WAY

S

LOOK BOTH WAYS LO

OK B

OTH

WAY

S

LOOK BOTH WAYS

LOOK BOTH WAYS

DISABLED DISABLED

BATHURST STREET

Existing round humps replaced with raised pedestrian crossing points

Parking bay length reduced by 3 metres

Existing cycle only facility widened

Early release signal for cyclists

Existing parking bays raised to footway level

Width restriction reconstructed with simple layout and cycle bypassesin both directions

Existing refuge islands removed

New informal crossing

Footway narrowed slightly Footway widened

Westminster Kingsway College

Con

tinue

d on

Sec

tion

9

For detailed changes to parking, waiting and loading restrictions see accompanying text

CS6

CS6 CS6

CS6

CS6

CS6

REGE

NT SQ

UARE

REGENT SQUARE

SIDMOUTH STREET

WES

TKIN

G PL

ACE

SEAF

ORD

STRE

ET

AMPTON STREET

AMPT

ON PL

ACE

GRAY

’S IN

N RO

AD

CUBIT

T STR

EET

SIDMOUTH STREET

SIDMO

UTH

MEW

S

TAVISTOCK PLACE WAKE

FIELD

STRE

ET

WAKE

FIELD

STRE

ET

North-South Cycle Superhighway (CS6)Section 8a - Ampton Street and Sidmouth Street

Section 8b - Sidmouth Street and Tavistock Place

Con

tinue

d on

Sec

tion

7

Con

tinue

d on

Sec

tion

8b b

elow

Con

tinue

d on

Sec

tion

8a a

bove

Signalised pedestrian or pedestrian/cycle crossing

New footway or traffic island

North-South Cycle Superhighway

Existing footway or traffic islandNew road markings

Trees

Existing road markings

Existing kerbline or speed hump removed

Key:

Santander Cycle Hire docking station

New cycle parkingP

Direction of Cycle SuperhighwayCS6

CS6

CS6

P

Page 9: North-South Cycle Superhighway (CS6) Section 1 ... Super… · North-South Cycle Superhighway Existing footway or traffic island New road markings Trees Existing road markings Existing

ENTRY

NO

DISABLEDDISABLED

DISABLED

CS6

CS6

CS6

CS6

CS6

CS6

CS6

CS6

Zebra crossing relocated south and junction raised to footway level

CSNS route continues on Judd Street

Early release signals for cyclists

Whole junction raised to footway level

Pelican crossing replaced with new zebra crossing

RNIB

For detailed changes to parking, waiting and loading restrictions see accompanying text

HUNTER STREET

TAVISTOCK PLACE

TAVISTOCK PLACE

LEIGH STREET

JUDD STREET

JUDD STREET

EUSTON ROAD

BIDBOROUGH ROAD

BIDBOROUGH ROAD

HASTINGS STREET

HASTINGS STREET

CROMER STREET

CROMER STREET

WAKEFIELD MEWS

Continued on Section 9b below

Continued on Section 9a above

Continued on Section 8

North-South C

ycle Superhighway

meets M

idland Road/ Euston Road

scheme -

subject to separate consultation

P.BOX

WO

LOADING

Signalised pedestrian or pedestrian/cycle crossing

New footway or traffic island

North-South Cycle Superhighway

Existing footway or traffic island

New road markings

Trees

Existing road markings

Existing kerbline or speed hump removed

Key:

Santander Cycle Hire docking station

North-South Cycle Superhighway (CS6)Section 9a - Judd Street & Tavistock Place

Section 9b - Judd Street

Link to Euston Road and Midland Road proposed as part of the Central London Grid (see separate consultation)

Direction of Cycle SuperhighwayCS6

CS6

CS6